The city's published records show little recorded distress here in the last three years. Less recorded distress than 53% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 20.4. In ZIP 11216, 38% of residential buildings hold an A and
19% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
6 heat or hot-water complaints in the last three years (winter 2023–24: 4 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.
4
’23–24
2
’25–26
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
20 service requests in the last three years. Most common: Noise (5) · HEAT/HOT WATER (3) · Derelict Vehicles (2) · Water System (2) · Rodent (2) · PLUMBING (2).
Filed construction activity
$2,752,306 in permitted construction work filed since
2016 (16 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1970)
Yes
Six or more residential units (32)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
BROOKLYN HOUSING PRESERVATION LP
Head officer
ROBERT CORSO
Managing agent
PROGRESSIVE MANAGEMENT OF NY
Last registered
2025-07-23
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$3,364,000
$1,513,800
2026
$3,365,000
$1,514,250
2027
$3,848,000
$1,731,600
The city's market estimate has risen
14% between tax years 2025 and 2027.
Tax exemptions on the roll: NYC HOUSING AUTH
Building systems
Energy grade (LL33)
D — ENERGY STAR score 2/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2020 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bedford-Nostrand Avs — G · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: none Nostrand Av — A C · 0.5 mi straight-line (about a 13-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Gates Av / Marcy Av — B52 · 550 ft
Citi Bike
Greene Ave & Nostrand Ave · 550 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
20 311 service requests from this address in the last three years — 3 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $3,706,216 on
2020-02-19 (lender: New York City Housing Development Corporation), covering 98 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2020-02-19
Mortgage $1,903,309 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,903,309
2020-02-19
Mortgage $3,944,982 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$3,944,982
2020-02-19
Mortgage $2,237,951 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$2,237,951
2020-02-19
Mortgage $2,330,429 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$2,330,429
2020-02-19
Mortgage $1,827,780 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,827,780
2020-02-19
Mortgage $1,755,249 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,755,249
2020-02-19
Mortgage $1,269,569 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,269,569
2020-02-19
MLEA $10,820,172 — from NEW YORK CITY HOUSING AUTHORITY to BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN
$10,820,172
2020-02-19
Mortgage $1,685,595 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG P to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,685,595
2020-02-19
Mortgage $2,063,858 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$2,063,858
2020-02-19
Mortgage $2,426,728 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIA to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$2,426,728
2020-02-19
Mortgage $2,527,007 — from BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$2,527,007
2020-02-19
Mortgage $1,981,959 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,981,959
2020-02-19
Mortgage $2,631,430 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$2,631,430
2020-02-19
Mortgage $2,740,168 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$2,740,168
Ten-year activity
2001000
2017
2018
2019
107
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
7
0
5
12
2018
0
0
5
0
7
12
2019
2
1
6
0
7
16
2020
24
7
20
52
4
107
2021
6
0
15
0
4
25
2022
0
0
25
0
5
30
2023
0
2
6
0
5
13
2024
0
0
17
0
7
24
2025
0
2
4
0
7
13
2026
0
0
11
0
12
23
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2022-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-30Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-01-30311: HEAT/HOT WATER — APARTMENT ONLY
2022-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-28HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE (FIRE DOOR 1ST FROM WEST AT NORTH)
2022-01-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-22311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-14HPD class A: § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE WITH GROUTED JOINTS OF VISIBLE [ MOLD ] AT WEST,
2022-01-14HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT APARTMENT IN THE ENTRANCE LOCATE
2022-01-14HPD class B: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQUARE FOOT AT CAULKING AT WEST WALL AR
2022-01-14HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAS
2022-01-14HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LEADING TO (FIRE ST
2022-01-14HPD class A: § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQUARE FOOT AT CAULKING AT WEST WALL AR
2022-01-11Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-02-06HPD class B: § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS STACK AT BUILDING WEST YARD A
2021-02-06HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BUILDING ENTRANCE , 1st STORY
2021-01-31Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-31311: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-26Job filed: INSTALLATION OF SUB-SLAB DEPRESSURIZATION SYSTEM. NO CHANGE IN EGRESS USE OR OCCUPANCY.$64,500
2021-01-26Job filed: INSTALLATION OF SUB-SLAB DEPRESSURIZATION SYSTEM. NO CHANGE IN EGRESS USE OR OCCUPANCY.$64,500
2020-07-23311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2020-07-21ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT THE TIME OF INSPECTION OF A 4 STY BLDG I OBSER
2020-07-21ECB CLASS - 2 violation: SEC. BC3314.4.3 INSPECTIONS. AT THE TIME OF INSPECTION OF 4 STY BLDG IOBSERVED SUSPENDED C-HOOK SCAFFOLDS INSTALLED AT EXP#1. I AL$625
2020-07-21ECB CLASS - 1 violation: SEC. BC3303.5.4 AIR POLLUTION/DUST. AT THE TIME OF INSPECTION OF A 4 STY BLDG I OBSERVED WORKERS PERFORMING FACADE WORK. WORKERS W$2,500
2020-07-21ECB CLASS - 1 violation: LICENSED RIGGER DESIGNATED ON UNQUALIFIED FOREMAN. AT THE TIME OF INSPECTION OF A 4 STY BLDG,ACTIVE WORK. OBSERVED WORKERS ON SUSP
2020-07-20311: General Construction/Plumbing — Safety Netting/Guard Rails - Damaged/Inadequate/None (6 Stories/75 Feet Or Less)
2020-06-25Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2020-06-22Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2020-06-18Permit EW — ISSUED
2020-06-12Job filed: RENOVATIONS TO THE EXISTING FACADE. NO CHANGE IN EGRESS USE OR OCCUPANCY.$43,995
2020-06-12Job filed: RENOVATIONS TO THE EXISTING FACADE. NO CHANGE IN EGRESS USE OR OCCUPANCY.$43,995
2020-05-28Job filed: REPLACEMENT (3) NEW COMBINATION GAS/OIL BURNERS ON (3) EXISTING LOW PRESSURE BOILERS. STRAIGHT GAS ONLY AT THIS TIME. NO CHANGE IN EGRESS USE GROUP $300,000
2020-05-27ECB CLASS - 2 violation: FRESH AIR FANS NOT WIRED EXSPOSED WIRES.$625
2020-05-27DOB complaint, category ?
2020-05-25Job filed: RECONNECT EXISTING LOW PRESSURE GAS LINE. (3) NEW GAS TRAINS. RECONNECT EXISTING HOUSE SERVICE. STRAIGHT GAS ONLY AT THIS TIME. NO CHANGE IN MEANS $50,000
2020-05-22Permit EW — ISSUED
2020-05-18Job filed: INSTALL NEW ROOF MEMBRANE OVER EXISTING ROOF ASSEMBLY, REPAIR OR REPLACE ALL BASE FLASHING AS REQUIRED AND INSTALL NEW ROOF INSULATION. NO CHANCE IN E$40,000
2020-05-15Job filed: NEW FURAN FLEX CHIMNEY LINER. LEGALLY REMOVE EXISTING OIL TANK FILED UNDER SEPARATE APPLICATION BY OTHERS. PLUMBING AND FUEL BURNING FILED UNDER SEPAR$74,000
2020-05-15Job filed: NEW FURAN FLEX CHIMNEY LINER. LEGALLY REMOVE EXISTING OIL TANK FILED UNDER SEPARATE APPLICATION BY OTHERS. PLUMBING AND FUEL BURNING FILED UNDER SEPAR$74,000
2020-05-08Job filed: FILING TO REMOVE ACCESSORY PARKING REFERENCE LISTED ON CERTIFICATE OF OCCUPANCY # 213298.$1,000
2020-05-08Job filed: FILING TO REMOVE ACCESSORY PARKING REFERENCE LISTED ON CERTIFICATE OF OCCUPANCY # 213298.$1,000
2020-02-19Mortgage $1,903,309 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,903,309
2020-02-19Mortgage $3,944,982 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,944,982
2020-02-19Mortgage $2,237,951 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,237,951
2020-02-19Mortgage $2,330,429 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,330,429
2020-02-19Mortgage $1,827,780 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,827,780
2020-02-19Mortgage $1,755,249 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,755,249
2020-02-19Mortgage $1,269,569 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,269,569
2020-02-19REL — from UNITED STATES DEPARTMENT OF HOUSING AND to NEW YORK CITY HOUSING AUTHORITY
2020-02-19SAGE — from NEW YORK CITY HOUSING AUTHORITY to BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; U.S. DEPARTM
2020-02-19Agreement — from NEW YORK CITY HOUSING AUTHORITY to BROOKLYN PACT HOUSING DEVELOPMENT FUND C; BROOKLYN HOUSING PRESERVATION, L.P.
2020-02-19MLEA $10,820,172 — from NEW YORK CITY HOUSING AUTHORITY to BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN$10,820,172
2020-02-19Mortgage $1,685,595 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG P to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,685,595
2020-02-19Mortgage $2,063,858 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,063,858
2020-02-19SAGE — from FEDERAL HOME LOAN MORTGAGE CORPORATION to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2020-02-19Mortgage $2,426,728 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIA to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,426,728
2020-02-19Mortgage $2,527,007 — from BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,527,007
2020-02-19Mortgage $1,981,959 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,981,959
2020-02-19Mortgage $2,631,430 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,631,430
2020-02-19Mortgage $2,740,168 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,740,168
2020-02-19Mortgage $4,702,897 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,702,897
2020-02-19Mortgage $2,853,399 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,853,399
2020-02-19Mortgage $1,433,547 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,433,547
2020-02-19Mortgage $1,554,471 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,554,471
2020-02-19Mortgage $3,094,091 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIA to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,094,091
2020-02-19Mortgage $4,897,233 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,897,233
2020-02-19Mortgage $3,221,947 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,221,947
2020-02-19Mortgage $5,679,536 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$5,679,536
2020-02-19Mortgage $5,454,156 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMS to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$5,454,156
2020-02-19Mortgage $5,237,720 — from BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG P to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$5,237,720
2020-02-19Mortgage $3,355,087 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,355,087
2020-02-19Mortgage $337,500,000 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$337,500,000
2020-02-19Mortgage $337,500,000 — from BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG to FEDERAL HOME LOAN MORTGAGE CORPORATION$337,500,000
2020-02-19Mortgage $3,493,728 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,493,728
2020-02-19Mortgage $2,971,309 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,971,309
2020-02-19Mortgage $3,788,434 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,788,434
2020-02-19Mortgage $3,638,098 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,638,098
2020-02-19SAGE — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to FEDERAL HOME LOAN MORTGAGE CORPORATION
2020-02-19Mortgage $1,618,706 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,618,706
2020-02-19Mortgage $1,376,660 — from BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,376,660
2020-02-19Mortgage $1,322,030 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMS to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,322,030
2020-02-19Mortgage $33,793,784 — from BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,793,784
2020-02-19Mortgage $3,706,216 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,706,216
2020-02-19SAGE — from BROOKLYN HOUSING PRESERVATION L.P. to BROOKLYN PACT II HOUSING DEVELOPMENT FUN
2020-02-19Agreement — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2020-02-19Mortgage $5,029,872 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$5,029,872
2020-02-19Mortgage $4,830,272 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,830,272
2020-02-19Mortgage $4,638,593 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,638,593
2020-02-19Mortgage $4,454,521 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,454,521
2020-02-19Mortgage $4,277,752 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,277,752
2020-02-19Mortgage $4,107,999 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,107,999
2020-02-19Mortgage $2,149,143 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMS to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,149,143
2020-02-19Mortgage $1,492,785 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,492,785
2020-02-05Boiler inspection
2020-02-05Boiler inspection — defects found
2020-02-05Boiler inspection
2019
2019-12-23Permit EW — ISSUED
2019-11-19Job filed: MODERATE INTERIOR RENOVATION OF EXISTING SPACE 390 LEXINGTON AVENUE INCLUDING BUT NOT LIMITED TO REPLACEMENT OF KITCHEN CABINETS, APPLIANCES, KITCHEN $1,840,000
2019-10-07Rodent inspection: Failed for Rat Activity
2019-08-06FDNY inspection (RISK)
2019-07-21311: Water Conservation — Illegal Use Of A Hydrant (CIN)
2019-06-15Rodent inspection: Failed for Other Reason
2019-06-12Asbestos abatement: Removal — AMC United, Inc.
2019-05-08Eviction executed (02A)
2019-04-03Rodent inspection: Failed for Other Reason
2010-01-08Job filed: INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2010-01-08Job filed: INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2010-01-08Permit EQ — ISSUED
2009
2009-12-08Permit EQ — ISSUED
2009-11-24Job filed: INSTALLATION OF APPROX. 475 LF. OF SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATIO
2009-11-24Job filed: INSTALLATION OF APPROX. 475 LF. OF SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATIO
2009-07-14Job filed: MASONRY REPAIR.$65,589
2009-07-14Job filed: MASONRY REPAIR.$65,589
2009-07-14Job filed: MASONRY REPAIR.$65,589
2007
2007-03-02Permit EQ — ISSUED
2007-01-03Job filed: PROPOSED INSTALLATION OF 48 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL/91. NO CHANGE IN USE, OC
2006
2006-08-03Job filed: EST COST $65,589 MASONRY REPAIR$65,589
2006-08-03Job filed: MASONRY REPAIR$65,589
2005
2005-07-01Permit EW — ISSUED
2005-07-01Permit PL — ISSUED
2005-07-01Permit EW — ISSUED
2005-07-01Permit EW — ISSUED
2005-07-01Permit EW — ISSUED
2005-05-03DECL — from NEW YORK CITY HOUSING AUTHORITY to UNITED STATES DEPT. OF HOUSING AND URBAN
2004
2004-05-26Job filed: REPLACE (2) LOW PRESSURE BOILERS AND GAS/OIL BURNERS WITH (3) BOILERS AND GAS/OIL BURNERS. MODIFY GAS PIPLING & CONNECT TO EXISTING GAS SERVICE. $125,000
2004-05-17Job filed: REPLACE DOMESTIC HOT WATER SUPPLY AND RETURN PIPING FROM 320 LEXINGTON AVENUE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$30,000
2003
2003-03-19DOB violation LL6291:
2003-03-19DOB violation LL6291:
2002
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2001
2001-02-27DOB violation LL6291:
2001-02-27DOB violation LL6291:
2000
2000-02-07DOB violation LL6291:
1999
1999-03-16DOB violation LL6291:
1999-03-16DOB violation LL6291:
1998
1998-05-04DOB violation LL6291:
1998-05-04DOB violation LL6291:
1994
1994-07-25DOB violation LL6291:
1994-06-01DOB violation LL6291:
1993
1993-08-16DOB violation LL6291:
1993-06-01DOB violation LL6291:
1991
1991-03-27Permit PL — ISSUED
1991-03-27Permit EW — ISSUED
1991-03-27Permit EW — ISSUED
1991-03-13Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL