A modest record — below the level that usually signals systemic problems. More recorded distress than 85% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 119. In ZIP 11233, 51% of residential buildings hold an A and
14% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
15 total — 6 class C (immediately hazardous), 7 class B, 2 class A. Oldest open since 2018-10-23.
status snapshot refreshed weekly from HPD records
Patterns
2 heat or hot-water complaints in the last three years (winter 2023–24: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
11 service requests in the last three years. Most common: Noise (5) · Illegal Parking (2) · Indoor Air Quality (1) · HEAT/HOT WATER (1) · FLOORING/STAIRS (1) · General Construction/Plumbing (1).
Filed construction activity
No permitted work with a declared cost filed in the last decade. Permit
costs cover filed construction work only — they do not capture routine maintenance or repairs done
without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1906)
Yes
Six or more residential units (6)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
411 CHAUNCEY HDFC
Head officer
MARIA BAUMAN
Managing agent
HSC MANAGEMENT CORP
Last registered
2024-07-19
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$932,000
$419,400
2026
$1,118,000
$503,100
2027
$1,342,000
$603,900
The city's market estimate has risen
44% between tax years 2025 and 2027.
Tax exemptions on the roll: ARTICLE XI
Building systems
Heating fuel
NO2FUEL
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Ralph Av — C · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: none Halsey St — J · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Saratoga Av / Bainbridge St — B7 · 250 ft
Citi Bike
Chauncey St & Howard Ave · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
11 311 service requests from this address in the last three years — 1 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $970,698 on
2015-11-04 (lender: NYC Department Of Housing Preservation & Developme). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2023-11-29
RPTT $23,519 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to MCSWEEN, RACHEL M
$23,519
2019-10-11
RPTT&RET $2,500 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to FARRELL, JOHN W
$2,500
2019-09-27
RPTT&RET $2,500 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to WALKER, PHYLISIA; WALKER, JAREK
$2,500
2019-09-27
RPTT&RET $2,500 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to WATSON, DIANA
$2,500
2019-09-27
RPTT&RET $23,519 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to BAUMAN, MARIA M
$23,519
2015-11-04
Mortgage $256,075 — from 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO to THE COMMUNITY PERSERVATION CORPORATION
$256,075
2015-11-04
Mortgage $970,698 — from 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO to NYC DEPARTMENT OF HOUSING PRESERVATION &
$970,698
2015-11-04
AL&R $256,075 — from 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO to THE COMMUNITY PERSERVATION CORPORATION
$256,075
2015-10-30
Deed $1,281,883 — from UHAB HOUSING DEVELOPMENT FUND CORPORATIO to 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO
$1,281,883
2009-07-13
Deed $56,000 — from NEIGHBORHOOD RESTORE HOUSING DEVELOPMENT to NEW-HAB HOUSING DEVELOPMENT FUND CORPORA
$56,000
2009-07-13
Mortgage $1,953,551 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to BPD BANK
$1,953,551
2009-07-13
Mortgage $4,391,026 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to BPD BANK
$4,391,026
2001-10-31
Mortgage $243,200 — from ALI, BRUCE to INTERSTATE RESOURCECORP
$243,200
1998-11-24
Mortgage $60,000 — from GUAVA REALTY CORP to DAVIS, H I
$60,000
1998-01-21
Mortgage $100,000 — from GUAVA REALTY CORP to MORNINGSTAR REAL ESTATE & MORTGAGE FINA
$100,000
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
41
2023
2024
2025
2026
EnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
4
0
0
4
2018
0
9
0
0
9
2019
0
3
4
0
7
2020
0
6
0
1
7
2021
0
4
0
0
4
2022
0
8
0
1
9
2023
0
40
1
0
41
2024
1
3
0
2
6
2025
0
7
0
1
8
2026
0
1
0
1
2
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-11-20
HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
The full timeline
2026
2026-05-29Rodent inspection: Passed
2026-05-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025
2025-11-20HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-03-15311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2023
2023-12-19Bedbug filing: 0 infested units
2023-12-11City emergency repair (OMO): at apt# 3a / foyer and roof .. i) trace and repair the source of water leaks damaging ceiling and wall plaster from the$2,000
2023-11-29RPTT $23,519 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to MCSWEEN, RACHEL M$23,519
2023-11-08HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT AT CEILING AT LOBBY, 1st STORY
2023-11-08HPD class C: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING, EAST AND WEST WALLS AT L
2023-11-08HPD class C: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT LOBBY, 1st STORY
2023-11-08HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, EAST AND WEST WALL AT LOBBY, 1st STORY
2023-11-08HPD class C: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 20 SQUARE FEET AT CEILING AND APPROX 40 SQUARE F
2023-11-08HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND WEST WINDOW RECESS IN THE 1st
2023-11-08HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY,
2023-11-08HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE FOYER LOCA
2023-11-08HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOODEN WASH BASIN BASE IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st A
2023-11-08HPD class C: § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EA
2023-11-08HPD class C: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 40 SQUARE FEET AT CEILING IN THE BATHROOM LOCATE
2023-11-08HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM N
2023-11-07311: HEAT/HOT WATER — ENTIRE BUILDING
2023-11-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-10-21311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2023-09-28HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTRU
2023-09-28HPD class C: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FR
2023-09-28HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED
2023-09-28HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM
2023-09-28HPD class B: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 25 SQ FT AT WEST WALL IN THE PRIVATE HALLWAY LOC
2023-09-28HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 2nd STORY
2023-09-28HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 2nd STORY
2023-09-28HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTRU
2023-09-23311: UNSANITARY CONDITION — MOLD
2023-09-23311: WATER LEAK — HEAVY FLOW
2023-09-23Tenant complaint: WATER LEAK — HEAVY FLOW
2022-07-25HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORT
2022-07-24311: HEAT/HOT WATER — ENTIRE BUILDING
2022-07-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-07-21311: Water System — Dirty Water (WE)
2022-02-23HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-02-23HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-07HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-07HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-06-04HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL AT PUBLIC HALL, 2nd STORY
2018
2018-12-04311: Damaged Tree — Branch or Limb Has Fallen Down
2018-10-23HPD class A: § 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO A CHAIN GUARD IN THE
2018-10-23HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130 F AT ALL HOT WATER FIXT
2018-10-23HPD class B: § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF FLOWER P
2018-10-20311: HEAT/HOT WATER — ENTIRE BUILDING
2018-10-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-10-16HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-01-05REL — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to THE CITY OF NEW YORK
2016-01-05Mortgage satisfied — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to BPD BANK
2016-01-05Mortgage satisfied — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to BPD BANK
2015
2015-11-04Mortgage $256,075 — from 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO to THE COMMUNITY PERSERVATION CORPORATION$256,075
2015-11-04Agreement — from 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO to NYC DEPARTMENT OF HOUSING PRESERVATION &
2015-11-04SUBM — from NYC DEPARTMENT OF HOUSING PRESERVATION & to THE COMMUNITY PERSERVATION CORPORATION
2015-11-04Mortgage $970,698 — from 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO to NYC DEPARTMENT OF HOUSING PRESERVATION &$970,698
2015-11-04AL&R $256,075 — from 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO to THE COMMUNITY PERSERVATION CORPORATION$256,075
2015-10-30Deed — from NEWHAB HOUSING DEVELOPMENT FUND CORPORAT to UHAB HOUSING DEVELOPMENT FUND CORPORATIO
2015-10-30Deed $1,281,883 — from UHAB HOUSING DEVELOPMENT FUND CORPORATIO to 411 CHAUNCEY HOUSING DEVELOPMENT FUND CO$1,281,883
2015-04-25311: ELECTRIC — NO LIGHTING
2015-04-25311: WATER LEAK — DAMP SPOT
2015-04-25Tenant complaint: ELECTRIC — NO LIGHTING
2015-04-25Tenant complaint: WATER LEAK — DAMP SPOT
2015-02-18HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2014
2014-11-01311: HEAT/HOT WATER — APARTMENT ONLY
2014-11-01Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2010-03-25Job filed: INSTALL BOILER IN CONJUNCTION TO JOB#: 310167690. NO CHANGE IN EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$11,200
2009
2009-12-31DOB violation LBLVIO:
2009-12-07Permit EQ — ISSUED
2009-12-07Permit AL — ISSUED
2009-10-22Permit EW — ISSUED
2009-10-22Permit PL — ISSUED
2009-10-05Permit PL — ISSUED
2009-08-19DOB complaint, category ?
2009-08-10Permit AL — ISSUED
2009-08-10Permit EQ — ISSUED
2009-08-10Permit PL — ISSUED
2009-07-13Deed $56,000 — from NEIGHBORHOOD RESTORE HOUSING DEVELOPMENT to NEW-HAB HOUSING DEVELOPMENT FUND CORPORA$56,000
2009-07-13Mortgage $1,953,551 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to BPD BANK$1,953,551
2009-07-13Mortgage $4,391,026 — from NEW-HAB HOUSING DEVELOPMENT FUND CORPORA to BPD BANK$4,391,026
2009-07-13Agreement — from NEW HAB HOUSING DEVELOPMENT FUND CORPORA to THE CITY OF NEW YORK
2009-07-13Agreement — from THE CITY OF NEW YORK to BPD BANK
2009-07-13REL — from NEIGHBORHOOD RESTORE HOUSING DEVELOPMENT to THE CITY OF NEW YORK
2009-06-10Job filed: INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH JOB #310167690. NO CHANHE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$95,000
2009-06-10Job filed: INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH JOB #310167690. NO CHANHE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$95,000
2009-04-22DOB complaint, category ?
2009-01-17Tenant complaint: HEATING — HEAT RELATED
2009-01-01DOB violation LL6291:
2008
2008-06-26Job filed: INTERIOR REHABLITATION OF EXISTING BUINDING INCLUDING PLUMBING FIXTURES,PARTIRIONS.$375,000
2008-06-26Job filed: INTERIOR REHABLITATION OF EXISTING BUINDING INCLUDING PLUMBING FIXTURES,PARTIRIONS.$375,000
2008-01-03DOB violation LL6291:
2007
2007-07-13City emergency repair (HWO): local law #1 violation : as per hpd's abatement requirement contracts and attached scope of work thoroughly remove all l$75
2007-07-09City emergency repair (OMO): public area) at 3rd story stairs bulkhead. re-secure loose balustrade. remove all work related debris. note: contractor $274
2007-07-03Tenant complaint: NONCONST — VERMIN
2007-06-04City emergency repair (HWO): apt 2l) at bathroom, bedroom and livingroom install window guard and stops, remove defective window guards and stops thr$286
2007-05-06HPD class C: § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIO
2007-05-06HPD class C: § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIO
2007-05-06HPD class C: § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIO
2007-01-24Deed — from COMMISSIONER OF FINANCE OF THE CITY OF N to NEIGHBORHOOD RESTORE HOUSING DEVELOPMENT
2006
2006-11-15Agreement — from NEIGHBORHOOD RESTORE HOUSING to CITY OF NEW YORK BY AND THRU
2006-07-01City emergency repair (OMO): con edison provide electric to building public areas and heating plant/hot water heater.
2006-07-01City emergency repair (OMO): provide automatic fuel delivery to above 7a building until further notice. # 2 fuel oil...tank capacity = 550 gallons [2$14,563
2006-03-06Tenant complaint: HEATING — HEAT RELATED
2006-03-05Tenant complaint: HEATING — HEAT RELATED
2006-03-04Tenant complaint: HEATING — HEAT RELATED
2005
2005-12-27Tenant complaint: HEATING — HEAT RELATED
2005-11-25Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2005-11-14City emergency repair (OMO): public area: exterminate entire building for rodents and roaches; to include termites. note tenant in aprtment 1l has ke$575
2005-07-01City emergency repair (OMO): provide automatic fuel delivery to above 7a building until further notice. # 2 fuel oil...tank capacity = 550 gallons [2$1,802
2005-07-01City emergency repair (OMO): con edison provide electric to building public areas and heating plant/hot water heater.$507
2005-06-29Permit EW — ISSUED
2005-06-24City emergency repair (OMO): as per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental p
2005-06-24Job filed: REPAIR/REPLACE EXISTING PARAPET WALL AND STEEL LINTES AT REAR OF THE BUILDING AS PER PLAN FILED. NO CHANGE IN USE EGRESS OR OCCUPANCY.$15,000
2005-06-24Job filed: REPAIR/REPLACE EXISTING PARAPET WALL AND STEEL LINTES AT REAR OF THE BUILDING AS PER PLAN FILED. NO CHANGE IN USE EGRESS OR OCCUPANCY.$15,000
2005-05-24City emergency repair (OMO): for payment purposes only to pacific petro. provide new low water cut-off for boiler and restore to proper working order$235
2005-05-16City emergency repair (OMO): as per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental p$26
2005-04-26City emergency repair (OMO): install a new 2'' oil fill line box complete at front of the building. note: contractor must contact hpd @(718) 636-3021$950
2005-04-06City emergency repair (OMO): apt. 2r: trace and repair all concealed leaks from above affecting bathroom. replace defective waste lines and water shu$899
2005-04-04City emergency repair (OMO): provide automatic fuel delivery to above 7a building until further notice. # 2 fuel oil...tank capacity = 550 gallons [2$452
2005-03-25City emergency repair (HWO): local law #1 violation : as per rc # . and attached scope of work thoroughly remove all lead violations as per new york $849
2005-03-21City emergency repair (OMO): provide single fuel drop with prime and start. # 2 fuel. fill tank. please report any problems immediately to esb fuel u$858
2005-03-21Tenant complaint: HEATING — HEAT RELATED
2005-03-16City emergency repair (OMO): #2 oil boiler: make all necessary repairs to #2 oil boiler to restore to proper working condition. restore heat to entir$200
2005-03-16Tenant complaint: HEATING — HEAT RELATED
2005-03-08Tenant complaint: HEATING — HEAT RELATED
2005-03-08Tenant complaint: HEATING — HEAT RELATED
2005-02-17City emergency repair (OMO): trace and repair all conceal leaks into cellar area, including restoration. remove all work related debris from premesis$700
2005-02-10City emergency repair (OMO): provide single fuel drop with prime and start. #2 fuel. fill tank. please report any problems immedialty to esb fuel uni$719
2005-01-27Tenant complaint: HEATING — HEAT RELATED
2005-01-26Tenant complaint: HEATING — HEAT-PLANT
2005-01-26Tenant complaint: HEATING — HEAT RELATED
2005-01-26Tenant complaint: HEATING — HEAT RELATED
2005-01-25Tenant complaint: HEATING — HEAT RELATED
2005-01-22Tenant complaint: HEATING — HEAT RELATED
2005-01-19City emergency repair (OMO): cut out all air pockets and install (36 sq. ft.) of 90 lbs. capsheet towards the roof drain section. provide pitch to dr$985
2004-11-15City emergency repair (OMO): provide single fuel drop with prime and start. #2 fuel. fill tank. please report any problems immedialty to esb fuel uni$699
2004-11-08Tenant complaint: HEATING — HEAT RELATED
2004-11-06Tenant complaint: HEATING — HEAT RELATED
2004-11-06Tenant complaint: HEATING — HEAT RELATED
2004-10-18Tenant complaint: HEATING — HEAT RELATED
2004-10-11Tenant complaint: PLUMBING — BASIN/SINK
2004-10-11Tenant complaint: PLUMBING — BASIN/SINK
2004-09-16City emergency repair (OMO): trace and repair concealed water leaks at bathroom ceiling from apartment above and reset toilet bowl. note:contractor m$632
2004-09-16City emergency repair (OMO): con edison provide electric to building public areas and heating plant/hot water heater.
2004-09-02Tenant complaint: ELECTRIC — LIGHTING
2004-09-02Tenant complaint: PLUMBING — WATER SUPPLY
2004-08-31Tenant complaint: HEATING — HEAT RELATED
2004-08-31Tenant complaint: ELECTRIC — LIGHTING
2004-08-31Tenant complaint: PLUMBING — WATER SUPPLY
2004-08-24City emergency repair (OMO): provide single fuel drop with prime and start. #2 fuel. fill tank. please report any problems immediatley to esb fuel un$306
2004-08-23Tenant complaint: ELECTRIC — ELECTRIC-SUPPLY
2004-08-23Tenant complaint: PLUMBING — BASIN/SINK
2004-08-12Tenant complaint: HEATING — HEAT RELATED
2004-08-12Tenant complaint: GENERAL — DOORS
2004-06-11City emergency repair (OMO): repair the rear boiler room wall and wall around the fresh air inlet. work must be done in order for balter lehigh (e314$529
2004-04-23Job filed: Installation of 8' high by 50' long chain link fence. No change of use, egress or occupancy under this application.$2,000
2004-03-19City emergency repair (OMO): provide single fuel drop with prime and start. # 2 fuel. fill tank. please report any problems immediately to esb fuel u$478
2004-03-12Tenant complaint: HEATING — HEAT RELATED
2004-02-19Tenant complaint: HEATING — HEAT RELATED
2004-02-13DOB violation LL6291:
2004-01-30City emergency repair (OMO): provide single fuel drop with prime and start. #2 fuel. fill tank. please report any problems immediatly to esb fuel uni$510
2004-01-27Tenant complaint: HEATING — HEAT RELATED
2004-01-27Tenant complaint: HEATING — HEAT RELATED
2004-01-25Tenant complaint: HEATING — HEAT RELATED
2004-01-23Tenant complaint: HEATING — HEAT RELATED
2004-01-23Tenant complaint: HEATING — HEAT RELATED
2004-01-23Tenant complaint: HEATING — HEAT RELATED
2004-01-23Tenant complaint: HEATING — HEAT RELATED
2004-01-08Tenant complaint: HEATING — HEAT RELATED
2004-01-07City emergency repair (OMO): provide single fuel drop with prime and start. # 2 fuel. fill tank. please report any problems immediately to esb fuel u$465
2004-01-07Tenant complaint: HEATING — HEAT RELATED
2004-01-07Tenant complaint: HEATING — HEAT RELATED
2004-01-06Tenant complaint: HEATING — HEAT RELATED
2004-01-06Tenant complaint: HEATING — HEAT RELATED
2004-01-05Tenant complaint: HEATING — HEAT RELATED
2004-01-05Tenant complaint: HEATING — HEAT RELATED
2004-01-04Tenant complaint: HEATING — HEAT RELATED
2004-01-03Tenant complaint: HEATING — HEAT RELATED
2004-01-02Tenant complaint: HEATING — HEAT RELATED
2003
2003-12-23City emergency repair (OMO): repair the rear boiler room wall and wall around the fresh air inlet. *omo e314070 pending final sign off from the depar$786
2003-12-03Tenant complaint: HEATING — HEAT RELATED
2003-12-02City emergency repair (OMO): provide single fuel drop with prime and start. # 2 fuel. fill tank. please report any problems immediately to esb fuel u$424
2003-12-02Tenant complaint: HEATING — HEAT RELATED
2003-11-28Tenant complaint: HEATING — HEAT RELATED
2003-10-19Tenant complaint: HEATING — HEAT RELATED
2003-09-23Permit EW — ISSUED
2003-09-23Permit EW — ISSUED
2003-09-23Permit EW — ISSUED
2003-09-17Tenant complaint: HEATING — HEAT RELATED
2003-07-08City emergency repair (OMO): provide single fuel drop with prime and start. #2 fuel. fill tank. please report any problems immediately to esb fuel un$245
2003-07-03Tenant complaint: HEATING — HEAT RELATED
2003-07-02City emergency repair (OMO): as per mini rc #315239 (iatl), perform total lead analysis of 20 dust wipe sample(s) via environmental protection agency$84
2003-02-24Tenant complaint: HEATING — HEAT RELATED
2002
2002-12-16HPD class C: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS AT LOWER SASHE WINDOW IN THE 4th ROOM FROM NORTH LOCATED AT APT 1-R, 1st S
2002-12-16HPD class C: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS AT UPPER SASH NORTH WINDOW IN THE 4th ROOM FROM NORTH LOCATED AT APT 1R, 1st STORY
2002-03-26DOB violation LL6291:
2001
2001-10-31Mortgage $243,200 — from ALI, BRUCE to INTERSTATE RESOURCECORP$243,200
2001-02-27DOB violation LL6291:
2000
2000-07-27TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2000-02-07DOB violation LL6291:
1999
1999-03-16DOB violation LL6291:
1998
1998-11-24Mortgage $60,000 — from GUAVA REALTY CORP to DAVIS, H I$60,000
1998-01-21Mortgage assigned — from GUAVA REALTY CORP to MORNIGSTAR REAL ESTATE & MORTGAGE FINANC
1998-01-21Deed — from SPENCE, TREVOR to GUAVA REALTY CORP
1998-01-21Mortgage $100,000 — from GUAVA REALTY CORP to MORNINGSTAR REAL ESTATE & MORTGAGE FINA$100,000
1997
1997-09-16DOB violation LL6291:
1997-02-10DOB violation LL6291:
1989
1989-01-26ECB Non-Hazardous violation: REPLACE COMBUSTION CHAMBER SIGHT GLASS. REPLACE BREECHING AND PROPERLY INSTALL METAL SCREWS ON SECTIONS.
1986
1986-07-31Deed — from PATTILIO, ANTHONY to SPENCE, TREVOR