The city's published records show little recorded distress here in the last three years. More recorded distress than 54% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 20. In ZIP 11238, 51% of residential buildings hold an A and
10% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
6 total — 0 class C (immediately hazardous), 0 class B, 6 class A. Oldest open since 2021-04-13.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
No 311 service requests from this address in the last three years.
Filed construction activity
$1,143,946 in permitted construction work filed since
2016 (4 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1937)
Yes
Six or more residential units (8)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
BEC CONTINUUM HOUSING DEVELOPMENT FUND COMPANY INC
Head officer
JORGE JORGE
Managing agent
LISA MANAGEMENT INC
Last registered
2024-02-27
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,987,000
$894,150
2026
$2,384,000
$1,072,800
2027
$2,861,000
$1,287,450
The city's market estimate has risen
44% between tax years 2025 and 2027.
Tax exemptions on the roll: 420C
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
7 Av — B Q · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: none Grand Army Plaza — 2 3 · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Vanderbilt Av / Prospect Pl — B69 · 350 ft
Citi Bike
Prospect Pl & Vanderbilt Ave · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $2,270,000 on
2022-07-22 (lender: New York City Housing Development Corporation), covering 46 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2022-07-22
Mortgage $2,270,000 — from BEC CONTINUUM HOUSING DEVELOPMENT FUND C; BEC CONTINUUM OWNER LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$2,270,000
2017-07-27
Mortgage $11,184,835 — from BEC CONTINUUM OWNER LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C; 19 PATCHEN GP LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$11,184,835
2017-07-27
Mortgage $8,314,080 — from BEC CONTINUUM HOUSING DEVELOPMENT FUND C; 19 PATCHEN GP LLC; BEC CONTINUUM OWNER LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$8,314,080
2017-07-27
Mortgage $5,400,000 — from 19 PATCHEN GP LLC; BEC CONTINUUM OWNER LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C to BEC CONTINUUM MANAGER LLC
$5,400,000
2017-07-27
Mortgage $225,000 — from BEC CONTINUUM HOUSING DEVELOPMENT FUND C; BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC to BEC CONTINUUM MANAGER LLC
$225,000
2017-07-27
Agreement $1,176,232 — from NEW YORK STATE DIVISION OF HOUSING AND to BEC CONTINUUM HOUSING DEVELOPMENT FUND C; BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC
$1,176,232
2017-07-27
Agreement $7,859,762 — from BEC CONTINUUM HOUSING DEVELOPMENT; BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC to THE CITY OF NEW YORK DEPARTMENT OF HOUSI
$7,859,762
2017-07-27
Mortgage $7,692,865 — from BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$7,692,865
2017-07-27
Mortgage $14,941,911 — from BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC; BEC CONTINUUM HOUSING DEVELOPMENT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$14,941,911
2017-07-27
Deed $3,475,528 — from WEEKSVILLE COMMONS ASSOCIATES, L.P. to BEC CONTINUUM HOUSING DEVELOPMENT FUND C
$3,475,528
2017-07-27
Mortgage $38,250,920 — from BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$38,250,920
1996-12-02
Mortgage $564,725 — from WEEKSVILLE COMMONS ASSOCIATES LP to NYC HPD
$564,725
1996-07-11
Mortgage $2,896,956 — from WEEKSVILLE COMMONS ASSOC LP to CITY OF NEW YORK
$2,896,956
Ten-year activity
50250
30
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
9
0
0
20
1
30
2018
4
0
0
0
0
4
2019
3
0
0
0
0
3
2020
0
0
0
0
2
2
2021
0
0
1
0
0
1
2022
0
0
3
7
0
10
2023
0
3
2
1
1
7
2024
0
1
2
0
1
4
2025
0
1
2
0
1
4
2026
0
0
1
0
2
3
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-29
Rodent inspection: Passed
2025-11-20
HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
The full timeline
2026
2026-10-08Boiler inspection
2026-05-05HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-29Rodent inspection: Passed
2025
2025-11-20HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-06-11HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-05-20Rodent inspection: Passed
2024
2024-11-29HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-04-11HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023
2023-12-21Agreement — from BEC CONTINUUM HOUSING DEVELOPMENT FUND C; BEC CONTINUUM OWNER LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR; THE CITY OF NEW YORK
2023-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-03-24HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022
2022-11-14HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-07-22SUBM — from THE CITY OF NEW YORK to HOUSING ASSISTANCE CORPORATION; NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2022-07-22SUBM — from BEC CONTINUUM MANGER LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2022-07-22SUBM — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to HOUSING ASSISTANCE CORPORATION
2022-07-22Mortgage $2,270,000 — from BEC CONTINUUM HOUSING DEVELOPMENT FUND C; BEC CONTINUUM OWNER LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,270,000
2022-07-22Agreement — from BEC CONTINUUM OWNER LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C to HOUSING ASSISTANCE CORPORATION; THE CITY OF NEW YORK; NEW YORK CITY HOUSING DEVELOPMENT CO
2022-07-22Agreement — from THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR; HOUSING ASSISTANCE CORPORATION
2022-07-22Agreement — from THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR; HOUSING ASSISTANCE CORPORATION
2022-03-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-03-02HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021
2021-04-13HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2020
2020-12-11Boiler inspection
2020-12-11Boiler inspection
2019
2019-12-10Permit PL — ISSUED
2019-04-15Permit EW — ISSUED
2019-03-29Permit EW — ISSUED
2018
2018-08-29Permit EQ — ISSUED
2018-08-14Permit EW — ISSUED
2018-08-14Permit PL — ISSUED
2018-04-03Permit EW — ISSUED
2017
2017-12-26Rodent inspection: Passed
2017-09-13Permit EQ — ISSUED
2017-09-08Job filed: INSTALLATION OF LIGHT DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING
2017-09-08Job filed: INSTALLATION OF LIGHT DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING
2017-08-09Permit EW — ISSUED
2017-07-27Mortgage $11,184,835 — from BEC CONTINUUM OWNER LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C; 19 PATCHEN GP LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$11,184,835
2017-07-27Mortgage $8,314,080 — from BEC CONTINUUM HOUSING DEVELOPMENT FUND C; 19 PATCHEN GP LLC; BEC CONTINUUM OWNER LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$8,314,080
2017-07-27Mortgage $5,400,000 — from 19 PATCHEN GP LLC; BEC CONTINUUM OWNER LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C to BEC CONTINUUM MANAGER LLC$5,400,000
2017-07-27Mortgage $225,000 — from BEC CONTINUUM HOUSING DEVELOPMENT FUND C; BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC to BEC CONTINUUM MANAGER LLC$225,000
2017-07-27Mortgage assigned — from THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2017-07-27Agreement $1,176,232 — from NEW YORK STATE DIVISION OF HOUSING AND to BEC CONTINUUM HOUSING DEVELOPMENT FUND C; BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC$1,176,232
2017-07-27Agreement — from BEC CONTINUUM OWNER LLC; BEC CONTINUUM HOUSING DEVELOPMENT; 19 PATCHEN GP LLC to THE CITY OF NEW YORK DEPARTMENT OF HOUSI
2017-07-27Agreement $7,859,762 — from BEC CONTINUUM HOUSING DEVELOPMENT; BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC to THE CITY OF NEW YORK DEPARTMENT OF HOUSI$7,859,762
2017-07-27Mortgage $7,692,865 — from BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$7,692,865
2017-07-27Mortgage satisfied — from WEEKSVILLE COMMONS ASSOCIATES, L.P. to THE NEW YORK CITY HOUSING DEVELOPMENT CO
2017-07-27TL&R — from THE CITY OF NEW YORK
2017-07-27Mortgage $14,941,911 — from BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC; BEC CONTINUUM HOUSING DEVELOPMENT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$14,941,911
2017-07-27SMIS — from THE CITY OF NEW YORK
2017-07-27Deed $3,475,528 — from WEEKSVILLE COMMONS ASSOCIATES, L.P. to BEC CONTINUUM HOUSING DEVELOPMENT FUND C$3,475,528
2017-07-27Agreement — from THE CITY OF NEW YORK to HOUSING ASSISTANCE CORPORATION; NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2017-07-27Agreement — from THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR; HOUSING ASSISTANCE CORPORATION
2017-07-27Agreement — from BEC CONTINUUM HOUSING DEVELOPMENT FUND C to BEC CONTINUUM OWNER LLC
2017-07-27Mortgage assigned — from THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2017-07-27Mortgage $38,250,920 — from BEC CONTINUUM OWNER LLC; 19 PATCHEN GP LLC; BEC CONTINUUM HOUSING DEVELOPMENT FUND C to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$38,250,920
2017-06-30Deed transfer (nominal price)
2017-06-29Permit EW — ISSUED
2017-03-23Job filed: HEREWITH FILING FOR PLUMBING AND BOILER WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$173,250
2017-03-23Job filed: HEREWITH FILING FOR PLUMBING AND BOILER WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$173,250
2017-03-23Job filed: HEREWITH FILING FOR GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$624,196
2017-03-23Job filed: HEREWITH FILING FOR PLUMBING AND BOILER WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$173,250
2016
2016-12-06SMIS — from THE CITY OF NEW YORK to WEEKSVILLE COMMONS ASSOCIATES, L.P.
2015
2015-02-24HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER