The city's published records show little recorded distress here in the last three years. Less recorded distress than 73% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 1.1. In ZIP 10035, 36% of residential buildings hold an A and
17% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
10 heat or hot-water complaints in the last three years (winter 2023–24: 2 · winter 2024–25: 2 · winter 2025–26: 6). Repeated winter clusters suggest a chronic heating problem.
2
’23–24
2
’24–25
6
’25–26
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
55 service requests in the last three years. Most common: Noise (37) · HEAT/HOT WATER (4) · Non (2) · Water System (2) · Sidewalk Condition (1) · Dirty Condition (1).
Filed construction activity
$2,604,812 in permitted construction work filed since
2016 (9 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (1984)
Yes
Six or more residential units (125)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
CASABE HOUSE ASSOCIATES LLC
Head officer
SHELDON FOX
Managing agent
SHINDA MANAGEMENT CORPORATION
Last registered
2025-10-20
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$11,430,000
$5,143,500
2026
$11,885,000
$5,348,250
2027
$13,908,000
$6,258,600
The city's market estimate has risen
22% between tax years 2025 and 2027.
Tax exemptions on the roll: 420C
Building systems
Energy grade (LL33)
C — ENERGY STAR score 66/100 (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SAFE (cycle 9)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 4 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2015 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
116 St — 6 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none 125 St — 4 5 6 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Lexington Av / E 122 St — M101 M103 · 250 ft
Citi Bike
Lexington Ave & E 120 St · 200 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
55 311 service requests from this address in the last three years — 4 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $21,567,000 on
2024-10-11 (lender: Merchants Capital Corp.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-10-11
Mortgage $21,567,000 — from CASABE II HOUSING DEVELOPMENT FUND COMPA; CASABE HOUSES ASSOCIATES LLC to MERCHANTS CAPITAL CORP.
$21,567,000
2024-03-08
RPTT&RET $6,763,516 — from MMA CASABE HOUSE, LLC; BFIM SPECIAL LIMITED PARTNER, INC. to CASABE INVESTOR LLC
$6,763,516
2007-02-02
Mortgage $3,803,749 — from CASABE II HOUSING DEVELOPMENT FUND COMPA; CASABE HOUSES ASSOCIATES, LLC to CASABE HOUSING DEVELOPMENT FUND COMPANY,
$3,803,749
2007-02-02
Deed $11,100,000 — from CASABE HOUSING DEVELOPMENT FUND COMPANY, to CASABE HOUSES ASSOCIATES; CASABE II HOUSING DEVELOPMENT FUND COMP
$11,100,000
2007-02-02
Mortgage $7,313,423 — from CASABE II HOUSING DEVELOPMENT FUND COMPA; CASABE HOUSES ASSOCIATES LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$7,313,423
2007-02-02
Mortgage $1,486,577 — from CASABE HOUSES ASSOCIATES LLC; CASABE II HOUSING DEVELOPMENT FUND COMPA to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,486,577
1982-06-11
Mortgage $7,861,400 — from CASABE H.D.FD CO.,INC to U.S. OF AMERICA(SECHUD)
$7,861,400
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
50
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
2
20
0
5
27
2018
0
0
7
0
4
11
2019
0
0
13
0
5
18
2020
0
0
15
0
4
19
2021
0
2
22
0
4
28
2022
0
1
25
0
5
31
2023
0
1
35
0
4
40
2024
6
2
30
8
4
50
2025
9
5
16
0
4
34
2026
7
0
14
0
0
21
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Installation of air handler unit in equipment room and related condenser on roof. No change in use, egress or occupancy.
2026-10-12
Job filed: Installation of new VERIZON site on the roof. Install 4 sectors (15 antennas) with associated parts, 8 RRH units, 4 GPS antennas and 3 equipment cabin
2026-10-09
311: UNSANITARY CONDITION — MOLD
2026-10-09
311: PLUMBING — BASIN/SINK
2026-10-09
Tenant complaint: UNSANITARY CONDITION — MOLD
2026-10-09
Tenant complaint: PLUMBING — BASIN/SINK
2026-09-02
311: Street Condition — Defective Hardware
2026-08-21
311: Street Light Condition — Street Light Out
2026-08-03
311: Sewer Maintenance — Backup
2026-07-31
Job filed: Installation of pv solar system on roof. No change of use, egress, or occupancy.
2026-07-06
311: Water System — Hydrant Running Full (WA4)
2026-07-04
311: Water System — Fire Hydrant Emergency (FHE)
2026-06-03
311: Consumer Complaint — Games of Chance
2026-05-21
Bedbug filing: 0 infested units
2026-04-15
Permit Mechanical Systems — Signed-off
2026-03-31
Permit Solar — Permit Issued
2026-03-31
Permit Solar — Signed-off
2026-03-26
Job filed: Installation of pv solar system on roof. No change of use, egress, or occupancy.
2026-02-01
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-01
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-20
311: Non-Residential Heat — Inadequate or No Heat
2025-12-31
311: Noise - Residential — Banging/Pounding
2025-12-30
311: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-30
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2025-12-16
311: Non-Residential Heat — Inadequate or No Heat
2025-12-03
Permit Suspended Scaffold — Permit Issued
2025-12-02
Bedbug filing: 0 infested units
2025-11-22
ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED INADEQUATE PEDESTRIAN PROTECTION ON PEDESTRIAN WALKWAY. SWS IS NOT INSTALLED TIGHTLY AGAINST THE F
2025-11-22
ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED CLOSED CONSTRUCTION SITE. MULTIPLE SUSPENDED SCAFFOLD PLATFORMS AT EXP. 1 AND 2 RAISED FROM GROUND.
2025-11-22
DOB complaint, category ?
2025-11-22
DOB complaint, category ?
2025-11-06
Permit Supported Scaffold — Signed-off
2025-11-04
Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC
The full timeline
2026
2026-10-12Job filed: Installation of air handler unit in equipment room and related condenser on roof. No change in use, egress or occupancy.$50,000
2026-10-12Job filed: Installation of new VERIZON site on the roof. Install 4 sectors (15 antennas) with associated parts, 8 RRH units, 4 GPS antennas and 3 equipment cabin$83,700
2025-11-22ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED INADEQUATE PEDESTRIAN PROTECTION ON PEDESTRIAN WALKWAY. SWS IS NOT INSTALLED TIGHTLY AGAINST THE F
2025-11-22ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED CLOSED CONSTRUCTION SITE. MULTIPLE SUSPENDED SCAFFOLD PLATFORMS AT EXP. 1 AND 2 RAISED FROM GROUND.
2025-11-22DOB complaint, category ?
2025-11-22DOB complaint, category ?
2025-11-06Permit Supported Scaffold — Signed-off
2025-11-04Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$7,000
2025-09-19Permit General Construction — Signed-off
2025-07-21Job filed: installation of outrigger for facade repair.
2025-07-03Permit Mechanical Systems — Signed-off
2025-06-24Permit Sidewalk Shed — Signed-off
2025-06-24Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $25,000
2025-06-05311: Indoor Air Quality — Dust from Construction
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-05-16Job filed: Proposed Modernization work of existing Senior Housing Building as Per Plan Under GC JOB# M01038316-I1. All Related MEP Filings will be filed under su$416,900
2022-03-02HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4
2022-02-28311: WATER LEAK — HEAVY FLOW
2022-02-28Tenant complaint: WATER LEAK — HEAVY FLOW
2022-02-21Facade (LL11) filing, cycle 9: SAFE
2022-02-15311: WATER LEAK — HEAVY FLOW
2022-02-15Tenant complaint: WATER LEAK — HEAVY FLOW
2022-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-30311: HEAT/HOT WATER — APARTMENT ONLY
2022-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-30Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-08-24HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4K, 4th STO
2020-08-24HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCA
2020-08-24HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT
2020-08-24HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4
2019-11-26Elevator permit: As per ASME A17.3 of 2002, as modified by Chapter K3 of Appendix K Section 3.10.12 of the New York City Building Code, provide new$16,000
2019-05-23HPD class A: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 4M, 4th STO
2019-05-23HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE KITCHEN L
2019-05-23HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT
2019-05-21311: FLOORING/STAIRS — FLOOR
2019-05-21311: WATER LEAK — DAMP SPOT
2019-05-21Tenant complaint: WATER LEAK — DAMP SPOT
2017-08-31HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIDGERATOR DOOR IN THE KITCHEN LOCATED AT APT 8H, 8th STORY,
2017-08-31HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BUZZER INTERCOM SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT 8H, 8th STORY, 2nd
2017-08-31HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SHOWER BODY IN THE BATHROOM LOCATED AT APT 8H, 8th STORY, 2nd APARTMENT FROM NO
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-08-02311: HEAT/HOT WATER — APARTMENT ONLY
2016-08-02Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2016-06-05311: Homeless Person Assistance — N/A
2016-03-10311: Hazardous Materials — Chemical Odor (HD1)
2015
2015-12-18HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AROUND BATH-TUB IN THE BATHROOM LO
2009-03-25Job filed: INTERIOR PARTITIONS AND PLUMBING WORK ADDITION RESURFACING OF SEVENTH FLOOR SO LARIUM.$115,000
2009-01-21Tenant complaint: HEATING — HEAT RELATED
2009-01-18Tenant complaint: HEATING — HEAT RELATED
2009-01-17Tenant complaint: HEATING — HEAT RELATED
2008
2008-12-11Permit EW — ISSUED
2008-12-01Permit EW — ISSUED
2008-11-13Job filed: REFILE APPLICATION FOR NEW FIRE PUMP IN EXISTING STANDPIPE IN CONJUNCTION WITH ALT2 APPLICATION 104631132 & 104655641. NO CHANGE IN EGRESS USE OR$50,000
2008-11-13Job filed: REFILE APPLICATION FOR NEW FIRE PUMP IN EXISTING STANDPIPE IN CONJUNCTION WITH ALT2 APPLICATION 104631132 & 104655641. NO CHANGE IN EGRESS USE OR$50,000
2008-06-10Permit EW — ISSUED
2008-06-09DOB violation E:
2008-06-09DOB violation E:
2008-05-29Agreement — from THE SECRETARY OF HOUSING AND URBAN DEVEL to CASABE HOUSING DEVELOPMENT FUND COMPANY,
2008-05-29Mortgage satisfied — from CASABE H.D.FD CO.,INC to THE SECRETARY OF HOUSING AND URBAN DEVEL
2008-05-23Job filed: INSTALLING NEW FIRE PUMP IN EXISTING STANDPIPE IN CONJUNCTION WITH ALT 2 APPLICATIONS # 104631132 AND 104655641. FIRE PUMP APPEARS ON APPROVED PLANS. $25,000
2008-05-23Job filed: INSTALLING NEW FIRE PUMP IN EXISTING STANDPIPE IN CONJUNCTION WITH ALT 2 APPLICATIONS # 104631132 AND 104655641. FIRE PUMP APPEARS ON APPROVED PLANS. $25,000
2008-01-22Permit PL — ISSUED
2008-01-10Permit EW — ISSUED
2008-01-07Permit EW — ISSUED
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2007
2007-11-16Job filed: Installation of Individually Coded Interior Fire Alarm System w/ central office connection and devices for SD-Fire Pump. There is no change in use, o$75,000
2007-11-10DOB complaint, category ?
2007-10-15Tenant complaint: PLUMBING — WATER SUPPLY
2007-09-30DOB complaint, category ?
2007-09-30DOB complaint, category ?
2007-09-29DOB complaint, category ?
2007-09-26Permit EW — ISSUED
2007-09-18DOB violation E:
2007-09-10Permit EW — ISSUED
2007-04-18Permit EQ — ISSUED
2007-04-17Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 326 AT 150 EAST 121ST STREET, 146 LF ON LEXINGTON AVENUE, 81 LF AT EAST 121 ST STREET, 56LF ON DOOR WAY, 4
2007-04-02DOB violation LL1081:
2007-02-02Agreement — from CASABE II HOUSING DEVELOPMENT FUND COMPA; CASABE HOUSES ASSOCIATES LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2007-02-02Mortgage $3,803,749 — from CASABE II HOUSING DEVELOPMENT FUND COMPA; CASABE HOUSES ASSOCIATES, LLC to CASABE HOUSING DEVELOPMENT FUND COMPANY,$3,803,749
2007-02-02Agreement — from CASABE II HOUSING DEVELOPMENT FUND COMPA; CASABE HOUSES ASSOCIATES LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2007-02-02SUBM — from DEPARTMENT OF HOUSING PRESERVATION AND D to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2007-02-02Deed $11,100,000 — from CASABE HOUSING DEVELOPMENT FUND COMPANY, to CASABE HOUSES ASSOCIATES; CASABE II HOUSING DEVELOPMENT FUND COMP$11,100,000
2007-02-02Agreement — from CASABE HOUSES ASSOCIATES LLC; CASABE II HOUSING DEVELOPMENT FUND COMPA to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2007-02-02Mortgage $7,313,423 — from CASABE II HOUSING DEVELOPMENT FUND COMPA; CASABE HOUSES ASSOCIATES LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$7,313,423
2007-02-02Agreement — from CASABE II HOUSING DEVELOPMENT FUND COMPA to CASABE HOUSES ASSOCIATES LLC
2007-02-02Mortgage $1,486,577 — from CASABE HOUSES ASSOCIATES LLC; CASABE II HOUSING DEVELOPMENT FUND COMPA to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,486,577
2007-01-18Job filed: Alteration type II is being filed herewith to modify existing sprinklers system @ cellar as per plans, to comply with aiditor's objection. Applicatio$25,000
2007-01-16Tenant complaint: GENERAL — DOORS
2007-01-16Tenant complaint: PLUMBING — TOILET
2006
2006-12-27Permit EW — ISSUED
2006-12-20Job filed: Alteration type II is being filed herewi th for some interior rennovatio boiler replacement, some window replacem ents, floor tile, roof replacement, $2,500,000
2006-12-05Facade (LL11) filing, cycle 6: SWARMP
2006-09-28DOB violation E:
2006-09-28DOB violation E:
2006-08-31ECB Non-Hazardous violation: FAILURE TO SUBMIT A 5TH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS: PERIODIC INSP OF EXTERIOR WALLS & APPURTENANCES A$10,000
2006-08-16Tenant complaint: GENERAL — FLOOR
2006-08-16Tenant complaint: GENERAL — FLOOR
2006-06-02ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APP$10,000
2006-01-31ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APP$10,000
2005
2005-07-14DOB complaint, category ?
2005-06-30ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APP$1,750
2005-04-11DOB complaint, category ?
2005-04-01DOB complaint, category ?
2005-03-30DOB violation E:
2005-03-30DOB violation E:
2005-02-26HPD class B: SECTION 27-2039 ADM CODE PROVIDE ADEQUATE LIGHT OF NOT LESS THAN 60 WATTS INCANDESCENT OR EQUIVALENT ILLUMINATION ... AT PUBLIC HALL, 2nd ST
2005-02-23Tenant complaint: ELECTRIC — LIGHTING
2005-02-23Tenant complaint: HEATING — HEAT RELATED
2005-01-14ECB Non-Hazardous violation: FAILURE TO SUBMIT A 5TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTEN$10,000
2004
2004-07-09ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPRURTENANCES AS REQUIRED BY LOCAL LAW$1,750
2004-04-21DOB violation LL1081:
2004-03-31ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LOCAL LAW 1$700
2004-03-02ECB Non-Hazardous violation: 83O02,04PP,55Y10,43H08,51K10,51H10,44O02,86U05,33O02,03X10,45Q03,34Q0352K10,16T07,84H10,10H10. 51-WORN-RUSTED AND EVIDANCE OF ROUG$2,500
2004-01-12ECB Non-Hazardous violation: 3X7,4P16,7X10,10H11,12X7,16L10,17H11,28Q3,39Y2,51K10,55Y13,59B7,64X7,66O2,85U5. 3X7= OUTSIDE COMMUNICATION 7X10= LIGHT RAY 12X7= C$2,500
2003
2003-11-17DOB complaint, category ?
2003-10-29Tenant complaint: HEATING — HEAT RELATED
2003-10-25Tenant complaint: HEATING — HEAT RELATED
2003-08-16DOB complaint, category ?
2002
2002-08-08DOB violation L1198:
2001
2001-05-25ECB Non-Hazardous violation: 07B11,40B07,39Y14,03B11,03M12,74B07, 07-REPAIR UPPER LIGHT RAY,40-PUT CORRECT INFO. ON TEST TAGS,39-SEAL TRACTION SUEAVE BEARING,7$180
2001-05-25ECB Non-Hazardous violation: 07X11,53B07,40B07,35B07,39Y14,01I12,03M12, 07-RETURN LIGHT RAY DEVICE TO SERVICE,53-PROVIDE ADDITIONAL LIGHTING,40-PUT CORRECT INF$180
2001-02-27DOB violation LL6291:
2000
2000-11-30DOB violation E: 1P32492
2000-11-30DOB violation E: 1P32491
1999
1999-09-07DOB complaint, category ?
1999-08-03ECB Non-Hazardous violation: 40D,57O,74D. PROPERTY POSITION TENSION WEIGHT SO AS TO MOVE SAFETY CABLE AWAY FROM BEAM, CLEAN PIT, COVER LEVELING UNIT BOE, TOP O
1999-04-02DOB violation E: 1P32492
1998
1998-09-02DOB complaint, category ?
1998-05-15Permit PL — ISSUED
1997
1997-11-22ECB Non-Hazardous violation: 25Q73O74L 74-DIRECTIONAL ARROWS NOT WORKING.$350
1994-07-26HPD class B: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CEILING 8 STY WEST WING SOUTHEAST APT 8J BATHROOM. , SECTION '' ''
1994-07-26HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE AND OR MAKE OPERABLE AIR VENTILATION 8 STY WEST WING SOUTHEAST APT 8J BATHR
1990-11-27HPD class A: SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS 8 STY 1 FROM SOUTH AT EAST
1990-06-18ECB Non-Hazardous violation: FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION. REMEDY:PROVIDE APPROVED PA PLANS.$115
1990-06-04DOB violation E: (74)REPAIR FLOOR STOPS ELEVATOR SKIPPING FLOORS