The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 0. In ZIP 11211, 58% of residential buildings hold an A and
7% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
91 service requests in the last three years. Most common: Noise (24) · Blocked Driveway (20) · Illegal Parking (15) · Abandoned Vehicle (12) · Street Condition (10) · Derelict Vehicles (3).
Filed construction activity
$1,917,500 in permitted construction work filed since
2016 (8 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2014)
Yes
Six or more residential units (28)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
THE 280 METROPOLITAN AVENUE CONDOMINIUM
Head officer
JEFFERY BIEBER
Managing agent
ARGO REAL ESTATE, LLC
Last registered
2025-09-17
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$599,454
$269,754
2026
$0
$0
2027
$556,649
$250,493
The city's market estimate has fallen
7% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 15 YR CAP
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $1,142,579 a year
($44.03 per sq ft), operating expenses $266,507
($10.27 per sq ft), net operating income $876,072. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Energy grade (LL33)
B — ENERGY STAR score 84/100 (2022 disclosure cycle)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bedford Av — L · 1,050 ft straight-line (about a 5-minute walk) · station accessibility: full Lorimer St — G L · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Driggs Av / N 4 St — B62 · 300 ft
Citi Bike
Roebling St & N 4 St · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
91 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2026-06-10Job filed: inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco
2026-05-27311: Blocked Driveway — No Access
2026-05-12311: Blocked Driveway — No Access
2026-04-06Mortgage satisfied — from CHIANG, VIRGINIA; LEE, MICHAEL to WELLS FARGO BANK, N.A.
2026-04-06Mortgage satisfied — from CHIANG, VIRGINIA; LEE, MICHAEL to WELLS FARGO BANK, N.A.
2026-03-31PAT — from CHIANG, REIKA to DOMINIQUE MILLER ESQ.
2026-03-31PAT — from SOUTH CLOUD LLC to THE 280 METROPOLITAN AVENUE CONDOMINIUM
2026-03-31PAT — from CHIANG, REIKA to DOMINIQUE MILLER ESQ.
2026-03-31Deed $1,025,000 — from LEE, MICHAEL; CHIANG, REIKA to SOUTH CLOUD LLC$1,025,000
2026-03-31PAT — from LEE, MICHAEL to DOMINIQUE MILLER ESQ.
2026-03-31PAT — from LEE, MICHAEL to DOMINIQUE MILLER ESQ.
2026-03-31Deed $1,025,000 — from LEE, MICHAEL; CHIANG, REIKA to SOUTH CLOUD LLC$1,025,000
2026-03-31PAT — from SOUTH CLOUD LLC to THE 280 METROPOLITAN AVENUE CONDOMINIUM
2026-03-29311: Street Condition — Rough, Pitted or Cracked Roads
2023-11-01Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION; JPMORGAN CHASE BANK, N.A.; FIRST REPUBLIC BANK to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-10-18311: Panhandling — N/A
2023-10-02Deed — from SHU, CHUNPING; WINSHORE LLC to MOQING LLC
2023-09-07PAT — from MOQING LLC to BRD OF MANAGERS OF THE 280 METROPOLITAN ; 280 METROPOLITAN PARTNERS LLC
2023-09-07Deed — from SHU, CHUNPING to MOQING LLC
2023-09-01PAT — from MOQING LLC to BOARD OF MANAGERS OF THE 280 METROPOLITA
2023-08-25311: Blocked Driveway — No Access
2023-08-15Deed transfer (nominal price)
2023-08-09Deed transfer (nominal price)
2023-07-28PAT — from KAYE, HOWARD to MILLER, DOMINIQUE
2023-07-28PAT — from HOWARD, WILLIAM to MILLER, DOMINIQUE
2023-07-28Deed $1,395,000 — from KAYE, HOWARD; HOWARD, WILLIAM to SEENIVASAN, AJEET$1,395,000
2023-07-28Mortgage $976,500 — from SEENIVASAN, AJEET to WELLS FARGO BANK NA$976,500
2023-07-28Mortgage $976,500 — from SEENIVASAN, AJEET to WELLS FARGO BANK NA$976,500
2023-07-28PAT — from SEENIVASAN, AJEET to THE 280 METROPOLITAN AVENUE CONDOMINIUM
2023-07-28PAT — from HOWARD, WILLIAM to MILLER, DOMINIQUE
2023-07-28PAT — from KAYE, HOWARD to MILLER, DOMINIQUE
2023-07-28PAT — from SEENIVASAN, AJEET to THE 280 METROPOLITAN AVENUE CONDOMINIUM
2023-07-28Deed $1,395,000 — from KAYE, HOWARD; HOWARD, WILLIAM to SEENIVASAN, AJEET$1,395,000
2023-07-25Mortgage satisfied — from KAYE, HOWARD; HOWARD, WILLIAM to FIRST REPUBLIC BANK
2023-07-20311: Lead — Lead Kit Request (Residential) (L10)
2023-07-04311: Blocked Driveway — No Access
2023-06-30Sold for $1,395,000$1,395,000
2023-06-30Sold for $1,395,000$1,395,000
2023-06-16311: Street Condition — Pothole
2023-06-14311: New Tree Request — For One Address
2023-03-30FDNY inspection (RISK)
2023-01-31Bedbug filing: 0 infested units
2022
2022-12-15311: Blocked Driveway — No Access
2022-12-15311: Blocked Driveway — No Access
2022-12-09311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2022-12-09DOB complaint, category ?
2022-11-17Mortgage satisfied — from KOGAN, BENJAMIN M to LOANCARE, LLC; GOLDMAN SACHS BANK USA
2022-11-14PAT — from MUNSTERS, JULIA to BOM OF THE 280 METROPOLITAN AVENUE CONDO
2022-11-14Deed $1,200,000 — from KOGAN, BENJAMIN M to MUNSTERS, JULIA$1,200,000
2022-10-31Mortgage $693,000 — from WARREN, JUSTIN; WAXMAN, JAMIE KAY to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; LOANDEPOT.COM, LLC$693,000
2022-10-31PAT — from WAXMAN, JAIME KAY to WARREN, JUSTIN
2022-10-31Deed $990,000 — from LO, FUNG LUM MINDY to WARREN, JUSTIN; WAXMAN, JAMIE KAY$990,000
2022-10-31PAT — from WARREN, JUSTIN; WAXMAN, JAMIE KAY to BOARD MANAGERS OF THE 280 METROPOLITAN A
2022-10-31Sold for $1,200,000$1,200,000
2022-10-26Sold for $990,000$990,000
2022-08-30Mortgage $792,000 — from ROY, DANIEL III to FIRST REPUBLIC BANK$792,000
2022-08-30PAT — from ROY, DANIEL III to THE CONDO BOARD OF THE 280 METROPOLITAN
2022-08-30Deed $990,000 — from JOHN, SHON; TO, LUCIA to ROY, DANIEL III$990,000
2022-08-23Sold for $990,000$990,000
2022-07-29311: Blocked Driveway — No Access
2022-05-18Deed $610,000 — from MURPHY, MEGAN to SCHMIDT, NICOLE BROOKE$610,000
2022-05-18Mortgage $579,500 — from SCHMIDT, NICOLE BROOKE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$579,500
2022-05-18PAT — from MURPHY, MEGAN to ROTH, JEREMY
2022-05-18PAT — from SCHMIDT, NICOLE BROOKE to THE 280 METROPOLITAN AVENUE CONDOMINIUM
2022-05-02Sold for $610,000$610,000
2022-04-13Mortgage satisfied — from RYAN, PATRICK to CITIZENS BANK, N.A.
2022-04-12311: Blocked Driveway — No Access
2022-04-04PAT — from TUCKER, LEA; CARLSON, NICOLE; TUCKER, KYLE; CARLSON, KEVEN to BOARD OF MANAGERS FOR 280 METROPOLITAN A
2022-04-04Deed $1,865,000 — from RYAN, PATRICK to TUCKER, LEA; CARLSON, NICOLE; TUCKER, KYLE; CARLSON, KEVEN$1,865,000
2022-04-04PAT — from TUCKER, LEA; CARLSON, NICOLE; TUCKER, KYLE; CARLSON, KEVEN to BOARD OF MANAGERS FOR 280 METROPOLITAN A
2022-04-04Deed $1,865,000 — from RYAN, PATRICK to TUCKER, LEA; CARLSON, NICOLE; TUCKER, KYLE; CARLSON, KEVEN$1,865,000
2022-04-04Mortgage $1,492,000 — from TUCKER, KYLE; CARLSON, NICOLE; TUCKER, LEA; CARLSON, KEVEN to GUARDHILL FINANCIAL CORP.; MERS$1,492,000
2022-04-04Mortgage $1,492,000 — from TUCKER, KYLE; CARLSON, NICOLE; TUCKER, LEA; CARLSON, KEVEN to GUARDHILL FINANCIAL CORP.; MERS$1,492,000
2022-03-22311: Noise - Vehicle — Car/Truck Music
2022-03-16Sold for $1,865,000$1,865,000
2022-03-16Sold for $1,865,000$1,865,000
2022-02-02Bedbug filing: 0 infested units
2022-01-30311: Blocked Driveway — No Access
2022-01-19311: Blocked Driveway — No Access
2021
2021-11-16Mortgage satisfied — from TERMINI, JOHN; TERMINI, KATE to UBS BANK USA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2021-10-21PAT — from TERMINI, JOHN to SUTTON, RICHARD W.
2021-10-21PAT — from TERMINI, KATE to SUTTON, RICHARD W.
2021-10-21Deed $3,800,000 — from TERMINI, JOHN; TERMINI, KATE to 280 METRO PHD LLC$3,800,000
2021-10-21PAT — from 280 METRO PHD LLC to BOARD OF MANAGERS / THE 280 METROPOLITAN
2021-10-21PAT — from 280 METRO PHD LLC to BOARD OF MANAGERS / THE 280 METROPOLITAN
2021-10-21Deed $3,800,000 — from TERMINI, JOHN; TERMINI, KATE to 280 METRO PHD LLC$3,800,000
2021-10-21PAT — from TERMINI, KATE to SUTTON, RICHARD W.
2021-10-21PAT — from TERMINI, JOHN to SUTTON, RICHARD W.
2021-10-17311: Lot Condition — Construction Debris
2021-10-08Sold for $3,800,000$3,800,000
2021-10-08Sold for $3,800,000$3,800,000
2021-09-08Mortgage satisfied — from NAKAI, MAO; NAKAI, JUNTA to WELLS FARGO BANK, N.A.
2021-09-08Mortgage satisfied — from NAKAI, MAO; NAKAI, JUNTA to WELLS FARGO BANK, N.A.
2021-09-01PAT — from NAKAI, JUNTA to MILLER, DOMINIQUE ESQ; SOBEL, BART ESQ; RUSSO, JENNA; SONN, KAREN ESQ; KWAST, ROSALIND ESQ
2021-09-01Deed $2,525,000 — from NAKAI, JUNTA; NAKAI, MAO to JEFFREY S. BIEBER 2009 TRUST; ROSENZWEIG, AS TRUSTEE, LINDA E; BIEBER, AS TRUSTEE, SANDER $2,525,000
2021-09-01PAT — from NAKAI, MAO to MILLER, DOMINIQUE ESQ; SONN, KAREN ESQ; KWAST, ROSALIND ESQ; RUSSO, JENNA; SOBEL, BART ESQ
2021-09-01PAT — from NAKAI, JUNTA to MILLER, DOMINIQUE ESQ; SOBEL, BART ESQ; RUSSO, JENNA; SONN, KAREN ESQ; KWAST, ROSALIND ESQ
2021-09-01PAT — from NAKAI, MAO to MILLER, DOMINIQUE ESQ; SONN, KAREN ESQ; KWAST, ROSALIND ESQ; RUSSO, JENNA; SOBEL, BART ESQ
2021-09-01PAT — from THE JEFFREY S. BEIBER TRUST; ROSENZWEIG, TRUSTEE, LINDA E; BIEBER, TRUSTEE, SANDER M to THE BD OF MGRS OF THE 280 METROPOLITAN A
2021-09-01Mortgage $1,739,500 — from THE JEFFREY S. BEIBER TRUST; BIEBER, TRUSTEE, SANDER M; ROSENZWEIG, TRUSTEE, LINDA E to MERS$1,739,500
2021-09-01Mortgage $1,739,500 — from THE JEFFREY S. BEIBER TRUST; BIEBER, TRUSTEE, SANDER M; ROSENZWEIG, TRUSTEE, LINDA E to MERS$1,739,500
2021-09-01PAT — from THE JEFFREY S. BEIBER TRUST; ROSENZWEIG, TRUSTEE, LINDA E; BIEBER, TRUSTEE, SANDER M to THE BD OF MGRS OF THE 280 METROPOLITAN A
2021-09-01Deed $2,525,000 — from NAKAI, JUNTA; NAKAI, MAO to JEFFREY S. BIEBER 2009 TRUST; ROSENZWEIG, AS TRUSTEE, LINDA E; BIEBER, AS TRUSTEE, SANDER $2,525,000
2021-08-25Sold for $2,525,000$2,525,000
2021-08-25Sold for $2,525,000$2,525,000
2021-08-11Deed $35,000 — from 280M PHA LLC to DELLA MOTTA, SILVINA$35,000
2021-07-29311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2021-07-29311: WATER LEAK — DAMP SPOT
2021-07-29Tenant complaint: WATER LEAK — DAMP SPOT
2021-07-29DOB complaint, category ?
2021-07-27PAT — from SHAH, SARJU to GROSSMAN, LOGAN
2021-07-27Mortgage $515,000 — from SHAH, SARAV; SHAH, SARJU to WELLS FARGO BANK, N.A.$515,000
2021-07-27Deed $935,000 — from AMH INVESTMENTS, LLC to SHAH, SARJU; SHAH, SARAV$935,000
2021-07-27PAT — from SHAH, SARV to GROSSMAN, LOGAN
2021-07-27PAT — from SHAH, SARJU; SHAH, SARAV to BOARD OF MANAGERS OF THE
2021-07-23PAT — from PQ USA RE LLC to BOARD OF MANAGERS OF THE
2021-07-23Deed $870,000 — from 280M PHA LLC to PQ USA RE LLC$870,000
2021-07-23Deed $870,000 — from 280M PHA LLC to PQ USA RE LLC$870,000
2021-07-23PAT — from PQ USA RE LLC to BOARD OF MANAGERS OF THE
2021-07-08Mortgage satisfied — from 280M PHA, LLC to WELLS FARGO BANK, N.A.
2021-06-18Sold for $870,000$870,000
2021-06-18Sold for $870,000$870,000
2021-06-17311: Overgrown Tree/Branches — Hitting Power Lines
2021-06-10Sold for $35,000$35,000
2021-06-08Sold for $935,000$935,000
2021-03-15DOB violation E:
2021-03-04FDNY inspection (STRUC_INT_3)
2021-02-03311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-08-26Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $4,500
2017-12-14ECB CLASS - 1 violation: WORK WITHOUT PERMIT.AT TIME OF INSPECTION ON 1ST FLOOR OBSERVED NEW GAS PIPING.AN EMERGENCY WORK NOTIFICATION WAS SUBMITTED DECEMB$1,630
2017-12-14DOB complaint, category ?
2017-12-14DOB complaint, category ?
2017-12-03311: Lead — Lead Kit Request (Residential) (L10)
2017-12-01Permit PL — ISSUED
2017-12-01Permit EW — ISSUED
2017-11-16Job filed: INSTALLATION OF MANUAL/AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM UTILIZING EXISTING RESIDENTIAL FIRE ALARM CONTROL PANEL.$50,000
2017-11-16Job filed: RELOCATION OF FIRE HOSE RACK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,500
2017-11-14Permit EW — ISSUED
2017-11-14Permit EW — ISSUED
2017-11-13Job filed: PARTITION, CEILING AND DOOR MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$850,000
2017-11-13Job filed: MECHANICAL AND PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$442,000
2017-11-13Job filed: SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$42,000
2017-11-13Job filed: SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$42,000
2017-11-13Job filed: MECHANICAL AND PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$442,000
2017-11-13Job filed: SPRINKLER MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$42,000
2017-11-01Certificate of occupancy Final
2017-09-11311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017-08-31DOB violation E:
2017-08-08Certificate of occupancy Temporary
2017-07-05Deed — from BRANCA, LINDSEY to 280 METROPOLITAN PARTNERS LLC
2017-07-05Deed — from BRANCA, LINDSEY to 280 METROPOLITAN PARTNERS LLC
2017-07-05Deed — from BRANCA, LINDSEY to 280 METROPOLITAN PARTNERS LLC
2017-06-27Deed transfer (nominal price)
2017-06-27Deed transfer (nominal price)
2017-06-27Deed transfer (nominal price)
2017-05-11Certificate of occupancy Temporary
2017-04-14Permit PL — ISSUED
2017-03-30311: Blocked Driveway — No Access
2017-03-13Permit EW — ISSUED
2017-03-13Permit PL — ISSUED
2017-03-13Permit EW — ISSUED
2017-03-02PAT — from 280M PHA LLC to THE 280 METROPOLITAN CONDOMINIUM
2017-03-02Deed $10,040 — from 280 METROPOLITAN PARTNERS LLC to 280M PHA, LLC$10,040
2017-02-22Deed $12,040 — from 280 METROPOLITAN PARTNERS LLC to LP 280 METRO LLC$12,040
2017-02-22PAT — from LP 280 METRO LLC to THE 280 METROPOLITAN CONDOMINIUM
2017-02-21Deed $11,540 — from 280 METROPOLITAN PARTNERS LLC to THE BOARD OF MANAGERS OF THE 280 METROPO$11,540
2017-02-17PAT — from PETERSEN, FREYA; PETERSEN, TYLER to THE 208 METROPOLITAN CONDOMINIUM
2017-02-17Deed $1,950,000 — from 280 METROPOLITAN PARTNERS, LLC to PETERSEN, FREYA; PETERSEN, TYLER$1,950,000
2017-02-17Mortgage $1,560,000 — from PETERSEN, TYLER; PETERSEN, FREYA to WELLS FARGO BANK, N.A.$1,560,000
2017-02-17PAT — from PETERSEN, FREYA; PETERSEN, TYLER to THE 208 METROPOLITAN CONDOMINIUM
2017-02-17Deed $1,950,000 — from 280 METROPOLITAN PARTNERS, LLC to PETERSEN, FREYA; PETERSEN, TYLER$1,950,000
2017-02-17Mortgage $1,560,000 — from PETERSEN, TYLER; PETERSEN, FREYA to WELLS FARGO BANK, N.A.$1,560,000
2017-02-17Certificate of occupancy Temporary
2017-02-10Sold for $1,950,000$1,950,000
2017-02-10Sold for $11,540$11,540
2017-02-10Sold for $12,040$12,040
2017-02-10Deed transfer (nominal price)
2017-02-10Sold for $10,040$10,040
2017-01-23Certificate of occupancy Temporary
2016
2016-12-20Mortgage $736,050 — from KAYE, HOWARD; HOWARD, WILLIAM to FIRST REPUBLIC BANK$736,050
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-11-16PAT — from SHU, CHUNPING; WINSHORE LLC to THE 280 METROPOLITAN CONDOMINIUM
2016-11-16PAT — from SHU, CHUNPING to AIBARA, JEFFREY
2016-11-16PAT — from WU, JINGYING to AIBARA, JEFFREY
2016-11-16Deed $964,746 — from 280 METROPOLITAN PARTNERS LLC to WINSHORE LLC; SHU, CHUNPING$964,746
2016-10-26PAT — from 280M PHA LLC to THE 280 METROPOLITAN CONDOMINIUM
2016-10-26Mortgage $500,000 — from 280M PHA LLC to WELLS FARGO BANK, N.A.$500,000
2016-10-26Deed $832,088 — from 280 METROPOLITAN PARTNERS LLC to 280M PHA LLC$832,088
2016-10-26Deed $832,088 — from 280 METROPOLITAN PARTNERS LLC to 280M PHA LLC$832,088
2016-10-25Certificate of occupancy Temporary
2016-10-14AL&R $6,000,000 — from CB WILLIAMSBURG LLC to RWNIH-DL 280 METROPOLITAN LLC$6,000,000
2016-10-14Mortgage $6,000,000 — from CB WILLIAMSBURG LLC to RWNIH-DL 280 METROPOLITAN LLC$6,000,000
2016-10-04Mortgage $55,000 — from GOPALAN, SRIRAM to WELLS FARGO BANK NA$55,000
2016-10-04Mortgage $55,000 — from GOPALAN, SRIRAM to WELLS FARGO BANK NA$55,000
2016-10-03Deed $8,392,688 — from 280 METROPOLITAN PARTNERS LLC to CB WILLIAMSBURG LLC$8,392,688
2016-10-03PAT — from CB WILLIAMSBURG LLC to BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-09-29PAT — from LP 280 METRO LLC to THE 280 METROPOLITAN CONDOMINIUM
2016-09-29Deed $881,937 — from 280 METROPOLITAN PARTNERS LLC to LP 280 METRO LLC$881,937
2016-09-26Deed $1,073,190 — from 280 METROPOLITAN PARTNERS LLC to HOWARD, WILLIAM; KAYE, HOWARD$1,073,190
2016-09-26PAT — from KAYE, HOWARD to HOWARD, WILLIAM
2016-09-26PAT — from KAYE, HOWARD to HOWARD, WILLIAM
2016-09-26PAT — from KAYE, HOWARD; HOWARD, WILLIAM to THE 280 METROPOLITAN CONDOMINIUM
2016-09-26Deed $28,002 — from 280 METROPOLITAN PARTNERS LLC to HOWARD, WILLIAM; KAYE, HOWARD$28,002
2016-09-22Sold for $8,392,687$8,392,687
2016-09-16PAT — from ZHANG, YUFENG to BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-09-16PAT — from ZHANG, YUFENG to AIBARA, JEFFREY
2016-09-16Deed $1,005,329 — from 280 METROPOLITAN PARTNERS LLC to ZHANG, YUFENG$1,005,329
2016-09-13Deed $924,016 — from 280 METROPOLITAN PARTNERS LLC to 280 METRO 4E LLC$924,016
2016-09-13PAT — from 280 METRO 4E LLC to THE 280 METROPOLITAN CONDOMINIUM
2016-09-06Deed $954,564 — from 280 METROPOLITAN PARTNERS LLC to LO, FUNG LUM MINDY$954,564
2016-09-06PAT — from LO, FUNG LUM MINDY
2016-09-01PAT — from SHU, CHUNPING to BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-09-01Deed $812,009 — from 280 METROPOLITAN PARTNERS LLC to WANG, ZHENG$812,009
2016-09-01PAT — from SHU, CHUNPING to AIBARA, JEFFREY
2016-09-01PAT — from WANG, ZHENG to BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-09-01PAT — from WANG, ZHENG to AIBARA, JEFFREY
2016-09-01Deed $832,374 — from 280 METROPOLITAN PARTNERS LLC to SHU, CHUNPING$832,374
2016-09-01Sold for $1,073,189$1,073,189
2016-09-01Sold for $28,001$28,001
2016-08-31REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-31PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-08-31Deed $628,724 — from 280 METROPOLITAN PARTNERS LLC to NDSS BKYLN LLC$628,724
2016-08-31PAT — from AMH INVESTMENTS LLC to THE 280 METROPOLITAN CONDOMINIUM
2016-08-31Deed $893,469 — from 280 METROPOLITAN PARTNERS LLC to AMH INVESTMENTS LLC$893,469
2016-08-31PAT — from NDSS BKLYN LLC to THE 280 METROPOLITAN CONDOMINIUM
2016-08-31Mortgage $492,000 — from NDSS BKLYN LLC to WELLS FARGO BANK, N.A.$492,000
2016-08-30Sold for $881,937$881,937
2016-08-26REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-26PREL — from CB DRIGGS LLC; 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-25Sold for $924,016$924,016
2016-08-25Sold for $1,005,329$1,005,329
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23Mortgage satisfied — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-23TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-17Deed $3,255,809 — from 280 METROPOLITAN PARTNERS LLC to BRANCA, LINDSEY$3,255,809
2016-08-17PAT — from BRANCA, LINDSEY to THE 280 METROPOLITAN CONDOMINIUM
2016-08-17Deed $3,255,809 — from 280 METROPOLITAN PARTNERS LLC to BRANCA, LINDSEY$3,255,809
2016-08-17Deed $3,255,809 — from 280 METROPOLITAN PARTNERS LLC to BRANCA, LINDSEY$3,255,809
2016-08-10Mortgage $813,395 — from TERMINI, JOHN; TERMINI, KATE to WELLS FARGO BANK, N.A.$813,395
2016-08-10PAT — from TERMINI, KATE; TERMINI, JOHN to BOARD OF MANAGERS THE 280 METROPOLITAN C
2016-08-10Deed $1,508,390 — from 280 METROPOLITAN PARTNER LLC to TERMINI, KATE; TERMINI, JOHN$1,508,390
2016-08-10Deed $1,508,390 — from 280 METROPOLITAN PARTNER LLC to TERMINI, KATE; TERMINI, JOHN$1,508,390
2016-08-10PAT — from TERMINI, KATE; TERMINI, JOHN to BOARD OF MANAGERS THE 280 METROPOLITAN C
2016-08-10Mortgage $813,395 — from TERMINI, JOHN; TERMINI, KATE to WELLS FARGO BANK, N.A.$813,395
2016-08-09Deed $1,687,704 — from 280 METROPOLITAN PARTNERS. LLC to YUNGUL, LEVENT$1,687,704
2016-08-09REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-09PREL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-08-09PAT — from YUNGUL, LEVENT to KRINSKY, ESQ., SCOTT
2016-08-09PAT — from YUNGUL, LEVENT to BD OF MGRS OF THE 280 METROPOLITAN CONDO
2016-08-08Mortgage $402,500 — from PAN, GREGORY; KWA, MARYANN to MERS$402,500
2016-08-08Deed $587,994 — from 280 METROPOLITAN PARTNERS LLC to KWA, MARYANN; PAN, GREGORY$587,994
2016-08-08PAT — from KWA, MARYANN; PAN, GREGORY to BOARD OF MANAGERS OF 280 METROPOLITAN CO
2016-08-03Sold for $954,563$954,563
2016-08-01Deed $893,514 — from 280 METROPOLITAN PARTNERS LLC to SIMCOE DANICA LLC$893,514
2016-08-01PAT — from SIMCOE DANICA LLC to BOARD OF MANAGERS OF THE 180 METROPOLITA
2016-08-01Certificate of occupancy Temporary
2016-07-29REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-29PREL — from CB DRIGGS LLC to BANK OF THE OZARKS
2016-07-28Deed $2,235,059 — from 280 METROPOLITAN PARTNERS LLC to NAKAI, JUNTA; NAKAI, MAO$2,235,059
2016-07-28REL — from BANK OF THE OZARKS to 280 METROPOLITAN PARNTERS LLC
2016-07-28Deed $2,235,059 — from 280 METROPOLITAN PARTNERS LLC to NAKAI, JUNTA; NAKAI, MAO$2,235,059
2016-07-28Mortgage $1,756,000 — from NAKAI, MAO; NAKAI, JUNTA to WELLS FARGO BANK, N.A.$1,756,000
2016-07-28PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARNTERS LLC
2016-07-28PAT — from NAKAI, MAO; NAKAI, JUNTA to BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-07-28Mortgage $1,756,000 — from NAKAI, MAO; NAKAI, JUNTA to WELLS FARGO BANK, N.A.$1,756,000
2016-07-28PAT — from NAKAI, MAO; NAKAI, JUNTA to BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-07-28PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARNTERS LLC
2016-07-28REL — from BANK OF THE OZARKS to 280 METROPOLITAN PARNTERS LLC
2016-07-27PAT — from CHEN, PU to MURPHY, MICHAEL; MATATOF, MATTHEW; MINTZ, LAUREN
2016-07-27PAT — from WANG, YISHAN to MINTZ, LAUREN; MURPHY, MICHAEL; MATATOF, MATTHEW
2016-07-27PAT — from WANG, YISHAN; CHEN, PU to BOARD OF MANAGERS
2016-07-27Deed $623,632 — from 280 METROPOLITAN PARTNERS LLC to CHEN, PU; WANG, YISHAN$623,633
2016-07-27PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-27REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-27PREL — from BANK OF THE OZARKS
2016-07-27PAT — from SHON, JOHN; TO, LUCIA to BD OF MGRS OF THE 280 METROPOLITAN CONDO
2016-07-27Deed $832,374 — from 280 METROPOLITAN PARTNERS LLC to TO, LUCIA; SHON, JOHN$832,374
2016-07-27REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-27Sold for $1,508,389$1,508,389
2016-07-27Deed transfer (nominal price)
2016-07-27Sold for $3,255,808$3,255,808
2016-07-26Deed $997,885 — from 280 METROPOLITAN PARTNERS LLC to RIVER E LLC$997,885
2016-07-26PAT — from RIVER E LLC to AIBARA, JEFFREY
2016-07-26PAT — from RIVER E LLC to BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-07-26PREL — from CBS DRIGGS LLC to BANK OF THE OZARKS
2016-07-26REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-25REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-25Deed $2,013,544 — from 280 METROPOLITAN PARTNERS LLC$2,013,544
2016-07-25Deed $2,013,544 — from 280 METROPOLITAN PARTNERS LLC$2,013,544
2016-07-25PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-25REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-25Mortgage $1,580,000 — from RYAN, PATRICK to CITIZENS BANK, N.A.$1,580,000
2016-07-25PAT — from RYAN, PATRICK to THE 280 METROPOLITAN CONDOMINIUM
2016-07-25PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-22Deed transfer (nominal price)
2016-07-22Sold for $832,088$832,088
2016-07-21PAT — from GOPALAN, SRIRAM to BOARD OF MANAGERS-THE 280 METROPOLITAN C
2016-07-21PAT — from GOPALAN, SRIRAM to BOARD OF MANAGERS-THE 280 METROPOLITAN C
2016-07-19TL&R — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-19PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-19TL&R — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-19PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-18PAT — from HU, JIM; PARK, JI YON to BOARD OF MANAGERS OF 280 METROPOLITAN CO
2016-07-18TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-18Deed $1,646,974 — from 280 METROPOLITAN PARTNERS LLC to HU, JIM; PARK, JI YON$1,646,974
2016-07-18PAT — from HU, JIM; PARK, JI YON to BOARD OF MANAGERS OF 280 METROPOLITAN CO
2016-07-18PAT — from PARK, JI YON to HU, JIM
2016-07-18Mortgage $1,211,250 — from HU, JIM; PARK, JI YON to WELLS FARGO BANK, N.A.$1,211,250
2016-07-18PAT — from PARK, JI YON to HU, JIM
2016-07-18PREL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-18TL&R — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-18PREL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-18Deed $1,646,974 — from 280 METROPOLITAN PARTNERS LLC to HU, JIM; PARK, JI YON$1,646,974
2016-07-15Sold for $812,008$812,008
2016-07-14PREL — from BANK OF THE OZARKS
2016-07-14Mortgage $884,000 — from GOPALAN, SRIRAM to WELLS FARGO BANK, N.A.$884,000
2016-07-14REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-14PREL — from 280 METROPOLITAN PARTNERS LLC; CB DRIGGS LLC to BANK OF THE OZARKS; CAN IV DRIGGS LLC
2016-07-14Deed $1,932,084 — from 280 METROPOLITAN PARTNERS LLC to GUPTA , DIPAYAN$1,932,084
2016-07-14PREL — from BANK OF THE OZARKS
2016-07-14Deed $1,127,666 — from 280 METROPOLITAN PARTNERS LLC to GOPALAN, SRIRAM$1,127,666
2016-07-14Mortgage $884,000 — from GOPALAN, SRIRAM to WELLS FARGO BANK, N.A.$884,000
2016-07-14Deed $1,127,666 — from 280 METROPOLITAN PARTNERS LLC to GOPALAN, SRIRAM$1,127,666
2016-07-14REL — from BANK OF THE OZARKS
2016-07-14PAT — from GUPTA , DIPAYAN to BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-07-14REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-14Sold for $893,468$893,468
2016-07-14Sold for $628,723$628,723
2016-07-13Sold for $623,632$623,632
2016-07-13Sold for $832,373$832,373
2016-07-12Sold for $893,514$893,514
2016-07-11Deed $832,374 — from 280 METROPOLITAN PARTNERS LLC to LEE, MICHAEL; CHIANG, VIRGINIA$832,374
2016-07-11Mortgage $480,000 — from CHIANG, VIRGINIA; LEE, MICHAEL to WELLS FARGO BANK, N.A.$480,000
2016-07-11PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-11PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-11REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-11PAT — from LEE, MICHAEL; CHIANG, VIRGINIA to THE 280 METROPOLITAN CONDOMINIUM BOARD O; 280 METROPOLITAN PARTNERS LLC
2016-07-11REL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-11PAT — from LEE, MICHAEL; CHIANG, VIRGINIA to THE 280 METROPOLITAN CONDOMINIUM BOARD O; 280 METROPOLITAN PARTNERS LLC
2016-07-11Deed $832,374 — from 280 METROPOLITAN PARTNERS LLC to LEE, MICHAEL; CHIANG, VIRGINIA$832,374
2016-07-11REL — from 280 METROPOLITAN PARTNERS LLC to BANK OF THE OZARKS
2016-07-11PAT — from MURPHY, MEGAN to THE 280 METROPOLITAN CONDOMINIUM
2016-07-11Deed $567,629 — from 280 METROPOLITAN PARTNERS LLC to MURPHY, MEGAN$567,629
2016-07-11Mortgage $480,000 — from CHIANG, VIRGINIA; LEE, MICHAEL to WELLS FARGO BANK, N.A.$480,000
2016-07-11PREL — from BANK OF THE OZARKS to 280 METROPOLITAN PARTNERS LLC
2016-07-08Sold for $832,373$832,373
2016-07-08Sold for $997,885$997,885
2016-07-08Sold for $964,746$964,746
2016-07-07PAT — from KOGAN, BENJAMIN M to 280 METROPOLITAN PARTNERS LLC; BOARD OF MANAGERS OF THE 280 METROPOLITA
2016-07-07Mortgage $824,000 — from KOGAN, BENJAMIN M to GOLDMAN SACHS BANK USA$824,000
2016-07-07Deed $1,051,298 — from 280 METROPOLITAN PARTNERS LLC to KOGAN, BENJAMIN M$1,051,298
2016-07-07PAT — from KOGAN, BENJAMIN M to BRAVERMAN, LORI J
2016-07-07Sold for $2,013,543$2,013,543
2016-07-07Deed transfer (nominal price)
2016-07-06Sold for $587,993$587,993
2016-06-30Deed transfer (nominal price)
2016-06-30Sold for $1,127,666$1,127,666
2016-06-29Sold for $1,051,297$1,051,297
2016-06-28Sold for $1,646,973$1,646,973
2016-06-28Deed transfer (nominal price)
2016-06-28Sold for $567,628$567,628
2016-06-27Deed transfer (nominal price)
2016-06-27Sold for $832,373$832,373
2016-06-27Sold for $2,235,058$2,235,058
2016-06-27Sold for $1,932,083$1,932,083
2016-06-16Sold for $1,687,703$1,687,703
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25MAPS — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-25CDEC — from 280 METROPOLITAN AVENUE CONDOMINIUM
2016-05-11Certificate of occupancy Temporary
2016-05-04Permit NB — ISSUED
2016-03-25Permit NB — ISSUED
2016-03-04DOB violation C: ADDT'L INFORMATION:TRANSFERRED CONCRETE COLUMNS ARE SUPPORTED ON THE SECOND FLR CONCRETE SLABS UNDER JOB #320613804. REMEDY:OWNER
2016-03-04DOB violation C: ADDT'L INFORMATION:TRANSFERRED CONCRETE COLUMNS ARE SUPPORTED ON THE SECOND FLR CONCRETE SLABS.UNDER JOB #320613804. REMEDY:ENG'R
2016-03-04DOB complaint, category ?
2015
2015-12-24Permit EW — ISSUED
2015-12-24Permit EW — ISSUED
2015-11-17Job filed: THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOTS 13 AND 15 INTO FORTY TWO (42) CONDO LOTS, 1001 AND 1043. NO WORK AND NO CHANGE IN USE, ZONING, OR
2015-11-09Permit EW — ISSUED
2015-11-09Permit EW — ISSUED
2015-11-09Permit PL — ISSUED
2015-11-09Permit PL — ISSUED
2015-09-22DOB complaint, category ?
2015-09-21DOB complaint, category ?
2015-09-01DOB complaint, category ?
2015-07-27Permit NB — ISSUED
2015-07-27Permit EQ — ISSUED
2015-05-20Permit EQ — ISSUED
2015-05-20Job filed: ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR BULKHEAD REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
2015-04-25ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. NOTED: AT 6TH STY,CONSTRUCTION DEBRIS SCATTERED THROUGHOUT ENT
2015-04-25ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. NOTED: NEW BLDG UNDER CONSTRUCTION UNDER APPROVE$250
2015-04-25ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: AT 6TH FL,WEST/CENTER NEAR EXP#4,CONCRETE $2,400
2015-04-17DOB complaint, category ?
2015-04-14Permit PL — ISSUED
2015-04-13Permit EW — ISSUED
2015-04-13Permit EW — ISSUED
2015-03-31Job filed: MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH$20,520
2015-03-31Job filed: INTERIOR RENOVATION TO INCLUDE NEW PARTITIONS AND FINISHES FOR TEMPORARY SALES OFFICE AS SHOWN ON PLANS FILED HEREWITH.$124,397
2015-03-25Permit EQ — ISSUED
2015-03-25Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2015-03-05DOB complaint, category ?
2015-02-20Permit EQ — ISSUED
2015-02-20Permit EQ — ISSUED
2015-02-20Job filed: _INSTALLATION OF 105 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILI DING CONSTRUCTION, FILED SEPERATELY. LIVE LOAD 300PSF. SIDEWALK SHED SH
2015-02-19Job filed: INSTALLATION OF A ROOF/OVERHEAD PROTECTION AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. ROOF/OVERHEAD PROTECTION SHALL COMPLY W
2015-02-19Job filed: INSTALLATION OF A ROOF/OVERHEAD PROTECTION AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. ROOF/OVERHEAD PROTECTION SHALL COMPLY W
2015-02-13311: Emergency Response Team (ERT) — After Hours Work - Illegal
2015-02-13DOB complaint, category ?
2015-02-12311: Emergency Response Team (ERT) — After Hours Work - Illegal
2015-02-12311: Emergency Response Team (ERT) — After Hours Work - Illegal
2015-02-12DOB complaint, category ?
2015-02-12DOB complaint, category ?
2015-02-11DOB complaint, category ?
2015-02-11ECB CLASS - 2 violation: WORK AFTER HOURS W/O VARIANCE PERMIT CONTRARY TO 28-105.12.5. NOTED: PREMISES IS A NEW BLDG UNDER JOB #3206138-04.EXPIRED 8/6/2015
2015-02-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2015-02-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2015-02-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2015-02-10DOB complaint, category ?
2015-01-28311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2015-01-28311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2015-01-28ECB CLASS - 1 violation: ELECTRICAL WORK W/O A PERMIT. NOTE: AT THE TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS. I OBSERVED THAT THERE WAS AN ELECT$800
2015-01-28ECB CLASS - 1 violation: BC 1906.3 CONCRETE FORM WORK DESIGN DRAWINGS.NOTE:@THE TIME OF MY INSPCONST WORK IN PROGRESS.I OBSERVED THAT WORKERS WERE IN THE P$400
2015-01-28ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQIPMENT MEASURES OR TEMP CONST-NO GUARDRAILS NOTE:@THE TIME OF MY INSP,CONST WORK IN PROGRES$1,200
2015-01-28DOB complaint, category ?
2015-01-28DOB complaint, category ?
2014
2014-12-18Permit NB — ISSUED
2014-11-19Permit EW — ISSUED
2014-11-19Permit EW — ISSUED
2014-11-19Permit PL — ISSUED
2014-11-12Permit PL — ISSUED
2014-09-20311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-09-20DOB complaint, category ?
2014-08-19311: Construction Safety Enforcement — Excavation Tracking Complaint
2014-08-19311: Construction Safety Enforcement — Excavation Tracking Complaint
2014-08-19DOB complaint, category ?
2014-08-19DOB complaint, category ?
2014-08-18ECB CLASS - 2 violation: FAILURE TO POST NO SMOKING SIGNS AT TIME OF INSPECTION I OBSERVED NO SMOKING SIGNS POSTED THROUGHOUT SITES. RMDY: POST SIGNS MAKE$800
2014-08-18ECB CLASS - 2 violation: FAILURE TO SAFEGUAR ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION I OBSERVED NO FIRE EXTINGU$1,200
2014-08-06Permit EQ — ISSUED
2014-08-06Permit NB — ISSUED
2014-06-09DOB complaint, category ?
2014-06-09DOB complaint, category ?
2014-06-09ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONS DOCS & OR APPROVED AMENDMENTS.NOTE:@ THE TIME OF MY INSP,DEMOLITION WORK IN PROGRESS I OBSE$250
2014-06-09ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCS & OR APPROVED AMMENDS.NOTE:@ THE TIME OF MY INSP,I OBSERVED EXCAVATOR BEING US$1,000
2014-06-09DOB complaint, category ?
2014-06-09ECB CLASS - 1 violation: 3306.9.8 FAILURE TO REMOVE HAZARDS SUCH AS GLASS IN WINDOWS DOORS,SKYLIGHTS & FIXTURES BEFORE COMMENCEMENT OF ACTUAL DEMOLITION.NO$1,600
2014-05-23311: BEST/Site Safety — Demolition Notification Received
2014-05-23311: BEST/Site Safety — Demolition Notification Received
2014-05-23DOB complaint, category ?
2014-05-23DOB complaint, category ?
2014-05-19Permit DM — ISSUED
2014-05-19Permit EQ — ISSUED
2014-05-16Permit EQ — ISSUED
2014-05-16Permit DM — ISSUED
2014-05-06DOB complaint, category ?
2014-05-06Job filed: - STRUCTURAL BRACING OF ADJOINING BUILDING (276 METROPOLITAN AVE.). FILED IN CONJUNCTION WITH DEMO JOB # 320848277.$40,000
2014-04-12311: Noise — Noise: Construction Before/After Hours (NM1)
2014-04-07Job filed: SUPPORT OF EXCAVATION WORK IN ASSOCIATION WITH NEW BUILDING.
2014-04-07Job filed: SUPPORT OF EXCAVATION WORK IN ASSOCIATION WITH NEW BUILDING.
2014-04-07Job filed: SUPPORT OF EXCAVATION WORK IN ASSOCIATION WITH NEW BUILDING.
2014-04-03Permit EQ — ISSUED
2014-04-03Permit EQ — ISSUED
2014-04-03Permit EQ — ISSUED
2014-04-03Permit EQ — ISSUED
2014-04-03Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-04-03Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-04-03Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-04-03Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-04-03Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-04-03Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-04-03Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013
2013-11-26Job filed: FULL DEMOLITION OF TWO STORY STRUCTURE, WITH AKA ADDRESS OF 284-290 METROPOLITAN AV. FULL DEMOLITION WILL BE PERFORMED USING MECHANICAL MEANS.
2013-11-26Job filed: FULL DEMOLITION OF TWO STORY STRUCTURE, USING MECHANICAL MEANS.
2013-11-15Job filed: SPRINKLER AND STANDPIPE SYSTEM INSTALLATION IN ASSOCIATION WITH NB 320613804$3,000
2013-11-15Job filed: SPRINKLER AND STANDPIPE SYSTEM INSTALLATION IN ASSOCIATION WITH NB 320613804$3,000
2013-11-14Job filed: PLUMBING AND MECHANICAL PLANS FILED HEREWITH FOR NEW BUILDING.
2013-11-14Job filed: APPLICATION FILED FOR BUILDERS PAVING PLAN IN ASSOCIATION WITH NB 320613804
2013-11-14Job filed: PLUMBING AND MECHANICAL PLANS FILED HEREWITH FOR NEW BUILDING.
2013-10-24Job filed: NB
2010
2010-10-06Permit AL — ISSUED
2010-08-05Job filed: APPLICATION FILED HEREWITH TO SHOW NEW STAIR ENCLOSURE AND STOREFRONT. CHANGE IN USE & OCCUPANCY. NO CHANGES TO BULK OR EGRESS.$10,000
2010-08-05Job filed: APPLICATION FILED HEREWITH TO SHOW NEW STAIR ENCLOSURE AND STOREFRONT. CHANGE IN USE & OCCUPANCY. NO CHANGES TO BULK OR EGRESS.$10,000
2010-06-24Permit PL — ISSUED
2010-06-14Permit EW — ISSUED
2010-06-14Permit EQ — ISSUED
2010-03-25Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF NON BEARING PARTITION, MODIFICATION OF STOREFRONT,WALL & FLOOR FINISHES, INSTALLATION OF PLUMBI$15,000
2010-03-25Job filed: APPLICATION FILED HEREWITH FOR THE INSTALLATION OF NON BEARING PARTITION, MODIFICATION OF STOREFRONT,WALL & FLOOR FINISHES, INSTALLATION OF PLUMBI$15,000