A modest record — below the level that usually signals systemic problems. More recorded distress than 67% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 37.6. In ZIP 10014, 69% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
15 total — 6 class C (immediately hazardous), 8 class B, 1 class A. Oldest open since 2006-10-20.
status snapshot refreshed weekly from HPD records
Patterns
14 heat or hot-water complaints in the last three years (winter 2023–24: 10 · winter 2025–26: 4). Repeated winter clusters suggest a chronic heating problem.
10
’23–24
4
’25–26
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
28 service requests in the last three years. Most common: Rodent (7) · HEAT/HOT WATER (6) · Noise (4) · GENERAL (2) · UNSANITARY CONDITION (2) · Sewer (2).
Filed construction activity
$405,248 in permitted construction work filed since
2016 (8 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1914)
Yes
Six or more residential units (20)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
ALTA VISTA CONDO
Head officer
IAN TWINN
Managing agent
MD Squared Property Group
Last registered
2025-08-01
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$216,213
$97,295
2026
$16,236
$7,306
2027
$232,092
$104,441
The city's market estimate has risen
7% between tax years 2025 and 2027.
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2021 estimate: gross income $743,952 a year
($54.51 per sq ft), operating expenses $200,899
($14.72 per sq ft), net operating income $543,054. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NO2FUEL
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Christopher St-Stonewall — 1 · 800 ft straight-line (about a 4-minute walk) · station accessibility: none 14 St — 1 2 3 F L M · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Hudson St / Perry St — M20 · 250 ft
Citi Bike
Perry St & Bleecker St · 100 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
28 311 service requests from this address in the last three years — 6 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2023-12-08Mortgage assigned — from JPMORGAN CHASE BANK NA; FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-16Mortgage assigned — from FIRST REPUBLIC BANK; JPMORGAN CHASE BANK NA; FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-16Boiler inspection
2023-11-13311: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-13HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT VESTIBULE DOOR AT PUBLIC HALL, 1st
2023-11-13HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 14, 5th STORY, 1st APARTMENT
2023-11-13HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 14, 5th STORY, 1st APARTMENT FROM SOUT
2023-11-13HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM AT BASEMENT
2023-11-13HPD class C: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 14, 5th STORY, 1st APARTMENT FRO
2023-11-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-11311: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-10HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2023-11-10HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1s
2023-11-10HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 10, 4th STORY, 1st APARTMENT FROM NOR
2023-11-08311: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-06HPD class C: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM
2023-11-03311: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-03311: GENERAL — COOKING GAS
2023-11-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-03Tenant complaint: GENERAL — COOKING GAS
2023-11-01RPTT $15,536,430 — from MEMBERS OF BP US REIT LLC to BPR HOLDING REIT I LLC$15,536,430
2023-11-01RPTT $15,536,430 — from MEMBERS OF BP US REIT LLC to BPR HOLDING REIT I LLC$15,536,430
2023-11-01RPTT $15,536,430 — from MEMBERS OF BP US REIT LLC to BPR HOLDING REIT I LLC$15,536,430
2023-11-01RPTT $15,536,430 — from MEMBERS OF BP US REIT LLC to BPR HOLDING REIT I LLC$15,536,430
2023-10-11311: Litter Basket Request — New Basket
2023-09-13311: Obstruction — Trash or Recycling
2023-08-19311: Noise - Helicopter — Other
2023-08-16Permit General Construction — Signed-off
2023-08-14DOB complaint, category ?
2023-08-08PAT — from MOSS, DENA SIMONE to BOARD OF MANAGERS OF THE ALTAVISTA CONDO; 382/384 BLEECKER, LLC
2023-08-08Deed $1,100,000 — from UNIT 3 PERRY STREET, LLC to THIM SAS$1,100,000
2023-07-28311: Illegal Dumping — Removal Request
2023-07-21Mortgage assigned — from GREENWICH REVOLVING TRUST to CIM TRUST 2020-R5; U.S. BANK NATIONAL ASSOCIATION,TRUSTEE
2023-07-12Sold for $1,100,000$1,100,000
2023-06-23311: Noise - Helicopter — Other
2023-06-14LOCC — from LUMPKIN, JOHN ANDREW to THE BOARD OF MANAGERS OF THE ALTAVISTA C
2023-06-01Job filed: Replace existing PL fixtures for unit 15 at 5th floor. All work is in conjunction with M00710179$18,000
2023-05-30DOB complaint, category ?
2023-05-06Permit General Construction — Permit Issued
2023-04-20Job filed: NEW WALLS/ FITTING ROOMS, DISPLAY FIXTURES, ELECTRICAL OUTLETS, LIGHTING, FLOORING & PAINT. NO CHANGE TO USE OR EGRESS UNDER THIS APPLICATION.$229,840
2023-04-03Bedbug filing: 0 infested units
2023-03-23Rodent inspection: Passed
2023-02-12311: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-08311: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-08311: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-01-11311: HEAT/HOT WATER — ENTIRE BUILDING
2023-01-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-01-10Bedbug filing: 0 infested units
2022
2022-12-25311: HEAT/HOT WATER — ENTIRE BUILDING
2022-12-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-21Permit General Construction — Signed-off
2022-10-03311: HEAT/HOT WATER — ENTIRE BUILDING
2022-10-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-09-12Mortgage satisfied — from LUMPKIN, JOHN to NYC COMMISSIONER OF SOCIAL SERVICES
2022-04-27Rodent inspection: Passed
2022-04-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2022-03-31Job filed: Interior Renovation of Unit 15 at 5th Floor. New flooring, cabinets, ceiling and tiles. Plumbing will be filed under separate application.$40,000
2022-03-31Job filed: Replace existing PL fixtures for unit 15 at 5th floor. All work is in conjunction with M00710179$18,000
2022-03-28311: HEAT/HOT WATER — ENTIRE BUILDING
2022-03-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-02-28Mortgage $8,361 — from REIBSTEIN, NANCY to DIME COMMUNITY BANK$8,361
2022-02-28Agreement $470,000 — from REIBSTEIN, NANCY to DIME COMMUNITY BANK$470,000
2022-02-16Bedbug filing: 0 infested units
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-03ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED DAMAGED STAIR TREAD TO THE FIRE ESCAPE BE$1,250
2022-02-03DOB violation C: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED DAMAGED STAIR TREAD TO THE FIRE ESCAPE
2022-01-31DOB complaint, category ?
2021
2021-12-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-12-08Agreement $899,677 — from NGUYEN VENTURES LLC to FIRST REPUBLIC BANK$899,677
2021-12-06311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2021-12-06DOB complaint, category ?
2021-12-02Boiler inspection
2021-11-27311: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-10Mortgage $5,081 — from NGUYEN VENTURES LLC to FIRST REPUBLIC BANK$5,081
2021-10-05Mortgage $1,180,000 — from NGUYEN PROPERTIES LLC to FIRST REPUBLIC BANK, A STATE BANK$1,180,000
2021-10-05PAT — from NGUYEN PROPERTIES LLC to THE ALTAVISTA CONDOMINIUM; THE ALTAVISTA CONDOMINIUM; THE ALTAVISTA CONDOMINIUM
2021-10-05Deed $1,475,000 — from JAEHNERT, FRANK; JAEHNERT, BETTINA to NGUYEN PROPERTIES LLC$1,475,000
2021-10-05PAT — from JAEHNERT, BETTINA to LANGONE, PETER
2021-10-05PAT — from JAEHNERT, BETTINA to LANGONE, PETER
2021-09-14Sold for $1,475,000$1,475,000
2021-08-20Rodent inspection: Passed
2021-08-02PAT — from HELMERS, LEO A; HELMERS, STACEY G to THE ALTAVISTA CONDOMINIUM
2021-08-02Deed $1,489,000 — from BRUSS, KATHRIN to HELMERS, STACEY G; HELMERS, LEO A$1,489,000
2021-08-02PAT — from BRUSS, KATHRIN to SNYDER, ALISON
2021-07-09Sold for $1,489,000$1,489,000
2021-06-16311: Noise — Noise: Construction Equipment (NC1)
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-31City emergency repair (OMO): division nyc - ''essential hpd emergency operations service work'' install hinges to make door self-closing arrange and $334
2021-03-29311: HEAT/HOT WATER — ENTIRE BUILDING
2021-03-29HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2021-03-29HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2021-03-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-03-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-03-02HPD class C: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS , IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT
2021-03-02HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2021-03-02HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2021-02-27311: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-21Mortgage $213,734 — from REIBSTEIN, NANCY to DIME COMMUNITY BANK$213,734
2019-11-21Agreement $480,000 — from REIBSTEIN, NANCY to DIME COMMUNITY BANK$480,000
2019-11-21Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to DIME COMMUNITY BANK
2019-11-04311: HEAT/HOT WATER — ENTIRE BUILDING
2019-11-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2019-10-25HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-10-06311: Dirty Conditions — E1A Litter Basket / Improper Use
2019-08-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-08-21311: Illegal Parking — Blocked Bike Lane
2019-08-06311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-08-02Permit EW — ISSUED
2019-07-27311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-07-25311: General Construction/Plumbing — Building Permit - None
2019-07-25DOB complaint, category ?
2019-07-20311: General Construction/Plumbing — Building Permit - None
2019-07-20DOB complaint, category ?
2019-07-17311: General Construction/Plumbing — Building Permit - None
2019-07-07311: General Construction/Plumbing — Building Permit - None
2019-07-07311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-07-07DOB complaint, category ?
2019-07-07DOB complaint, category ?
2019-06-26311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2019-06-26DOB complaint, category ?
2019-06-08311: Consumer Complaint — Retail Store
2019-05-31311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-05-23Boiler inspection
2019-05-21Rodent inspection: Passed
2019-04-22M&CON $517,586 — from LUMPKIN, JOHN ANDREW to SELENE FINANCE LP; U.S. BANK NATIONAL ASSOCIATION$517,586
2019-04-17311: General Construction/Plumbing — Building Permit - None
2019-04-17DOB complaint, category ?
2019-04-15Permit EW — ISSUED
2018
2018-12-19PAT — from BONETTI, FABIO to ESPOSITO, GIANLUIGI; OPPOLITI, NICCOLO
2018-12-19Deed $1,350,000 — from BENASSI, MARCO to BONETTI, FABIO$1,350,000
2018-12-19PAT — from BENASSI, MARCO to CONTE, MICAELA
2018-12-11Sold for $1,350,000$1,350,000
2018-10-05HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-10-04311: New Tree Request — For One Address
2018-09-12DOB complaint, category ?
2018-08-14Mortgage $349,495 — from NGUYEN VENTURES LLC to FIRST REPUBLIC BANK$349,495
2018-08-14Agreement $955,500 — from NGUYEN VENTURES LLC to FIRST REPUBLIC BANK$955,500
2018-08-14PAT — from NGUYEN VENTURES LLC to 382/384 BLEECKER, LLC; BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2018-08-14Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to FIRST REPUBLIC BANK
2018-08-14Deed $1,365,000 — from THOMAS HO LEE (AS TRUSTEE); THE TXL REVOCABLE TRUST AGREEMENT DATED to NGUYEN VENTURES LLC$1,365,000
2018-08-10Rodent inspection: Passed
2018-08-07Permit EW — ISSUED
2018-07-26Sold for $1,365,000$1,365,000
2018-07-23Rodent inspection: Failed for Other Reason
2018-07-17HPD class B: § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AN
2018-05-01SPRD $20,500,000 — from BOP 387 BLEECKER STREET LLC; BOP 350 BLEECKER STREET LEASEHOLD LLC; BOP 367-369 BLEECKER S to EMIGRANT BANK$20,500,000
2018-05-01Deed $9,035,503 — from ARC NYBLKST002, LLC to BOP 382-384 BLEECKER STREET LLC$9,035,503
2018-05-01TL&R — from COLUMN FINANCIAL, INC. to ARC NYBLKST002, LLC
2018-05-01Deed $9,035,503 — from ARC NYBLKST002, LLC to BOP 382-384 BLEECKER STREET LLC$9,035,503
2018-05-01AL&R $20,500,000 — from BOP 382-384 BLEECKER STREET LLC; BOP 367-369 BLEECKER STREET LLC; BOP 387 BLEECKER STREET to EMIGRANT BANK$20,500,000
2018-05-01Mortgage assigned — from COLUMN FINANCIAL, INC. to EMIGRANT BANK
2018-05-01Mortgage assigned — from COLUMN FINANCIAL, INC. to EMIGRANT BANK
2018-05-01Mortgage assigned — from COLUMN FINANCIAL, INC. to EMIGRANT BANK
2018-05-01TL&R — from COLUMN FINANCIAL, INC. to ARC NYBLKST002, LLC
2018-05-01AL&R $20,500,000 — from BOP 382-384 BLEECKER STREET LLC; BOP 367-369 BLEECKER STREET LLC; BOP 387 BLEECKER STREET to EMIGRANT BANK$20,500,000
2018-05-01PAT — from BOP 382-384 BLEECKER STREET LLC to 382/384 BLEECKER, LLC; THE COMMERCIAL UNIT OWNER, EACH AUTHORIZ; BOARD OF MANAGERS OF THE
2018-05-01SPRD $20,500,000 — from BOP 387 BLEECKER STREET LLC; BOP 350 BLEECKER STREET LEASEHOLD LLC; BOP 367-369 BLEECKER S to EMIGRANT BANK$20,500,000
2018-05-01PAT — from BOP 382-384 BLEECKER STREET LLC to 382/384 BLEECKER, LLC; THE COMMERCIAL UNIT OWNER, EACH AUTHORIZ; BOARD OF MANAGERS OF THE
2018-05-01PREL — from COLUMN FINANCIAL, INC. to ARC NYCTGRG001, LLC; ARC NY120W5701 TRS, LLC; ARC NYW42ST001, LLC; 50 VARICK LLC; ARC NYS1
2018-05-01AL&R $20,500,000 — from BOP 382-384 BLEECKER STREET LLC; BOP 367-369 BLEECKER STREET LLC; BOP 387 BLEECKER STREET to EMIGRANT BANK$20,500,000
2018-05-01SPRD $20,500,000 — from BOP 387 BLEECKER STREET LLC; BOP 350 BLEECKER STREET LEASEHOLD LLC; BOP 367-369 BLEECKER S to EMIGRANT BANK$20,500,000
2018-05-01PREL — from COLUMN FINANCIAL, INC. to ARC NYCTGRG001, LLC; ARC NY120W5701 TRS, LLC; ARC NYW42ST001, LLC; 50 VARICK LLC; ARC NYS1
2018-05-01PREL — from COLUMN FINANCIAL, INC. to ARC NYCTGRG001, LLC; ARC NY120W5701 TRS, LLC; ARC NYW42ST001, LLC; 50 VARICK LLC; ARC NYS1
2018-05-01TL&R — from COLUMN FINANCIAL, INC. to ARC NYBLKST002, LLC
2018-05-01SPRD $20,500,000 — from BOP 387 BLEECKER STREET LLC; BOP 350 BLEECKER STREET LEASEHOLD LLC; BOP 367-369 BLEECKER S to EMIGRANT BANK$20,500,000
2018-05-01TL&R — from COLUMN FINANCIAL, INC. to ARC NYBLKST002, LLC
2018-05-01Mortgage assigned — from COLUMN FINANCIAL, INC. to EMIGRANT BANK
2018-05-01Deed $9,035,503 — from ARC NYBLKST002, LLC to BOP 382-384 BLEECKER STREET LLC$9,035,503
2018-05-01Deed $9,035,503 — from ARC NYBLKST002, LLC to BOP 382-384 BLEECKER STREET LLC$9,035,503
2018-05-01PREL — from COLUMN FINANCIAL, INC. to ARC NYCTGRG001, LLC; ARC NY120W5701 TRS, LLC; ARC NYW42ST001, LLC; 50 VARICK LLC; ARC NYS1
2018-05-01AL&R $20,500,000 — from BOP 382-384 BLEECKER STREET LLC; BOP 367-369 BLEECKER STREET LLC; BOP 387 BLEECKER STREET to EMIGRANT BANK$20,500,000
2018-05-01PAT — from BOP 382-384 BLEECKER STREET LLC to 382/384 BLEECKER, LLC; THE COMMERCIAL UNIT OWNER, EACH AUTHORIZ; BOARD OF MANAGERS OF THE
2018-05-01PAT — from BOP 382-384 BLEECKER STREET LLC to 382/384 BLEECKER, LLC; THE COMMERCIAL UNIT OWNER, EACH AUTHORIZ; BOARD OF MANAGERS OF THE
2018-04-20PAT — from SCHUETZ, FLORIAN to GREENE, JOSHUA
2018-04-20PAT — from BRUSS, KATHRIN to FELDMAN, MICHAEL R
2018-04-20Deed $1,350,000 — from SCHUETZ, FLORIAN to BRUSS, KATHRIN$1,350,000
2018-04-20PAT — from BRUSS, KATHRIN to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2018-04-19Deed transfer (nominal price)
2018-04-19Deed transfer (nominal price)
2018-04-19Sold for $9,035,503$9,035,503
2018-04-19Deed transfer (nominal price)
2018-04-12Sold for $1,350,000$1,350,000
2018-02-06Job filed: MINOR INTERIOR RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$24,408
2017
2017-11-08311: New Tree Request — For One Address
2017-11-06PAT — from WACO ENTERPRISES, LLC to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2017-11-06Deed $1,260,000 — from VIS PUGNANDI SRL to WACO ENTERPRISES, LLC$1,260,000
2017-10-23Sold for $1,260,000$1,260,000
2017-10-10PAT — from JAEHNERT, FRANK M to HEIBERGER HARRISON, JAMIE L; CARCHEDI, BRIAN A
2017-10-10Deed $1,330,000 — from CALABI, CLAUDIO to JAEHNERT, FRANK M; JAEHNERT, BETTINA$1,330,000
2017-10-10PAT — from CALABI, CLAUDIO ROBERTO to KOTLAREWSKI, AURELIA DEBIAZE; DUARTE, LORENA
2017-10-10PAT — from JAEHNERT, BETTINA to HEIBERGER HARRISON, JAMIE L; CARCHEDI, BRIAN A
2017-10-10PAT — from JAEHNERT, BETTINA; JAEHNERT, FRANK M to THE ALTAVISTA CONDOMINIUM BOARD
2017-09-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017-09-28Sold for $1,330,000$1,330,000
2017-09-15Boiler inspection
2017-08-04LOCC — from LUMPKIN, JOHN ANDREW to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2017-07-19Rodent inspection: Passed
2017-05-17Mortgage satisfied — from PREUSS, F DOMINIC to UBS MORTGAGE LLC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; AS NOMINEE FOR MORGAN STANLEY
2017-05-16PAT — from PREUSS, FRANCIS DOMINIC to LIPSIG, DIANA ESQ
2017-05-16Deed $999,000 — from PREUSS, F. DOMINIC; PREUSS, FRANCIS DOMINIC to NEISE, PATRICK; NEISE, SUSANNE$999,000
2017-05-16PAT — from NEISE, SUSANNE; NEISE, PATRICK to BOARD OF MANAGERS
2017-05-16Mortgage $50,000 — from LUMPKIN, JOHN to NYC COMMISSIONER OF SOCIAL SERVICES$50,000
2017-05-04Sold for $999,000$999,000
2017-01-25AL&R $500,000,000 — from ARC NYBLKST002, LLC to COLUMN FINANCIAL, INC.$500,000,000
2017-01-25AL&R $500,000,000 — from ARC NYBLKST002, LLC to COLUMN FINANCIAL, INC.$500,000,000
2017-01-25AL&R $500,000,000 — from ARC NYBLKST002, LLC to COLUMN FINANCIAL, INC.$500,000,000
2017-01-25AL&R $500,000,000 — from ARC NYBLKST002, LLC to COLUMN FINANCIAL, INC.$500,000,000
2016-09-15Mortgage $4,634 — from THE TXL REVOCABLE TRUST; LEE, TRUSTEE, THOMAS HO to JPMORGAN CHASE BANK, N.A.$4,634
2016-09-15Mortgage assigned — from FIRST REPUBLIC BANK to JPMORGAN CHASE BANK, N.A.
2016-09-15Agreement $630,116 — from THE TXL REVOCABLE TRUST; LEE, TRUSTEE, THOMAS HO to JPMORGAN CHASE BANK, N.A.$630,116
2016-09-08FDNY inspection (COM_OCPCY)
2016-08-31PAT — from SCHUETZ, FLORIAN to GREENE, ESQ., JOSHUA
2016-08-31Deed $1,375,000 — from OLDFIELD, JENNIFER LISTER; OLDFIELD, ANTHONY to SCHUETZ, FLORIAN$1,375,000
2016-08-31PAT — from SCHUETZ, FLORIAN to EACH COMMERCIAL UNIT OWNER; BOARD OF MANAGERS OF THE ALTAVISTA CONDO; 382/384 BLEECKER, LL
2016-08-25FDNY inspection (COM_OCPCY)
2016-08-17FDNY inspection (COM_OCPCY)
2016-08-11FDNY inspection (RISK)
2016-07-14311: Homeless Person Assistance — N/A
2016-07-01Permit PL — ISSUED
2016-06-16Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to BANK OF AMERICA, N.A.
2016-06-15Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to BANK OF AMERICA, N.A.
2016-06-14Permit EW — ISSUED
2016-06-12311: Noise — Noise: Construction Before/After Hours (NM1)
2016-06-11311: Emergency Response Team (ERT) — After Hours Work - Illegal
2016-06-11DOB complaint, category ?
2016-06-10Permit PL — ISSUED
2016-05-28311: Noise — Noise: Construction Before/After Hours (NM1)
2016-05-19Permit EW — ISSUED
2016-05-17Job filed: FILING FOR REPLACEMENT OF PLUMBING FIXTURES WITH NEW WITH MINOR RENOVATION, NO CHANGE TO USE EGRESS OR OCCUPANCY$25,000
2016-05-17Job filed: FILING FOR REPLACEMENT OF PLUMBING FIXTURES WITH NEW,WITH MINOR RENOVATION NO CHANGE TO USE EGRESS OR OCCUPANCY$25,000
2016-05-17Job filed: FILING FOR REPLACEMENT OF PLUMBING FIXTURES WITH NEW WITH MINOR RENOVATION, NO CHANGE TO USE EGRESS OR OCCUPANCY$25,000
2016-04-26Sold for $1,375,000$1,375,000
2016-04-18311: Emergency Response Team (ERT) — After Hours Work - Illegal
2016-04-18311: Noise — Noise: Construction Before/After Hours (NM1)
2016-04-18DOB complaint, category ?
2016-04-11DOB complaint, category ?
2016-03-24ECB CLASS - 2 violation: WORK W/O A PERMIT.NOTED: AT 6TH FL APT 21 COMPELTE RENOVATION OF APT/REMOVED/INSTALLED NEW PLUMBING WATER AND WASTE LINES,NEW BATH$400
2015-10-13Agreement $18,000,000 — from ARC NYBLKST002, LLC to CAPITAL ONE, NATIONAL ASSOCIATION$18,000,000
2015-10-13Mortgage assigned — from U. S. BANK NATIONAL ASSOCIATION, AS TRUS to CAPITAL ONE, NATIONAL ASSOCIATION
2015-10-13Mortgage assigned — from U. S. BANK NATIONAL ASSOCIATION, AS TRUS to CAPITAL ONE, NATIONAL ASSOCIATION
2015-10-13Deed — from ARC NYBLKST004, LLC to ARC NYBLKST002, LLC
2015-10-13Agreement $18,000,000 — from ARC NYBLKST002, LLC to CAPITAL ONE, NATIONAL ASSOCIATION$18,000,000
2015-10-13Deed — from ARC NYBLKST003, LLC to ARC NYBLKST002, LLC
2015-10-13Agreement $18,000,000 — from ARC NYBLKST002, LLC to CAPITAL ONE, NATIONAL ASSOCIATION$18,000,000
2015-10-13Mortgage assigned — from U. S. BANK NATIONAL ASSOCIATION, AS TRUS to CAPITAL ONE, NATIONAL ASSOCIATION
2015-10-13Agreement $18,000,000 — from ARC NYBLKST002, LLC to CAPITAL ONE, NATIONAL ASSOCIATION$18,000,000
2015-10-13Mortgage assigned — from U. S. BANK NATIONAL ASSOCIATION, AS TRUS to CAPITAL ONE, NATIONAL ASSOCIATION
2015-10-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2014-09-18311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2014-09-18ECB CLASS - 1 violation: LICENSED RIGGER FAILED TO ENSURE SCAFFOLD WORKER MET MINIMUM REQUIREMENTS. NOTED: 2 WORKERS DID NOT HAVE A CERT OF FITNESS ISSUED $1,600
2014-09-18ECB CLASS - 2 violation: THE PERMIT HOLDER OR PERSON DIRECTLY IN CHARGE OF ANY SUSPENDED SCAFFOLD SHALL NOTIFY THE DEPT PRIOR TO INSTALLATION. NOTED: AT TI$400
2014-09-18ECB CLASS - 1 violation: SEC. 3314.10.10 PSWO (SUSPENDED SCAFFOLD) ISSUED PURSUANT TO 28-2072 POSTED NO DESIGN DRAWING FOR PARPET CLAMPS. NOTED: DURRING IN$1,600
2014-09-18ECB CLASS - 2 violation: SEC. 3307.6.4.5 WHERE THE EDGE OF THE SIDEWALK SHED (ABUTS) BLDG,THE DECKING SHALL BE BROUGHT TIGHT TO THE FACE OF THE BLDG. NOTED$2,400
2014-09-18ECB CLASS - 1 violation: SEC. 3314.4.7 WORKERS WHO USE SUSPENSION SCAFFOLD SHALL MEET THE REQUIREMENTS SET 4TH IN RULES PROMULGATED BY THE COMMISSIONER. NO$1,600
2014-09-04Mortgage satisfied — from YEN, HELEN; LAM, STEPHEN W to TD BANK, N.A.
2014-08-15Permit EW — ISSUED
2014-08-13Job filed: GENERAL CONSTRUCTION TO INCLUDE RAILING AND ROOF TILE INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$74,725
2014-08-13Job filed: GENERAL CONSTRUCTION TO INCLUDE RAILING AND ROOF TILE INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$74,725
2014-08-08PAT — from YEN, HELEN S to ROSHCO, DANIEL S
2014-08-08PAT — from TWINN, IAN to THE ALTAVISTA CONDOMINIUM
2014-08-08Mortgage $580,000 — from TWINN, IAN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$580,000
2014-08-08Deed $830,000 — from YEN, HELEN S; LAM, STEPHEN W to TWINN, IAN$830,000
2014-08-08PAT — from LAM, STEPHEN W to ROSHCO, DANIEL S
2014-07-03Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY
2014-07-02Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2014-06-17Permit PL — ISSUED
2014-06-17Permit EW — ISSUED
2014-05-19Job filed: INSTALL A/C SPLIT-SYSTEM WITH CONDENSER ON ROOF AT PARTIAL FIFTH FLOOR (APT 17) AS PER PLANS FILED HEREWITH; NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2014-05-13Permit EW — ISSUED
2014-05-12Job filed: INTERIOR RENOVATION OF PARTIAL 5TH FLOOR, APARTMENT 17: REMOVE AND REPLACE NON-BEARING PARTITIONS AND PLUMBING AS PER PLANS FILED HEREWITH; NO CHANGE $50,750
2014-05-02Job filed: INTERIOR RENOVATION OF PARTIAL 5TH FLOOR, APARTMENT 17: REMOVE AND REPLACE NON-BEARING PARTITIONS AND PLUMBING AS PER PLANS FILED HEREWITH; NO CHANGE $50,750
2014-05-02Job filed: INTERIOR RENOVATION OF PARTIAL 5TH FLOOR, APARTMENT 17: REMOVE AND REPLACE NON-BEARING PARTITIONS AND PLUMBING AS PER PLANS FILED HEREWITH; NO CHANGE $50,750
2014-04-28Job filed: EXTERIOR MASONRY REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$57,270
2014-03-24PAT — from CARNEY, ROCHELLE R; MOSES, ROCHELLE R to MUNOZ, VIRGINIA
2014-03-24Mortgage satisfied — from CARNEY, WILLIAM JOSEPH to JPMORGAN CHASE BANK, N.A.
2014-03-24PAT — from CARNEY, WILLIAM JOSEPH to MUNOZ, VIRGINIA
2014-03-24Deed $1,250,000 — from CARNEY, ROCHELLE R; MOSES, ROCHELLE R; WILLIAM JOSEPH, CARNEY to 92 PERRY STREET PROPERTY LLC$1,250,000
2014-02-23311: Street Condition — Pothole
2014-02-07Permit EW — ISSUED
2014-02-06311: GENERAL — DOORS
2014-02-06Permit EW — ISSUED
2014-02-06Tenant complaint: GENERAL — DOORS
2014-02-05DOB complaint, category ?
2014-02-03311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2014-02-03DOB complaint, category ?
2014-01-22HPD class A: § 27-2005 ADM CODE REFIT DOOR IN THE BATHROOM LOCATED AT APT 12, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
2014-01-22HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 12, 4th S
2014-01-22HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2014-01-22HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS AND ALL WALLS IN THE ENTIRE APART
2014-01-22HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BIKES AND PLASTIC BAGS AT LOBBY, 1st STORY
2013-08-31HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2012-10-22Job filed: JOB FILED FOR APR #16 INTERIOR RENOVATION: REPLACE PARTITIONS, PLUBMING FIXTURES AS PLAN SHOWS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$41,500
2012-10-22Job filed: JOB FILED FOR APR #16 INTERIOR RENOVATION: REPLACE PARTITIONS, PLUBMING FIXTURES AS PLAN SHOWS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$41,500
2012-10-22Job filed: JOB FILED FOR APR #16 INTERIOR RENOVATION: REPLACE PARTITIONS, PLUBMING FIXTURES AS PLAN SHOWS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$41,500
2012-09-11Agreement $483,241 — from PREUSS, F. DOMINIC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$483,241
2012-09-11Mortgage assigned — from WELLS FARGO BANK NA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2012-09-11Mortgage $10,737 — from PREUSS, F. DOMINIC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$10,737
2012-08-20TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2012-08-20TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2012-08-20TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2012-08-20TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2012-06-07Mortgage assigned — from GOLDMAN SACHS MORTGAGE COMPANY to U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2012-06-07Mortgage assigned — from GOLDMAN SACHS MORTGAGE COMPANY to U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2012-06-07Mortgage assigned — from GOLDMAN SACHS MORTGAGE COMPANY to U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2012-06-07Mortgage assigned — from GOLDMAN SACHS MORTGAGE COMPANY to U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2011-07-22Mortgage $525,000 — from COLON PLAZA HOUSING DEVELOPMENT FUND COR; COLON PLAZA ASSOCIATES, L.P. to 116 TH STREET BLOCK ASSOCIATION , INC$525,000
2011-07-22Mortgage assigned — from 116 TH STREET BLOCK ASSOCIATION , INC to BDP BANK
2011-07-08Agreement $489,000 — from MALGUARNERA, SALVATORE JR to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; COLE TAYLOR BANK$489,000
2011-07-05Mortgage assigned — from J.P. MORGAN CHASE, N.A. to COLE TAYLOR BANK; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2011-07-05Mortgage $14,796 — from MALGUARNERA, SALVATORE J JR to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; COLE TAYLOR BANK$14,796
2011-06-11311: Noise — Noise: Construction Before/After Hours (NM1)
2011-05-04Permit EQ — ISSUED
2011-05-03Job filed: INSTALLATION OF A HEAVY DUTY 22'L X 12'H X 10'W PLUS 50'L X 12'H X 10'W FROM BLEECKER STREET SIDEWALK SHED.O CHANGE IN USE, EGRESS, OR OCCUPANCY.
2010-12-06311: Non-Emergency Police Matter — Other (complaint details)
2010-12-02Permit EW — ISSUED
2010-12-02Permit EW — ISSUED
2010-10-28Job filed: FACADE RESTORATION. ARCHITECTURAL WORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$300,000
2010-10-28Job filed: MECHANICAL WORK IN CONJUNCTION WITH FACADE RESTORATION. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$20,000
2010-10-28Job filed: FACADE RESTORATION. ARCHITECTURAL WORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$300,000
2010-10-28Job filed: MECHANICAL WORK IN CONJUNCTION WITH FACADE RESTORATION. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$20,000
2010-10-28Job filed: MECHANICAL WORK IN CONJUNCTION WITH FACADE RESTORATION. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$20,000
2010-10-25Permit PL — ISSUED
2010-10-22Permit EW — RE-ISSUED
2010-10-22Permit EW — ISSUED
2010-10-22Permit EW — ISSUED
2010-10-04Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF AN EXISTING RETAIL STORE ON THE 1ST FLOOR AND ASSOCIATED WORK IN THE CELLAR, ROOF AND 2$45,000
2010-10-04Job filed: RENOVATION OF EXISTING RETAIL STTORE ON THE 1ST FLOOR AND ASSOCIATED WORK IN THE CELLAR, ROOF AND 2ND FLOOR. ARCHITECTURAL WORK. NO CHANGE OF USE, OCC$300,000
2010-10-04Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF AN EXISTING RETAIL STORE ON THE 1ST FLOOR AND ASSOCIATED WORK IN THE CELLAR, ROOF AND 2$45,000
2010-10-04Job filed: RENOVATION OF EXISTING RETAIL STTORE ON THE 1ST FLOOR AND ASSOCIATED WORK IN THE CELLAR, ROOF AND 2ND FLOOR. ARCHITECTURAL WORK. NO CHANGE OF USE, OCC$300,000
2010-10-04Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF AN EXISTING RETAIL STORE ON THE 1ST FLOOR AND ASSOCIATED WORK IN THE CELLAR, ROOF AND 2$45,000
2010-10-04Job filed: STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION OF AN EXISTING RETAIL STORE ON THE 1ST FLOOR AND ASSOCIATED WORK IN THE CELLAR, ROOF AND 2ND FLOOR. NO $15,000
2010-10-04Job filed: STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION OF AN EXISTING RETAIL STORE ON THE 1ST FLOOR AND ASSOCIATED WORK IN THE CELLAR, ROOF AND 2ND FLOOR. NO $15,000
2010-09-29Permit EQ — ISSUED
2010-09-28Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 30'L X 8'H X 8'W.
2010-09-09Mortgage satisfied — from LEOPOLD, JACQUELINE ROSE; LEOPOLD, SAUL O to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; HSBC MORTGAGE CORPORATION USA
2010-09-09Mortgage satisfied — from LEOPOLD, JACQUELINE ROSE; LEOPOLD, SAUL O to HSBC MORTGAGE CORPORATION (USA); MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2010-09-09Permit EQ — ISSUED
2010-09-09Job filed: INSTALLATION OF PLYWOOD FENCE ENCLOSURE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS U
2010-09-09Job filed: INSTALLATION OF PLYWOOD FENCE ENCLOSURE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS U
2010-09-08Mortgage satisfied — from LAM, STEPHEN; YEN, HELEN to TD BANK, N.A.
2010-09-08Permit EW — ISSUED
2010-09-07Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR OF A 6 STORY BUILDING.$29,250
2010-09-07Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR OF A 6 STORY BUILDING.$29,250
2010-09-01Deed $885,000 — from LEOPOLD, JACQUELINE ROSE; LEOPOLD, SAUL O. to CHUANG, MICHELLE T.$885,000
2010-09-01PAT — from LEOPOLD, JACQUELINE ROSE to LEOPOLD, SAUL O
2010-08-20Mortgage $400,000 — from LAM, STEPHEN W; YEN, HELEN to TD BANK, NA$400,000
2010-08-19Permit EQ — ISSUED
2010-08-19Permit EQ — ISSUED
2010-08-19Job filed: INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UN
2010-08-19Job filed: INSTALLATION OF 85 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2010-08-19Job filed: INSTALLATION OF 85 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2010-08-16RPTT&RET $772,688 — from OLIVE & BETTE'S CO., INC. to 382-384 PERRY RETAIL, LLC$772,688
2010-05-17Job filed: PROPOSED INSTALLATION OF 25 LF OF SIDEWALK SHED TO PERFORM REMEDIAL WORK. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY, OR EGRESS TO THE BUILDING FOR TH
2010-05-17Job filed: PROPOSED INSTALLATION OF 25 LF OF SIDEWALK SHED TO PERFORM REMEDIAL WORK. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY, OR EGRESS TO THE BUILDING FOR TH
2010-01-20311: Noise — Noise: Construction Equipment (NC1)
2009
2009-12-31Tenant complaint: GENERAL — COOKING GAS
2009-12-23MAPS — from ALTAVISTA CONDOMINIUM
2009-12-23ADEC — from ALTAVISTA CONDOMINIUM
2009-12-14Job filed: FILED TO REFLECT CHANGE TO EXISTING CONDO LOT DESIGNATION AS FILED UNDER SC 104408213.LOTS 1101,1122,1123,1124 ARE 4 COMMERCIAL UNITS. LOTS 1102-1121
2009-12-14Job filed: FILED TO REFLECT CHANGE TO EXISTING CONDO LOT DESIGNATION AS FILED UNDER SC 104408213.LOTS 1101,1122,1123,1124 ARE 4 COMMERCIAL UNITS. LOTS 1102-1121
2009-11-30Permit EW — ISSUED
2009-10-05Agreement $597,500 — from CARNEY, WILLIAM JOSEPH; MOSES, ROCHELLE R to JPMORGAN CHASE BANK, N.A.$597,500
2009-10-05Deed — from CARNEY, WILLIAM JOSEPH to CARNEY, WILLIAM JOSEPH; MOSES, ROCHELLE R
2009-10-05Mortgage $772 — from MOSES, ROCHELLE R; CARNEY, WILLIAM JOSEPH to JPMORGAN CHASE BANK, N.A.$772
2009-09-22Mortgage satisfied — from CARNEY, WILLIAM JOSEPH to JPMORGAN CHASE BANK, N.A.
2009-09-17Mortgage $11,727 — from REIBSTEIN, NANCY to JPMORGAN CHASE BANK, NA$11,727
2009-09-17Agreement $330,000 — from REIBSTEIN, NANCY to JPMORGAN CHASE BANK, NA$330,000
2009-09-01Job filed: INSTALL A/C UNIT AT 1ST FLOOR STORE WITH CONDENSER UNIT ON ROOF. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$15,000
2009-08-26Permit EQ — ISSUED
2009-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 30'LINEAR FEET BY 8'TALL AS PER PLANS DURING FACADE RESTORATION.SIDEWALK SHED TO COMPLY WITH
2009-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 30'LINEAR FEET BY 8'TALL AS PER PLANS DURING FACADE RESTORATION.SIDEWALK SHED TO COMPLY WITH
2009-08-07PAT — from GIOVANNI LONGO, JR. NYC REAL ESTATE, LLC to THE BOARD OF MASNGERS OF THE ALTAVISTA C
2009-08-07Deed $900,000 — from VASSALLO, CHARLES J to GIOVANNI LONGO, JR. NYC REAL ESTATE, LLC$900,000
2009-08-07PAT — from VASSALLO, CHARLES J to PINKAS, EDAN E; FRIEDBERG, BRUCE D
2009-08-04Mortgage satisfied — from VASSALLO, CHARLES J to WELLS FARGO BANK, N. A.
2009-07-21DOB complaint, category ?
2009-07-06Permit PL — ISSUED
2009-06-11Mortgage satisfied — from LAM, STEPHEN W; YEN, HELEN S to JPMORGAN CHASE BANK, N.A.
2009-06-08Mortgage $249,279 — from YEN, HELEN; LAM, STEPHEN to TD BANK, NA$249,279
2009-05-28Permit EQ — ISSUED
2009-05-28Permit AL — ISSUED
2009-05-05Mortgage satisfied — from GEREGHTY, MEGHAN E to WELLS FARGO BANK, N.A.
2009-04-27Deed $675,000 — from GEREGHTY, MEGHAN E; GEREGHTY SHANLEY, MEGHAN to BENASSI, MARCO$675,000
2009-04-27PAT — from GEREGHTY SHANLEY, MEGHAN; GEREGHTY, MEGHAN E to BRYAN W. KISHNER, ESQ.; RYAN MILLER, ESQ.; SCOTT GOLDMAN, ESQ.; AMI WHELAN, ESQ.
2009-03-20PAT — from VIS PUGNANDI SRL to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2009-03-20Deed $1,110,911 — from 382/384 BLEECKER, LLC to VIS PUGNANDI SRL$1,110,911
2009-03-06Job filed: CONSTRUCTION EQ. INSTALLATION (WOOD FENCE)
2009-03-06Job filed: CONSTRUCTION EQ. INSTALLATION (WOOD FENCE)
2009-03-02REL — from 382/384 BLEEKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2009-03-02PREL — from ANGLO IRISH BANK CORPORATION PLC to 382/384 BLEEKER, LLC
2009-03-02Mortgage $124,450 — from LUMPKIN , JOHN ANDREW to MERS$124,450
2009-03-02Mortgage $497,800 — from LUMPKIN , JOHN ANDREW to MERS$497,800
2009-03-02PAT — from LUMPKIN , JOHN ANDREW to BOARD OF MANAGERS OF ALTAVISTA CONDOMINI
2009-03-02Deed $633,607 — from 382/384 BLEEKER, LLC to LUMPKIN, JOHN ANDREW$633,607
2009-02-12Job filed: FILINF HEREWITH ADDITIONAL STRUCTURAL WORKTYPE NEW STEEL JOIST AT 1ST FLR CREA TE ENTRANCE TO PROPOSED STORE RAISE OPENING ABOVE PROPOSED DOOR AND ISN
2009-01-22City emergency repair (OMO): fire escape - at 1st story - properly adjust the drop ladder in guides and restore to p.w.o. contractor must sign and re$179
2009-01-02ECB CLASS - 1 violation: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AY ALLEYWAY INREAR YARD EXIT PASSAGEWAY BLOCKED BY STORAGE BIN, CARDBOARD $1,200
2009-01-02ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: IMPROPER EXIT/EXIT ACCESS DOORWAY ARRANGEMENT PER BC 1014.2; 27-361. NOTED: AT
2009-01-02DOB complaint, category ?
2009-01-02DOB complaint, category ?
2008
2008-12-22Tenant complaint: HEATING — HEAT RELATED
2008-12-10Tenant complaint: GENERAL — COOKING GAS
2008-12-10Tenant complaint: GENERAL — COOKING GAS
2008-12-02Tenant complaint: GENERAL — COOKING GAS
2008-09-22PREL — from ANGLO IRISH BANK CORPORATION PLC to 382/384 BLEECKER, LLC
2008-09-22REL — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-08-08Deed $824,200 — from 382/384 BLEECKER, LLC to OLDFIELD, JENNIFER LISTER; OLDFIELD, ANTHONY$824,200
2008-08-08PAT — from OLDFIELD, ANTHONY; OLDFIELD, JENNIFER LISTER to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2008-08-08Deed $824,200 — from 382/384 BLEECKER, LLC to OLDFIELD, JENNIFER LISTER; OLDFIELD, ANTHONY$824,200
2008-08-08PAT — from OLDFIELD, ANTHONY; OLDFIELD, JENNIFER LISTER to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2008-08-08PAT — from OLDFIELD, ANTHONY; OLDFIELD, JENNIFER LISTER to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2008-08-08Deed $824,200 — from 382/384 BLEECKER, LLC to OLDFIELD, JENNIFER LISTER; OLDFIELD, ANTHONY$824,200
2008-08-08Deed $824,200 — from 382/384 BLEECKER, LLC to OLDFIELD, JENNIFER LISTER; OLDFIELD, ANTHONY$824,200
2008-08-08PAT — from OLDFIELD, ANTHONY; OLDFIELD, JENNIFER LISTER to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2008-07-23Permit PL — ISSUED
2008-06-30Permit PL — ISSUED
2008-06-26Job filed: APPLICATION BEING FILED TO SHOW PLUMBING WORK IN CONJUNTION WITH ALT 2 #110023778 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2008-06-04Permit EW — ISSUED
2008-05-27PAT — from CALABI, CLAUDIO to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2008-05-27PAT — from CALABI, CLAUDIO to HARTMAN, ROBERT
2008-05-27Deed $824,782 — from 382/384 BLEECKER, LLC to CALABI, CLAUDIO$824,783
2008-05-23Permit EW — ISSUED
2008-05-23Permit EW — ISSUED
2008-05-22Mortgage $508,000 — from YEN, HELEN S; LAM, STEPHEN W to JPMORGAN CHASE BANK, N.A.$508,000
2008-05-22PAT — from LAM, STEPHEN W; YEN, HELEN S to THE ALTAVISTA CONDOMINIUM BOARD OF MANAG
2008-05-22Deed $656,771 — from 382/384 BLEECKER, LLC to LAM, STEPHEN W; YEN, HELEN S$656,771
2008-05-20Job filed: INSTALL ROOF-TOP A/C UNIT SUPPLYING APARTMENT 15 AT THE 5TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$25,000
2008-05-13Deed $707,684 — from 382/384 BLEECKER, LLC to BONETTI , FABIO$707,684
2008-05-13PAT — from BONETTI , FABIO to BOARD OF MANAGERS OF
2008-04-15Permit PL — ISSUED
2008-04-15Permit EW — ISSUED
2008-04-15Permit EW — ISSUED
2008-04-01Permit EW — ISSUED
2008-04-01Permit EW — ISSUED
2008-03-18Job filed: RENOVATION OF APARTMENT 15 AT THE 5TH FLOOR. MINOR PARTITION WORK, RELATED FINISH AND PLUMBING WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$45,000
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-03-17TL&R — from ANGLO IRISH BANK CORPORATION PLC
2008-02-27Job filed: REMOVAL AND RELOCATION OF EXISTING INTERIOR PARTITIONS AND PLUMBING FIXTURES WITH NEW MECHANICAL VENTILATION IN APARTMENT 11 ON THE 4TH FLOOR. NO CHN$10,000
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-02-06Mortgage satisfied — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2008-01-24Job filed: INSTALL A/C UNIT AT APARTMENT 5 AND THE 2ND FLOOR. INSTALL CONDENSING UNIT ON EXISTING STEEL DUNNAGE AT THE ROOF. NO CHANGE TO USE,EGRESS OR OCCUPANCY$50,000
2008-01-22Permit EW — ISSUED
2008-01-16Permit PL — ISSUED
2008-01-09PAT — from 92 PERRY-BLEECKER, INC. to 382/384 BLEECKER, LLC
2008-01-09Deed $646,589 — from 382, 384 BLEEKER, LLC to 92 PERRY-BLEEKER, INC.$646,589
2008-01-09Job filed: CONVERT EXISTING 1ST FLOOR APARTMENT TO RETAIL STORE. USE GROUP 6. PARTITION C HANGES, REPLACEMENT OF PLUMBING FIXTURES AND NEW STOREFRONT.$38,000
2008-01-09Job filed: CONVERT EXISTING 1ST FLOOR APARTMENT TO RETAIL STORE. USE GROUP 6. PARTITION C HANGES, REPLACEMENT OF PLUMBING FIXTURES AND NEW STOREFRONT.$38,000
2008-01-03Permit EW — ISSUED
2008-01-02Job filed: Renovation of apartment 5 at the 2nd floor. Demolition and construction of interior partitions, related plumbing and finish work. No change to room co$40,000
2007
2007-12-31Deed — from 382/384 BLEECKER, LLC to 382/384 PERRY RETAIL, LLC
2007-12-31Deed — from 382/384 BLEECKER, LLC to 382/384 PERRY RETAIL, LLC
2007-12-31Deed — from 382/384 BLEECKER, LLC to 382/384 PERRY RETAIL, LLC
2007-12-14Job filed: Renovation of apartment 18 at the 6th floor. Partition work, finish work, related plumbing work. No change to room count. No change to use, occupancy $45,000
2007-11-20ECB Non-Hazardous violation: WORK W/O A PERMIT WORK NOTED:COMPLETE REHAB. PARTITIONS REMOVED SUB FLOORING REMOVED DOUBLING UP ON FL BEAMS 2ND FL APT 5 S/E APT.$2,500
2007-11-12Tenant complaint: HEATING — HEAT RELATED
2007-11-09Tenant complaint: HEATING — HEAT RELATED
2007-11-03DOB complaint, category ?
2007-11-03DOB complaint, category ?
2007-11-03Tenant complaint: HEATING — HEAT RELATED
2007-11-03Tenant complaint: HEATING — HEAT RELATED
2007-10-29Tenant complaint: HEATING — HEAT RELATED
2007-10-28Tenant complaint: HEATING — HEAT RELATED
2007-10-23Deed $366,296 — from 382,384 BLEECKER, LLC to REIBSTEIN, NANCY$366,296
2007-10-23PAT — from REIBSTEIN, NANCY to BOARD OF MANAGERS
2007-10-23Mortgage $325,100 — from REIBSTEIN, NANCY to JPMORGAN CHASE BANK N.A.$325,100
2007-10-17Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2007-10-13Tenant complaint: HEATING — HEAT RELATED
2007-09-07REL — from ANGLO IRISH BANK CORPORATION PLC
2007-09-07PAT — from DILORENZO, LORETTA G; DILORENZO, ROBERT W to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2007-09-07Deed $890,969 — from 382/384 BLEECKER, LLC to DILORENZO, LORETTA G; DILORENZO, ROBERT W$890,969
2007-09-07PREL — from ANGLO IRISH BANK CORPORATION PLC
2007-09-07DOB complaint, category ?
2007-07-27Permit PL — ISSUED
2007-07-26Permit EW — ISSUED
2007-07-26Permit EW — ISSUED
2007-07-26Permit EW — ISSUED
2007-07-19Permit EW — ISSUED
2007-07-19Permit EW — ISSUED
2007-07-19Permit EW — ISSUED
2007-07-05REL — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2007-07-05PREL — from ANGLO IRISH BANK CORPORATION PLC to 382/384 BLEECKER LLC
2007-07-02Deed $604,587 — from 382, 384 BLEECKER, LLC to PREUSS, FRANCIS DOMINIC$604,587
2007-07-02Mortgage $475,000 — from PREUSS, FRANCIS DOMINIC to USB MORTGAGE LLC$475,000
2007-07-02Mortgage assigned — from USB MORTGAGE LLC to WELLS FARGO BANK N.A.
2007-07-02PAT — from PREUSS, FANCIS DOMINIC to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2007-06-26Deed $864,494 — from 382/384 BLEECKER, LLC to COHEN, DAVID OLIVER; ANDREWS, CRISTIANA J$864,494
2007-06-26Mortgage $848,616 — from ANDREWS, CRISTIANA J.; COHEN, DAVID OLIVER to EMIGRANT MORTGAGE COMPANY, INC.$848,616
2007-06-26PAT — from COHEN, DAVID OLIVER; ANDREWS, CRISTIANA J. to THE BOARD OF MGRS OF THE ALTAVISTA CONDO
2007-06-25PAT — from ROSE-LEOPOLD, JACQUELINE A; LEOPOLD, SAUL O to THE ALTAVISTA CONDOMINIUM
2007-06-25Mortgage $121,000 — from LEOPOLD, SAUL O; ROSE, JACQUELINE A to HSBC MORTGAGE CORPORATION (USA)$121,000
2007-06-25Mortgage $660,000 — from ROSE, JACQUELINE A; LEOPOLD, SAUL O to MERS$660,000
2007-06-25Deed $840,056 — from 382, 384 BLEECKER, LLC to LEOPOLD, SAUL O; ROSE, JACQUELINE A$840,056
2007-06-21PREL — from ANGLO IRISH BANK CORPORATION, PLC to 382/384 BLEECKER, LLC
2007-06-21REL — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION, PLC
2007-06-21Mortgage $548,000 — from GEREGHTY, MEGHAN E to WELLS FARGO BANK, N.A.$548,000
2007-06-21Deed $697,501 — from 382, 384 BLEECKER, LLC to GEREGHTY, MEGHAN E$697,501
2007-06-14Deed $864,494 — from 382/384 BLEECKER, LLC to VASSALLO, CHARLES J$864,494
2007-06-14Mortgage $540,000 — from VASSALLO, CHARLES J to WELLS FARGO BANK, N.A.$540,000
2007-06-14PAT — from VASSALLO, CHARLES J to BOARD OF MANAGERS OF THE ALTAVISTA CONDO
2007-06-14PAT — from VASSALLO, CHARLES J to HERB, PETER L
2007-06-13REL — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2007-06-13PREL — from 382/384 BLEECKER, LLC to ANGLO IRISH BANK CORPORATION PLC
2007-06-11PAT — from MALGUARNERA, SALVATORE JR. to THE ALTAVISTA CONDOMINIUM
2007-06-11Mortgage $500,000 — from MALGUARNERA, SALVATORE JR. to JPMORGAN CHASE BANK, N.A.$500,000
2007-06-11Deed $625,000 — from 382/384 BLEECKER, LLC to MALGUARNERA, SALVATORE JR.$625,000
2007-06-08Mortgage $612,500 — from CARNEY, WILLIAM JOSEPH to JPMORGAN CHASE BANK, NA$612,500
2007-06-08Deed $890,969 — from 382, 384 BLEECKER, LLC to CARNEY, WILLIAM JOSEPH$890,969
2007-06-08PAT — from CARNEY, WILLIAM JOSEPH to THE ALTAVISTA CONDOMINIUM
2007-06-05PREL — from ANGLO IRISH BANK CORPORATION PLC to 382/384 BLEECKER LLC
2007-06-05REL — from 382/384 BLEECKER LLC to ANGLO IRISH BANK CORPORATION PLC
2007-06-01Deed $890,969 — from 382, 384 BLEECKER, LLC to YAMAGAMI, ANDREA AKEMI; YAMAGAMI, KARA SUMIKO; YAMAGAMI, JANICE M; YAMAGAMI, DICK N$890,969
2007-06-01PAT — from YAMAGAMI, ANDREA AKEMI; YAMAGAMI, KARA SUMIKO; YAMAGAMI, JANICE M; YAMAGAMI, DICK N to BOARD OF MANAGERS, 382/384 BLEECKER, LLC
2007-06-01PAT — from YAMAGAMI, JANICE to YAMAGAMI, KARA SUMIKO
2007-06-01PAT — from YAMAGAMI, DICK N to YAMAGAMI, KARA SUMIKO
2007-06-01PAT — from YAMAGAMI, ANDREA AKEMI to YAMAGAMI, KARA SUMIKO
2007-05-30Job filed: HVAC wiith ductwork and new units and plumbing work as shown.$32,000
2007-05-30Job filed: Structural work associated with interior renovation as shown.$3,000
2007-05-29Job filed: Interior demolition and general construction as shown for proposed renovation to existing retail space. No change in use, egress, or occupancy.$30,000
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-05-18CDEC — from THE ALTAVISTA CONDOMINIUM
2007-05-18MAPS — from THE ALTAVISTA CONDOMINIUM
2007-04-27Permit PL — ISSUED
2007-04-23Permit EQ — ISSUED
2007-04-17Permit PL — ISSUED
2007-04-16Permit AL — ISSUED
2007-03-19Permit EW — ISSUED
2007-03-19Permit EW — ISSUED
2007-03-19Permit EW — ISSUED
2007-03-16Permit EW — ISSUED
2007-01-30Job filed: RENOVATION OF PARTMENT 6 ON 3RD FLOOR.MINOR PRTITION CAHNGES,RELATED PLUMBING AND FINISH WORK. NO CHNGEIN USE, EGRESS OR OCCUPANCY. room count.$30,000
2007-01-12Permit EW — ISSUED
2007-01-12Permit EW — ISSUED
2006
2006-11-25Tenant complaint: HEATING — HEAT RELATED
2006-11-24Tenant complaint: HEATING — HEAT RELATED
2006-11-24Tenant complaint: HEATING — HEAT RELATED
2006-11-16DOB complaint, category ?
2006-11-08City emergency repair (OMO): public area: install new metal treads 3rd, 4th, 5th, and 6th stories west fire escapes. prime and paint. '' remove all w$690
2006-10-20HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR .. IN THE ENTIRE APARTMENT LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM WEST AT N
2006-09-11Job filed: Install A/C units in apartments and condenser units on the roof, as per plans. No change to use, occupancy or egress.$150,000
2006-09-11Job filed: Install A/C units in apartments and condenser units on the roof, as per plans. No change to use, occupancy or egress.$150,000
2006-09-09City emergency repair (OMO): public area: at public hall front north area side walk bridge make opening to allow fire escape ladder to drop down. '' $500
2006-08-30DOB complaint, category ?
2006-08-16Permit EW — ISSUED
2006-08-16Permit EW — ISSUED
2006-08-15Tenant complaint: NONCONST — RUBBISH
2006-08-14Tenant complaint: GENERAL — DOORS
2006-08-14Tenant complaint: NONCONST — RUBBISH
2006-08-11Permit EW — ISSUED
2006-08-11Permit EQ — ISSUED
2006-08-11Permit EW — ISSUED
2006-08-10Tenant complaint: NONCONST — RUBBISH
2006-08-09Tenant complaint: NONCONST — RUBBISH
2006-08-08Permit EQ — ISSUED
2006-08-07Job filed: INSTALL HEAVY DUTY SIDEWALK SHED FOR A TOTAL OF 115 FT LONG AT 92 PERRY STREET. DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH LL33/91. NO CHANGE IN US
2006-08-04DOB complaint, category ?
2006-08-02DOB complaint, category ?
2006-07-28Tenant complaint: NONCONST — RUBBISH
2006-07-27DOB complaint, category ?
2006-07-21DOB complaint, category ?
2006-07-21Permit EW — ISSUED
2006-07-21Permit EW — ISSUED
2006-07-19Job filed: Remove existing roof deck and steel dunnage. Replace portions of roof as required, install pitch pockets for future fence posts. No change to use, occ$40,000
2006-07-19Job filed: New steel dunnage and structural work in conjunction with roof repair.$60,000
2006-07-18DOB complaint, category ?
2006-07-17City emergency repair (OMO): as per rc # 2006001274404 (enviro-probe inc), perform total lead analysis of 03 dust wipe sample(s) via environmental pr$11
2006-06-15Job filed: Patching of existing construction; installation of HVAC system; no change to use, egress or occupancy.$16,000
2006-06-15Job filed: Patching of existing construction; installation of HVAC system; no change to use, egress or occupancy.$16,000
2006-05-30DOB complaint, category ?
2006-05-17City emergency repair (HWO): p/h: install 6 window guards complete in public hall all stories.$466
2006-05-17City emergency repair (OMO): (public area) secure properly the loose metal 12th,13th and 14th from bottom at fire escape front of building between 5t$459
2006-05-17ECB Non-Hazardous violation: WORK WITHOUT PERMIT. WORK NOTED: AT ROOF LEVEL OF PREMISES ERECTED 1) WOOD FRAME DECK APPROX. SIZE 10'X 15' WITH WOOD RAILING. 2)
2006-05-09DOB complaint, category ?
2006-04-18Job filed: SC
2006-04-17Permit PL — ISSUED
2006-04-12Permit AL — ISSUED
2006-04-05Tenant complaint: HEATING — HEAT RELATED
2006-04-05Tenant complaint: HEATING — HEAT RELATED
2005-12-12Job filed: STRUCTURAL WORK IN CONJUNCTION WITHBUILDING RENOVATION. REPLACE LINTELS AT STOREFRONT. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$30,000
2005-12-12Job filed: STRUCTURAL WORK IN CONJUNCTION WITHBUILDING RENOVATION. REPLACE LINTELS AT STOREFRONT. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$30,000
2005-11-03Job filed: Remove wall plaster from upper portion of stair hallway walls, exposing existing brickwork, 1st through 6th floors and roof stair. Install dropped cei$60,000
2005-11-03Job filed: Remove wall plaster from upper portion of stair hallway walls, exposing existing brickwork, 1st through 6th floors and roof stair. Install dropped cei$60,000
2005-11-03Tenant complaint: GENERAL — DOORS
2005-10-26DOB complaint, category ?
2005-10-21City emergency repair (OMO): public area: install 1 new metal tread 11th. from bottom 2nd. sty. front fire escape prime and paint to match existing. $389
2005-10-21DOB complaint, category ?
2005-10-15DOB complaint, category ?
2005-10-14DOB complaint, category ?
2005-10-03Job filed: REPOINT ANDEMORTAR ALLJOINTS IN STONE &BRICKWORK. SCRAPE AND WIREBRUSH ALL IRONWORK AT FIRE ESCAPE,REMOVE ALLLOOSE PAINT AND REPAINT TO MATCH EXIS$200,000
2005-09-30DOB complaint, category ?
2005-09-30Permit PL — ISSUED
2005-09-29ECB Non-Hazardous violation: WORK WITHOUT PERMIT WORK NOTED:REMOVAL OF PLASTER TOP COAT APPROX 3/4"X 5" AT LOBBY THROUGHOUT TO 6TH FL INCLUDING STAIRCASE AND L$2,500
2005-09-28DOB complaint, category ?
2005-09-28DOB complaint, category ?
2005-09-28DOB complaint, category ?
2005-09-28Tenant complaint: GENERAL — STAIRS
2005-09-19Permit EW — ISSUED
2005-09-14Permit EW — ISSUED
2005-09-11DOB complaint, category ?
2005-09-09DOB complaint, category ?
2005-09-09DOB complaint, category ?
2005-08-08Job filed: REPLACE KITCHEN AND BATHROOM FIXTURESAND FINISHES IN APARTMENTS NO CHANGE IN USE EGRESS OR OCCUPANCY$30,000
2005-08-08Job filed: FINISH WORK IN APTS. 2 AND 19. REPLACE WOOD AND CERAMIC TILE FLOORS. MINOR DOOR CHANGES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$20,000
2005-07-12DOB complaint, category ?
2005-06-15ECB Non-Hazardous violation: WORK WITHOUT PERMIT WORK NOTED WORK IN PROGRESS ON 2ND FL IN APT#4 WITHOUT PERMITS (1) DEMO OF BATHROOM (2) METAL FRAMING STUDS CR$250
2005-06-11DOB complaint, category ?
2005-06-11DOB complaint, category ?
2005-06-10DOB complaint, category ?
2005-06-09DOB complaint, category ?
2005-06-09DOB complaint, category ?
2005-06-03DOB complaint, category ?
2005-06-03DOB complaint, category ?
2005-05-31Job filed: Convert superintendent's apartment at cellar to retail store, use group 6. New certificate of occupancy to clarify existing stores, use group 6, and o$50,000
2005-05-31Job filed: Convert superintendent's apartment at cellar to retail store, use group 6. New certificate of occupancy to clarify existing stores, use group 6, and o$50,000
2005-05-23Job filed: SC
2005-05-20Permit EW — ISSUED
2004
2004-03-26Job filed: INSTALLING TELECOMMUNICATIONS CABINETS ON CONCRETE PAD ON GRADE WITH ANTENNAS MOUNTED TO FACADE OF BUILDING ALL IN CONFORMANCE WITH TPPN 5/98 NO CHANG$25,000
2004-03-26Job filed: INSTALLING TELECOMMUNICATIONS CABINETS ON CONCRETE PAD ON GRADE WITH ANTENNAS MOUNTED TO FACADE OF BUILDING ALL IN CONFORMANCE WITH TPPN 5/98 NO CHANG$25,000
2003
2003-12-13Tenant complaint: HEATING — HEAT RELATED
2003-11-26Tenant complaint: HEATING — HEAT RELATED
2003-11-20DOB complaint, category ?
2003-10-20Permit EW — ISSUED
2003-10-14Permit EW — ISSUED
2003-10-14Permit EQ — ISSUED
2003-10-14Permit EW — ISSUED
2003-10-09Job filed: REPLACE AUTOMATIC FIRE SUPPRESSION SYSTEM IN EXISTING KITCHEN RANGEHOOD. NO CHANGE IN USE, EGRESS AND OCCUPANCY. COOKING EQUIPMENTS WERE FIELD UNDER C$3,000
2003-10-03Tenant complaint: HEATING — HEAT RELATED
2003-10-01Job filed: Design Structure to enlarge an existing window on the fist floor. No change to use, egress or occupancy.$5,000
2003-09-30Job filed: Enlarge existing mansonry window opening on 1st floor. No change to use, egress or occupancy.$10,000
2003-09-09Permit EQ — ISSUED
2003-09-08Job filed: INSTALLATION OF HEAY DUTY SIDEWALK SHED 25FT AT 382 BLEEKER STREET - DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL33/91 NO CHANGE IN USE EGRESS O
2003-09-08Job filed: INSTALLATION OF HEAY DUTY SIDEWALK SHED 25FT AT 382 BLEEKER STREET - DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL33/91 NO CHANGE IN USE EGRESS O
2003-05-06Tenant complaint: HEATING — HEAT RELATED
2003-04-23Tenant complaint: HEATING — HEAT RELATED
2003-04-06Tenant complaint: HEATING — HEAT RELATED
2002
2002-10-09Permit PL — ISSUED
2002-09-30Permit EQ — ISSUED
2002-09-30Permit EW — ISSUED
2002-09-30Job filed: NEW STORE FRONT AND INTERIOR RENOVATIONOF EXISTING TWO STORES TO COMBINE INTO ONE STORE. NO CHANGE TOUSE, OCCUPANCY OR EGRESS. THIS APPLICATION.$110,000