A modest record — below the level that usually signals systemic problems. More recorded distress than 82% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 10. In ZIP 11216, 38% of residential buildings hold an A and
19% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
3 service requests in the last three years. Most common: Noise (3).
Filed construction activity
$48,000 in permitted construction work filed since
2016 (2 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1896)
No
Six or more residential units (2)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
ALBANY KINGSTON LLC
Head officer
ILSOO KIM
Managing agent
PROGRESSIVE MANAGEMENT OF NY
Last registered
2025-08-07
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,594,000
$95,640
2026
$2,018,000
$121,080
2027
$1,758,000
$105,480
The city's market estimate has risen
10% between tax years 2025 and 2027.
Tax exemptions on the roll: 420C
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
3 street-flooding or sewer-backup complaints at this address since
2010 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Kingston-Throop Avs — C · 600 ft straight-line (about a 3-minute walk) · station accessibility: none Utica Av — A C · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Fulton St / Marcus Garvey Blvd — B25 · 350 ft
Citi Bike
Albany Ave & Fulton St · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
3 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $16,235,000 on
2020-11-24 (lender: Housing Development Corporation and New York City Housing Development Corporation), covering 15 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2020-11-24
Deed $15,000,000 — from ALBANY CROSSINGS APARTMENTS L.P to ALBANY KINGSTON LLC; ALBANY KINGSTON HOUSING DEVELOPMENT FUND
$15,000,000
2020-11-24
Mortgage $16,235,000 — from ALBANY KINGSTON HOUSING DEVELOPMENT FUND; KINGSTON HEIGHTS HOUSING LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR; HOUSING DEVELOPMENT CORPORATION
$16,235,000
2020-10-21
Sold for $15,000,000
$15,000,000
$7,500,000
2010-03-12
Mortgage $2,000,000 — from ALBANY CROSSINGS APARTMENTS L.P. to THE CITY OF NEW YORK ACTING BY AND THROU
$2,000,000
2009-01-27
Agreement $4,595,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,595,000
2009-01-27
Agreement $3,655,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$3,655,000
2009-01-27
Agreement $1,600,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,600,000
2008-01-10
Mortgage $1,600,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$1,600,000
2008-01-10
Mortgage $4,595,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$4,595,000
2008-01-10
Mortgage $2,583,284 — from ALBANY CROSSINGS APARTMENTS L.P.
$2,583,284
2008-01-10
Mortgage $3,655,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
$3,655,000
2008-01-07
Deed $6,865,622 — from ALBANY-DECATUR REDEVELOPMENT COMPANY to ALBANY CROSSINGS APARTMENTS L.P.
$6,865,622
Ten-year activity
1050
2017
2018
2019
2020
10
2021
2022
2023
2024
2025
2026
ConstructionHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
0
0
0
2018
0
0
0
3
3
2019
0
2
0
3
5
2020
0
1
8
0
9
2021
0
6
4
0
10
2022
0
1
0
1
2
2023
0
4
0
0
4
2024
0
3
1
1
5
2025
2
2
2
2
8
2026
2
0
0
1
3
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: MODERATE TENANT-IN-PLACE ROOF RECOVER OVER EXISTING TOREMAIN. ROOF RECOVER TO INCLUDE NEW PROTECTION BOARDS OVER EXISTINGROOFING WITH NEW CODE COMPLIA
2025-12-11
Bedbug filing: 0 infested units
2025-11-26
Rodent inspection: Passed
2025-10-22
311: Noise - Street/Sidewalk — Loud Music/Party
The full timeline
2026
2026-03-23Rodent inspection: Passed
2026-03-18Permit General Construction — Signed-off
2026-01-16Job filed: MODERATE TENANT-IN-PLACE ROOF RECOVER OVER EXISTING TOREMAIN. ROOF RECOVER TO INCLUDE NEW PROTECTION BOARDS OVER EXISTINGROOFING WITH NEW CODE COMPLIA$18,000
2025-09-25Rodent inspection: Failed for Rat Activity
2025-09-15Agreement — from ALBANY KINGSTON HOUSING DEVELOPMENT; ALBANY KINGSTON LLC to SECRETARY OF HOUSING AND URBAN DEVELOPME
2025-09-15Agreement — from ALBANY KINGSTON HOUSING DEVELOPMENT; ALBANY KINGSTON LLC to SECRETARY OF HOUSING AND URBAN DEVELOPME
2025-08-21Permit General Construction — Permit Issued
2025-08-18Job filed: Filing for Moderate Tenant-in-Place Interior Apartment Renovation to include the removal and replacement of Kitchen countertops , appliances, . Bathro$30,000
2024-05-10Agreement — from ALBANY KINGSTON HOUSING DEVELOPMENT FUND; KINGSTON HEIGHTS HOUSING LLC; ALBANY KINGSTON LL to THE CITY OF NEW YORK; NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2023
2023-12-06Bedbug filing: 0 infested units
2023-07-11311: Noise - Residential — Loud Talking
2023-02-13311: HEAT/HOT WATER — APARTMENT ONLY
2023-02-13Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022
2022-12-07Bedbug filing: 0 infested units
2022-10-25Rodent inspection: Passed
2021
2021-12-22Bedbug filing: 0 infested units
2021-11-11311: Missed Collection — Trash
2021-11-10311: Illegal Dumping — Removal Request
2021-11-05311: HEAT/HOT WATER — APARTMENT ONLY
2021-11-05Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-05-21Bedbug filing: 0 infested units
2021-04-08Mortgage satisfied — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2021-04-08Mortgage satisfied — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2021-04-08Mortgage satisfied — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2021-03-26LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020
2020-12-18311: Snow — E9 Snow / Icy Sidewalk
2020-11-24SAGE — from ALBANY KINGSTON HOUSING DEVELOPMENT FUND to ALBANY KINGSTON LLC
2020-11-24Deed $15,000,000 — from ALBANY CROSSINGS APARTMENTS L.P to ALBANY KINGSTON LLC; ALBANY KINGSTON HOUSING DEVELOPMENT FUND$15,000,000
2020-11-24Mortgage $16,235,000 — from ALBANY KINGSTON HOUSING DEVELOPMENT FUND; KINGSTON HEIGHTS HOUSING LLC to NEW YORK CITY HOUSING DEVELOPMENT CORPOR; HOUSING DEVELOPMENT CORPORATION$16,235,000
2020-11-24ASPM — from ALBANY CROSSINGS APARTMENTS, L.P; ALBANY KINGSTON LLC to ALBANY KINGSTON HOUSING DEVELOPMENT FUND
2020-11-24SUBM — from DEPT OF HOUSING PRESERVATION AND DEVELOP; THE CITY OF NEW YORK to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2020-11-24SAGE — from ALBANY KINGSTON LLC; ALBANY CROSSINGS APARTMENTS LP to SECRETARY OF HOUSING AND URBAN DEVELOPME
2020-11-24Agreement — from NEW YORK CITY HOUSING DEVELOPMENT CORPOR; KINGSTON HEIGHTS HOUSING LLC; ALBANY KINGSTON HO to THE CITY OF NEW YORK; DEPARTMENT OF HOUSING PRESERVATION AND D
2010-03-12Mortgage $2,000,000 — from ALBANY CROSSINGS APARTMENTS L.P. to THE CITY OF NEW YORK ACTING BY AND THROU$2,000,000
2010-02-22EASE — from ALBANY CROSSINGS APARTMENTS L.P to ALBANY CROSSINGS APARTMENTS L.P
2010-01-22SMIS — from ALBANY CROSSINGS APARTMENTS L.P. to SECRETARY OF HOUSING AND URBAN DEVELOPME
2010-01-08Permit PL — ISSUED
2009
2009-10-30Tenant complaint: HEATING — HEAT RELATED
2009-10-26Tenant complaint: HEATING — HEAT RELATED
2009-02-10SMIS — from SECRETARY OF HOUSING AND URBAN DEVELOPME to ALBANY-DECATUR REDEVELOPMENT COMPANY
2009-02-10Mortgage satisfied — from ALBANY-DECATUR REDEVELOPMENT COMPANY to SECRETARY OF HOUSING AND URBAN DEVELOPME
2009-02-04Permit EW — ISSUED
2009-01-27Agreement $4,595,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,595,000
2009-01-27Agreement $3,655,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,655,000
2009-01-27Agreement $1,600,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,600,000
2008
2008-11-21Tenant complaint: HEATING — HEAT RELATED
2008-11-20Job filed: HEAVY DUTY TEMP. SIDEWALK SHED (300PSF) FOR EXTERIOR FACADE REPAIR. THE WORK TO COMPLY WITH LL 33/91. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS
2008-11-20Permit EQ — ISSUED
2008-10-07Permit PL — ISSUED
2008-07-16Permit EW — ISSUED
2008-03-17Tenant complaint: HEATING — HEAT RELATED
2008-02-11Tenant complaint: HEATING — HEAT RELATED
2008-01-10Agreement — from ALBANY CROSSINGS APARTMENTS L.P. to THE CITY OF NEW YORK
2008-01-10Mortgage $1,600,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$1,600,000
2008-01-10Agreement — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR
2008-01-10Agreement — from ALBANY CROSSINGS APARTMENTS L.P. to SECRETARY OF HOUSING AND URBAN DEVELOPME
2008-01-10Mortgage $4,595,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$4,595,000
2008-01-10Mortgage $2,583,284 — from ALBANY CROSSINGS APARTMENTS L.P.$2,583,284
2008-01-10Agreement — from ALBANY CROSSINGS APARTMENTS L.P. to SECRETARY OF HOUSING AND URBAN DEVELOPME
2008-01-10Mortgage $3,655,000 — from ALBANY CROSSINGS APARTMENTS L.P. to NEW YORK CITY HOUSING DEVELOPMENT CORPOR$3,655,000
2008-01-07Deed $6,865,622 — from ALBANY-DECATUR REDEVELOPMENT COMPANY to ALBANY CROSSINGS APARTMENTS L.P.$6,865,622
2007
2007-12-31Job filed: FILING APPLICATION FOR PL & BL WORKTYPE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$31,500
2007-12-31Job filed: FILING APPLICATION TO PERFORM COMPLETERENOVATION OF ENTIRE BUILDING NO CHANGE IN USE, EGRESS AND OCCUPANCY.$125,000
2005
2005-08-18Mortgage assigned — from REILLY MORTGAGE ASSOCIATES, L.P., to SECRETARY OF HOUSING & URBAN DEV. OF WAS
1997
1997-02-10DOB violation LL6291:
1996
1996-12-06Mortgage assigned — from USGI INC to REILLY MORTGAGE ASSOCIATES L.P.
1990
1990-10-30Mortgage assigned — from WEYERHAEUSER MTGE CO to USGI INC
1984
1984-09-12Mortgage assigned — from GOVERNMENT NATL MTGASSN to WEYERHAEUSER MTGE CO
1983
1983-08-19Agreement — from ALBANY-DECATUR REDEVL CO to CITIBANK, NA
1983-08-19Mortgage assigned — from CITIBANK, NA to GOVERNMENT NATL MTGEASN
1980
1980-10-01SAGE — from ALBANY DECATUR REDEVELOPMENT CO; CITY OF NEW YORK
1980-10-01SAGE — from CITIBANK NA; ALBANY DECATUR REDEVELOPMENT CO
1980-10-01SMIS — from CITY OF NEW YORK to ALBANY DECATUR REDEVELOPMENT CO; ALBANY DECATUR REDEVELOPMENT COMPANY
1980-10-01SMIS — from ALBANY DECATUR REDEVELOPMENT CO; ALBANY DECATUR REDEVELOPMENT COMPANY to CITIBANK NA; CITIBANK
1971
1971-04-21Deed — from FINANCE ADMINISTRATOR OF THE CITY OF NEW; FIN ADM CITY OF NY; FIN ADMIN CITY OF NY; FIN AD to CITYOF NEW YORK; CITY NEW YORK; CITY OF NEW YORK; CITY OF N Y; CITY OF NY; THE CITY OF NEW