The city's published records show little recorded distress here in the last three years. Less recorded distress than 62% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 10. In ZIP 10011, 68% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$6,250 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
2 service requests in the last three years. Most common: Noise (2).
Filed construction activity
$401,646 in permitted construction work filed since
2016 (7 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2005)
Yes
Six or more residential units (11)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
519 West 23rd Street Condominiums
Head officer
Chris Swensen
Managing agent
Daisy Management
Last registered
2026-06-29
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$546,204
$245,792
2026
$309,469
$139,261
2027
$0
$0
The city's market estimate has fallen
100% between tax years 2025 and 2027.
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2020 estimate: gross income $1,029,600 a year
($42.90 per sq ft), operating expenses $319,920
($13.33 per sq ft), net operating income $709,680. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Facade (Local Law 11)
UNSAFE — unsafe conditions reported (cycle 10)
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
23 St — C E · 0.4 mi straight-line (about a 10-minute walk) · station accessibility: none 34 St-Hudson Yards — 7 · 0.5 mi straight-line (about a 13-minute walk) · station accessibility: full
Bus
Nearest boarding stop: W 23 St / 10 Av — M23-SBS · 150 ft · Select Bus Service
Citi Bike
W 22 St & 10 Ave · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
2 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Deed $1,695,000 — from PETER Y. LEE REVOCABLE TRUST; GABRIELLE LEE, TRUSTEE; PETER Y. LEE, TRUSTEE; GABRIELLE LEE to MORDECHAY ROSENBLUM, AS TRUSTEE; LYNN ROSENBLUM, AS TRUSTEE; MORDECHAY AND LYNN ROS
$1,695,000
2026-08-28
Sold for $1,695,000
$1,695,000
$154,091
2025-06-02
Mortgage $510,000 — from VAN ELDEN, LEONTINE; BOELENS, JAAP JAN to MEMORIAL SLOAN-KETTERING CANCER CENTER
$510,000
2025-06-02
Deed $2,550,000 — from KEREIAKES, SCOTT HAUER; CHUNG, TINA CHIN to VAN ELDEN, LEONTINE; BOELENS, JAAP JAN
$2,550,000
2025-06-02
Agreement $1,275,000 — from BOELENS, JAAP JAN; VAN ELDEN, LEONTINE to CITIZENS BANK, N.A.
$1,275,000
2025-06-02
Mortgage $510,000 — from BOELENS, JAAP JAN; VAN ELDEN, LEONTINE to MEMORIAL SLOAN-KETTERING CANCER CENTER
$510,000
2025-05-22
Sold for $2,550,000
$2,550,000
$231,818
2025-03-10
Agreement $2,000,000 — from CHUNG, TINA CHIN; KEREIAKES, SCOTT HAUER to U.S. BANK NATIONAL ASSOCIATION
$2,000,000
2024-09-05
Deed $2,400,000 — from PETER MAINSTAIN, TRUSTEE; SERENITY PROPERTY TRUST to GOLDMAN, ALEXANDRA
$2,400,000
2024-08-26
Sold for $2,400,000
$2,400,000
$218,182
2022-09-19
Deed $2,337,500 — from FEDER, AMIR; MOTT, CHRISTINE to OUYANG, AS TRUSTEE, YUANYUAN; CHEN, AS TRUSTEE, CHENGFENG; THE CHEN 2020 REVOCABLE TRUST
$2,337,500
2022-09-19
Agreement $1,000,000 — from OUYANG, AS TRUSTEE, YUANYUAN; CHEN, AS TRUSTEE, CHENGFENG; THE CHEN 2020 REVOCABLE TRUST to CITIZENS BANK NA
$1,000,000
2022-09-08
Sold for $2,337,500
$2,337,500
$212,500
2022-01-14
Agreement $1,793,000 — from WOHN, ULRICH to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; UBS BANK USA
$1,793,000
2021-06-08
Mortgage $42,542 — from FILICIA, THOMAS L to MAHOPAC BANK
$42,542
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
2024
28
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
1
1
20
22
2018
0
2
1
3
13
19
2019
0
3
1
10
11
25
2020
0
0
0
0
1
1
2021
0
3
2
9
2
16
2022
2
4
3
9
4
22
2023
4
5
3
0
4
16
2024
0
0
2
5
4
11
2025
9
4
1
13
1
28
2026
5
1
0
4
5
15
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Mortgage satisfied — from LEE, GABRIELLE; LEE, PETER Y to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CITIBANK
2026-09-04
PAT — from MORDECHAY AND LYNN ROSENBLUM LIVING TRUS; MORDECHAY ROSENBLUM, AS TRUSTEE; LYNN ROSENBLUM, to 519 WEST 23RD STREET CONDO BOARD
2026-09-04
Deed $1,695,000 — from PETER Y. LEE REVOCABLE TRUST; GABRIELLE LEE, TRUSTEE; PETER Y. LEE, TRUSTEE; GABRIELLE LEE to MORDECHAY ROSENBLUM, AS TRUSTEE; LYNN ROSENBLUM, AS TRUSTEE; MORDECHAY AND LYNN ROS
2026-08-28
Sold for $1,695,000
2026-08-10
Cooling tower inspection
2026-07-20
Permit Sidewalk Shed — Permit Issued
2026-06-03
Job filed: REPLACEMENT OF GLASS RAILINGS ON 10TH AND 12TH FLOOR TERRACES TO RESPOND AND RESOLVE VATE ORDER AND VIOLATION #07252325LL011DO3. NO CHANGE IN USE, EGR
2026-05-15
Rodent inspection: Passed
2026-04-20
ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A AND 10A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES
2026-04-14
Boiler inspection
2026-04-14
Boiler inspection
2026-02-13
Permit General Construction — Signed-off
2026-02-13
Permit Structural — Signed-off
2025-12-24
Permit Structural — Signed-off
2025-12-24
Permit General Construction — Signed-off
2025-12-08
Bedbug filing: 0 infested units
2025-11-26
Mortgage satisfied — from LUNDQUIST, KEVIN R R to TD BANK N.A.
The full timeline
2026
2026-10-14Permit Sidewalk Shed — Permit Issued
2026-10-01Facade (LL11) filing, cycle 10: UNSAFE
2026-09-18Mortgage satisfied — from LEE, GABRIELLE; LEE, PETER Y to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CITIBANK
2026-09-04PAT — from MORDECHAY AND LYNN ROSENBLUM LIVING TRUS; MORDECHAY ROSENBLUM, AS TRUSTEE; LYNN ROSENBLUM, to 519 WEST 23RD STREET CONDO BOARD
2026-09-04Deed $1,695,000 — from PETER Y. LEE REVOCABLE TRUST; GABRIELLE LEE, TRUSTEE; PETER Y. LEE, TRUSTEE; GABRIELLE LEE to MORDECHAY ROSENBLUM, AS TRUSTEE; LYNN ROSENBLUM, AS TRUSTEE; MORDECHAY AND LYNN ROS$1,695,000
2026-08-28Sold for $1,695,000$1,695,000
2026-08-10Cooling tower inspection
2026-07-20Permit Sidewalk Shed — Permit Issued
2026-06-03Job filed: REPLACEMENT OF GLASS RAILINGS ON 10TH AND 12TH FLOOR TERRACES TO RESPOND AND RESOLVE VATE ORDER AND VIOLATION #07252325LL011DO3. NO CHANGE IN USE, EGR$110,000
2026-05-15Rodent inspection: Passed
2026-04-20ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A AND 10A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES$1,250
2026-04-14Boiler inspection
2026-04-14Boiler inspection
2026-02-13Permit General Construction — Signed-off
2026-02-13Permit Structural — Signed-off
2025
2025-12-24Permit Structural — Signed-off
2025-12-24Permit General Construction — Signed-off
2025-12-08Bedbug filing: 0 infested units
2025-11-26Mortgage satisfied — from LUNDQUIST, KEVIN R R to TD BANK N.A.
2025-09-29Permit Structural — Signed-off
2025-09-29Permit General Construction — Signed-off
2025-09-10Job filed: REPLACEMENT OF GLASS RAILINGS ON 10TH AND 12TH FLOOR TERRACES TO RESPOND AND RESOLVE VATE ORDER AND VIOLATION #07252325LL011DO3. NO CHANGE IN USE, EGR$110,000
2025-07-25DOB violation C: PARTIAL VACATE ORDER. DUE TO THE HAZARDOUS CONDITION: RUSTED AND DELAMINATED SUPPORT AT 10TH & 12TH FL TERRANCES SOUTH EXP 1.
2025-07-25DOB complaint, category ?
2025-07-25DOB complaint, category ?
2025-07-22Permit Supported Scaffold — Signed-off
2025-07-21Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$9,000
2025-07-15Permit Sidewalk Shed — Permit Issued
2025-07-14Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2025-07-11ECB CLASS - 1 violation: FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE BUILDING FACADE AS PER TECHNICAL REPORT NUMBE$5,000
2025-06-23Facade (LL11) filing, cycle 10: UNSAFE
2025-06-02Mortgage $510,000 — from VAN ELDEN, LEONTINE; BOELENS, JAAP JAN to MEMORIAL SLOAN-KETTERING CANCER CENTER$510,000
2025-06-02PAT — from KEREIAKES, SCOTT HAUER to PINKAS, EDAN E; HANNA, KATRINA E
2025-06-02PAT — from CHUNG, TINA CHIN to HANNA, KATRINA E; PINKAS, EDAN E
2025-06-02LOCC — from FILICIA, THOMAS LEONARD to BOARD OF MANAGERS OF THE
2025-06-02Deed $2,550,000 — from KEREIAKES, SCOTT HAUER; CHUNG, TINA CHIN to VAN ELDEN, LEONTINE; BOELENS, JAAP JAN$2,550,000
2025-06-02Mortgage assigned — from U.S BANK NATIONAL ASSOCIATION to CITIZENS BANK, N.A.
2025-06-02Agreement $1,275,000 — from BOELENS, JAAP JAN; VAN ELDEN, LEONTINE to CITIZENS BANK, N.A.$1,275,000
2025-06-02PAT — from VAN ELDEN, LEONTINE; BOELENS, JAAP JAN to BOARD OF MANAGERS
2025-06-02Mortgage $510,000 — from BOELENS, JAAP JAN; VAN ELDEN, LEONTINE to MEMORIAL SLOAN-KETTERING CANCER CENTER$510,000
2025-05-22Sold for $2,550,000$2,550,000
2025-03-13Mortgage assigned — from BANK OF AMERICA, N.A; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to U.S. BANK NATIONAL ASSOCIATION
2025-03-10Agreement $2,000,000 — from CHUNG, TINA CHIN; KEREIAKES, SCOTT HAUER to U.S. BANK NATIONAL ASSOCIATION$2,000,000
2023-05-01311: Street Condition — Plate Condition - Shifted
2023-04-26FDNY inspection (RISK)
2023-04-20Permit General Construction — Signed-off
2023-03-29Permit Sidewalk Shed — Permit Issued
2023-03-29Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 20$9,000
2023-03-03Facade (LL11) filing, cycle 9: UNSAFE
2022
2022-12-22Job filed: new 1" cold water connect to cellar boiler room , and new gycol feed tank piping connection to condenser water riser at roof as per pl plans , no ch$8,000
2022-12-13Bedbug filing: 0 infested units
2022-12-09Boiler inspection
2022-12-09Boiler inspection
2022-12-01Job filed: LIMITED EXTERIOR REPAIRS OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$150,646
2022-09-19PAT — from FEDER, AMIR to FORMAN, STUART A
2022-09-19PAT — from MOTT, CHRISTINE to FORMAN, STUART A
2022-09-19PAT — from CHEN, AS TRUSTEE, CHENGFENG; THE CHEN 2020 REVOCABLE TRUST; OUYANG, AS TRUSTEE, YUANYUAN to 519 WEST 23RD STREET CONDOMINIUM
2022-09-19Deed $2,337,500 — from FEDER, AMIR; MOTT, CHRISTINE to OUYANG, AS TRUSTEE, YUANYUAN; CHEN, AS TRUSTEE, CHENGFENG; THE CHEN 2020 REVOCABLE TRUST$2,337,500
2022-09-19Agreement $1,000,000 — from OUYANG, AS TRUSTEE, YUANYUAN; CHEN, AS TRUSTEE, CHENGFENG; THE CHEN 2020 REVOCABLE TRUST to CITIZENS BANK NA$1,000,000
2022-09-08Sold for $2,337,500$2,337,500
2022-08-23Mortgage satisfied — from MOTT, CHRISTINE; FEDER, AMIR to CITIZENS BANK, N.A.
2022-02-14DOB violation FISPFCS: CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
2022-02-14DOB complaint, category ?
2022-01-24FDNY inspection (RISK)
2022-01-21Bedbug filing: 0 infested units
2022-01-14Mortgage assigned — from CITIBANK, N.A. to UBS BANK USA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2022-01-14Agreement $1,793,000 — from WOHN, ULRICH to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; UBS BANK USA$1,793,000
2022-01-06Cooling tower inspection
2021
2021-12-15Boiler inspection
2021-12-15Boiler inspection
2021-06-08Mortgage $42,542 — from FILICIA, THOMAS L to MAHOPAC BANK$42,542
2021-06-08Agreement $805,000 — from FILICIA, THOMAS L to MAHOPAC BANK$805,000
2021-06-08PAT — from FILICIA, THOMAS L to CHIMOS, BILL P
2021-06-08Mortgage assigned — from ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA to MAHOPAC BANK
2021-06-03ECB CLASS - 1 violation: FOUND DOOR RESTRICTOR (DOOR ZONE LOCK) IS NOT WORKING. REPAIR AND ADJUST. BRAKE TAG IN EEVATOR MACHINE ROOM EXPIRED. PERFORM BRAKE$1,250
2021-04-26311: Elevator — Elevator - Single Device On Property/No Alternate Service
2021-04-26DOB complaint, category ?
2021-03-12Bedbug filing: 0 infested units
2021-03-03PAT — from MARIANO, LAURA to BASHANI, TALI A
2021-03-03PAT — from MARIANO, JOHN to BASHANI, TALI A
2021-03-03Deed $1,970,000 — from THE SHAWN GLICK REVOCABLE TRUST; SHAWN A. GLICK, TRUSTEE to MARIANO, LAURA; MARIANO, JOHN$1,970,000
2021-03-03PAT — from MARIANO, JOHN; MARIANO, LAURA to BOARD OF MANAGERS OF 519 WEST 23RD STREE
2021-01-29Sold for $1,970,000$1,970,000
2021-01-06DOB violation E:
2020
2020-10-15Cooling tower inspection
2019
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-10-16Elevator permit: Furnish and install components and software providing Door Monitor Circuitry to existing controller. All work to comply with ASME$13,767
2019-09-19Mortgage satisfied — from BERGMAN, ROBERT to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; JPMORGAN CHASE BANK, N.A.; BANK OF AMERICA, N.A.
2019-09-06PAT — from LEE, PETER; LEE, GABRIELLE to BOARD OF MANAGERS OF 519 WEST 23RD STREE
2019-09-06Deed $1,600,000 — from BERGMANN, ROBERT; UNGAR, ROBERT DALE; UNGAR, ROBERT; BERGMAN, ROBERT; BERGMAN UNGAR, ROBER to LEE, GABRIELLE; LEE, PETER Y$1,600,000
2019-09-06PAT — from BERGMANN, ROBERT; BERGMAN UNGAR, ROBERT; BERGMAN, ROBERT; UNGAR, ROBERT; UNGAR, ROBERT DAL to HERB, ESQ, PETER L
2019-09-06Mortgage $1,200,000 — from LEE, GABRIELLE; LEE, PETER Y to MERS, INC.$1,200,000
2015-12-07Mortgage $150,000 — from LUNDQUIST, KEVIN R to TD BANK N.A.$150,000
2015-10-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-07-31ECB CLASS - 1 violation: FILED A CERT FORM CONTAINING A MATERIAL FALSE STATEMENT.JOB# 121894968PW1 SECTION 2B INDICATES A NO TO CERT REGARDING OCCUPIED HOU$4,800
2015-07-22311: Miscellaneous Categories — Inspection Work Order (DOB)
2015-07-22DOB complaint, category ?
2015-05-07DOB violation E:
2015-04-22FDNY inspection (RISK)
2015-02-10Mortgage satisfied — from HAMILTON, LINDA to CITIMORTGAGE, INC.
2015-01-07PAT — from CHUNG, TINA; KEREIAKES, SCOTT H to BOM OF 519 WEST 23RD ST CONDOMINIUMS
2015-01-07Deed $2,850,000 — from HAMILTON, LINDA to CHUNG, TINA; KEREIAKES, SCOTT H$2,850,000
2015-01-07PAT — from HAMILTON, LINDA to ALMAZAN, TRACY ESQ
2015-01-07Mortgage $1,995,000 — from KEREIAKES, SCOTT H; CHUNG, TINA C to FIRST REPUBLIC BANK$1,995,000
2014
2014-12-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-12-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-12-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-11-17Permit AL — ISSUED
2014-08-21ECB CLASS - 1 violation: EC 250.24(B). SYSTEM GROUNDING CONNECTIONS. A PREMISES WIRING SYSTEM SUPPLIED BY A GROUNDED AC SERVICE SHALL HAVE A GROUNDING ELEC$800
2014-08-21ECB CLASS - 1 violation: FAILURE TO PROPERLY BOND ELECTRICAL SYSTEMS. BASEMENT SERVICE SWITCHES: 1200 AMP & 400 AMP SERVICE SWITCHES, NEUTRAL BARS ARE NOT $1,500
2014-08-21ECB CLASS - 1 violation: UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. BASEMENT ELECTRICAL$800
2014-06-26Mortgage satisfied — from SAEZ-FROMM, CLAUDIA; FROMM, MARK to WELLS FARGO BANK, N.A.
2014-06-25Mortgage satisfied — from FROMM, MARK; SAEZ-FROMM, CLAUDIA to WELLS FARGO BANK, NA
2014-06-19311: Noise — Noise: air condition/ventilation equipment (NV1)
2014-06-10Deed $2,883,200 — from FROMM, MARK; SAEZ-FROMM, CLAUDIA to CDLINE LLC$2,883,200
2014-06-10PAT — from CDLINE LLC to THE BOARD OF MANAGERS AT 519 WEST 23RD S
2014-04-11Permit AL — ISSUED
2014-01-29Mortgage $25,200 — from BERGMAN-UNGAR, ROBERT to BANK OF AMERICA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$25,200
2014-01-29Agreement — from BERGMAN-UNGAR, ROBERT to BANK OF AMERICA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2014-01-29Deed — from BERGMAN, ROBERT to BERGMAN-UNGAR, ROBERT
2014-01-29Mortgage assigned — from JPMORGAN CHASE BANK to BANK OF AMERICA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2014-01-13Job filed: FILING TO REPLACE SKYLIGHT AT THE ROOF TERRACE WITH NEW STRUCTURAL GLASS ROOF TILE OVER 32 SQFT. NO CHANGE TO USE EGRESS OR OCCUPANCY.$16,000
2014-01-13Job filed: FILING TO REPLACE SKYLIGHT AT THE ROOF TERRACE WITH NEW STRUCTURAL GLASS ROOF TILE OVER 32 SQFT. NO CHANGE TO USE EGRESS OR OCCUPANCY.$16,000
2013
2013-12-26311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2013-12-26DOB complaint, category ?
2013-12-11Permit EQ — ISSUED
2013-12-11Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-10-28Mortgage satisfied — from SLEEPY HUDSON, LLC to BUILDERS BANK
2013-10-28TL&R — from BUILDERS BANK
2013-10-24Deed $4,276,650 — from THE HIGHLINE PARK, LLC to 319/25 LLC$4,276,650
2013-10-24PAT — from 319/25 LLC to THE CONDOMINIUM BOARD OF 519 WEST 23RD S
2013-10-17311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2013-10-17DOB complaint, category ?
2013-10-08Mortgage satisfied — from THE HIGHLINE PARK LLC to BUILDERS BANK
2013-10-08TL&R — from BUILDERS BANK
2013-09-25Job filed: FILING TO REMOVE SKYLIGHT LOCATED AT THE ROOF TERRACE AND REPLACE WITH NEW STRUCTURAL GLASS ROOF TILE OVER 32 SQFT. NO CHANGE TO USE EGRESS OR OCCUPAN$16,000
2013-09-25Job filed: FILING TO REMOVE SKYLIGHTS LOCATED AT THE ROOF TERRACE AND INSTALLATION OF NEW STRUCTURAL GLASS ROOF TILE OVER 32 SQFT. NO CHANGE TO USE EGRESS OR OCC$16,000
2013-09-25Job filed: FILING TO REMOVE SKYLIGHTS LOCATED AT THE ROOF TERRACE AND INSTALLATION OF NEW STRUCTURAL GLASS ROOF TILE OVER 32 SQFT. NO CHANGE TO USE EGRESS OR OCC$16,000
2013-09-25Job filed: FILING TO REMOVE SKYLIGHT LOCATED AT THE ROOF TERRACE AND REPLACE WITH NEW STRUCTURAL GLASS ROOF TILE OVER 32 SQFT. NO CHANGE TO USE EGRESS OR OCCUPAN$16,000
2010-12-23Mortgage satisfied — from PHAM, JULIE; PHAM, NAM to INVESTORS SAVINGS BANK
2010-12-14Deed $1,575,000 — from PHAM, NAM; PHAM, JULIE to FILICIA, THOMAS LEONARD$1,575,000
2010-12-14PAT — from FILICIA, THOMAS LEONARD; FILICIA, THOM to SEKLIR, ESQ, STEVEN A
2010-12-14PAT — from PHAM, NAM to PHAM, JULIE
2010-12-14PAT — from FILICIA, THOMAS LEONARD to CONDOMINIUM BOARD
2010-12-14Mortgage $1,000,000 — from FILICIA, THOMAS LEONARD to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$1,000,000
2010-08-12PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2010-08-12REL — from THE HIGHLINE PARK, LLC to BUILDERS BANK
2010-05-05Rodent inspection: Passed
2010-05-03Deed $1,425,000 — from THE HIGHLINE PARK, LLC to MANUEL, OLIVIER$1,425,000
2010-05-03Mortgage $570,000 — from MANUEL, OLIVIER to BANK OF AMERICA, N.A.$570,000
2010-05-03PAT to THE HIGHLINE PARK LLC; 519 23RD STREET CONDOMINIUM
2010-04-23DOB violation E:
2010-02-11311: Building/Use — Illegal. Commercial Use In Resident Zone
2010-02-11DOB complaint, category ?
2010-02-01TL&R — from THE HIGHLINE PARK LLC to BUILDERS BANK
2009
2009-12-18Mortgage $1,268,000 — from LUNDQUIST, KEVIN R to MERS$1,268,000
2009-12-18PAT — from LUNDQUIST, KEVIN R to BOARD OF MANAGERS OF THE
2009-12-18Deed $1,585,000 — from NUCOMPASS MOBILITY SERVICES INC. to LUNDQUIST, KEVIN R$1,585,000
2009-11-17REL — from BUILDERS BANK
2009-11-17PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2009-09-30PAT — from PHAM, NAM to PHAM, JULIE
2009-09-30Deed $1,400,000 — from THE HIGHLINE PARK, LLC to PHAM, NAM; PHAM, JULIE$1,400,000
2009-09-30PAT — from PHAM, JULIE; PHAM, NAM to 519 WEST 23RD STREET CONDOMINIUM
2009-09-30Mortgage $980,000 — from PHAM, NAM; PHAM, JULIE to MERS$980,000
2009-09-30Mortgage assigned — from GFI MORTGAGE BANKERS, INC.; MERS, AS NOMINEE to INVERSTORS SAVINGS BANK
2009-08-19Permit PL — ISSUED
2009-07-13Deed $2,087,500 — from CULP, KATHERINE SHAIN; CULP, JR., HARRY ROYER to NUCOMPASS MOBILITY SERVICES INC.$2,087,500
2009-05-28Mortgage satisfied — from CULP, KATHERINE S; CULP, HARRY R JR to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2008
2008-12-05Mortgage $191,785 — from THE HIGHLINE PARK, LLC to BUILDERS BANK$191,785
2008-12-05Mortgage $191,785 — from THE HIGHLINE PARK, LLC to BUILDERS BANK$191,785
2008-12-05Mortgage $191,785 — from THE HIGHLINE PARK, LLC to BUILDERS BANK$191,785
2008-12-05AL&R — from THE HIGHLINE PARK, LLC to BUILDERS BANK
2008-12-05AL&R — from THE HIGHLINE PARK, LLC to BUILDERS BANK
2008-12-05AL&R — from THE HIGHLINE PARK, LLC to BUILDERS BANK
2008-08-18Permit PL — ISSUED
2008-05-08Mortgage satisfied — from BROWN, PAUL; GARLOCK, GENE to BANK OF AMERICA, N.A.
2008-05-08Mortgage satisfied — from BROWN, PAUL C; GARLOCK, GENE to BANK OF AMERICA, N.A.
2008-05-01PAT — from GLICK, SHAWN A to 519 WEST 23RD STREET CONDOMINIUM
2008-05-01Mortgage $1,100,000 — from GLICK, SHAWN A to MERS$1,100,000
2008-05-01PAT — from GARLOCK, GENE to BROWN, PAUL
2008-05-01Deed $2,175,000 — from GARLOCK, GENE; BROWN, PAUL to GLICK, SHAWN A$2,175,000
2008-04-17PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-04-17PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-03-21DOB violation LL1081:
2008-03-19PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-03-19PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-03-19TL&R — from THE HIGHLINE PARK, LLC to BUILDERS BANK
2008-03-19PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-03-13Permit EW — ISSUED
2008-03-06REL — from BUILDERS BANK
2008-03-06PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-28PAT — from ROSA PRESTIA CASCARDO, TRUSTEE OF SERENI to BD OF MGRS 519 W 23RD STREET CONDOS
2008-02-28PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-28PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-28PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-28Deed $2,540,534 — from THE HIGHLINE PARK, LLC to SERENITY PROPERTY TRUST; CASCARDO, TRUSTEE, ROSA PRESTIA$2,540,534
2008-02-28PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-28REL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-28PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-25PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-25PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-25PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-25PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-25REL — from THE HIGHLINE PARK, LLC to BUILDERS BANK
2008-02-25PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-20PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-20PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-20PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-20PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-20REL — from BUILDERS BANK
2008-02-20PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-19REL — from THE HIGHLINE PARK, LLC to BUILDERS BANK
2008-02-19PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-19PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-19PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-19PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-19PREL — from BUILDERS BANK to THE HIGHLINE PARK, LLC
2008-02-08PREL — from THE HIGHLINE PARK, LLC to THE BUILDERS BANK
2008-02-08REL — from THE HIGHLINE PARK, LLC to THE BUILDERS BANK
2008-02-08PREL — from THE HIGHLINE PARK, LLC to THE BUILDERS BANK
2008-02-08PREL — from THE HIGHLINE PARK, LLC to THE BUILDERS BANK
2008-02-08PREL — from THE HIGHLINE PARK, LLC to THE BUILDERS BANK
2008-02-08PREL — from THE HIGHLINE PARK, LLC to THE BUILDERS BANK
2008-02-05Job filed: Modification of interior partitions in apartment 4. Filed in conjunction with NB 103682702. No change in use, egress or occupancy.$15,000
2008-01-10DOB complaint, category ?
2007
2007-12-31Deed $1,323,725 — from THE HIGHLINE PARK, LLC to BERGMAN, ROBERT$1,323,725
2007-12-31PAT — from BERGMAN, ROBERT to BOARD OF MANAGERS OF
2007-12-31Mortgage $950,000 — from BERGMAN, ROBERT to JPMORGAN CHASE BANK, N.A.$950,000
2007-12-06Permit EQ — ISSUED
2007-12-06Permit NB — ISSUED
2007-11-28Deed $2,301,245 — from THE HIGHLINE PARK, LLC to HAMILTON, LINDA$2,301,245
2007-11-28PAT — from HAMILTON, LINDA ANN to SCAVONE, ADAM; FEILEN, DEBRA
2007-11-28PAT — from HAMILTON, LINDA to 519 WEST 23RD STREET CONDOMINIUMS
2007-11-28Mortgage $1,695,000 — from HAMILTON, LINDA to CITIMORTGAGE, INC.$1,695,000
2007-11-27DOB violation E:
2007-11-13Job filed: Modification of interior partitions in apartment number 4. No change in use, egress, or occupancy. Filed in conjunction with NB#103682702.$15,000
2007-11-07Mortgage $1,410,500 — from SAEZ-FROMM, CLAUDIA; FROMM, MARK to WELLS FARGO BANK, N.A.$1,410,500
2007-11-07Mortgage $434,000 — from FROMM, MARK; SAEZ-FROMM, CLAUDIA to WELLS FARGO BANK, N.A.$434,000
2007-11-07PAT — from SAEZ-FROMM, CLAUDIA; FROMM, MARK to THE HIGHLINE PARK, LLC; THE CONDOMINIUM BOARD OF 519 WEST 23RD S
2007-11-07Deed $2,209,602 — from THE HIGHLINE PARK, LLC to SAEZ-FROMM, CLAUDIA; FROMM, MARK$2,209,603
2007-10-30Deed $1,781,938 — from THE HIGHLINE PARK, LLC to BROWN, PAUL; GARLOCK, GENE$1,781,938
2007-10-30Mortgage $400,000 — from GARLOCK, GENE; BROWN, PAUL to BANK OF AMERICA, NA$400,000
2007-10-30Mortgage $1,000,000 — from BROWN, PAUL; GARLOCK, GENE to BANK OF AMERICA, NA$1,000,000
2007-10-30PAT — from GARLOCK, GENE; BROWN, PAUL to 519 WEST 23RD STREET CONDOMINIUM
2007-10-26Deed $2,336,884 — from THE HIGHLINE PARK, LLC to CULP, KATHERINE SHAIN; CULP, HARRY ROYER JR.$2,336,884
2007-10-26PAT — from CULP, KATHERINE SHAIN; CULP, HARRY ROYER JR. to BOARD OF MANAGERS OF
2007-10-26Mortgage $2,065,500 — from CULP, KATHERINE SHAIN; CULP, HARRY ROYER JR. to MERS$2,065,500
2007-10-22DOB complaint, category ?
2007-10-20DOB violation C:
2007-10-17Deed $2,545,625 — from THE HIGHLINE PARK, LLC to WOHN, ULRICH$2,545,625
2007-10-17Mortgage $1,750,000 — from WOHN, ULRICH to JPMORGAN CHASE BANK, N.A.$1,750,000
2007-10-17Mortgage $500,000 — from WOHN, ULRICH to JPMORGAN CHASE BANK, N.A.$500,000
2007-10-17PAT — from WOHN, ULRICH to BOARD OF MANAGERS OF 519 WEST 23RD STREE
2007-10-12PAT — from SPAIN, CRAIG to BOARD OF MANAGERS OF 519 WEST 23RD STREE
2007-10-12Deed $1,832,850 — from THE HIGHLINE PARK, LLC to SPAIN, CRAIG$1,832,850
2007-09-18ECB Non-Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY DURING CONSTRUCTION OPERATION NOTED: NB UP TO ROOF SCAFFOLD INSTALLED FROM GROUND TO 11TH $1,000
2007-09-18DOB violation C:
2007-09-18DOB complaint, category ?
2007-09-15DOB complaint, category ?
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28CDEC — from THE HIGHLINE PARK LLC
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-08-28MAPS — from 519 WEST 23RD STREET CONDOMINIUMS
2007-06-13Permit EW — ISSUED
2007-04-10Permit EQ — ISSUED
2007-04-02Permit EQ — ISSUED
2007-04-02DOB violation LL1081:
2007-03-30Job filed: INSTALLATION OF SCAFFOLD 25' LONG BY 122' HIGH AT REAR OF BUILDING. BUILDING HAS EXISTING SHED (104300631)AND SCAFFOLD(104621786) IN FRONT, DURING NEW
2007-03-30Job filed: INSTALLATION OF SCAFFOLD 25' LONG BY 122' HIGH AT REAR OF BUILDING. BUILDING HAS EXISTING SHED (104300631)AND SCAFFOLD(104621786) IN FRONT, DURING NEW
2007-03-27Permit EQ — ISSUED
2007-02-03DOB violation C:
2007-02-03DOB complaint, category ?
2007-01-30Job filed: Install 2 new gas fired boilers (B-1& B-2) & 1 gas fired HW (HWH) Boiler in conjunction with NB#103682702. No change in use, egress or occupa$1,000
2007-01-25Permit EW — ISSUED
2007-01-25Permit NB — ISSUED
2007-01-25Permit EW — ISSUED
2007-01-25Permit EQ — ISSUED
2007-01-24Job filed: Fire Protection plan filed herewith in conjunction with NB# 103682702. No change in use, egress or occupancy.$1,000
2007-01-22Job filed: Sprinkler and Fire Standpipe work filed in conjunction with NB# 103682702. No change in use, egress or occupancy$2,000
2007-01-22Job filed: Sprinkler and Fire Standpipe work filed in conjunction with NB# 103682702. No change in use, egress or occupancy$2,000
2007-01-22Job filed: Sprinkler and Fire Standpipe work filed in conjunction with NB# 103682702. No change in use, egress or occupancy$2,000
2007-01-19Permit NB — ISSUED
2007-01-19Permit EQ — ISSUED
2006
2006-12-19DOB complaint, category ?
2006-12-18ECB Hazardous violation: HANDRAILS MISSING ON STAIRWAYS DURING CONSTRUCTION OPERATION. OPEN INSPECTION FROM BASEMENT TO 11TH FLR NO HANDRAILS HAVE BEEN PRO$5,000
2006-12-18ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY EFFECTED BY CONSTRUCTION OPERATIONS:OPEN INSPECTION I OBSERVED 3 MEN RIDING ON TOP OF HOIST$5,000
2006-12-08Permit EQ — ISSUED
2006-12-07Job filed: INSTALLATION OF A HEAVY DUTY STEEL SCAFFOLD, 25' LONG BY 100' HIGH DURING NEW BUILDING CONSTRUCTION BIS# 103682702. NO CHANGE IN USE, EGRESS OR OCCUP
2006-12-07Job filed: INSTALLATION OF A HEAVY DUTY STEEL SCAFFOLD, 25' LONG BY 100' HIGH DURING NEW BUILDING CONSTRUCTION BIS# 103682702. NO CHANGE IN USE, EGRESS OR OCCUP
2006-11-27ECB Hazardous violation: NO GUARD RAILS NB#103682702.ON INSPECTION NO GUARD RAILS PROVIDED AT EDGE OF ROOF LEVEL. NO PROTECTION PROVIDED FOR APPROX 100' DR$5,000
2006-11-27DOB violation C:
2006-11-21DOB complaint, category ?
2006-11-03Job filed: SC
2006-10-19DOB complaint, category ?
2006-08-05DOB complaint, category ?
2006-07-26ECB Non-Hazardous violation: FAILURE TO COMPLY W/ STOP WORK ORDER DATED 5/10/06.DOB#051006C04AA02, ECB#34518223P W/ SPECIFICATIONS TO STOP ALL WORK ABOVE 7 FL $1,500
2006-07-06DOB complaint, category ?
2006-06-29DOB violation C:
2006-06-28DOB complaint, category ?
2006-06-04DOB complaint, category ?
2006-05-10ECB Non-Hazardous violation: NO ELEVATOR IN READINESS UNDER APPLICATION # N.B. 103682702 EXP. 01/21/07 FOR PROPOSED 11 STY. NOTE: OBSERVED HOIST ELEVATOR ERECT$1,000
2006-05-10DOB complaint, category ?
2006-05-06DOB complaint, category ?
2006-04-27Job filed: Fire Alarm system for Sprinkler and Smoke Detectors for apartment house. Application filed in conjunction with NB# 103682702. No change in use, egress$1,000
2006-04-27Job filed: Installation of 2 gas fired boilders filed in conjunctio with NB# 103682702. No change in use, egress or occupancy. Plumbing work for boiler filed un$1,000
2006-04-27Job filed: Fire Alarm system for Sprinkler and Smoke Detectors for apartment house. Application filed in conjunction with NB# 103682702. No change in use, egress$1,000
2006-04-27Job filed: Installation of 2 gas fired boilders filed in conjunctio with NB# 103682702. No change in use, egress or occupancy. Plumbing work for boiler filed un$1,000
2006-04-13Permit EQ — ISSUED
2006-04-13Permit EQ — ISSUED
2006-04-13DOB complaint, category ?
2006-04-12DOB complaint, category ?
2006-03-04DOB complaint, category ?
2006-01-29DOB complaint, category ?
2006-01-27Permit NB — ISSUED
2006-01-27Permit EQ — ISSUED
2006-01-18ECB Non-Hazardous violation: SIDEWALK SHED DOES NOT MEET BLDG. CODE SPEC. UPON INSP. TOP OF SIDEWALK SHED NOW WORKING PLATFORM W/OFFICE TRAILER ON TOP W/STELL $2,000
2006-01-18ECB Non-Hazardous violation: EXPIRED PERMIT FENCE. UPON INSP. FENCE PERMITED # 103682702-FN HAS EXPIRED ON 12/31/05. REMEDY: RENEW ALL PERMITS AS PER BLDG. COD$2,500
2006-01-17DOB complaint, category ?
2006-01-17DOB complaint, category ?
2005
2005-12-27Permit EQ — ISSUED
2005-12-24DOB complaint, category ?
2005-12-16Job filed: INSTALLATION OF A CONSTRUCTION TRAILER ON EXISTING SHED 104300631 DURING NB CONSTRUCTION 103682702. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2005-12-02Permit EQ — ISSUED
2005-11-30Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 65' DURING NB CONSTRUCTION. NO CHANGES IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9
2005-11-30Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 65' DURING NB CONSTRUCTION. NO CHANGES IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9
2005-11-23Permit NB — ISSUED
2005-11-23Permit EQ — ISSUED
2005-11-09Permit EQ — ISSUED
2005-11-09Permit NB — ISSUED
2005-09-03DOB complaint, category ?
2005-08-23Permit PL — ISSUED
2005-08-11Permit NB — ISSUED
2005-07-01DOB complaint, category ?
2005-07-01DOB complaint, category ?
2005-05-07DOB violation C:
2005-05-07DOB complaint, category ?
2005-04-30DOB complaint, category ?
2005-03-04ECB Hazardous violation: FAILURE TO SAFWGUARD PUBLIC & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.DEFECT NOTED:AS A RSULT OF PILE DRIVING ON WEST ELEV.TH$5,000
2005-01-25Permit EQ — ISSUED
2005-01-03ECB Non-Hazardous violation: FAILURE TO PROVIDE APP.PLANS ON SITE.UPON INSPECTION APPROX 5 WORKERS WORKING ON UNDERPINNING ADJ 1 STORY BLD.ON EAST SIDE OF SITE$130
2005-01-03ECB Non-Hazardous violation: POSTING OF PERMITS.UPON INSPECTION 5 WORKERS AT SITE NO POSTED NB PERMIT. REMEDY:POST ALL PERMITS AS PER BLD CODE.$130
2005-01-03ECB Non-Hazardous violation: WORK WITHOUT PERMIT.EXPIRED.UPON INSPECTION APPROX 5 MEN WORKING ON UNDERPINNING OF ADJ BLD ON EAST SIDE OF SITE.THE NB HAS EXPIRE
2004
2004-12-30DOB complaint, category ?
2004-12-14DOB complaint, category ?
2004-12-13ECB Non-Hazardous violation: FAILURE TO PROVIDE CONTRACTOR'S SIGN. UPON INSP. ONE WORKER ON SITE UNDER PLANNING IN PROGRESS NB#103682702 NO CONTRACTORS SIGN PR$250
2004-11-15Permit NB — ISSUED
2004-11-15Permit EQ — ISSUED
2004-08-23ECB Non-Hazardous violation: WORK W/OUT A PERMIT.NOTED:APPLICATION (DM #103771125) WITH DRAWN BY CONTRACTOR ANCOR CONSTRUCTION. REMEDY:STOP ALL WORK OBTAI
2004-08-12ECB Non-Hazardous violation: FAILURE TO PROTECT ADJACENT STRUCTRES DURING DEMOLITION OPERATIONS VIOLATION NOTED:CONTRACTOR DEMOLISHED BLDG AT THE ABOVE ADDRESS$1,500
2004-08-12DOB complaint, category ?
2004-06-24DOB complaint, category ?
2004-06-16Permit NB — ISSUED
2004-06-16Permit EQ — ISSUED
2004-06-09Job filed: UNDERPINNING AND SHORING DETAILS FILED FOR APPROVAL.
2004-05-20ECB Non-Hazardous violation: FAILURE TO PROVIDE CONTRACTORS SIGN DEMOLITION OF CONC. BLOCK WALL AT RIGHT SIDE WAS IN PROGRESS AND CONTRACTOR'S SIGN WAS NOT POS$250
2004-05-14Permit DM — ISSUED
2004-05-03Job filed: DM
2004-04-01Job filed: MECHANICAL AND PLUMBING PLANS WITH SCHED ULE B FILED FOR APPROVAL
2004-04-01Job filed: NB
2004-03-31Permit EQ — ISSUED
2004-03-30Job filed: A3
2004-03-30Job filed: A3
2004-03-30Job filed: SPRINKLER AND FIRE STANDPIPE PLANS FILED IN CONJUCTION WITH NB10368270 NO CHANGES$2,000
2004-03-30ECB Non-Hazardous violation: DEMOILITION WORK W/OUT A PERMIT.WORK NOTED:BLDG HAD BEEN PARTIALLY DEMOLISHED (APPROX 90%) PRIOR TO INSPECTION AND REAR BLOCK WALL
2004-01-29Job filed: A3
2004-01-09Job filed: NB
2003
2003-05-30ECB Non-Hazardous violation: WORK WITHOUT PERMIT WORK NOTED ERECTED 8-0 HIGH PLYWOOD CONSTRUCTION FENCE AT FRONT OF PREMISES REMEDY: OBTAIN PERMIT OR REMOVE FE$250
2003-05-29DOB complaint, category ?
2003-05-15DOB complaint, category ?
2003-04-21DOB complaint, category ?
2003-04-17DOB complaint, category ?
2003-04-17DOB complaint, category ?
2003-02-27DOB complaint, category ?
2003-01-17ECB Non-Hazardous violation: FAILURE TO OBTAIN PERMIT FOR TEMPORARY CONSTRUCTION. PERMIT NOT OBTAIN FOR FENCE (8' HIGH) AT FRONT OF PREMISES. REMEDY: OBTAIN A $400
2003-01-14DOB complaint, category ?
2002
2002-03-04DOB complaint, category ?
2002-01-10Permit EW — ISSUED
2001
2001-11-30Job filed: APPLICATION FILED FOR TEMPORARY SHORING AS INDICATED ON PLANS SUBMITTED HEREWITH NO CHANGE IN USE EGRESS OR OCCU PANCY.$50,000
2001-11-30Job filed: APPLICATION FILED FOR TEMPORARY SHORING AS INDICATED ON PLANS SUBMITTED HEREWITH NO CHANGE IN USE EGRESS OR OCCU PANCY.$50,000
2001-10-30Permit EW — ISSUED
2001-10-30Permit EW — ISSUED
2001-10-30Permit EW — ISSUED
2001-10-15DOB complaint, category ?
2001-09-10DOB complaint, category ?
2001-08-30DOB complaint, category ?
2001-08-15DOB complaint, category ?
2001-07-27DOB complaint, category ?
2001-06-20Permit AL — ISSUED
2001-06-08DOB complaint, category ?
2001-06-04ECB Hazardous violation: FAILURE TO PROTECT ADJOINING STRUCTURES (BUILDING)DURING EXCAVATION OPERATION.CONCRETE FLOOR SLAB AT FIRST FLOOR OF 521 WEST 23 ST
2001-06-04DOB complaint, category ?
2001-05-11DOB complaint, category ?
2001-05-11DOB complaint, category ?
2001-04-25DOB complaint, category ?
2001-04-19DOB complaint, category ?
2001-04-12DOB violation C:
2001-04-12ECB Non-Hazardous violation: WORK WITHOUT A PERMIT NOTED:WOODEN FENCE ERECTED IN FRONT OF BLDG UNDER CONSTRUCTION FENCE.APPROX 8 FEET HIGH 12 FEET WIDE 15 FEET
2001-04-10DOB complaint, category ?
2001-03-22DOB complaint, category ?
2001-03-22DOB complaint, category ?
2001-03-22DOB complaint, category ?
2001-03-22DOB complaint, category ?
2001-03-21ECB Hazardous violation: (HAZARDOUS) FAILURE TO SAFEGUARD PUBLIC AND PROPERTY EFFECTED BY CONSTRUCTION OPERATIONS.DEFECT IS:PIPE SCAFFOLDING ERECTED AT FRO$1,500
2001-03-15Job filed: PA
2001-03-15Job filed: PA
2001-03-15Job filed: PA
2001-03-15Job filed: PA
2001-03-13DOB complaint, category ?
2001-03-09DOB complaint, category ?
2001-03-07Job filed: Install new sprinkler heads with asociated piping as required for new Cabaret/Eating and Drinking Establishment, Use Group 12, Occupancy F-4. No chan$50,000
2001-03-07Job filed: Install new sprinkler heads with asociated piping as required for new Cabaret/Eating and Drinking Establishment, Use Group 12, Occupancy F-4. No chan$50,000
2001-03-03ECB Non-Hazardous violation: FAILURE TO OBTAIN A PERMIT FOR CONSTRUCTION FENCE REMEDY:OBTAIN PERMIT
2001-03-01Job filed: Application filed for new C of O for new Cabaret and Eating Establishment as shown all work under separate work applications.$1,000
2001-03-01Permit EW — RE-ISSUED
2001-03-01Permit EW — RE-ISSUED
2001-03-01Permit EW — RE-ISSUED
2001-03-01Permit EW — RE-ISSUED
2001-02-28Job filed: Interior renovation as shown on plans filed herewith to include new partitions and hung ceiling in conjunction with ALT Type I for change of use. No$250,000
2001-02-28Job filed: Structural work including repair of existing foundations along with new construction as shown on plans filed herewith in conjunction with interior ren$900,000
2001-02-28Job filed: Interior renovation as shown on plans filed herewith to include new partitions and hung ceiling in conjunction with ALT Type I for change of use. No$250,000
2001-02-28Job filed: Structural work including repair of existing foundations along with new construction as shown on plans filed herewith in conjunction with interior ren$900,000
2001-02-28Job filed: New HVAC and new plumbing in conjunction with interior renovation.$215,000
2001-02-20DOB complaint, category ?
2001-02-12DOB complaint, category ?
2000
2000-12-06Job filed: Interior demolition as shown on plans filed herewith. No change to use, egress o r occupancy.$10,000