The city's published records show little recorded distress here in the last three years. Less recorded distress than 89% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0.7. In ZIP 11238, 51% of residential buildings hold an A and
10% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
34 service requests in the last three years. Most common: Blocked Driveway (14) · Illegal Parking (8) · Noise (6) · Damaged Tree (3) · Non (2) · Urinating in Public (1).
Filed construction activity
$5,000 in permitted construction work filed since
2016 (5 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974
Yes
Six or more residential units (14)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
532 CLINTON AVENUE CONDOMINIUM
Head officer
STELLA SHAPIRO
Managing agent
NYRET SERVICES & PROPERTY MANAGEMENT
Last registered
2025-08-21
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$17,612
$7,926
2026
$548,792
$246,956
2027
$592,826
$266,771
The city's market estimate has risen
3266% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Clinton-Washington Avs — C · 400 ft straight-line (about a 2-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Vanderbilt Av / Atlantic Av — B69 · 200 ft
Citi Bike
Fulton St & Waverly Ave · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
34 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-02-17
311: Blocked Driveway — Partial Access
2025-12-21
311: Blocked Driveway — Partial Access
2025-12-16
Deed — from KIM, JUN; WALSH, AMANDA to WALSH, AS TRUSTEE, AMANDA; KIM, AS TRUSTEE, JUN SUP; THE JUN KIM AND AMANDA WALSH LIVING T
2025-12-11
Deed transfer (nominal price)
2025-12-11
Deed transfer (nominal price)
The full timeline
2026
2026-06-20311: Blocked Driveway — No Access
2026-06-01311: Blocked Driveway — Partial Access
2026-05-27311: Noise — Noise: Alarms (NR3)
2026-05-17311: Noise - Vehicle — Car/Truck Horn
2026-05-11Bedbug filing: 0 infested units
2026-05-09311: Noise - Vehicle — Car/Truck Horn
2026-05-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-02-17311: Blocked Driveway — Partial Access
2025
2025-12-21311: Blocked Driveway — Partial Access
2025-12-16Deed — from KIM, JUN; WALSH, AMANDA to WALSH, AS TRUSTEE, AMANDA; KIM, AS TRUSTEE, JUN SUP; THE JUN KIM AND AMANDA WALSH LIVING T
2025-12-11Deed transfer (nominal price)
2025-12-11Deed transfer (nominal price)
2025-08-21311: Blocked Driveway — Partial Access
2025-06-11Deed $2,375,000 — from GALIARDO, CHRISTOPHER to FIDEL, ARIELLE; FIDEL, ALEXANDER$2,375,000
2025-06-11Mortgage $1,425,000 — from FIDEL, ARIELLE; FIDEL, ALEXANDER to WELLS FARGO BANK, N.A.$1,425,000
2025-06-11Mortgage $1,425,000 — from FIDEL, ARIELLE; FIDEL, ALEXANDER to WELLS FARGO BANK, N.A.$1,425,000
2025-06-11Deed $2,375,000 — from GALIARDO, CHRISTOPHER to FIDEL, ARIELLE; FIDEL, ALEXANDER$2,375,000
2025-06-11PAT — from FIDEL, ARIELLE; FIDEL, ALEXANDER to THE 532 CLINTON AVENUE CONDOMINIUM
2025-06-11PAT — from FIDEL, ARIELLE; FIDEL, ALEXANDER to THE 532 CLINTON AVENUE CONDOMINIUM
2023-10-30Mortgage $300,000 — from WAHL, JASMINE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$300,000
2023-09-27Mortgage $950,000 — from SHAH, MEERA to WELLS FARGO BANK, N.A.$950,000
2023-09-27Deed $2,291,062 — from 532 CLINTON LLC to SHAH, MEERA$2,291,063
2023-09-27PAT — from SHAH, MEERA to THE 532 CLINTON AVENUE CONDOMINIUM
2023-09-21Sold for $2,291,063$2,291,063
2023-08-15Certificate of occupancy Final
2023-08-15Certificate of occupancy Final
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-07-12CDEC — from 532 CLINTON LLC
2023-06-30PAT — from GKAGIA, EIRINI-MARIA; KENNEDY, GERARD RD to THE BOARD OF MANAGERS OF THE 532 CLINTON
2023-06-30Mortgage $1,932,000 — from GKAGIA, EIRINI-MARIA; KENNEDY, GERARD RD to TD BANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$1,932,000
2023-06-30PAT — from GKAGIA, EIRINI-MARIA; KENNEDY, GERARD RD to THE BOARD OF MANAGERS OF THE 532 CLINTON
2023-06-30Deed $2,504,895 — from 532 CLINTON LLC to KENNEDY, GERARD RD; GKAGIA, EIRINI-MARIA$2,504,895
2023-06-30Mortgage $1,932,000 — from GKAGIA, EIRINI-MARIA; KENNEDY, GERARD RD to TD BANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$1,932,000
2023-06-30Deed $2,504,895 — from 532 CLINTON LLC to KENNEDY, GERARD RD; GKAGIA, EIRINI-MARIA$2,504,895
2023-06-09Sold for $2,504,895$2,504,895
2023-06-09Sold for $2,504,895$2,504,895
2023-05-11Deed $2,317,102 — from 532 CLINTON LLC to COHEN-SMITH, ALEXANDER; GOLDSTEIN, FREDDI$2,317,103
2023-05-11Deed $2,317,102 — from 532 CLINTON LLC to COHEN-SMITH, ALEXANDER; GOLDSTEIN, FREDDI$2,317,103
2023-05-11PAT — from COHEN-SMITH, ALEXANDER; GOLDSTEIN, FREDDI to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-05-11Mortgage $1,816,000 — from GOLDSTEIN, FREDDI; COHEN-SMITH, ALEXANDER to TD BANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$1,816,000
2023-05-11PAT — from COHEN-SMITH, ALEXANDER; GOLDSTEIN, FREDDI to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-05-11Mortgage $1,816,000 — from GOLDSTEIN, FREDDI; COHEN-SMITH, ALEXANDER to TD BANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$1,816,000
2023-05-04Permit Supported Scaffold — Signed-off
2023-05-04Permit Sidewalk Shed — Signed-off
2023-05-04Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY W$1,000
2023-04-25Sold for $2,317,103$2,317,103
2023-04-25Sold for $2,317,103$2,317,103
2023-04-21Deed $2,163,871 — from 532 CLINTON LLC to GALIARDO, CHRISTOPHER D$2,163,871
2023-04-21PAT — from GALIARDO, CHRISTOPHER to THE 532 CLINTON AVENUE CONDOMINIUM
2023-04-21Deed $2,163,871 — from 532 CLINTON LLC to GALIARDO, CHRISTOPHER D$2,163,871
2023-04-21PAT — from GALIARDO, CHRISTOPHER to THE 532 CLINTON AVENUE CONDOMINIUM
2023-04-20Mortgage $1,740,000 — from SILVERIO, SARAH to CITIBANK NA; MERS$1,740,000
2023-04-19PAT — from WAHI, JASMINE to THE 532 CLINTON AVENUE CONDOMINIUM BD OF
2023-04-19Deed $1,624,109 — from 532 CLINTON LLC to WAHI, JASMINE$1,624,109
2023-04-17Deed $2,520,169 — from 532 CLINTON LLC to CROWLEY, SHAWN$2,520,169
2023-04-17Mortgage $1,740,000 — from JOSHI, ADITYA; PATIL, KRITTIKA to MERS$1,740,000
2023-04-17PAT — from CROWLEY, SHAWN to ANTICO, JARED J
2023-04-17Deed $2,520,169 — from 532 CLINTON LLC to CROWLEY, SHAWN$2,520,169
2023-04-17PAT — from CROWLEY, SHAWN to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-17Deed $2,214,694 — from 532 CLINTON LLC to PATIL, KRITTIKA; JOSHI, ADITYA$2,214,694
2023-04-17PAT — from CROWLEY, SHAWN to ANTICO, JARED J
2023-04-17Mortgage $1,960,000 — from CROWLEY, SHAWN to MERS$1,960,000
2023-04-17PAT — from JOSHI, ADITYA; PATIL, KRITTIKA to THE 532 CLINTON AVENUE CONDOMINIUM
2023-04-17PAT — from CROWLEY, SHAWN to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-14Sold for $2,163,871$2,163,871
2023-04-14Sold for $2,163,871$2,163,871
2023-04-13PAT — from SILVERIO, SARAH to BOARD OF MANAGERS OF THE 532 CLINTON AVN
2023-04-13Deed $2,214,694 — from 532 CLINTON LLC to SILVERIO, SARAH$2,214,694
2023-04-13Deed $2,214,694 — from 532 CLINTON LLC to SILVERIO, SARAH$2,214,694
2023-04-13PAT — from SILVERIO, SARAH to BOARD OF MANAGERS OF THE 532 CLINTON AVN
2023-04-12Sold for $1,624,109$1,624,109
2023-04-12PAT — from TOMASZEWSKI, JAN MINSOO; WYBLE, MELISSA MARIE to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-12Mortgage $1,845,600 — from WYBLE, MELISSA MARIE; TOMASZEWSKI, JAN MINSOO to MERS$1,845,600
2023-04-12PAT — from TOMASZEWSKI, JAN MINSOO; WYBLE, MELISSA MARIE to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-12Deed $2,355,721 — from 532 CLINTON LLC to TOMASZEWSKI, JAN MINSOO; WYBLE, MELISSA MARIE$2,355,721
2023-04-12Deed $2,355,721 — from 532 CLINTON LLC to TOMASZEWSKI, JAN MINSOO; WYBLE, MELISSA MARIE$2,355,721
2023-04-12Mortgage $1,845,600 — from WYBLE, MELISSA MARIE; TOMASZEWSKI, JAN MINSOO to MERS$1,845,600
2023-04-11PAT — from ATMAR, ANDREA; ATMAR, HARRIS to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-11Deed $2,387,796 — from 532 CLINTON LLC to ATMAR, HARRIS; ATMAR, ANDREA$2,387,796
2023-04-11Mortgage $1,755,000 — from ATMAR, HARRIS; ATMAR, ANDREA to MERS$1,755,000
2023-04-11Mortgage $1,999,999 — from KIM, JUN; WALSH, AMANDA to FIRST HORIZON BANK$1,999,999
2023-04-11Deed $2,240,150 — from 532 CLINTON LLC to MULVEY, SIMON; WISKIN, MELISSA MAE$2,240,150
2023-04-11Mortgage $1,760,000 — from WISKIN, MELISSA MAE M; MULVEY, SIMON to MERS$1,760,000
2023-04-11PAT — from MULVEY, SIMON; WISKIN, MELISSA MAE to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-11Mortgage $1,999,999 — from KIM, JUN; WALSH, AMANDA to FIRST HORIZON BANK$1,999,999
2023-04-11PAT — from WALSH, AMANDA; KIM, JUN to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-11Deed $2,276,200 — from 532 CLINTON LLC to KIM, JUN; WALSH, AMANDA$2,276,200
2023-04-11PAT — from ATMAR, ANDREA; ATMAR, HARRIS to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-11Deed $2,387,796 — from 532 CLINTON LLC to ATMAR, HARRIS; ATMAR, ANDREA$2,387,796
2023-04-11Deed $2,276,200 — from 532 CLINTON LLC to KIM, JUN; WALSH, AMANDA$2,276,200
2023-04-11Mortgage $1,755,000 — from ATMAR, HARRIS; ATMAR, ANDREA to MERS$1,755,000
2023-04-11PAT — from WALSH, AMANDA; KIM, JUN to BOARD OF MANAGERS OF THE 532 CLINTON AVE
2023-04-05Sold for $2,214,694$2,214,694
2023-04-05Sold for $2,355,721$2,355,721
2023-04-05Sold for $2,355,721$2,355,721
2023-04-05Sold for $2,214,694$2,214,694
2023-04-05Sold for $2,214,694$2,214,694
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05TL&R — from 532 CLINTON LLC to POPULAR BANK
2023-04-05Mortgage satisfied — from 532 CLINTON LLC to POPULAR BANK
2023-04-04Deed $2,143,575 — from 532 CLINTON LLC to MAK, ANDREW; MAK, STEVE; YU, TIFFANY; YEE, PATTY$2,143,575
2023-04-04PAT — from MAK, STEVE; YEE, PATTY; MAK, ANDREW; YU, TIFFANY to BOARD OF MANAGERTHE 532 CLINTON AVENUE C
2023-04-04Deed $2,143,575 — from 532 CLINTON LLC to MAK, ANDREW; MAK, STEVE; YU, TIFFANY; YEE, PATTY$2,143,575
2023-04-04PAT — from MAK, STEVE; YEE, PATTY; MAK, ANDREW; YU, TIFFANY to BOARD OF MANAGERTHE 532 CLINTON AVENUE C
2023-04-03Sold for $2,387,796$2,387,796
2023-04-03Sold for $2,387,796$2,387,796
2023-04-03FDNY inspection (CONSTR)
2023-03-31Sold for $2,520,169$2,520,169
2023-03-31Sold for $2,520,169$2,520,169
2023-03-30Sold for $2,276,200$2,276,200
2023-03-30Sold for $2,240,150$2,240,150
2023-03-30Sold for $2,276,200$2,276,200
2023-03-24Sold for $2,143,575$2,143,575
2023-03-24Sold for $2,143,575$2,143,575
2023-03-16Certificate of occupancy Initial
2023-02-09Elevator permit: Furnish and Install New One (1) 9 Stop MRL Passenger Elevator as per code. P1- Device shall be used for Temporary Construction a$175,000
2022
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05DECL — from 532 CLINTON LLC
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-12-05MAPS — from THE 532 CLINTON AVENUE CONDOMINIUM
2022-11-05DOB complaint, category ?
2022-11-05ECB CLASS - 1 violation: NOTED: AT TIME OF INSPECTION OF AN NONE ACTIVE JOBSITE OBSERVED MACHINERY/ELECTRICALLY CHARGED MACHINE NOT FULLY GUARDED,SHIELDED
2022-11-05ECB CLASS - 2 violation: NOTED: AT TIME OF INSPECTION OF AN NONE ACTIVE JOBSITE OBSERVED THROUGH THE VIEWING PANEL INADEQUATE CONSTRUCTION HOSEKEEPING AT E
2022-10-22DOB complaint, category ?
2022-09-14Elevator permit: Furnish and Install New One (1) 9 Stop MRL Passenger Elevator as per code. P1- Device shall be used for Temporary Construction a$175,000
2022-08-16Permit NB — ISSUED
2022-07-29Job filed: ALLOCATION OF CONDOMINIUM LOT NUMBERS TO CONDOMINIUM UNITS
2022-06-23Permit Construction Fence — Signed-off
2022-05-21DOB complaint, category ?
2022-05-04Permit Supported Scaffold — Signed-off
2022-04-14Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2022-03-29Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-03-18DOB complaint, category ?
2022-03-18DOB complaint, category ?
2022-03-17ECB CLASS - 2 violation: SEC. BC 3314.5.1 TRAINING FOR SUPPORTED SCAFFOLD INSPECTORS. AT TIME OF MY INSPECTION,I OBSERVED A SUPPORTED SCAFFOLD IN EXCESS OF
2022-03-17ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS/AMENDMENTS. AT TIME OF MY INSPECTION,I OBSERVED A SYSTEM SCAFFOLD A NEEDL
2022-02-10Permit Sidewalk Shed — Signed-off
2022-02-09Permit PL — ISSUED
2022-01-26Elevator permit: Furnish and Install New One (1) 9 Stop MRL Passenger Elevator as per code. P1- Device shall be used for Temporary Construction a$175,000
2022-01-04Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021
2021-12-02DOB complaint, category ?
2021-10-12DOB complaint, category ?
2021-10-12ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AT TIME OF INSPECTION OBSERVED TEMPORARY PLATF
2021-09-04DOB complaint, category ?
2021-08-24Permit NB — ISSUED
2021-08-12DOB complaint, category ?
2021-06-23Permit Construction Fence — Signed-off
2021-06-22Permit NB — ISSUED
2021-06-22Permit FO — ISSUED
2021-06-22Permit FO — ISSUED
2021-06-09Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-06-08ECB CLASS - 1 violation: BC3307.4.7 WORK OR STORAGE ZONES.INADEQUATE WORK IN STORAGE ZONES-STOP ALL WORK IN STORAGE ZONE AT EXP #1.NOTE:AT TIME OF INSPECTI$2,500
2021-06-03Permit Construction Fence — Signed-off
2021-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-06-01DOB complaint, category ?
2021-05-21Permit Structural — Signed-off
2021-05-20Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2021-05-18Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-05-13DOB complaint, category ?
2021-05-13ECB CLASS - 1 violation: BC3309.10 PROTECTION OF ROOFS WHENEVER ANY BLDG BEING CONST ROOF OF ADJOINING BLDG TO BE PROTECTED FROM DAMAGE@ALL TIMES PROVIDE P$2,500
2021-05-01Permit Supported Scaffold — Signed-off
2021-04-30Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-04-01DOB complaint, category ?
2021-03-31ECB CLASS - 2 violation: AC28-105.12 CONDITION OF NB PERMIT NOTED:ATOI OF INACTIVE CONST SITE,OBSERVED ON BIS SYSTEM NB PERMIT321514535-01-NB W/'LINE 13' S
2021-03-25DOB complaint, category ?
2021-03-25DOB complaint, category ?
2021-03-18FDNY inspection (CONSTR)
2021-03-01DOB complaint, category ?
2021-03-01ECB CLASS - 2 violation: SEC. 3307.6.4.2.2 STORAGE. NOTE: AT THE TIME OF INSPECTION OF A 7 STY NEW BLDG CONSTRUCTION AT 3RD LEVEL,I OBSERVED SIDEWALK SHED
2021-02-22FDNY inspection (STRUC_INT_3)
2021-02-17DOB complaint, category ?
2021-02-12Permit Sidewalk Shed — Signed-off
2021-02-10Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-01-26DOB complaint, category ?
2021-01-05Permit PL — ISSUED
2020
2020-12-23Permit NB — ISSUED
2020-09-23DOB complaint, category ?
2020-09-23DOB complaint, category ?
2020-09-17DOB complaint, category ?
2020-09-15DOB complaint, category ?
2020-08-14Permit FO — ISSUED
2020-08-14Permit FO — ISSUED
2020-07-14Permit Construction Fence — Signed-off
2020-06-15Permit Construction Fence — Signed-off
2020-04-08Permit Construction Fence — Signed-off
2020-03-16Job filed: ERECT 8 ft HIGH TEMPORARY CONSTRUCTION WOOD FENCE ON PROPERTY LINE FOR NB # 321514535$1,000
2020-02-07DOB complaint, category ?
2020-02-07ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXP PERMIT. NOTED: AT TIME OFINSPECTION OBSERVED TEMPORARY CONSTRUCTION FENCE THAT IS ERE
2019
2019-12-05Sold for $6,500,000$6,500,000
2018
2018-12-13ECB CLASS - 1 violation: CONSTRUCTION SUPERINTENDENT FAILS TO HAVCE DESIGNATED COMPETENT PERSONAT JOBSITE WHEN REQUIRED. AT TIME OF INSPECTION OF A 2 STY B$10,000
2018-12-07DOB complaint, category ?
2018-11-29DOB complaint, category ?
2018-11-29DOB complaint, category ?
2018-11-29Permit DM — ISSUED
2018-11-29Permit DM — ISSUED
2018-09-20Permit Construction Fence — Signed-off
2018-09-01DOB violation UB:
2018-08-24DOB complaint, category ?
2018-07-27Sold for $3,694,444$3,694,444
2018-06-28Job filed: ERECT 8 ft HIGH TEMPORARY CONSTRUCTION WOOD FENCE ON PROPERTY LINE FOR DEMO # 321783478$1,000
2018-05-18Job filed: LEGALIZATION OF ONE CAR GARAGE
2018-03-08Job filed: DEMO OF ONE FAMILY STRUCTURE
2018-03-08Job filed: DEMO OF ONE FAMILY STRUCTURE
2018-02-07Job filed: BPP 57' FRONTAGE. IN CONJUNCTIONS WITH NB # 321514535
2018-02-07Job filed: BPP 57' FRONTAGE. IN CONJUNCTIONS WITH NB # 321514535
2017
2017-11-17Rodent inspection: Failed for Other Reason
2017-11-14Job filed: NB
2017-11-14Job filed: NB
2017-09-29Rodent inspection: Failed for Other Reason
2016
2016-12-05Sold for $525,000$525,000
2013
2013-01-31DOB complaint, category ?
2012
2012-01-24Rodent inspection: Passed
2011
2011-12-22Rodent inspection: Failed for Rat Activity