A modest record — below the level that usually signals systemic problems. More recorded distress than 81% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 6.7. In ZIP 11216, 38% of residential buildings hold an A and
19% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
4 heat or hot-water complaints in the last three years (winter 2025–26: 4).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
6 service requests in the last three years. Most common: Noise (3) · HEAT/HOT WATER (2) · Derelict Vehicles (1).
Filed construction activity
$241,751 in permitted construction work filed since
2016 (5 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (1980)
No
Six or more residential units (2)
No
421-a / J-51 tax benefit on the current tax roll
0 of 3 signals present. None of the common signals are present — stabilization is unlikely (though never impossible). The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
BROOKLYN HOUSING PRESERVATION LP
Head officer
ILSOO KIM
Managing agent
PROGRESSIVE MANAGEMENT OF NY
Last registered
2025-07-23
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,400,000
$84,000
2026
$1,464,000
$87,840
2027
$1,393,000
$83,580
The city's market estimate has risen
0% between tax years 2025 and 2027.
Tax exemptions on the roll: NYC HOUSING AUTH
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bedford-Nostrand Avs — G · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: none Nostrand Av — A C · 0.4 mi straight-line (about an 11-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Gates Av / Marcy Av — B52 · 350 ft
Citi Bike
Marcy Ave & Gates Ave · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
6 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $3,706,216 on
2020-02-19 (lender: New York City Housing Development Corporation), covering 98 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2020-02-19
Mortgage $3,706,216 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$3,706,216
2020-02-19
Mortgage $33,793,784 — from BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$33,793,784
2020-02-19
Mortgage $337,500,000 — from BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG to FEDERAL HOME LOAN MORTGAGE CORPORATION
$337,500,000
2020-02-19
Mortgage $337,500,000 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$337,500,000
2020-02-19
Mortgage $4,897,233 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,897,233
2020-02-19
Mortgage $4,702,897 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,702,897
2020-02-19
Mortgage $5,679,536 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$5,679,536
2020-02-19
Mortgage $5,454,156 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMS to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$5,454,156
2020-02-19
Mortgage $5,237,720 — from BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG P to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$5,237,720
2020-02-19
Mortgage $5,029,872 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$5,029,872
2020-02-19
Mortgage $4,830,272 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,830,272
2020-02-19
Mortgage $4,638,593 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,638,593
2020-02-19
Mortgage $4,454,521 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,454,521
2020-02-19
Mortgage $4,277,752 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,277,752
2020-02-19
Mortgage $4,107,999 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,107,999
Ten-year activity
100500
2017
2018
2019
66
2020
2021
2022
2023
2024
2025
2026
ConstructionHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
0
1
1
2018
0
1
0
3
4
2019
3
1
0
4
8
2020
9
4
52
1
66
2021
1
12
0
1
14
2022
0
10
0
2
12
2023
0
16
0
2
18
2024
0
1
0
3
4
2025
0
5
0
2
7
2026
0
4
0
2
6
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2023-09-27HPD class B: § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT
2023-09-27HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT A, 1st STORY,
2023-09-27HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT A, 1st STOR
2023-09-27HPD class B: § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT A
2021-04-21HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2020
2020-12-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-12-29311: Illegal Parking — Blocked Bike Lane
2020-12-03Permit AL — ISSUED
2020-11-03Permit EW — ISSUED
2020-11-03Permit EW — ISSUED
2020-11-03Permit EW — ISSUED
2020-06-26Permit EW — ISSUED
2020-06-12Job filed: RENOVATIONS TO THE EXISTING FACADE. NO CHANGE IN EGRESS USE OR OCCUPANCY.$2,751
2020-06-05Permit EW — ISSUED
2020-05-28Job filed: INSTALL NEW ROOF MENBRANE OVER EXISTING ROOF ASSEMBLY, REPAIR OR REPLACE ALL BASE FLASHING AS REQUIRED AND INSTALL NEW ROOF INSULATION. NO CHANCE IN E$8,000
2020-05-26311: Non-Emergency Police Matter — Social Distancing
2020-05-16311: Non-Emergency Police Matter — Social Distancing
2020-05-08Job filed: FILING TO REMOVE ACCESSORY PARKING REFERENCE LISTED ON CERTIFICATE OF OCCUPANCY # 208829.$1,000
2020-02-26Rodent inspection: Passed
2020-02-19SAGE — from FEDERAL HOME LOAN MORTGAGE CORPORATION to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2020-02-19Mortgage $3,706,216 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,706,216
2020-02-19Mortgage $33,793,784 — from BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$33,793,784
2020-02-19SAGE — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR to FEDERAL HOME LOAN MORTGAGE CORPORATION
2020-02-19Mortgage $337,500,000 — from BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG to FEDERAL HOME LOAN MORTGAGE CORPORATION$337,500,000
2020-02-19Mortgage $337,500,000 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$337,500,000
2020-02-19Mortgage $4,897,233 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,897,233
2020-02-19Mortgage $4,702,897 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,702,897
2020-02-19Mortgage $5,679,536 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$5,679,536
2020-02-19Mortgage $5,454,156 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMS to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$5,454,156
2020-02-19Mortgage $5,237,720 — from BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG P to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$5,237,720
2020-02-19Mortgage $5,029,872 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$5,029,872
2020-02-19Mortgage $4,830,272 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,830,272
2020-02-19Mortgage $4,638,593 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,638,593
2020-02-19Mortgage $4,454,521 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,454,521
2020-02-19Mortgage $4,277,752 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,277,752
2020-02-19Mortgage $4,107,999 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,107,999
2020-02-19Mortgage $3,944,982 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,944,982
2020-02-19Mortgage $3,788,434 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,788,434
2020-02-19Mortgage $3,638,098 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,638,098
2020-02-19Mortgage $3,493,728 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,493,728
2020-02-19Mortgage $3,355,087 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,355,087
2020-02-19Mortgage $3,221,947 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,221,947
2020-02-19Mortgage $3,094,091 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIA to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,094,091
2020-02-19Mortgage $2,971,309 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,971,309
2020-02-19Mortgage $2,853,399 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,853,399
2020-02-19Mortgage $2,740,168 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,740,168
2020-02-19Mortgage $2,631,430 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,631,430
2020-02-19Mortgage $2,527,007 — from BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,527,007
2020-02-19Mortgage $2,426,728 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIA to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,426,728
2020-02-19Mortgage $2,330,429 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,330,429
2020-02-19Mortgage $2,237,951 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,237,951
2020-02-19Mortgage $2,149,143 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMS to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,149,143
2020-02-19Mortgage $2,063,858 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$2,063,858
2020-02-19Mortgage $1,981,959 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,981,959
2020-02-19Mortgage $1,903,309 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,903,309
2020-02-19Mortgage $1,827,780 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,827,780
2020-02-19Mortgage $1,755,249 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,755,249
2020-02-19Mortgage $1,685,595 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG P to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,685,595
2020-02-19Mortgage $1,618,706 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,618,706
2020-02-19Mortgage $1,554,471 — from WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,554,471
2020-02-19Mortgage $1,492,785 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,492,785
2020-02-19Mortgage $1,433,547 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,433,547
2020-02-19Mortgage $1,376,660 — from BROOKLYN HOUSING PRESERVATION L.P.; WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PAC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,376,660
2020-02-19Mortgage $1,322,030 — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; WILLIAMS to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,322,030
2020-02-19Mortgage $1,269,569 — from WILLIAMSBURG PACT HOUSING DEVELOPMENT FU; BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKL to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,269,569
2020-02-19Agreement — from BROOKLYN PACT II HOUSING DEVELOPMENT FUN; WILLIAMSBURG HOUSING PRESERVATION L.P.; BROOKLYN to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2020-02-19SAGE — from BROOKLYN HOUSING PRESERVATION L.P. to BROOKLYN PACT II HOUSING DEVELOPMENT FUN
2020-02-19MLEA $10,820,172 — from NEW YORK CITY HOUSING AUTHORITY to BROOKLYN HOUSING PRESERVATION L.P.; BROOKLYN PACT II HOUSING DEVELOPMENT FUN$10,820,172
2020-02-19Agreement — from NEW YORK CITY HOUSING AUTHORITY to BROOKLYN PACT HOUSING DEVELOPMENT FUND C; BROOKLYN HOUSING PRESERVATION, L.P.
2020-02-19SAGE — from NEW YORK CITY HOUSING AUTHORITY to BROOKLYN PACT II HOUSING DEVELOPMENT FUN; BROOKLYN HOUSING PRESERVATION L.P.; U.S. DEPARTM
2020-02-19REL — from UNITED STATES DEPARTMENT OF HOUSING AND to NEW YORK CITY HOUSING AUTHORITY
2019
2019-12-24Permit EW — ISSUED
2019-11-19Job filed: MODERATE INTERIOR RENOVATION OF EXISTING SPACE INCLUDING BUT NOT LIMITED TO REPLACING KITCHEN CABINETS, APPLIANCES, FLOORING, APARTMENT ENTRY DOORS, $115,000
2019-11-19Job filed: MODERATE INTERIOR RENOVATION OF EXISTING SPACE INCLUDING BUT NOT LIMITED TO REPLACING KITCHEN CABINETS, APPLIANCES, FLOORING, APARTMENT ENTRY DOORS, $115,000
2015-05-18SMIS — from NEW YORK CITY HOUSING AUTHORITY to UNITED SATES DEPT. OF HOUSING AND DEV.
2015-04-29Rodent inspection: Passed
2015-04-09SMIS — from NEW YORK CITY HOUSING AUTHORITY to UNITED STATES DEPT. OF HOUSING AND DEVEL
2006
2006-08-03Job filed: EST COST $65,589 MASONRY REPAIR$65,589
2005
2005-05-03DECL — from NEW YORK CITY HOUSING AUTHORITY to UNITED STATES DEPT. OF HOUSING AND URBAN
2004
2004-05-21Job filed: REPLACE DOMESTIC HOT WATER SUPPLY AND RETURN PIPING FROM 441 GATES AVENUE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$30,000
2004-05-21Job filed: REPLACE DOMESTIC HOT WATER SUPPLY AND RETURN PIPING FROM 441 GATES AVENUE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$30,000