A modest record — below the level that usually signals systemic problems. More recorded distress than 63% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 7.7. In ZIP 10009, 59% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
10 total — 2 class C (immediately hazardous), 6 class B, 2 class A. Oldest open since 2026-05-24.
status snapshot refreshed weekly from HPD records
Patterns
138 heat or hot-water complaints in the last three years (winter 2025–26: 112 · winter 2026–27: 2). Repeated winter clusters suggest a chronic heating problem.
112
’25–26
2
’26–27
No bedbug-infested units reported in the last three years of filings.
$39,375 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
502 service requests in the last three years. Most common: Noise (290) · HEAT/HOT WATER (64) · Illegal Fireworks (43) · Elevator (18) · Illegal Parking (11) · PLUMBING (8).
Filed construction activity
$38,686,366 in permitted construction work filed since
2016 (47 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (1980)
Yes
Six or more residential units (616)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
CAMPOS PLAZA II PACT PARTNERS
Head officer
HERMINIO TORRES
Managing agent
C&C APARTMENT MANAGEMENT
Last registered
2026-06-26
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$106,477,000
$47,914,650
2026
$107,724,000
$48,475,800
2027
$106,681,000
$48,006,450
The city's market estimate has risen
0% between tax years 2025 and 2027.
Tax exemptions on the roll: NYC HOUSING AUTH
Building systems
Energy grade (LL33)
F — did not submit required benchmarking data, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
UNSAFE — unsafe conditions reported (cycle 8)
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2015 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
1 Av — L · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 14 St / Avenue C — M14D-SBS · 350 ft · Select Bus Service
Citi Bike
E 14 St & Ave B · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
502 311 service requests from this address in the last three years — 64 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $1,300,000 on
2026-02-13 (lender: Citibank, N.A.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.
$1,300,000
2026-02-13
Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.
$20,216,481
2026-02-13
Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.
$20,216,481
2026-02-13
Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.
$20,216,481
2026-02-13
Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.
$20,216,481
Ten-year activity
1,0005000
2017
2018
2019
2020
2021
2022
2023
2024
2025
782
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
18
7
26
0
4
55
2018
33
9
35
0
12
89
2019
26
23
68
0
15
132
2020
23
4
95
0
7
129
2021
18
3
88
0
11
120
2022
17
7
109
0
14
147
2023
14
7
75
0
18
114
2024
12
7
123
21
9
172
2025
22
6
198
0
7
233
2026
32
28
306
93
323
782
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: Construction Lead Dust — Common Areas and Apartment
2026-10-07
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-10-06
Elevator permit: MODERNIZE (2) ELEVATOR PER DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8, SECTION 8.7.2, AS MODIFIED BY
2026-10-06
311: Noise - Residential — Loud Music/Party
2026-09-25
Air permit (REGISTRATION), fuel: NATURALGAS
2026-09-25
Air permit (REGISTRATION), fuel: NATURALGAS
2026-09-25
Elevator permit: MODERNIZE (3) ELEVATOR PER DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8, SECTION 8.7.2, AS MODIFIED BY
2026-09-25
311: Elevator — Elevator - Multiple Devices On Property
2026-09-25
DOB complaint, category ?
2026-09-21
Rodent inspection: Failed for Rat Activity
2026-09-20
311: Sidewalk Condition — Broken Sidewalk
2026-09-20
HPD class B: § 27-2005 HMC: REFIT THE BUILDING FRONT ENTRANCE DOOR , 1st STORY, SECTION ''643''
2026-09-20
HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT THE PUSHBAR OF THE BUILDING FRONT ENTRANCE DOOR , 1st STORY,
2026-09-20
HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-09-20
HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-09-19
311: Noise - Residential — Loud Music/Party
2026-09-18
Elevator permit: MODERNIZE (2) ELEVATOR PER DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8, SECTION 8.7.2, AS MODIFIED BY
2026-10-07311: Construction Lead Dust — Common Areas and Apartment
2026-10-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-10-06Elevator permit: MODERNIZE (2) ELEVATOR PER DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8, SECTION 8.7.2, AS MODIFIED BY $771,400
2026-09-25Elevator permit: MODERNIZE (3) ELEVATOR PER DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8, SECTION 8.7.2, AS MODIFIED BY $1,157,100
2026-09-25311: Elevator — Elevator - Multiple Devices On Property
2026-09-25DOB complaint, category ?
2026-09-21Rodent inspection: Failed for Rat Activity
2026-09-20HPD class B: § 27-2005 HMC: REFIT THE BUILDING FRONT ENTRANCE DOOR , 1st STORY, SECTION ''643''
2026-09-20HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT THE PUSHBAR OF THE BUILDING FRONT ENTRANCE DOOR , 1st STORY,
2026-09-20HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-09-20HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-09-18Elevator permit: MODERNIZE (2) ELEVATOR PER DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8, SECTION 8.7.2, AS MODIFIED BY $771,600
2026-08-11311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2026-08-11311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2026-08-11DOB complaint, category ?
2026-08-11DOB complaint, category ?
2026-07-30HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-07-30HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF MAGNETIC DOOR STOP INSTALLED AT FLOOR, AT FIRE
2026-07-30HPD class B: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLIES, AT BUILDING ENTRANCE DOOR , 1st STORY
2026-07-30HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-07-28311: HEAT/HOT WATER — APARTMENT ONLY
2026-07-28Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-07-27311: PLUMBING — WATER SUPPLY
2026-07-27Tenant complaint: PLUMBING — WATER SUPPLY
2026-07-24Rodent inspection: Failed for Rat Activity
2026-07-18311: Water System — Hydrant Running Full (WA4)
2026-07-17DOB complaint, category ?
2026-07-17HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-07-17HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-07-17HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2026-07-17HPD class A: § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGE
2026-07-17HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-07-17HPD class B: § 27-2005 HMC: REFIT THE FIRE DOOR LEADING TO STAIR 'A' AT 1st PUBLIC HALL STAIRS FROM EAST, 1st STORY
2026-07-16311: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-16DOB complaint, category ?
2026-07-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-13Asbestos abatement: Removal — ESG, Inc.
2026-07-13Asbestos abatement: Removal — ESG, Inc.
2026-07-13Asbestos abatement: Removal — ESG, Inc.
2026-07-13Asbestos abatement: Removal — ESG, Inc.
2026-07-13Asbestos abatement: Removal — ESG, Inc.
2026-07-13Asbestos abatement: Removal — ESG, Inc.
2026-07-10Permit General Construction — Permit Issued
2026-06-05Permit General Construction — Permit Issued
2026-06-02311: Elevator — Elevator - Multiple Devices On Property
2026-06-02311: Elevator — Elevator - Multiple Devices On Property
2026-06-02311: Elevator — Elevator - Multiple Devices On Property
2026-06-02DOB complaint, category ?
2026-06-01City emergency repair (OMO): at fire door leading to north section ph , 14th story. make door latch. nyc hpd emergency operations division essent$527
2026-05-29DOB complaint, category ?
2026-05-26311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2026-05-26311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2026-05-26311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2026-05-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-24HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 8F, 8th STORY, 2nd APARTMENT FROM SOUT
2026-05-24HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11E, 11th STORY, 1st APARTMENT FROM NO
2026-05-24HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-05-24HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-05-24HPD class B: § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN AC
2026-05-24HPD class B: § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVI
2026-05-24HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT
2026-05-24HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8B, 8th STORY, 1st APARTMENT FR
2026-05-24HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE 3rd ROOM FRO
2026-05-24HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 8B, 8th STORY, 1st APARTMENT FROM
2026-05-24HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
2026-05-24HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND SOUTH WALL IN THE 3rd ROOM FROM NORTH LOC
2026-05-24HPD class C: HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FRO
2026-05-24HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT
2026-05-24HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE BATHROOM LOC
2026-05-24HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 8B, 8th STORY, 1st APARTMENT FROM NORT
2026-05-24HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM NO
2026-05-24HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
2026-05-24HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
2026-05-23311: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-22Permit Plumbing — Permit Issued
2026-05-21HPD class C: § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEAVY DUTY LATCH SET AND ASSEMBLY AT ENTRANCE DOOR TO BUILDING
2026-05-21HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-05-20311: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-19311: WATER LEAK — HEAVY FLOW
2026-05-19311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2026-05-19311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2026-05-19311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2026-05-19DOB complaint, category ?
2026-05-19DOB complaint, category ?
2026-05-19DOB complaint, category ?
2026-05-19Tenant complaint: WATER LEAK — HEAVY FLOW
2026-05-18311: General Construction/Plumbing — Adjacent Buildings Not Protected
2026-05-18311: General Construction/Plumbing — Adjacent Buildings Not Protected
2026-05-18311: General Construction/Plumbing — Adjacent Buildings Not Protected
2026-05-18311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2026-05-18311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2026-05-18311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2026-05-18311: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-18311: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-18DOB complaint, category ?
2026-05-18DOB complaint, category ?
2026-05-18DOB complaint, category ?
2026-05-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-17Tenant complaint: PLUMBING — WATER SUPPLY
2026-05-17Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-05-17HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 8F, 8th STORY, 1st APARTMENT FROM EAST
2026-05-17HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLER AT BOILER ROOM
2026-05-17HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 8B, 8th STORY, 1st APARTMENT FROM WEST
2026-05-16311: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-16311: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-05-08DOB complaint, category ?
2026-05-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-05-06Job filed: Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and$100,000
2026-05-05Rodent inspection: Failed for Rat Activity
2026-05-01HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING ENT
2026-05-01HPD class B: § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT THE
2026-04-30311: Missed Collection — Bulky Trash
2026-04-30311: HEAT/HOT WATER — ENTIRE BUILDING
2026-04-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-04-30HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2026-04-30HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-04-30HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-04-29HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-23Permit Structural — Permit Issued
2026-04-21311: Non-Emergency Police Matter — Other (complaint details)
2026-04-20Job filed: SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS AS PER PLANS FILED HERWITH.
2026-04-20Job filed: Suspended Scaffold Installation for facade repairs and inspections
2026-04-20Permit Mechanical Systems — Permit Issued
2026-04-16311: HEAT/HOT WATER — ENTIRE BUILDING
2026-04-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-04-15Job filed: MECHANICAL WORK FILED IN CONJUNCTION WITH GC APPLICATION: REPLACEMENT AND NEW MECHANICAL SYSTEM FOR EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCC$1,716,502
2026-04-14311: HEAT/HOT WATER — ENTIRE BUILDING
2026-04-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-04-10ECB CLASS - 1 violation: VF... R T S .. 97-X-17....ELEVATOR IN BUILDING OUT OF SERVICE UP ON INSPECTION THE DEVICE IS FOUND TO BE OUT OF SERVICE ,REPAIR AN$1,250
2026-04-06Rodent inspection: Bait applied
2026-04-02311: Elevator — Elevator - Multiple Devices On Property
2026-03-26Job filed: INTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF INTERIOR UNITS AND CORRIDORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$2,612,800
2026-03-24311: Elevator — Elevator - Multiple Devices On Property
2026-03-24311: PLUMBING — TOILET
2026-03-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-24311: Elevator — Elevator - Multiple Devices On Property
2026-03-24311: HEAT/HOT WATER — APARTMENT ONLY
2026-03-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-24Tenant complaint: PLUMBING — TOILET
2026-03-23Rodent inspection: Bait applied
2026-03-23311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-23311: Elevator — Elevator - Multiple Devices On Property
2026-03-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-23Job filed: INTERIOR AND FIRST FLOOR EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF INTERIOR UNITS AND CORRIDORS. NO CHANGE TO USE, EGRESS OR$3,919,200
2026-03-19311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-19311: HEAT/HOT WATER — APARTMENT ONLY
2026-03-19DOB complaint, category ?
2026-03-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-17311: HEAT/HOT WATER — APARTMENT ONLY
2026-03-17311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-17Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-16311: HEAT/HOT WATER — APARTMENT ONLY
2026-03-16Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-15311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-14HPD class A: § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM
2026-03-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-12311: PLUMBING — WATER SUPPLY
2026-03-12ECB CLASS - 1 violation: CLASS 1 ITEM: FIREFIGHTERS SERVICE PHASE 2 INOPERATIVE. REPAIR.$1,250
2026-03-12ECB CLASS - 1 violation: CLASS 1 ITEM: FIREFIGHTERS SERVICE PHASE 2 INOPERATIVE. REPAIR.$1,250
2026-03-12ECB CLASS - 2 violation: CLASS 2 ITEM: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE. RE$625
2026-03-12Tenant complaint: PLUMBING — WATER SUPPLY
2026-03-07311: Non-Emergency Police Matter — Other (complaint details)
2026-03-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-07311: Elevator — Elevator - Multiple Devices On Property
2026-03-07311: PLUMBING — WATER SUPPLY
2026-03-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-07311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-07DOB complaint, category ?
2026-03-07Tenant complaint: PLUMBING — WATER SUPPLY
2026-03-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-07HPD class B: § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASH BASIN IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 1st APA
2026-03-06311: Elevator — Elevator - Multiple Devices On Property
2026-03-06311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06DOB complaint, category ?
2026-03-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05311: HEAT/HOT WATER — APARTMENT ONLY
2026-03-05311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-05Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-04311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-04311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-04311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-04HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM SOUT
2026-03-04HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
2026-03-04HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM NORT
2026-03-04HPD class A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT SOUTH WALL IN THE BATHROOM LOCATE
2026-03-04Permit Structural — Permit Issued
2026-03-03311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-03311: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-03311: HEAT/HOT WATER — APARTMENT ONLY
2026-03-03311: PLUMBING — WATER SUPPLY
2026-03-03Tenant complaint: PLUMBING — WATER SUPPLY
2026-03-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-03Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-03-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-03-03Permit Mechanical Systems — Permit Issued
2026-03-02Rodent inspection: Failed for Rat Activity
2026-03-01311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2026-03-01DOB complaint, category ?
2026-02-28311: Elevator — Elevator - Multiple Devices On Property
2026-02-28311: Elevator — Elevator - Multiple Devices On Property
2026-02-28311: Elevator — Elevator - Multiple Devices On Property
2026-02-28311: Elevator — Elevator - Multiple Devices On Property
2026-02-28DOB complaint, category ?
2026-02-26311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-26311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-26311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-26311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-26311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-26Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-26Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-26HPD class B: § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVI
2026-02-26HPD class B: § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN AC
2026-02-26HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING ENT
2026-02-26HPD class B: § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT BUI
2026-02-26Permit General Construction — Permit Issued
2026-02-26Permit Earth Work — Permit Issued
2026-02-25311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-25Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-24311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-24311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-23311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-23311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-23311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-23311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-23HPD class B: § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVI
2026-02-23HPD class B: § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN AC
2026-02-23HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED BOILER ROOM DOOR AT BOILER ROOM
2026-02-23HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT
2026-02-23HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 3rd STORY, 2nd APARTMENT
2026-02-23HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT
2026-02-22311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-22311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-22311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-22311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-22311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-22Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-21Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-19311: HEAT/HOT WATER — APARTMENT ONLY
2026-02-19311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-02-19Permit Construction Fence — Permit Issued
2026-02-19Permit Construction Fence — Permit Issued
2026-02-18Job filed: Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and$100,000
2026-02-18Job filed: Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and$100,000
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $1,300,000 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to CITIBANK, N.A.$1,300,000
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13Mortgage $20,216,481 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$20,216,481
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13SUBM — from CITIBANK, N.A. to NEW YORK CITY HOUSING AUTHORITY
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage $10,496,743 — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC to NEW YORK CITY HOUSING AUTHORITY$10,496,743
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage assigned — from CITIBANK, N.A. to FEDERAL HOME LOAN MORTGAGE CORPORATION
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13Mortgage $74,570,000 — from CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CITIBANK, N.A.$74,570,000
2026-02-13EASE — from NYCHA TRIBOROUGH PRESERVATION HDFC; TRIBOROUGH PRESERVATION LLC to CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC
2026-02-13Agreement — from CAMPOS PLAZA II HOUSING DEVELOPMENT FUND to CAMPOS PLAZA II PACT PARTNERS LLC
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13MLEA $12,108,784 — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II PACT PARTNERS LLC; CAMPOS PLAZA II HOUSING DEVELOPMENT FUND$12,108,784
2026-02-13Agreement — from NEW YORK CITY HOUSING AUTHORITY to CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC
2026-02-13Agreement — from UNITED STATES DEPT OF HOUSING & URBAN DE to CAMPOS PLAZA II HOUSING DEVELOPMENT FUND; CAMPOS PLAZA II PACT PARTNERS LLC; NEW YORK CITY
2026-02-13REL — from UNITED STATES OF AMERICA to NEW YORK CITY HOUSING AUTHORITY
2025-12-17Job filed: ROOF REPLACEMENT IN CONJUNCTION WITH RENOVATION OF 17-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000,000
2025-12-16311: Elevator — Elevator - Multiple Devices On Property
2025-12-16DOB complaint, category ?
2025-12-15Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH GC APPLICATION: INSTALL NEW AND REPLACED PLUMBING FIXTURES AT 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY$1,248,320
2025-12-15Job filed: FILING FOR NEW SPRINKLER WORK AT 1ST FLOOR: RELOCATION, REMOVAL AND ADDITION OF EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$45,665
2025-12-15Job filed: FILING FOR NEW SPRINKLER WORK AT 1ST FLOOR: RELOCATION, REMOVAL AND ADDITION OF EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$45,665
2025-12-15Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH GC APPLICATION: INSTALL NEW AND REPLACED PLUMBING FIXTURES AT 2ND THROUGH 17TH FLOORS. NO CHANGE TO USE, EGRES$1,177,400
2025-12-15Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH GC APPLICATION: INSTALL NEW AND REPLACED PLUMBING FIXTURES AT 2ND THROUGH 9TH FLOORS. NO CHANGE TO USE, EGRESS$1,177,400
2025-11-21Job filed: PROVIDE SITE REMOVAL WITHIN COURTYARD AND LIMITS OF WORK AS REQUIRED FOR RELATED IMPROVEMENTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,063,392
2025-11-19Job filed: LIMITED EXTERIOR REPAIR IN CONJUNCTION WITH RENOVATION OF 17-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,520,832
2025-11-19Job filed: LIMITED EXTERIOR REPAIR IN CONJUNCTION WITH RENOVATION OF 9-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$3,781,248
2025-11-17Job filed: INTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF INTERIOR UNITS AND CORRIDORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$2,612,800
2025-10-16Job filed: FACADE SUPPORT FOR NEW OPENINGS AND ENCLOSURE AT 1ST FLOOR, NEWCANOPY AND SUPPORT OF NEW MECHANICAL EQUIPMENT ON THE ROOF. NO CHANGE IN USE, EGRESS, O$65,000
2025-10-16Job filed: FACADE SUPPORT FOR NEW OPENINGS AND ENCLOSURE AT 1ST FLOOR, NEWCANOPY AND SUPPORT OF NEW MECHANICAL EQUIPMENT ON THE ROOF. NO CHANGE IN USE, EGRESS, O$65,000
2025-06-09Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH GC APPLICATION: INSTALL NEW AND REPLACED PLUMBING FIXTURES AT 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY$1,248,320
2025-06-09Job filed: PLUMBING WORK FILED IN CONJUNCTION WITH GC APPLICATION: INSTALL NEW AND REPLACED PLUMBING FIXTURES AT 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY$1,872,480
2025-05-15Job filed: MECHANICAL WORK FILED IN CONJUNCTION WITH GC APPLICATION: REPLACEMENT AND NEW MECHANICAL SYSTEM FOR EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCC$1,716,502
2025-05-14Job filed: MECHANICAL WORK FILED IN CONJUNCTION WITH GC APPLICATION: REPLACEMENT AND NEW MECHANICAL SYSTEM FOR EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCC$2,574,754
2025-03-10Job filed: INTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF INTERIOR UNITS AND CORRIDORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$2,612,800
2025-03-10Job filed: INTERIOR AND FIRST FLOOR EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF INTERIOR UNITS AND CORRIDORS. NO CHANGE TO USE, EGRESS OR$3,919,200
2024-10-28DOB violation C: PARTIAL VACATE ORDER AT EXPOSURE #3, WEST ELEVATION PLAYGROUND AREA DUE TO HAZARDOUS CONDITIONS OBSERVED SUCH AS LOOSE/SPALLING
2024-10-26311: Noise — Noise: Construction Before/After Hours (NM1)
2024-10-25ECB CLASS - 1 violation: FAILURE TO TAKE REQUIRED SAFETY MEASURES TO SECURE PUBLIC SAFETY FOR DOCUMENTED UNSAFE FACADE FILING#900750-94.NOTE:AT THE TIME OF$25,000
2024-10-11Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 612 EAST 14 STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APP$10,000
2024-09-20Rodent inspection: Failed for Rat Activity
2024-09-11ECB CLASS - 1 violation: FAILURE TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFETY-UNSAFE FACADE. NOTE: OBSERVED AT EXPOSURE 3, WEST ELEVATION, INADEQUATE/$10,000
2024-09-09311: Water System — Hydrant Running (WC3)
2024-06-27Job filed: INSTALLATION OF NEW AUTOMATIC GAS SHUT-OFF VALVE, CONNECTED TO EXISTING ANSUL SYSTEM, REPLACEMENT OF EXISTING. NO CHANGE IN USE OR EGRESS.$6,336
2024-06-26Rodent inspection: Failed for Rat Activity
2024-05-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-05311: Homeless Person Assistance
2024-05-01311: Indoor Air Quality — Other (Explain Below)
2024-04-26Rodent inspection: Failed for Rat Activity
2024-04-25Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 612 EAST 14 STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APP$10,000
2024-04-16311: Noise - Vehicle — Car/Truck Music
2024-04-08311: Noise - Vehicle — Car/Truck Music
2024-03-29Rodent inspection: Failed for Rat Activity
2023-11-14Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 612 E14TH STREET, NEW YORK NY1009 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, O$10,000
2023-11-13311: Homeless Person Assistance
2023-11-04311: Elevator — Elevator - Multiple Devices On Property
2023-11-04DOB complaint, category ?
2023-10-30Rodent inspection: Failed for Rat Activity
2023-10-21Job filed: DEMO 1 EXISTING EXHAUST HOOD&DUCT AND EXISTING EXHAUST FANS.INSTALL 1 NEW EXHAUST HOOD, 1 12 GA BLACK IRON EXHAUST DUCT, GREASE EXHAUST FAN. NO CHANGE$36,850
2023-10-04Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 612 EAST 14 STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APP$10,000
2023-10-02FDNY inspection (COM_OCPCY)
2023-10-02FDNY inspection (RISK)
2023-10-02FDNY inspection (COM_OCPCY)
2023-09-30Rodent inspection: Failed for Rat Activity
2019-11-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-04Elevator permit: FURNISH and INSTALL CONTROLLER DOOR LOCK and BRAKE MONITORING TO MEET NYC CODE REQUIREMENTS. ALL WORK TO COMPLY WITH A17.3 OF 2002$30,999
2019-10-30Elevator permit: FURNISH and INSTALL CONTROLLER DOOR LOCK and BRAKE MONITORING TO MEET NYC CODE REQUIREMENTS. ALL WORK TO COMPLY WITH A17.3 OF 2002$30,999
2019-10-28311: ELECTRIC — POWER OUTAGE
2019-10-26311: UNSANITARY CONDITION — SEWAGE
2019-10-22Rodent inspection: Failed for Rat Activity and Other Reason
2019-10-22311: Homeless Person Assistance — N/A
2019-10-16Permit EQ — ISSUED
2019-10-16Permit EQ — ISSUED
2019-10-11311: Rodent — Rat Sighting
2019-10-11311: Elevator — Elevator - Multiple Devices On Property
2019-10-11DOB complaint, category ?
2019-10-10311: Illegal Parking — Blocked Bike Lane
2019-10-05311: Elevator — Elevator - Multiple Devices On Property
2019-10-05DOB complaint, category ?
2019-09-28Rodent inspection: Failed for Rat Activity
2019-09-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-25311: Illegal Parking — Blocked Bike Lane
2019-09-18ECB CLASS - 1 violation: FAILURE TO NOTFIY DEPARTMENT OF AN INCIDNET THAT RESULTED IN A FATALITY OR INJURY NOTE ONE WORKER TWISTED HIS KJNEEE WHILE MOVING
2019-07-25311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-07-25DOB complaint, category ?
2019-07-16Rodent inspection: Failed for Rat Activity and Other Reason
2019-07-10311: Elevator — Elevator - Multiple Devices On Property
2019-07-10DOB complaint, category ?
2019-07-05311: Illegal Parking — Blocked Bike Lane
2019-06-26311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-06-26311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-06-26DOB complaint, category ?
2019-06-26ECB CLASS - 2 violation: 3307.6.5.7 UPON COMPLETION OF THE INSTALLATION OF A SIDEWALK SHED SHALL BE INSPECTED BY A QUALIFIED PERSON. AT THE TIME OF INS
2019-06-26ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. AT THE TIME OF INSPECTION ON AN ACTIVE JOBSITE I OBSERVED LIGHTS AT SIDE
2019-06-26ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED CONSTRUCTION DOCUMENTS AT JOB SITE AT TIME OF INSPECTION. AT THE TIME OF INSPECTION I OBSE
2019-06-26DOB complaint, category ?
2019-06-26ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE C
2019-06-26ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT THE TIME OF INSPECTION ON AN ACTING JOBSITE I OBSERVED AT
2019-06-19Rodent inspection: Failed for Rat Activity and Other Reason
2019-06-08FDNY inspection (COM_OCPCY)
2019-06-08FDNY inspection (RISK)
2019-06-08FDNY inspection (COM_OCPCY)
2019-06-07311: Illegal Parking — Blocked Bike Lane
2019-06-05311: Rodent — Rat Sighting
2019-06-03311: Water System — Other Water Problem (Use Comments) (WZZ)
2019-06-01311: Damaged Tree — Branch Cracked and Will Fall
2019-05-28311: Damaged Tree — Branch Cracked and Will Fall
2019-05-24Permit PL — ISSUED
2019-05-24Permit PL — ISSUED
2019-05-24Permit PL — ISSUED
2019-05-24Permit PL — ISSUED
2019-05-20311: Noise — Noise: Construction Equipment (NC1)
2019-05-18Permit Supported Scaffold — Signed-off
2019-05-17Permit Sidewalk Shed — Signed-off
2019-05-17Permit Sidewalk Shed — Signed-off
2019-05-17Permit Supported Scaffold — Signed-off
2019-05-03Rodent inspection: Failed for Rat Activity and Other Reason
2018-11-06311: Elevator — Elevator - Multiple Devices On Property
2018-11-06DOB complaint, category ?
2018-10-28311: Illegal Parking — Blocked Sidewalk
2018-10-26HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-10-02Elevator permit: Provide Door Lock Monitoring System Overlay Unit as per attached drawings. Installation to comply with ASME A17.3 of 2002 Chapter $10,000
2018-10-01Job filed: INSTALLATION OF FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2018-09-28Rodent inspection: Failed for Rat Activity and Other Reason
2018-09-18Permit Construction Fence — Signed-off
2018-09-18Permit Sidewalk Shed — Signed-off
2018-08-26311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-08-15Permit Sidewalk Shed — Signed-off
2018-08-13Rodent inspection: Failed for Rat Activity
2018-06-07Job filed: INSTALLATION OF PIPE SCAFFOLD AT 612 EAST 14 STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLIC$20,000
2018-06-07Job filed: INSTALLATION OF PIPE SCAFFOLD AT 641 EAST 13 STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLIC$20,000
2018-06-07Permit Supported Scaffold — Signed-off
2018-06-07Permit PL — ISSUED
2018-06-07Permit PL — ISSUED
2018-06-07Permit PL — ISSUED
2018-06-05Permit Construction Fence — Signed-off
2018-06-04Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 612 EAST 14 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OC$7,000
2018-06-02Permit Sidewalk Shed — Signed-off
2018-06-01Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 612 EAST 14 STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS AP$10,000
2018-05-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2018-05-24Permit Sidewalk Shed — Signed-off
2018-05-23Permit Sidewalk Shed — Signed-off
2018-05-22311: Animal Abuse — Neglected
2018-05-22Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 604 EAST 14TH STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS A$8,000
2018-05-22Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 633 EAST 13TH STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS A$12,000
2018-05-15311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-14311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-05-12311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-24Rodent inspection: Failed for Rat Activity
2018-04-24311: Illegal Parking — Blocked Sidewalk
2018-04-19Rodent inspection: Monitoring visit
2018-04-19Elevator permit: Provide Door Lock Monitoring System Overlay Unit as per attached drawings. Installation to comply with ASME A17.3 of 2002 Chapter $10,000
2018-04-13Permit EW — ISSUED
2018-04-13Permit EW — ISSUED
2018-04-12Rodent inspection: Bait applied
2018-04-05311: Noise — Noise: Construction Equipment (NC1)
2017-12-11HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-11-06HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-11-03311: Water System — Hydrant Defective (WC2)
2017-11-03Permit EW — ISSUED
2017-11-03Permit EW — ISSUED
2017-11-03Permit EW — ISSUED
2017-11-03Permit EW — ISSUED
2017-11-03Permit EW — ISSUED
2017-11-01Permit EQ — ISSUED
2017-11-01Permit EQ — ISSUED
2017-10-12Job filed: INSTALLATION OF (+/-) 599 L.FT TEMPORARY CONSTRUCTION FENCE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS
2017-10-12Job filed: INSTALLATION OF (+/-)627 L.FT NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
2017-10-12Job filed: INSTALLATION OF (+/-)979 L.FT NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
2017-10-12Job filed: INSTALLATION OF (+/-) 1432 L.FT TEMPORARY CONSTRUCTION FENCE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THI
2017-09-25Job filed: FACADE SSP FILLED IN CONJUNCTION WITH THE APPLICATION NO.122136321. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$5,000
2017-07-15311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-07-13ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG.WEST ELEV EXP3 SCREENS & A/C UNITS NOT SECURED AS PER CODE.SECURE ALL SCREENS & A/C UNIT IMMEDIA$2,500
2017-07-12Rodent inspection: Failed for Rat Activity
2017-06-27311: Noise — Noise: Construction Equipment (NC1)
2017-06-27311: Noise — Noise: Jack Hammering (NC2)
2017-06-26311: Noise — Noise: Construction Equipment (NC1)
2017-06-22311: Animal Abuse — Other (complaint details)
2017-06-21311: Noise — Noise: Construction Equipment (NC1)
2017-06-14Rodent inspection: Failed for Rat Activity
2017-05-31311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-05-31311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2017-04-07ECB CLASS - 2 violation: FAILURE TO MAINTAIN-EXTERIOR BLDG. GENERAL NOTE: INSTALL ALL A/C UNITS SCREENS,A/C COVER PANELS,UNDER SIZED A/C UNITS AS PER CODE-
2017-03-07Job filed: PA
2017-02-16DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016
2017-01-03DOB violation ACH1: VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACH1: VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-30311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-12-30DOB complaint, category ?
2016-12-09Rodent inspection: Failed for Rat Activity
2016-11-29HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-11-17311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2016-11-17DOB complaint, category ?
2016-11-01311: Noise — Noise: Alarms (NR3)
2016-10-24HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-09-13311: Emergency Response Team (ERT) — Lights From Parking Lot Shining On Building
2016-08-10Rodent inspection: Failed for Rat Activity
2016-08-04311: Derelict Vehicle — With License Plate
2016-07-19Permit EQ — ISSUED
2016-07-15Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS, FILE FIRE SUPP. SHUT OFF GAS VALVE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,500
2016-07-12Rodent inspection: Failed for Rat Activity
2016-06-30Rodent inspection: Failed for Rat Activity
2016-06-27Job filed: INSTALLATION OF PIPE SCAFFOLD 286'-0' LONG AND 20'-0' HIGH ON MAIN ROOF TO BULKHEAD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS,
2016-06-27Job filed: INSTALLATION OF PIPE SCAFFOLD 286'-0" LONG AND 20'-0" HIGH ON MAIN ROOF TO BULKHEAD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS,