The city's published records show little recorded distress here in the last three years. Less recorded distress than 58% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 14.7. In ZIP 10011, 68% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
89 total — 17 class C (immediately hazardous), 50 class B, 22 class A. Oldest open since 1989-09-20.
status snapshot refreshed weekly from HPD records
Patterns
4 heat or hot-water complaints in the last three years (winter 2023–24: 4).
No bedbug-infested units reported in the last three years of filings.
$40,625 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
17 service requests in the last three years. Most common: Dirty Condition (4) · Noise (4) · HEAT/HOT WATER (2) · Encampment (2) · Rodent (1) · New Tree Request (1).
Filed construction activity
$1,629,000 in permitted construction work filed since
2016 (39 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1915)
Yes
Six or more residential units (39)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
18TH STREET REALTY
Head officer
JOSEPH NABAVI
Managing agent
DIRECT MANAGEMENT CORP.
Last registered
2024-01-23
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$4,753,000
$2,138,850
2026
$5,053,000
$2,273,850
2027
$5,194,000
$2,337,300
The city's market estimate has risen
9% between tax years 2025 and 2027.
Building systems
Heating fuel
NO2FUEL
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
14 St — A C E L · 400 ft straight-line (about a 2-minute walk) · station accessibility: full 18 St — 1 · 600 ft straight-line (about a 3-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 8 Av / W 17 St — M20 · 200 ft
Citi Bike
W 17 St & 8 Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
17 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $1,850,000 on
2025-01-24 (lender: 244 246 W 18 Capital LLC). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-01-24
Mortgage $1,850,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC
$1,850,000
2025-01-24
AL&R $11,150,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC
$11,150,000
2025-01-24
Mortgage $11,150,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC
$11,150,000
2025-01-24
AL&R $1,850,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC
$1,850,000
2024-08-15
Deed $10,500,000 — from 246-18 REALTY LLC to 246 WEST 18TH STREET LAND LLC
$10,500,000
2024-08-15
AL&R $8,000,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC
$8,000,000
2024-08-15
Mortgage $8,000,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC
$8,000,000
2024-08-15
AL&R $8,000,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC
$8,000,000
2024-08-15
Mortgage $8,000,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC
$8,000,000
2024-08-05
Sold for $10,500,000
$10,500,000
$269,231
2020-12-16
AL&R $8,000,000 — from 246-18 REALTY LLC to EMERALD CREEK CAPITAL 3, LLC
$8,000,000
2020-12-16
Agreement $8,000,000 — from 246-18 REALTY LLC to EMERALD CREEK CAPITAL 3, LLC
$8,000,000
2020-12-16
Mortgage $3,797,434 — from 246-18 REALTY LLC to EMERALD CREEK CAPITAL 3, LLC
$3,797,434
2020-10-30
Sold for $6,000,000
$6,000,000
$153,846
2018-06-28
Agreement $4,340,000 — from 246-18 REALTY LLC to SANTANDER BANK, N.A.
$4,340,000
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
2024
87
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
19
0
6
25
2018
6
0
38
5
4
53
2019
4
2
31
0
7
44
2020
0
1
14
6
2
23
2021
1
2
15
1
1
20
2022
5
1
27
0
1
34
2023
1
8
10
4
9
32
2024
1
2
11
8
11
33
2025
37
9
11
8
22
87
2026
52
12
6
0
7
77
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Elevator permit: FandI (1) new overhead gearless traction passenger elevator. PAA- P7: Amend to request temporary use of the elevator as construct
2026-09-10
Job filed: 11 story, 21 dwellings new building
2026-08-28
Permit Sidewalk Shed — Permit Issued
2026-08-18
ECB CLASS - 1 violation: AT TIME OF INSPECTION, IT WAS DETERMINED THAT THE GENERAL CONTRACTOR DID NOT SUBMIT THE REQUIRED INCIDENT INFORMATION THROUGH THE
2026-08-18
Job filed: SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK.
2026-08-18
DOB complaint, category ?
2026-07-29
DOB complaint, category ?
2026-07-17
Permit General Construction — Permit Issued
2026-07-17
Permit Construction Fence — Permit Issued
2026-07-13
Elevator permit: FandI one (1) new overhead gearless traction passenger elevator. PAA- P7: Amend to request temporary use of the elevator as const
2026-06-16
Permit Suspended Scaffold — Permit Issued
2026-06-16
Permit Protection and Mechanical Methods — Permit Issued
2026-06-15
FDNY inspection (DEMO)
2026-06-15
FDNY inspection (E-CIDS)
2026-06-15
Job filed: INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-06-05
Job filed: Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
2026-06-05
Permit Protection and Mechanical Methods — Permit Issued
2026-06-04
Permit Sidewalk Shed — Permit Issued
2026-05-26
Job filed: SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK.
2026-05-19
Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-05-14
Permit Protection and Mechanical Methods — Permit Issued
2026-05-14
Permit Protection and Mechanical Methods — Permit Issued
2026-05-14
Permit Supported Scaffold — Permit Issued
2026-05-14
Permit Protection and Mechanical Methods — Permit Issued
2026-05-13
Job filed: Installation of a temporary SUPPORTED SCAFFOLD & SITE SPECIFICENGINEERED ENCLOSURE and plywood enclosure per plan submitted. Work shall comply with 20
2026-05-13
Permit Protection and Mechanical Methods — Permit Issued
2026-05-13
Permit Protection and Mechanical Methods — Signed-off
2026-04-29
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-29
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-23
Job filed: Plumbing work (Water/Sanitary, Storm & Vent) for an 11 story, 19 dwelling new building. Systems to comply with NYCBC2022, NYCPC2022 & NYCECC2020.
2026-04-21
Job filed: Installation of a temporary SUPPORTED SCAFFOLD & SITE SPECIFICENGINEERED ENCLOSURE and plywood enclosure per plan submitted. Work shall comply with 20
2026-04-20
Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-04-19
311: Encampment — N/A
2026-04-19
311: Encampment — N/A
2026-04-19
311: Illegal Dumping — Removal Request
2026-04-14
Job filed: Installation of a temporarily supported scaffold and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No c
2026-04-03
Permit Mechanical Systems — Permit Issued
2026-04-03
Permit General Construction — Permit Issued
2026-04-01
ECB CLASS - 2 violation: ON EXPOSURE #2 FROM 1ST FLOOR TO 7TH FLOOR AND EXPOSURE #4 FROM 2ND FLOOR TO 7TH FLOOR EXTERIOR WALLS OUTBOARD INSULATION WERE INS
2026-03-31
DOB complaint, category ?
2026-03-27
Job filed: Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No chan
2026-03-25
Elevator permit: FandI (1) new overhead gearless traction passenger elevator. PAA- P7: Amend to request temporary use of the elevator as construct
2026-03-25
Elevator permit: FandI one (1) new overhead gearless traction passenger elevator. PAA- P7: Amend to request temporary use of the elevator as const
2026-03-25
Permit Standpipe — Permit Issued
2026-03-25
Permit Sprinklers — Permit Issued
2026-03-24
Permit Standpipe — Permit Issued
2026-03-24
Permit Sprinklers — Permit Issued
2026-03-10
Job filed: Installation of a temporarily supported scaffold and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No c
2026-03-10
Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-03-04
FDNY inspection (DEMO)
2026-03-04
FDNY inspection (E-CIDS)
2026-03-04
Permit Protection and Mechanical Methods — Signed-off
2026-03-02
Job filed: PLACEMENT AND USE OF KNUCKLEBOOM ON SIDEWALK AND ROADWAY FOR HOISTING MATERIALS FOR NEW BUILDING CONJUNCTION WITH M01135836-I1
2026-02-24
Job filed: EQUIPMENT USE: SINGLE 7000# CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP
2026-02-23
Elevator permit: Installation of a Single 7000 LB Capacity Personnel Hoist during NB Construction, filed separately. Installations and Tests as per
2026-02-10
Job filed: EQUIPMENT USE: SINGLE 7000# CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP
2026-02-10
Job filed: Installation of a temporary engineered enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a
2026-02-10
Permit Protection and Mechanical Methods — Permit Issued
2026-02-07
Elevator permit: Installation of a Single 7000 LB Capacity Personnel Hoist during NB Construction, filed separately. Installations and Tests as per
2026-01-30
Permit Protection and Mechanical Methods — Permit Issued
2026-01-29
Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ
2026-01-29
Job filed: Installation of a temporarily supported scaffold and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No c
2026-01-27
FDNY inspection (CONSTR)
2026-01-23
Job filed: Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No chan
2026-01-23
Permit Protection and Mechanical Methods — Permit Issued
2026-01-22
Job filed: EQUIPMENT USE: SINGLE 7000# CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP
2026-01-21
Permit Standpipe — Permit Issued
2026-01-11
Elevator permit: Installation of a Single 7000 LB Capacity Personnel Hoist during NB Construction, filed separately. Installations and Tests as per
2026-01-08
311: Noise — Noise: Construction Equipment (NC1)
2026-01-08
Job filed: PROPOSED SUPERSTRUCTURE CONSISTING OF CONCRETE CAST IN PLACE COLUMNS, SHEAR WALLS, FLAT SLABS.
2026-01-08
Job filed: 11 story, 21 dwellings new building
2026-01-08
Job filed: EQUIPMENT USE: SINGLE 7000# CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP
2026-01-08
Permit Protection and Mechanical Methods — Signed-off
2026-01-08
Permit Protection and Mechanical Methods — Permit Issued
2026-01-06
ECB CLASS - 2 violation: RESPONDED TO AN INCIDENT IN WHICH A WORKER WAS STRUCK ON THE WRIST BY A RESHORE POST WHILE RECEIVING IT FROM ANOTHER WORKER. INSPE
2026-01-06
DOB complaint, category ?
2026-01-05
Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg
2025-12-22
Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg
2025-12-21
ECB CLASS - 2 violation: OBSERVED TEMPORARY CONSTRUCTION SIDEWALK NOT ADEQUATELY ILLUMINATED DURING NIGHTTIME HOURS, RESULTING IN POOR VISIBILITY FOR PEDES
2025-12-21
DOB complaint, category ?
showing the 80 most recent
The full timeline
2026
2026-10-06Elevator permit: FandI (1) new overhead gearless traction passenger elevator. PAA- P7: Amend to request temporary use of the elevator as construct$400,000
2026-09-10Job filed: 11 story, 21 dwellings new building
2026-08-28Permit Sidewalk Shed — Permit Issued
2026-08-18ECB CLASS - 1 violation: AT TIME OF INSPECTION, IT WAS DETERMINED THAT THE GENERAL CONTRACTOR DID NOT SUBMIT THE REQUIRED INCIDENT INFORMATION THROUGH THE $10,000
2026-08-18Job filed: SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK.
2026-08-18DOB complaint, category ?
2026-07-29DOB complaint, category ?
2026-07-17Permit General Construction — Permit Issued
2026-07-17Permit Construction Fence — Permit Issued
2026-07-13Elevator permit: FandI one (1) new overhead gearless traction passenger elevator. PAA- P7: Amend to request temporary use of the elevator as const$400,000
2026-06-16Permit Protection and Mechanical Methods — Permit Issued
2026-06-15FDNY inspection (DEMO)
2026-06-15FDNY inspection (E-CIDS)
2026-06-15Job filed: INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-06-05Job filed: Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
2026-06-05Permit Protection and Mechanical Methods — Permit Issued
2026-06-04Permit Sidewalk Shed — Permit Issued
2026-05-26Job filed: SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK.
2026-05-19Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ$7,500
2026-05-14Permit Protection and Mechanical Methods — Permit Issued
2026-05-14Permit Protection and Mechanical Methods — Permit Issued
2026-05-14Permit Protection and Mechanical Methods — Permit Issued
2026-05-13Job filed: Installation of a temporary SUPPORTED SCAFFOLD & SITE SPECIFICENGINEERED ENCLOSURE and plywood enclosure per plan submitted. Work shall comply with 20$8,200
2026-05-13Permit Protection and Mechanical Methods — Permit Issued
2026-05-13Permit Protection and Mechanical Methods — Signed-off
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-23Job filed: Plumbing work (Water/Sanitary, Storm & Vent) for an 11 story, 19 dwelling new building. Systems to comply with NYCBC2022, NYCPC2022 & NYCECC2020.
2026-04-21Job filed: Installation of a temporary SUPPORTED SCAFFOLD & SITE SPECIFICENGINEERED ENCLOSURE and plywood enclosure per plan submitted. Work shall comply with 20$8,200
2026-04-20Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ$7,500
2026-04-19311: Encampment — N/A
2026-04-19311: Encampment — N/A
2026-04-19311: Illegal Dumping — Removal Request
2026-04-14Job filed: Installation of a temporarily supported scaffold and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No c$8,200
2026-04-03Permit Mechanical Systems — Permit Issued
2026-04-03Permit General Construction — Permit Issued
2026-04-01ECB CLASS - 2 violation: ON EXPOSURE #2 FROM 1ST FLOOR TO 7TH FLOOR AND EXPOSURE #4 FROM 2ND FLOOR TO 7TH FLOOR EXTERIOR WALLS OUTBOARD INSULATION WERE INS$6,250
2026-03-31DOB complaint, category ?
2026-03-27Job filed: Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No chan$22,500
2026-03-25Elevator permit: FandI (1) new overhead gearless traction passenger elevator. PAA- P7: Amend to request temporary use of the elevator as construct$400,000
2026-03-25Elevator permit: FandI one (1) new overhead gearless traction passenger elevator. PAA- P7: Amend to request temporary use of the elevator as const$400,000
2026-03-25Permit Standpipe — Permit Issued
2026-03-25Permit Sprinklers — Permit Issued
2026-03-24Permit Standpipe — Permit Issued
2026-03-24Permit Sprinklers — Permit Issued
2026-03-10Job filed: Installation of a temporarily supported scaffold and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No c$8,200
2026-03-10Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ$7,500
2026-03-04FDNY inspection (DEMO)
2026-03-04FDNY inspection (E-CIDS)
2026-03-04Permit Protection and Mechanical Methods — Signed-off
2026-03-02Job filed: PLACEMENT AND USE OF KNUCKLEBOOM ON SIDEWALK AND ROADWAY FOR HOISTING MATERIALS FOR NEW BUILDING CONJUNCTION WITH M01135836-I1$6,000
2026-02-24Job filed: EQUIPMENT USE: SINGLE 7000# CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP$10,000
2026-02-23Elevator permit: Installation of a Single 7000 LB Capacity Personnel Hoist during NB Construction, filed separately. Installations and Tests as per$10,000
2026-02-10Job filed: EQUIPMENT USE: SINGLE 7000# CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP$10,000
2026-02-10Job filed: Installation of a temporary engineered enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a
2026-02-10Permit Protection and Mechanical Methods — Permit Issued
2026-02-07Elevator permit: Installation of a Single 7000 LB Capacity Personnel Hoist during NB Construction, filed separately. Installations and Tests as per$10,000
2026-01-30Permit Protection and Mechanical Methods — Permit Issued
2026-01-29Job filed: Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ$7,500
2026-01-29Job filed: Installation of a temporarily supported scaffold and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No c$8,200
2026-01-27FDNY inspection (CONSTR)
2026-01-23Job filed: Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No chan$22,500
2026-01-23Permit Protection and Mechanical Methods — Permit Issued
2026-01-22Job filed: EQUIPMENT USE: SINGLE 7000# CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP$10,000
2026-01-21Permit Standpipe — Permit Issued
2026-01-11Elevator permit: Installation of a Single 7000 LB Capacity Personnel Hoist during NB Construction, filed separately. Installations and Tests as per$10,000
2026-01-08311: Noise — Noise: Construction Equipment (NC1)
2026-01-08Job filed: PROPOSED SUPERSTRUCTURE CONSISTING OF CONCRETE CAST IN PLACE COLUMNS, SHEAR WALLS, FLAT SLABS.
2026-01-08Job filed: 11 story, 21 dwellings new building
2026-01-08Job filed: EQUIPMENT USE: SINGLE 7000# CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUP$10,000
2026-01-08Permit Protection and Mechanical Methods — Signed-off
2026-01-08Permit Protection and Mechanical Methods — Permit Issued
2026-01-06ECB CLASS - 2 violation: RESPONDED TO AN INCIDENT IN WHICH A WORKER WAS STRUCK ON THE WRIST BY A RESHORE POST WHILE RECEIVING IT FROM ANOTHER WORKER. INSPE$5,000
2026-01-06DOB complaint, category ?
2026-01-05Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,200
2025
2025-12-22Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,200
2025-12-21ECB CLASS - 2 violation: OBSERVED TEMPORARY CONSTRUCTION SIDEWALK NOT ADEQUATELY ILLUMINATED DURING NIGHTTIME HOURS, RESULTING IN POOR VISIBILITY FOR PEDES$10,000
2025-12-21DOB complaint, category ?
2025-12-17Permit Structural — Permit Issued
2025-12-17Permit General Construction — Permit Issued
2025-12-16Permit Plumbing — Permit Issued
2025-12-13311: Noise - Vehicle — Engine Idling
2025-12-03Job filed: Foundation system for 11 story new building, SOE filed under M01135836-S1
2025-12-01Job filed: Support of Excavation for the construction of a new 11-story building with one cellar level. SOE consist of soldier piles, timber lagging and tie-back
2025-11-20Permit Plumbing — Permit Issued
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-10-31311: Noise — Noise: Construction Equipment (NC1)
2025-10-31311: Noise — Noise: Construction Equipment (NC1)
2025-10-30Permit Foundation — Permit Issued
2025-10-16Permit Support of Excavation — Permit Issued
2025-10-01ECB CLASS - 2 violation: AT TIME OF INSPECTION,BUILDING HAS BEEN DEMOLISHED UNDER PERMIT M01163529-I1-FD EXPIRING 11/11/2025 ,HOWEVER NO CERTIFICATE OF COR$6,250
2025-09-25DOB complaint, category ?
2025-09-17Job filed: FILED HEREWITH BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB M01135836.
2025-09-15FDNY inspection (DEMO)
2025-09-15FDNY inspection (DEMO)
2025-09-09311: Air Quality — Air: Dust, Other (Use Comments) (AE5)
2025-09-02Job filed: Filed herewith a Temporary Standpipe for a new building. Standpipe as per NFPA 14, as modified by BC Appendix Q.
2025-08-29Rodent inspection: Passed
2025-08-19Permit Full Demolition — Signed-off
2025-08-06Job filed: Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter $2,200
2025-08-06Job filed: Installation of a temporarily supported scaffold and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No c$8,200
2025-07-25Permit Full Demolition — Signed-off
2025-07-24Job filed: PROPOSED SUPERSTRUCTURE CONSISTING OF CONCRETE CAST IN PLACE COLUMNS, SHEAR WALLS, FLAT SLABS.
2025-07-16Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,200
2025-07-16Job filed: Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter $2,200
2025-07-16Permit Construction Fence — Permit Issued
2025-07-08Permit Sidewalk Shed — Signed-off
2025-07-08Permit Supported Scaffold — Signed-off
2025-07-01ECB CLASS - 2 violation: FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 10000025771Y0001 IN ACCORDANCE WITH THE RULES OF$3,125
2025-06-27Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,200
2025-06-27Job filed: Installation of a temporary SUPPORTED SCAFFOLD & SITE SPECIFICENGINEERED ENCLOSURE and plywood enclosure per plan submitted. Work shall comply with 20$8,200
2025-06-25Job filed: Temporary 8' construction fence in conjunction with demolition and new building applications.$6,000
2025-06-23Job filed: Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg$2,200
2025-06-23Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a$8,200
2025-06-13ZONE — from 246 WEST 18TH STREET LAND LLC
2025-06-13CERT — from TOWER ABSTRACT SERVICES, LLC
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-06-02Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-23Asbestos abatement: Removal — ESG, Inc.
2025-05-05Job filed: Support of Excavation for the construction of a new 11-story building with one cellar level. SOE consist of soldier piles, timber lagging and tie-back
2025-05-05Job filed: Mechanical system for 19 dwelling new building
2025-05-01Job filed: Plumbing work (Water/Sanitary, Storm & Vent) for an 11 story, 19 dwelling new building. Systems to comply with NYCBC2022, NYCPC2022 & NYCECC2020.
2025-04-30Job filed: Filed herewith a new Sprinkler and Standpipe for a new building. Sprinkler as per NFPA 13 and Standpipe as per NFPA 14, as modified by BC Appendix Q.
2025-04-29Job filed: Foundation system for 11 story new building, SOE filed under M01135836-S1
2025-04-25TERA — from MAXIM CREDIT GROUP, LLC to 244 246 W 18 CAPITAL LLC
2025-04-25Mortgage assigned — from 244 246 W 18 CAPITAL LLC to OAKNORTH BANK PLC
2025-04-16Job filed: SUSPENDED SCAFFOLD INSTALLATION AND MATERIAL HOIST FOR FACADE REPAIRS AND INSPECTIONS
2025-03-31Job filed: Full demolition of a 5 story & a cellar building using hand held and mech means$80,000
2025-03-27311: Dirty Condition — Trash
2025-03-26311: Dirty Condition — Trash
2025-03-10311: Dirty Condition — Trash
2025-02-20Job filed: FILED HEREWITH BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB M01135836.
2025-02-04Job filed: Hand demolition of a 5 story structure (basement + 4 story)$70,000
2025-01-24Mortgage $1,850,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC$1,850,000
2025-01-24AL&R $11,150,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC$11,150,000
2025-01-24Mortgage $11,150,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC$11,150,000
2025-01-24AL&R $1,850,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC$1,850,000
2024
2024-12-26Agreement — from 244 246 W 18 CAPITAL LLC to MAXIM CREDIT GROUP, LLC
2024-12-05Job filed: 11 story, 21 dwellings new building
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-08-15Deed $10,500,000 — from 246-18 REALTY LLC to 246 WEST 18TH STREET LAND LLC$10,500,000
2024-08-15AL&R $8,000,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC$8,000,000
2024-08-15Mortgage $8,000,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC$8,000,000
2024-08-15AL&R $8,000,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC$8,000,000
2024-08-15Mortgage $8,000,000 — from 246 WEST 18TH STREET LAND LLC to 244 246 W 18 CAPITAL LLC$8,000,000
2024-08-15CTOR — from 246-18 REALTY LLC
2024-08-12311: General Construction/Plumbing — Building - Vacant, Open And Unguarded
2024-08-12DOB complaint, category ?
2024-08-05Sold for $10,500,000$10,500,000
2024-05-28311: New Tree Request — For One Address
2024-05-03Rodent inspection: Bait applied
2024-04-12Rodent inspection: Bait applied
2024-04-05Rodent inspection: Bait applied
2024-04-02Rodent inspection: Failed for Rat Activity and Other Reason
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-03-04Rodent inspection: Failed for Rat Activity and Other Reason
2024-02-20Rodent inspection: Bait applied
2024-02-08Bedbug filing: 0 infested units
2024-02-06Rodent inspection: Bait applied
2024-01-30Rodent inspection: Bait applied
2024-01-02311: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-01311: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023
2023-12-18Boiler inspection
2023-12-13Job filed: proposed repairs of existing building, resurface floor, all as shown on drawings herewith attached.$25,000
2023-11-27Rodent inspection: Failed for Rat Activity
2023-11-17Boiler inspection — defects found
2023-11-16311: Rodent — Rat Sighting
2023-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-08-25ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED THE FRONT ENTRANCE OF THE BUILDING $1,250
2023-04-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-03-15SAGE — from 244 246 W 18 SME LLC to MAXIM CREDIT GROUP, LLC
2023-03-15AALR — from ECC STERLING, LLC to 244 246 W 18 SME LLC
2023-03-15Mortgage assigned — from ECC STERLING, LLC to 244 246 W 18 SME LLC
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-03-13311: HEAT/HOT WATER — APARTMENT ONLY
2023-03-13Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2023-02-01Mortgage assigned — from EMERALD CREEK CAPITAL 3, LLC to ECC STERLING, LLC
2022-11-17Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-11-14City emergency repair (OMO): hpd emergency operations service work'' division install hinges to make door self-closing at the entrance located at apt$334
2022-11-14City emergency repair (OMO): hpd emergency operations service work'' division install hinges to make door self-closing at the entrance located at apt$334
2022-10-26HPD class A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APROX 5 SQFT AT CEILING IN THE 1st ROOM FROM NORTH LOCA
2022-10-26HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM F
2022-10-26HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE . IN THE ENTRANCE LOCATED AT APT 9,
2022-10-25Job filed: standpipe and sprinkler related work for new building$55
2022-10-25Job filed: plumbing related work and service for new building project$50,000
2022-10-22HPD class B: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 10 SQ.FT IN THE 2nd ROOM FROM NORTH A
2022-10-22HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 9, 4th STORY, 1
2022-10-22HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT E
2022-10-22HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT
2022-10-22HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 9, 4th STORY, 1st APARTMENT FROM EA
2022-10-22HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT W
2022-10-20311: HEAT/HOT WATER — APARTMENT ONLY
2022-10-20311: GENERAL — BELL/BUZZER/INTERCOM
2022-10-20311: PAINT/PLASTER — CEILING
2022-10-20Tenant complaint: GENERAL — BELL/BUZZER/INTERCOM
2022-10-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-10-18Job filed: mechanical related work for new building$15,000
2022-10-18Job filed: DEMOLISHED ENTIRE BUILDING
2022-08-02Job filed: proposed new building, all as shown on drawings herewith submitted.$15,000
2022-06-30HPD litigation: CONH
2022-02-17Bedbug filing: 0 infested units
2022-02-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-01-31DOB complaint, category ?
2022-01-18311: Food Poisoning — 1 or 2
2022-01-15311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021
2021-11-20311: HEAT/HOT WATER — APARTMENT ONLY
2021-11-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-11-16311: HEAT/HOT WATER — APARTMENT ONLY
2021-11-16Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-11-10311: Missed Collection — Recycling - Paper
2021-11-03311: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-10-18311: HEAT/HOT WATER — ENTIRE BUILDING
2021-10-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-09-24Job filed: new building construction, 29 dwelling units, and commercial use at the 1st floor, and cellar$1,000,000
2021-07-19Boiler inspection
2021-06-09ECB CLASS - 1 violation: AT FRONT OF BUILDING, FIRE ESCAPE DROP LADDER EXIT PASSAGEWAY HAS WROUGHT IRON FENCE PADLOCKED OBSTRUCTING EGRESS TO STREET., REMO$625
2021-06-08DOB complaint, category ?
2021-06-04AALR — from EMERALD CREEK CAPITAL 3, LLC to ECC STERLING, LLC
2021-05-30311: Food Poisoning — 1 or 2
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-13311: Street Condition — Defective Hardware
2020-11-06311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-10-30Sold for $6,000,000$6,000,000
2020-10-30Placed on Speculation Watch List — bought by 246-18 REALTY LLC$6,000,000
2020-08-04311: Homeless Person Assistance — N/A
2020-07-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-07-14311: GENERAL — BELL/BUZZER/INTERCOM
2020-07-14311: GENERAL — BELL/BUZZER/INTERCOM
2020-07-14Tenant complaint: GENERAL — BELL/BUZZER/INTERCOM
2020-07-14Tenant complaint: GENERAL — BELL/BUZZER/INTERCOM
2020-06-05311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-05-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-03-11Bedbug filing: 0 infested units
2020-02-04Rodent inspection: Passed
2020-01-20311: Non-Emergency Police Matter — Other (complaint details)
2020-01-06FDNY inspection (RISK)
2020-01-06311: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019
2019-12-10Rodent inspection: Failed for Rat Activity and Other Reason
2019-11-15Rodent inspection: Failed for Rat Activity
2019-11-15Rodent inspection: Failed for Rat Activity
2019-11-13311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-12311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-12311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-11311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-11-08311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-10-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-07-28311: HEAT/HOT WATER — ENTIRE BUILDING
2019-07-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-07-24HPD class A: § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES
2019-07-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-07-20311: HEAT/HOT WATER — ENTIRE BUILDING
2019-07-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-07-19311: HEAT/HOT WATER — APARTMENT ONLY
2019-07-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-04-24311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2019-04-24DOB complaint, category ?
2019-04-23Permit PL — ISSUED
2019-04-10311: HEAT/HOT WATER — ENTIRE BUILDING
2019-04-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-04-06311: HEAT/HOT WATER — ENTIRE BUILDING
2019-04-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-03-29Rodent inspection: Passed
2019-03-29Rodent inspection: Passed
2019-03-13Permit EW — ISSUED
2019-03-13Permit EW — ISSUED
2019-03-12Job filed: REPLACEMENT OF TWO (2) HVAC UNITS ON THE ROOF, AS PER PLANS. EXISTING DUNNAGE AND DUCT WORK TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THI$30,000
2018-06-21311: Other Enforcement — E6 Commercial Waste Disposal
2018-05-08HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AND VINYL TILES AT FOYER LOCATED AT APT 2C, 2nd
2018-05-08HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AND VINYL TILES AT KITCHEN LOCATED AT APT 2C, 2n
2018-05-08HPD class B: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT APARTMENT ENTRANCE LOCATED AT AP
2018-04-20Permit PL — ISSUED
2018-04-10Permit EW — ISSUED
2018-03-26311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-26311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-25311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-25311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-25311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-24311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-23311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-19311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-17311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-17311: PLUMBING — WATER SUPPLY
2018-03-17311: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-17Tenant complaint: PLUMBING — WATER SUPPLY
2018-03-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-03-14Job filed: PARTITIONS & PLUMBING RENOVATIONS AS PER SUBMITTED PLANS. NO STRUCTURAL WORK; NO CHANGE TO EGRESS OR OCCUPANCY$55,000
2018-03-14Job filed: PARTITIONS & PLUMBING RENOVATIONS AS PER SUBMITTED PLANS. NO STRUCTURAL WORK; NO CHANGE TO EGRESS OR OCCUPANCY$55,000
2018-02-24311: HEAT/HOT WATER — ENTIRE BUILDING
2018-02-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-02-18Job filed: PARTITIONS & PLUMBING RENOVATIONS AS PER SUBMITTED PLANS. NO STRUCTURAL WORK; NO CHANGE TO EGRESS OR OCCUPANCY$13,000
2018-02-18Job filed: PARTITIONS & PLUMBING RENOVATIONS AS PER SUBMITTED PLANS. NO STRUCTURAL WORK; NO CHANGE TO EGRESS OR OCCUPANCY$13,000
2018-02-01311: HEAT/HOT WATER — ENTIRE BUILDING
2018-02-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-17HPD class C: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE AT BUILDING STREET ENTRANCE DOOR
2018-01-17HPD class B: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BUILDING STREET ENTRANCE
2017
2017-12-29311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-28HPD class B: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT ENTRANCE TO BLDG. , 1st STORY
2017-12-27311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-10-19311: General Construction/Plumbing — Failure To Maintain
2015-10-19DOB complaint, category ?
2015-10-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-09-21311: Noise - Vehicle — Car/Truck Horn
2015-09-01Job filed: MODIFICATION OF ANSUL SYSTEM ONLY GAS VALVE FILED UNDER APP# 120045003$3,000
2015-09-01Job filed: MODIFICATION OF ANSUL SYSTEM ONLY GAS VALVE FILED UNDER APP# 120045003$3,000
2015-08-27DOB complaint, category ?
2015-05-01311: Street Condition — Defective Hardware
2015-03-21Job filed: REPLACE GAS PIPING TO COMMERCIAL KITCHEN. REPLACE AND INSTALL COOKING APPLIANCES IN COMMERCIAL KITCHEN$21,000
2015-03-21Job filed: REPLACE GAS PIPING TO COMMERCIAL KITCHEN. REPLACE AND INSTALL COOKING APPLIANCES IN COMMERCIAL KITCHEN$21,000
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-01-26HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 5th STORY
2015-01-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AT PUBLIC HALL, 5th STORY
2015-01-16HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DROP LADDER AT NORTH STACK OBSTRUCTED BY AWNING AND MAKESHIFT PORCH AT ENT
2015-01-11311: PAINT/PLASTER — CEILING
2015-01-11311: WATER LEAK — DAMP SPOT
2015-01-11311: UNSANITARY CONDITION — PESTS
2015-01-11311: ELECTRIC — OUTLET/SWITCH
2015-01-11311: ELECTRIC — OUTLET/SWITCH
2015-01-11311: UNSANITARY CONDITION — PESTS
2015-01-11311: UNSANITARY CONDITION — PESTS
2015-01-11311: HEAT/HOT WATER — APARTMENT ONLY
2015-01-11Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-01-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-05311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-05311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-03ECB CLASS - 1 violation: B154,1,51,15,32A,50A,38,50B,50C,50D,50E. 50A-REMOVE DRAFT INDUCER FROM FLUEPIPE IN BOILER; 50B-FLUE PIPE NOT PROPERLY SEALED TO CH$1,000
2014
2014-12-26ECB CLASS - 1 violation: B154,1,51. 51-OPERATING SEALED BOILER; DO NOT OPERATE BOILER UNTIL ALLHAZARDOUS CONDITIONS ARE IMMEDIATLEY CORRECTD AND DOB IS NOT$1,000
2014-12-16ECB CLASS - 1 violation: 51,32A,34A/B,38,50,50A. 51-DRAFRT INDUCER ON FLUE PIPE NO GOOD 51A-NOCOMBSTION AIR, 50 NO LIGHTS IN BOILER ROOM; 60A-FLUE IPE NOT$1,000
2014-10-06ECB CLASS - 2 violation: 15,32A,34A,34B,36,38,50.36-WEIL MCLAIN BOILER MODEL 67819 NOT REGISTERED-RESGISTER THE BOILER & ALL VIOLATING CONDITIONS LISTED AB$500
2014-10-02311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2014-07-29311: Street Condition — Defective Hardware
2014-07-01Permit EW — ISSUED
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-02Job filed: MODIFICATION OF EXISTING FIRE SUPPRESSION SYSTEM FILED UNDER APPL # 121662940. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2014-04-24HPD litigation: Heat and Hot Water
2014-04-21HPD class B: § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT THE RADIATOR SHUT OFF VALVE IN THE KITCHEN LOCATED AT APT 3, 2nd STORY, 1st
2014-04-21HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY, 1
2014-04-21HPD class C: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING STEAM VALVE AT THE RADIATOR IN THE KITCHEN LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM S
2014-04-21HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM SO
2014-04-21HPD class C: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING STEAM VALVE AT THE RADIATOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3, 2nd STORY, 1st APAR
2014-04-19311: HEAT/HOT WATER — ENTIRE BUILDING
2014-04-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-03-04Tenant complaint: HEATING — HEAT RELATED
2014-03-04Tenant complaint: HEATING — HEAT RELATED
2014-03-04Tenant complaint: HEATING — HEAT RELATED
2014-03-04Tenant complaint: HEATING — HEAT RELATED
2014-03-04Tenant complaint: HEATING — HEAT RELATED
2014-03-03311: HEATING — HEAT RELATED
2014-03-03311: HEATING — HEAT
2014-03-03311: HEATING — HEAT
2014-03-03Tenant complaint: HEATING — HEAT RELATED
2014-03-03Tenant complaint: HEATING — HEAT RELATED
2014-03-03Tenant complaint: HEATING — HEAT RELATED
2014-03-03HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 11, 4th STORY,
2014-03-03HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11, 4th STORY, 1st APARTMENT FROM NORT
2014-03-03HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM SOUTH
2014-03-03HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4, 2nd STORY, 1st
2014-03-03HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 11, 4th STORY, 1st APARTMENT FROM N
2014-03-03HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING,CELLAR AT BOILER ROOM
2014-03-03HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM SOUT
2014-03-03HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LOCKABLE SLIDE BOLT CAPABLE OF BEING PADLOCK AT DOOR IN THE ENTRANCE LOCAT
2014-03-03HPD class C: § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRI
2014-03-03HPD class C: § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRI
2014-03-02311: HEATING — HEAT
2014-03-02311: HEATING — HEAT
2014-03-02311: HEATING — HEAT
2014-03-02311: HEATING — HEAT
2014-03-02Tenant complaint: HEATING — HEAT RELATED
2014-03-02Tenant complaint: HEATING — HEAT RELATED
2014-03-02Tenant complaint: HEATING — HEAT RELATED
2014-03-02Tenant complaint: HEATING — HEAT RELATED
2014-03-01311: HEATING — HEAT
2014-03-01Tenant complaint: HEATING — HEAT RELATED
2013-05-09Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2013-05-09Tenant complaint: NONCONST — VERMIN
2013-04-26HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR MATERIAL AT BRICKWORK AT LOWER EAST SECTION AT 2ND S
2013-04-19311: PLUMBING — RADIATOR
2013-04-19311: HEATING — HEAT-PLANT
2013-04-19311: PLUMBING — RADIATOR
2013-04-19Tenant complaint: PLUMBING — RADIATOR
2013-04-19Tenant complaint: PLUMBING — RADIATOR
2013-04-19Tenant complaint: HEATING — HEAT-PLANT
2013-04-11Rodent inspection: Passed
2013-04-04HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM SO
2013-04-04HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY, 1
2013-04-01Tenant complaint: HEATING — HEAT RELATED
2012-12-05HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED
2011-09-01Job filed: FOR INTERIOR APARTMENT, CEILING, FLOORING, NEW PLUMBING FIXTURES AND MECHANICAL VENT FOR THE KITCHENS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$30,020
2011-09-01Job filed: FOR INTERIOR APARTMENT, CEILING, FLOORING, NEW PLUMBING FIXTURES AND MECHANICAL VENT FOR THE KITCHENS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$30,020
2011-09-01Job filed: FOR INTERIOR APARTMENT, CEILING, FLOORING, NEW PLUMBING FIXTURES AND MECHANICAL VENT FOR THE KITCHENS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$30,020
2011-08-05Agreement $3,250,000 — from 246-18 REALTY LLC to NEW YORK COMMUNITY BANK$3,250,000
2011-08-05Mortgage $1,616,912 — from 246-18 REALTY LLC to NEW YORK COMMUNITY BANK$1,616,912
2009-12-30City emergency repair (HWO): (apt. #6) at apartment entrance door:remove hasp and eye from padlock at apartment entrance door.$30
2009-12-28DOB complaint, category ?
2009-12-22Tenant complaint: GENERAL — FLOOR
2009-12-22Tenant complaint: GENERAL — FLOOR
2009-12-22Tenant complaint: PAINT/PLASTER — WALL
2009-12-22Tenant complaint: PLUMBING — RADIATOR
2009-12-22DOB complaint, category ?
2009-12-16DOB complaint, category ?
2009-12-03ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED PLANS.WORK BEING DONE UNDER JOB #120200852.NON-CONFORMING$2,500
2009-11-23Permit EW — ISSUED
2009-11-20Permit EW — ISSUED
2009-11-19Tenant complaint: HEATING — HEAT RELATED
2009-11-19Tenant complaint: GENERAL — FLOOR
2009-11-19Tenant complaint: NONCONST — VERMIN
2009-11-19Tenant complaint: GENERAL — DOORS
2009-11-19Tenant complaint: PLUMBING — RADIATOR
2009-11-19Tenant complaint: PAINT/PLASTER — WALL
2009-11-19Tenant complaint: GENERAL — CABINET
2009-11-19Tenant complaint: PLUMBING — TOILET
2009-11-19Job filed: FILING FOR RENOVATIONS TO EXISTING STORE FRONT & REAR DECK$30,000
2009-11-19DOB complaint, category ?
2009-11-18ECB CLASS - 1 violation: 51 50ABC 50A-FLUE PIPE NOT PROPERLY SEALED TO CHIMNEY BASE 50B-FLUE PIPE IMPROPER INSTILLATION FUMES 50C-FLUE PIPE MUST RAISED THR
2009-11-18ECB CLASS - 1 violation: 54 3B 32A 34A 50ABC 50A-FLUE PIPE NOT PROPERLY SEALED TO CHIMNEY 50B-FLUE PIPE NEED TO BE INSTALL THREE FEET ABOVE THE TOP OF THE $5,000
2009-11-18DOB complaint, category ?
2009-11-17DOB complaint, category ?
2009-11-17DOB complaint, category ?
2009-11-17DOB complaint, category ?
2009-11-09Permit AL — ISSUED
2009-11-06Job filed: CONSTRUCT NEW RETAINING WALL AT REAR EAST SIDE & FLOOR$5,000
2009-11-06DOB complaint, category ?
2009-11-05Tenant complaint: HEATING — HEAT RELATED
2009-11-04Tenant complaint: HEATING — HEAT RELATED
2009-11-04Tenant complaint: HEATING — HEAT RELATED
2009-11-04Tenant complaint: HEATING — HEAT RELATED
2009-11-02Tenant complaint: HEATING — HEAT RELATED
2009-11-02ECB CLASS - 2 violation: FAIL TO PROVIDE APPROVED/ACCEPTED PLANS AT TIME OF INSPECTION. NOTED: AT JOB SITE ON 1ST FL AND CELLAR, THE INSPECTOR REQUESTED PL
2009-10-21Tenant complaint: HEATING — HEAT RELATED
2009-10-13DOB complaint, category ?
2009-10-09Permit PL — ISSUED
2009-09-21Job filed: INSTALL 17 TON AIR CONDITIONING SYSTEM WITH 5 AIR HANDLERS AND DUCTWORK. INSTALL KITCHEN EXHAUST HOOD WITH BLOWER AND EXHAUST DUCT.$93,500
2009-09-17Permit EW — RE-ISSUED
2009-09-03Permit PL — ISSUED
2009-09-03Permit PL — ISSUED
2009-08-05Permit EW — ISSUED
2009-07-29DOB complaint, category ?
2009-07-14Tenant complaint: NONCONST — VERMIN
2009-07-14Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2009-07-14Tenant complaint: PAINT/PLASTER — WALL
2009-07-14Tenant complaint: ELECTRIC — WIRING
2009-07-14Tenant complaint: GENERAL — MOLD
2009-07-14Tenant complaint: GENERAL — CABINET
2009-07-14Tenant complaint: GENERAL — FLOOR
2009-07-06HPD class A: § 27-2051 ADM CODE PROVIDE A MANAGER WHO SHALL BE RESPONSIBLE FOR THE CONDUCT, OPERATION AND MAINTENANCE OF PREMISES AND WHO SHALL LIVE ON P
2009-07-06HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2009-07-02Permit EW — ISSUED
2009-05-22Job filed: ENLARGEMENT AT FIRST FLOOR COURTYARD, REAR DECK RENOVATION, INSTALL STOREFRONT, NEW GAS METER & PIPING;INSTALL COOKING EQUIPMENT, NEW PLUMBING FOR$97,000
2009-05-22Job filed: ENLARGEMENT AT FIRST FLOOR COURTYARD, REAR DECK RENOVATION, INSTALL STOREFRONT, NEW GAS METER & PIPING;INSTALL COOKING EQUIPMENT, NEW PLUMBING FOR$97,000
2009-05-22Job filed: REPAIR SHEETROCK WALLS AND CEILINGS CAUSE BY WATER DAMAGE FROM FIRE. NO CHANGE TO LAYOUT, EGRESS OR OCCUPANCY.$4,000
2009-05-22Job filed: REPAIR SHEETROCK WALLS AND CEILINGS CAUSE BY WATER DAMAGE FROM FIRE. NO CHANGE TO LAYOUT, EGRESS OR OCCUPANCY.$4,000
2009-05-22Job filed: ENLARGEMENT AT FIRST FLOOR COURTYARD, REAR DECK RENOVATION, INSTALL STOREFRONT, NEW GAS METER & PIPING;INSTALL COOKING EQUIPMENT, NEW PLUMBING FOR$97,000
2009-04-30ECB CLASS - 3 violation: WORK W/O A PERMIT WORK NOTED AT 1ST FL IN COMMERCIAL STORE HAVING REMOVE FIRE RATED MATERIAL FROM CELLAR TO EXPOSE JOISTS ERECTED $100
2009-04-30Job filed: MINOR PARTITION WORK ON CELLAR AND FIRST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$62,000
2009-04-30Job filed: MINOR PARTITION WORK ON CELLAR AND FIRST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$62,000
2009-04-29DOB complaint, category ?
2009-04-08Tenant complaint: HEATING — HEAT RELATED
2008-09-17Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2008-09-17Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2008-09-17Tenant complaint: GENERAL — FLOOR
2008-09-03Tenant complaint: NONCONST — VERMIN
2008-09-03DOB complaint, category ?
2008-06-05HPD litigation: Comp Supplemental Cases
2008-05-01DOB complaint, category ?
2008-04-14DOB complaint, category ?
2008-04-14DOB complaint, category ?
2008-03-24HPD litigation: CONH
2008-02-29HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM
2008-02-29HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WALL CABINET IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
2008-02-29HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FRO
2008-02-29HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NOR
2008-02-29HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NOR
2008-02-29HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN BED BUGS IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM
2008-02-29HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT
2008-02-29HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM
2008-02-26Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2008-02-26Tenant complaint: PLUMBING — TOILET
2008-02-26Tenant complaint: PAINT/PLASTER — WALL
2008-02-26Tenant complaint: ELECTRIC — WIRING
2008-02-26Tenant complaint: NONCONST — VERMIN
2008-02-26Tenant complaint: GENERAL — FLOOR
2008-02-26Tenant complaint: NONCONST — VERMIN
2008-02-26Tenant complaint: GENERAL — FLOOR
2008-02-26Tenant complaint: ELECTRIC — WIRING
2008-02-24Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2008-02-24Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2008-02-24Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2008-02-08HPD litigation: Tenant Action
2008-02-07City emergency repair (OMO): public area: at basement shower: remove and replace broken or defective ceramic floor tiles, including plywood base. mak$640
2008-01-11HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE AT CELLAR
2008-01-11HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT BASEMENT STY ,AT SHOWER STALL ,CEILING AND WALLS AT
2008-01-11HPD class B: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE 1st ROOM FROM EAST LOCATE
2008-01-11HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES AT 1st WATER CLOSET COMPARTMENT FROM NORTH, 3rd STORY, SECTION AT SOUTHEA
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDING MATERIAL AT CEILING AT CELLAR
2008-01-11HPD class A: § 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE 1st ROOM FROM EAST LOCATED AT B-ROOM 2A, 1st STORY, 1st B-ROOM FROM NORTH AT EAST , SECTION AT
2008-01-11HPD class A: § 27-2005 ADM CODE PROVIDE A PROPER SEAT FOR WATER CLOSET .. AT 1st WATER CLOSET COMPARTMENT FROM NORTH, 3rd STORY, SECTION AT SOUTHEAST
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE BASEMENT STY,VINYL TILES AT WALLS AT 1st WATER CLOSET COMPARTMENT FROM NORTH, SECTION AT SOUTHE
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT 1st WATER CLOSET COMPARTMENT FROM NO
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT WEST WALL SHOWER STALL AT 2nd COMMUNITY BATHROOM FROM NO
2008-01-11HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITION INSTALLED AT WINDOW OF EGRESS TO FIRE ESCAPE IN THE 1st ROOM
2008-01-11HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE 1st ROOM FROM EAST LOCATED AT B-ROOM 2C, 1st STORY, 1st B-ROOM FROM
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASEMENT STY,AT SHOWER STALL,FIRE RETARDING MATERIAL AT CEI
2008-01-11HPD class B: § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW A
2008-01-11HPD class A: § 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE 1st ROOM FROM EAST LOCATED AT B-ROOM 2C, 1st STORY, 1st B-ROOM FROM NORTH AT EAST , SECTION AT
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYKL FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT B-R
2008-01-11HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE 1st ROOM FROM EAST LOCATED AT B-ROOM 2C, 1st STORY, 1st B-ROOM FRO
2008-01-11HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE 1st ROOM FROM EAST LOCATED AT B-ROOM 2C, 1st STORY, 1st B-ROOM FROM N
2008-01-11HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT BASEMENT STY ,SOUTH WALL AT PUBLIC HALL, SECTION AT
2008-01-11HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE 1st ROOM FROM EAST LOCATED AT B-ROOM 2A, 1st STORY, 1st B-ROOM FROM N
2008-01-11HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WALLS IN THE 1st ROOM FROM
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES AT PUBLIC HALL, 3rd STORY
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASEMENT STY,FIRE RETARDING MATERIAL AT SOUTH WALL AT PUBLI
2008-01-11HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS AT 1st WATER CLOSET COMPARTMENT F
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FLOOR HOLE AT NORTH EAST CORNER AT PUBLIC HALL, 3rd STORY, SECTION AT NORTHEAST
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FLOOR HOLE AT SOUTH WEST CORNER AT PUBLIC HALL, 3rd STORY
2008-01-11HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN BED BUGS IN THE 1st ROOM FROM EAST LOCATED AT B-ROOM 2A, 1st STORY, 1st B-ROOM FR
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASEMENT STY ,CEILING AND EAST WALL AT 1st WATER CLOSET COM
2008-01-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT B-RO
2008-01-11HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES AT CELLAR
2008-01-11HPD class B: § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW A
2008-01-11HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN WATER BUGS AT CELLAR
2008-01-10Tenant complaint: GENERAL — CERAMIC-TILE
2008-01-10Tenant complaint: PAINT/PLASTER — WALL
2008-01-10Tenant complaint: GENERAL — CERAMIC-TILE
2008-01-01Tenant complaint: HEATING — HEAT RELATED
2007
2007-12-10Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2007-12-07Tenant complaint: NONCONST — VERMIN
2007-12-07Permit PL — ISSUED
2007-12-07Permit EW — ISSUED
2007-11-21Tenant complaint: HEATING — HEAT RELATED
2007-11-20Tenant complaint: HEATING — HEAT RELATED
2007-11-17Tenant complaint: HEATING — HEAT RELATED
2007-11-05Job filed: REPLACE GAS BOILER (NYC BOILER NO. MD25771-01). NO CHAGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.$19,000
2007-10-29Tenant complaint: HEATING — HEAT RELATED
2007-10-10Job filed: A1$200,000
2007-10-04HPD litigation: Tenant Action
2007-09-27HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT COMMUNITY BATHROOM, 1st STORY
2007-08-18HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 1st STORY, 2nd APARTMENT FROM WES
2007-08-18HPD class B: § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW A
2007-08-14Tenant complaint: PLUMBING — BASIN/SINK
2007-08-14Tenant complaint: PLUMBING — BASIN/SINK
2007-08-10City emergency repair (OMO): payment purposes for the service charge to sj fuel.$100
2007-06-22City emergency repair (OMO): remove existing heating plant .supply/ install new gas boiler with coil to supply adequate heat and hot water to buildin$13,900
2007-06-22Tenant complaint: GENERAL — FIRE-ESCAPE
2007-06-22Tenant complaint: GENERAL — FIRE-ESCAPE
2007-06-22Tenant complaint: GENERAL — FIRE-ESCAPE
2007-06-12DOB violation C:
2007-06-11Tenant complaint: HEATING — HEAT RELATED
2007-06-07Tenant complaint: HEATING — HEAT RELATED
2007-06-01DOB complaint, category ?
2007-05-24Tenant complaint: HEATING — HEAT RELATED
2007-05-15Tenant complaint: CONSTRUCTION — PAVEMENT
2007-05-11City emergency repair (OMO): demo the existing fire escape at the rear side of the building. supply and install a new fire escape system at all floor$19,800
2007-05-09City emergency repair (OMO): provide fire watch (7) days a week (24) hours a dayuntil further notice. note: contractor must sign and return with bids
2007-05-09HPD litigation: Tenant Action
2007-05-09Tenant complaint: GENERAL — FIRE-ESCAPE
2007-05-08ECB Hazardous violation: FAILURE TO MAINTAIN.DEFECTS NOTED:FIRE ESCAPE AT REAR OF BLDG/EXPOSURE(3)PARTIALLY COLLAPSE AT 2FL LEVEL THE REST OF FIRE ESCAPE R$800
2007-05-08ECB Hazardous violation: FAILURE TO PROVIDE AT LEAST 2 MEANS OF EGRESS FROM ROOM SPACE AS REQUIREMENTS.NOTED:REAR FIRE ESCAPE PARTIALLY COLLAPSED.NO 2 MEAN$480
2007-05-08DOB complaint, category ?
2007-04-11DOB violation C:
2007-04-11DOB complaint, category ?
2007-01-19DOB violation LL6291:
2007-01-18Tenant complaint: PLUMBING — BASIN/SINK
2007-01-18Tenant complaint: PLUMBING — BASIN/SINK
2006
2006-10-13HPD litigation: Comprehensive
2006-05-22AL&R $800,000 — from NEW YORK COMMUNITY BANK to 246-18 REALTY LLC$800,000
2006-05-22Mortgage $800,000 — from 246-18 REALTY LLC to NEW YORK COMMUNITY BANK$800,000
2006-03-28City emergency repair (OMO): public area: remove approx (60cubic yards) of debris from cellar. note: contractor must sign and return with bids. contr$3,200
2006-03-27AL&R $1,000,000 — from NEW YORK COMMUNITY BANK to 246-18 REALTY LLC$1,000,000
2006-03-27Mortgage $182,395 — from 246-18 REALTY LLC to NEW YORK COMMUNITY BANK$182,395
2006-03-27Mortgage assigned — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to NEW YORK COMMUNITY BANK
2006-03-27Agreement $1,000,000 — from NEW YORK COMMUNITY BANK to 246-18 REALTY LLC$1,000,000
2006-03-17City emergency repair (OMO): public area: repair shoe at drop ladder front fire escape. note: contractor must sign and return with bids. *if landlord$300
2006-03-11HPD class B: § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW A
2006-03-11HPD class B: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BULKHEAD ROOF
2006-03-11HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER INSTALLED AT EGRESS WINDOW IN THE ROOM LOCATED AT B-ROOM 3
2006-03-03HPD class C: § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE HOUSE HOLE ITEMS-BOXES
2006-03-03HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXCESSIVE HOUSE HOLE ITEMS BLOCKING EXIT TO FIRE ESCAPE IN THE ROOM LOCATE
2006-01-06DOB violation LL6291:
2006-01-05Tenant complaint: HEATING — HEAT RELATED
2005-12-29Tenant complaint: GENERAL — CERAMIC-TILE
2005-12-29Tenant complaint: GENERAL — DOORS
2005-12-29Tenant complaint: PLUMBING — RADIATOR
2005-12-29Tenant complaint: PAINT/PLASTER — WALL
2005-12-29Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2005-12-29Tenant complaint: GENERAL — CABINET
2005-12-29Tenant complaint: PLUMBING — BASIN/SINK
2005-10-27Tenant complaint: HEATING — HEAT RELATED
2005-09-25HPD class A: § 27-2005 ADM CODE REFIT DOOR IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
2005-09-16Tenant complaint: GENERAL — FLOOR
2005-09-16Tenant complaint: GENERAL — DOORS
2005-09-16Tenant complaint: PAINT/PLASTER — WALL
2005-09-16Tenant complaint: PAINT/PLASTER — WALL
2005-09-16DOB complaint, category ?
2005-02-11Tenant complaint: HEATING — HEAT RELATED
2005-01-31DOB violation LL6291:
2004
2004-11-08Tenant complaint: HEATING — HEAT RELATED
2004-02-13Job filed: TO CONVERT THE EXISTING STRUCTURE FROM S RO INTO ONE FAMILY AND COMMUNIT FACILITY AT FIRST FLOOR. NEW PLUMBING F IXTURES AS PER PLANS FILED HEREWITH.$20,000
2004-02-13Job filed: TO CONVERT THE EXISTING STRUCTURE FROM S RO INTO ONE FAMILY AND COMMUNIT FACILITY AT FIRST FLOOR. NEW PLUMBING F IXTURES AS PER PLANS FILED HEREWITH.$20,000
2004-01-24Tenant complaint: HEATING — HEAT RELATED
2004-01-21Tenant complaint: HEATING — HEAT RELATED
2004-01-14Tenant complaint: HEATING — HEAT RELATED
2003
2003-12-26Tenant complaint: HEATING — HEAT RELATED
2003-12-25Tenant complaint: HEATING — HEAT RELATED
2003-02-04ECB Hazardous violation: B4B-BQ9-6B-16-32A-34A-34B-36-40-45A-50A-50B-50C-50D-50E-45B-48A. BQ9 - WEIL MCLAIN BOILER MUST BE LEGALIZED. 32A - MISSING AQUASTA
2002
2002-03-26DOB violation LL6291:
2001
2001-11-01Agreement — from 246-18 REALTY LLC to DIME SAVINGS BANK OFWILLIAMSBURGH
2001-11-01Mortgage $220,623 — from 246-18 REALTY LLC to DIME SAVINGS BANK OFWILLIAMSBURGH$220,623
2001-11-01SAGE — from M&T REAL ESTATE, INC.
2001-11-01Deed — from 18 STREET REALTY ASSOCIATES to 246-18 REALTY LLC
2001-11-01Mortgage assigned — from M&T REAL ESTATE, INC. to DIME SAVINGS BANK OFWILLIAMSBURGH
2001-02-27DOB violation LL6291:
1999
1999-08-19DOB complaint, category ?
1999-07-29DOB complaint, category ?
1999-07-21DOB complaint, category ?
1999-07-21DOB complaint, category ?
1999-07-20Permit EW — ISSUED
1999-05-18DOB complaint, category ?
1999-01-19HPD class B: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ROOF DOOR.
1999-01-19HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ROOF DOOR HANDLE MISSING.
1998
1998-11-19HPD class A: § 27-2026 ADM CODE PROVIDE A SUITABLE STRAINER FOR THE DRAIN SOUTH DOOR AT ROOF.
1998-08-13Mortgage $368,218 — from 18 STREET REALTY ASSOCIATES to M&T REAL ESTATE, INC.$368,218
1998-08-13Agreement — from 18 STREET REALTY ASSOCIATES to M&T REAL ESTATE, INC.
1998-08-13SAGE — from DIME SAVINGS BANK OFNEW YORK
1998-08-13Mortgage assigned — from DIME SAVINGS BANK OFNEW YORK to M&T REAL ESTATE, INC.
1998-08-13Mortgage assigned — from 18 STREET REALTY ASSOCIATES to M&T REAL ESTATE, INC.
1997
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1996
1996-07-09HPD class C: § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING 2 ROOM FROM FRONT 3 STY NORTHWEST A
1996-07-09HPD class C: § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT NORTH WALL BATHROOM 3 STY NORTHWEST APT 7 E
1996-07-09HPD class C: § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT EAST WALL AND NORTH WALL UNDER SINK KITCHEN
1996-07-09HPD class C: § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT HEAT RISER FRONT ROOM 3 STY NORTHWEST APT 7
1995
1995-08-29DOB violation LL6291:
1995-03-21DOB complaint, category ?
1994
1994-10-13Mortgage $290,000 — from 18 STREET REALTY ASSOCIATES to BANKERS FEDERAL SAVINGS$290,000
1994-10-13Deed — from VELEZ, JULISSA DEF; AJAX ROOFING & CONSTRUCTION CORP; VELEZ, ZORAIDA DEF; EVENS, LESTER RE to 18 STREET REALTY ASSOCIATES
1994-10-13Mortgage assigned — from 18 STREET REALTY ASSOCIATES to BANKERS FEDERAL SAVINGS FSB
1993
1993-04-22Permit EW — ISSUED
1993-04-22Permit PL — ISSUED
1993-04-22Permit EW — ISSUED
1993-03-18DOB violation LL6291:
1989
1989-09-20HPD class A: § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKIN
1989-09-20HPD class A: § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKIN
1989-09-20HPD class A: § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKIN
1987
1987-09-22Deed — from CHELSEA ASSOCIATES to 246 WEST 18TH ST ASSOC
1987-09-22Mortgage $180,000 — from 246 WEST 18TH ASSOC to CHELSEA ASSOCIATES$180,000
1987-03-02Agreement — from CHELSEA ASSOCIATES to BANKERS FDRL SVG&LNASSN
1986
1986-10-21Mortgage assigned — from 246 REALTY CO. to BANKERS FEDL SAVGS ETC.
1986-10-21Mortgage assigned — from SACKS, MARTIN; NEWMAN, PETER to BANKERS FDRL SVG&LNASSN
1986-10-21Mortgage $63,222 — from CHELSEA ASSOCIATES to BANKERS FEDL SAVGS ETC.$63,222
1986-10-21Mortgage assigned — from CHELSEA ASSOCIATES to BANKERS FDRL SVG&LNASSN
1986-10-21Mortgage assigned — from LEFKOVITS, LEOPOLD; LEFKOVITS, EUGENE; LEFKOVITS, CHAIM to BANKERS FEDL SAVGS ETC.
1985
1985-03-14Mortgage assigned — from 246 WEST 18TH ASSOC. to NEWMAN, PETER; SACKS, MARTIN
1984
1984-08-21Deed — from 246 WEST 18TH ST ASSOC to CHELSEA ASSOCIATES
1984-08-21Mortgage $95,000 — from CHELSEA ASSOCIATES to 246 W 18TH STREET ASSOC$95,000
1984-03-28Mortgage satisfied — from 246 W.18TH ST. RLTYCP. to DELTA RLTY INVESTINGCP.
1982
1982-08-26Deed — from 246 REALTY COMPANY to 246 W 18TH ST ASSOCIATES
1982-08-26Mortgage $205,000 — from 246 W.18 ST.ASSOCIATES to 246 REALTY COMPANY$205,000
1979
1979-12-10Deed — from 246 W 18 ST REALTY CORP to 246 REALTY CO
1978
1978-08-17Mortgage — from 246 W 18 ST REALTY CORP to LEFKOVITS, LEOPOLD; LEFKOVITS, CHAIM; LEFKOVITS, EUGENE
1978-08-17Mortgage — from 246 W 18 ST REALTY CORP to DELTA REALTY INVESTING
1978-08-17Mortgage assigned — from IRVINE, RUTH I to LEFKOVTIS, EUGENE; LEFKOVITS, CHAIM
1978-08-17Deed — from LEFKOVITS, LEOPOLD; LEFKOVITS, EUGENE; LEFKOVITS, CHAIM to 246 W 18 ST REALTY CORP
1978-08-02Deed — from LEFTEX CORP to LEFKOVITS, EUGENE; LEFKOVITS, LEOPOLD; LEFKOVITS, CHAIM