The city's published records show little recorded distress here in the last three years. Less recorded distress than 52% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 21.2. In ZIP 10468, 36% of residential buildings hold an A and
17% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
2 total — 1 class C (immediately hazardous), 0 class B, 1 class A. Oldest open since 2026-03-16.
status snapshot refreshed weekly from HPD records
Patterns
10 heat or hot-water complaints in the last three years (winter 2024–25: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
25 service requests in the last three years. Most common: Noise (12) · HEAT/HOT WATER (5) · General Construction/Plumbing (4) · Illegal Parking (1) · Indoor Air Quality (1) · Air Quality (1).
Filed construction activity
$670,000 in permitted construction work filed since
2016 (8 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2022)
Yes
Six or more residential units (25)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
NFW MARION LLC
Head officer
MORGAN MAGISTRO
Managing agent
BRONX PRO GROUP LLC
Last registered
2025-10-14
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,477,000
$664,650
2026
$3,085,000
$1,388,250
2027
$3,249,000
$1,462,050
The city's market estimate has risen
120% between tax years 2025 and 2027.
Tax exemptions on the roll: 420C
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Bedford Park Blvd-Lehman College — 4 · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: none Bedford Park Blvd — B D · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Grand Concourse / Minerva Pl — Bx1 Bx2 · 350 ft
Citi Bike
Jerome Ave & E 198 St · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
25 311 service requests from this address in the last three years — 5 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $1,149,490 on
2025-05-02 (lender: Marion Developer LLC), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-05-02
Agreement $7,464,824 — from NFW MARION LLC to THE CITY OF NEW YORK; MARION CRESTON HOUSING DEVELOPMENT FUND
$7,464,824
2025-05-02
Mortgage $1,611,782 — from MARION CRESTON HOUSING DEVELOPMENT FUND ; NFW MARION LLC to MARION DEVELOPER LLC
$1,611,782
2025-05-02
Mortgage $1,886,875 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to THE CITY OF NEW YORK
$1,886,875
2025-05-02
Mortgage $1,149,490 — from MARION CRESTON HOUSING DEVELOPMENT FUND ; NFW MARION LLC to MARION DEVELOPER LLC
$1,149,490
2025-05-02
Mortgage $4,700,000 — from NFW MARION LLC to WEBSTER BANK, NATIONAL ASSOCIATION; MARION CRESTON HOUSING DEVELOPMENT FUND
$4,700,000
2024-02-16
RPTT $105,171,185 — from FDIC AS RECEIVER FOR SIGNATURE BRIDGE BA to UIG LIHTC INVESTOR LLC
$105,171,185
2023-08-24
Mortgage $1,014,824 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to WEBSTER BANK, NATIONAL ASSOCIATION
$1,014,824
2023-08-24
Mortgage $570,638 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to MARION DEVELOPER LLC
$570,638
2023-08-24
Mortgage $1,058,711 — from MARION CRESTON HOUSING DEVELOPMENT FUND ; NFW MARION LLC to MARION DEVELOPER LLC
$1,058,711
2021-07-16
AL&R $8,358,767 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK
$8,358,767
2021-07-16
AL&R $1,703,422 — from MARION CRESTON HOUSING DEVELOPMENT FUND; NFW MARION LLC to STERLING NATIONAL BANK
$1,703,422
2021-07-16
Mortgage $570,638 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to MARION DEVELOPER LLC
$570,638
2021-07-16
AL&R $1,140,525 — from MARION CRESTON HOUSING DEVELOPMENT FUND; NFW MARION LLC to STERLING NATIONAL BANK
$1,140,525
2021-07-16
Mortgage $1,140,525 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK
$1,140,525
2021-07-16
Mortgage $6,450,000 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK
$6,450,000
Ten-year activity
50250
2017
2018
2019
2020
47
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
3
4
2
9
2018
9
0
0
2
1
12
2019
4
1
0
1
1
7
2020
0
0
1
0
0
1
2021
8
11
8
14
6
47
2022
9
3
1
0
1
14
2023
9
9
4
4
3
29
2024
5
5
14
1
2
27
2025
0
5
10
13
3
31
2026
0
1
16
0
1
18
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
City emergency repair (OMO): location: 1. 6th story public hall/ compactor door. 2. 5th story public hall/ compactor door. -emergency operations divi
2026-06-05
311: Non-Emergency Police Matter — Trespassing
2026-06-05
311: Noise - Residential — Loud Talking
2026-05-25
311: General Construction/Plumbing — Adjacent Buildings Not Protected
2026-05-25
DOB complaint, category ?
2026-05-14
311: Noise - Residential — Banging/Pounding
2026-05-08
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-04-04
311: Noise - Residential — Loud Music/Party
2026-03-16
HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-03-16
HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-03-16
HPD class B: § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVI
2026-03-16
HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-03-16
HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING PIECE OF WOOD AT PUBLIC STAIR (B) AT PUBLIC HALL, 6th STORY
2026-03-16
HPD class B: § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN AC
2026-02-08
311: Noise - Residential — Loud Music/Party
2026-01-17
311: Noise - Residential — Loud Music/Party
2025-12-22
Boiler inspection
2025-12-22
Boiler inspection
2025-11-20
311: Noise - Residential — Loud Music/Party
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
The full timeline
2026
2026-09-02311: Noise - Residential — Loud Talking
2026-07-30Rodent inspection: Passed
2026-06-16City emergency repair (OMO): location: 1. 6th story public hall/ compactor door. 2. 5th story public hall/ compactor door. -emergency operations divi$2,000
2026-05-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-03-16HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-03-16HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-03-16HPD class B: § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVI
2026-03-16HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-03-16HPD class C: § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING PIECE OF WOOD AT PUBLIC STAIR (B) AT PUBLIC HALL, 6th STORY
2026-03-16HPD class B: § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN AC
2025-08-23311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2025-08-19311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2025-08-19DOB complaint, category ?
2025-08-17311: Indoor Air Quality — Dust from Construction
2025-08-17311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2025-08-17DOB complaint, category ?
2025-08-15311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2025-08-15DOB complaint, category ?
2025-05-02Agreement $7,464,824 — from NFW MARION LLC to THE CITY OF NEW YORK; MARION CRESTON HOUSING DEVELOPMENT FUND $7,464,824
2025-05-02Mortgage $1,611,782 — from MARION CRESTON HOUSING DEVELOPMENT FUND ; NFW MARION LLC to MARION DEVELOPER LLC$1,611,782
2025-05-02TL&R — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK; WEBSTER BANK, NATIONAL ASSOCIATION
2025-05-02Mortgage $1,886,875 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to THE CITY OF NEW YORK$1,886,875
2025-05-02SAGE — from THE CITY OF NEW YORK to WEBSTER BANK, NATIONAL ASSOCIATION
2025-05-02SAGE — from MARION CRESTON HOUSING DEVELOPMENT FUND ; NFW MARION LLC to THE CITY OF NEW YORK
2025-05-02Mortgage satisfied — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to WEBSTER BANK, NATIONAL ASSOCIATION; STERLING NATIONAL BANK
2025-05-02TL&R — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK; WEBSTER BANK, NATIONAL ASSOCIATION
2025-05-02Mortgage $1,149,490 — from MARION CRESTON HOUSING DEVELOPMENT FUND ; NFW MARION LLC to MARION DEVELOPER LLC$1,149,490
2025-05-02Mortgage assigned — from WEBSTER BANK NATIONAL ASSOCIATION to THE CITY OF NEW YORK
2025-05-02Mortgage satisfied — from MARION CRESTON HOUSING DEVELOPMENT FUND ; NFW MARION LLC to STERLING NATIONAL BANK; WEBSTER BANK, NATIONAL ASSOCIATION
2025-05-02Mortgage assigned — from WEBSTER BANK NATIONAL ASSOCIATION to THE CITY OF NEW YORK
2025-05-02Mortgage $4,700,000 — from NFW MARION LLC to WEBSTER BANK, NATIONAL ASSOCIATION; MARION CRESTON HOUSING DEVELOPMENT FUND $4,700,000
2025-04-04311: Noise — Noise: Construction Before/After Hours (NM1)
2025-02-02311: Noise - Residential — Loud Talking
2025-01-28Bedbug filing: 0 infested units
2025-01-28Bedbug filing: 0 infested units
2024
2024-12-06Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-09-26Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-09-26311: HEAT/HOT WATER — APARTMENT ONLY
2024-09-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-09-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2024-09-24311: HEAT/HOT WATER — APARTMENT ONLY
2024-09-24311: HEAT/HOT WATER — ENTIRE BUILDING
2024-09-23Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-09-23311: HEAT/HOT WATER — ENTIRE BUILDING
2024-07-12Certificate of occupancy Renewal Without Change
2024-05-09FDNY inspection (CONSTR)
2024-05-09FDNY inspection (STRUC_INT_3)
2024-05-09FDNY inspection (SPECIAL-OTH)
2024-04-24Rodent inspection: Passed
2024-04-19Certificate of occupancy Renewal Without Change
2024-04-17HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-02-16RPTT $105,171,185 — from FDIC AS RECEIVER FOR SIGNATURE BRIDGE BA to UIG LIHTC INVESTOR LLC$105,171,185
2024-01-26Certificate of occupancy Initial
2024-01-03Elevator permit: INSTALL NEW 2:1 UNDERSLUNG MRL PASSENGER ELEVATOR PER ASME A17.1-2013, PART 2, SAFETY CODE FOR ELEVATORS AND ESCALATORS AS MODIFIE$220,000
2023-08-31ECB CLASS - 2 violation: AT THE TIME OF INSPECTION, OBSERVED REMOVED SIDEWALK SHED WHILE ROOF PARAPET WORK STILL REMAINS. G.C. FAILED TO PROVIDE PEDESTRIAN
2023-08-29311: Blocked Driveway — No Access
2023-08-24Mortgage $1,014,824 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to WEBSTER BANK, NATIONAL ASSOCIATION$1,014,824
2023-08-24Mortgage $570,638 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to MARION DEVELOPER LLC$570,638
2023-08-24SAGE — from THE CITY OF NEW YORK DEPT OF HPD to WEBSTER BANK, NATIONAL ASSOCIATION; STERLING NATIONAL BANK
2023-08-24Mortgage $1,058,711 — from MARION CRESTON HOUSING DEVELOPMENT FUND ; NFW MARION LLC to MARION DEVELOPER LLC$1,058,711
2023-08-01Rodent inspection: Passed
2023-07-10Permit Sidewalk Shed — Signed-off
2023-07-10Permit Supported Scaffold — Signed-off
2023-07-07ECB CLASS - 2 violation: NO EN DRAWING AND COM/CHECK APPROVED FROM DOB PROVIDED ON JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUC
2023-07-05Permit Supported Scaffold — Signed-off
2023-07-05Permit Sidewalk Shed — Signed-off
2023-05-22ECB CLASS - 2 violation: NO ARCHITECTURAL DRAWING APPROVED FROM DOB PROVIDED AT JOB SITE ON THE TIME OF INSPECTION., PROVIDE APPROVED /ACCEPTED CONSTRUCTIO
2023-05-17Permit NB — ISSUED
2023-05-03Permit Construction Fence — Signed-off
2023-04-13Rodent inspection: Failed for Rat Activity
2023-04-10311: Noise — Noise: Jack Hammering (NC2)
2023-03-21ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION OBSERVED EXCESSIVE COMBUSTIBLE CONSTRUCT$625
2023-03-21ECB CLASS - 2 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY MEASURES: UNSAFE EQUIPMENT. AT TIME OF INSPECTION OF INSPECTION OBSERVED 2X MASONRY/METAL CUT
2023-03-21ECB CLASS - 2 violation: FAILURE TO SAFE GUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSP. OBSERVED ONGOING EXCAVATION WOR$5,000
2023-03-21DOB complaint, category ?
2023-03-21ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION DRAWING # A-104.00 STAT
2023-03-17Elevator permit: INSTALL NEW 2:1 UNDERSLUNG MRL PASSENGER ELEVATOR PER ASME A17.1-2013, PART 2, SAFETY CODE FOR ELEVATORS AND ESCALATORS AS MODIFIE$220,000
2023-03-15Permit PL — ISSUED
2023-01-31Permit EW — ISSUED
2023-01-18Job filed: INSTALLATION OF 300PSF SIDEWALK SHED, PIPE SCAFFOLDING AND NEEDLE BEAM AS PER PLANS, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014$5,000
2022
2022-11-09DOB complaint, category ?
2022-10-19Job filed: INSTALLATION OF 300PSF SIDEWALK SHED, PIPE SCAFFOLDING AND NEEDLE BEAM AS PER PLANS, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014$5,000
2022-09-28311: General Construction/Plumbing — Site Conditions Endangering Workers
2022-09-28DOB complaint, category ?
2022-07-13Permit Sidewalk Shed — Signed-off
2022-07-13Permit Supported Scaffold — Signed-off
2022-07-13Job filed: INSTALLATION OF 300PSF SIDEWALK SHED, PIPE SCAFFOLDING AND NEEDLE BEAM AS PER PLANS, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014$5,000
2022-05-23Rodent inspection: Passed
2022-05-19Permit Construction Fence — Signed-off
2022-05-12Permit FO — ISSUED
2022-05-12Permit NB — ISSUED
2022-05-12Permit FO — ISSUED
2022-03-21FDNY inspection (CONSTR)
2022-02-25Permit PL — ISSUED
2021
2021-12-16311: General Construction/Plumbing — Adjacent Buildings Not Protected
2021-12-16DOB complaint, category ?
2021-12-09311: Street Condition — Blocked - Construction
2021-12-01311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-12-01311: General Construction/Plumbing — Fence - None/Inadequate
2021-12-01DOB complaint, category ?
2021-12-01ECB CLASS - 2 violation: MISSING REBAR CAPS.NOTE:AT THE TIME OF INSPECTION OBSERVED A 7 STORY BLDG UNDER CONSTRUCTION AT EXCAVATION/FOUNDATION LEVEL.WORKE$625
2021-12-01DOB complaint, category ?
2021-12-01ECB CLASS - 1 violation: BC107.7.3 INADEQUATE DETAILED DRAWINGS(SOE/FOUNDATION).NOTE:AT THE TIME OF INSPECTION OBSERVED A 7 STORY BLDG UNDER CONSTRUCTION A$625
2021-12-01ECB CLASS - 1 violation: FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION.NOTE:AT THE TIME OF INSPECTION OBSERVED A 7 STORY BLDG UNDER CONSTRUCTIO$5,000
2021-12-01ECB CLASS - 1 violation: BC3309.2 NO LICENSE TO ENTER ADJOINING PROPERTY.NOTE:AT THE TIME OF INSPECTION OBSERVED A 7 STORY BLDG UNDER CONSTRUCTION AT EXCAV
2021-10-26311: Investigations and Discipline (IAD) — Investigative Inspection
2021-10-26311: Noise — Noise: Construction Before/After Hours (NM1)
2021-08-25ECB CLASS - 1 violation: FAILURE TO PROVIDE PEDESTRIAN PROTECTION FOR SIDEWALKS&WALKWAYS NOTED:ATOI OF DEMO JOBSITE 3STYBLDG.I OBSERVED SIDEWALK@EXP1.UPON $2,500
2021-08-19Rodent inspection: Bait applied
2021-08-06Permit Construction Fence — Signed-off
2021-07-16AL&R $8,358,767 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK$8,358,767
2021-07-16SAGE — from MARION CRESTON HOUSING DEVELOPMENT FUND; NFW MARION LLC to THE CITY OF NEW YORK DEPT OF HPD
2021-07-16SAGE — from MARION CRESTON HOUSING DEVELOPMENT FUND to NFW MARION LLC
2021-07-16SAGE — from THE CITY OF NEW YORK DEPT OF HPD to STERLING NATIONAL BANK
2021-07-16AL&R $1,703,422 — from MARION CRESTON HOUSING DEVELOPMENT FUND; NFW MARION LLC to STERLING NATIONAL BANK$1,703,422
2021-07-16Mortgage $570,638 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to MARION DEVELOPER LLC$570,638
2021-07-16AL&R $1,140,525 — from MARION CRESTON HOUSING DEVELOPMENT FUND; NFW MARION LLC to STERLING NATIONAL BANK$1,140,525
2021-07-16Mortgage $1,140,525 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK$1,140,525
2021-07-16Mortgage $6,450,000 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK$6,450,000
2021-07-16Mortgage $8,358,767 — from MARION CRESTON HOUSING DEVELOPMENT FUND; NFW MARION LLC to STERLING NATIONAL BANK$8,358,767
2021-07-16Mortgage $1,703,422 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to STERLING NATIONAL BANK$1,703,422
2021-07-16Deed — from NFW MARION LLC to MARION CRESTON HOUSING DEVELOPMENT FUND
2021-07-16Mortgage $1,058,811 — from NFW MARION LLC; MARION CRESTON HOUSING DEVELOPMENT FUND to MARION DEVELOPER LLC$1,058,811
2021-07-08DOB complaint, category ?
2021-07-01Rodent inspection: Bait applied
2021-06-29Deed transfer (nominal price)
2021-06-22DOB complaint, category ?
2021-06-17Permit DM — ISSUED
2021-06-17Permit DM — ISSUED
2021-06-10Permit Construction Fence — Signed-off
2021-05-26Rodent inspection: Bait applied
2021-04-30Rodent inspection: Failed for Rat Activity and Other Reason
2021-04-09Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH.$5,000
2021-02-10Rodent inspection: Failed for Rat Activity
2019-12-06Mortgage satisfied — from NFW MARRION LLC to LOW INCOME INVESTMENT FUND
2019-10-01DOB violation RWNRF: FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
2019-08-01Rodent inspection: Passed
2019-01-15Job filed: DM
2019-01-15Job filed: DM
2019-01-15Job filed: DM
2019-01-15Job filed: DM
2018
2018-09-11CERT — from ULTIMATE ABSTRACT OF NEW YORK, INC
2018-09-11ZONE — from NFW MARION LLC
2018-09-10Job filed: INSTALLATION OF SPRINKLER SYSTEM FOR NEW SEVEN STORY BUILDING AS PER PLANS FIL ED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION.$200,000
2018-09-10Job filed: INSTALLATION OF SPRINKLER SYSTEM FOR NEW SEVEN STORY BUILDING AS PER PLANS FIL ED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION.$200,000
2018-09-10Job filed: BUILDERS PAVEMENT PLANS IN CONJUNCTION WITH NEW BUILDING APPLICATION #220665340
2018-09-10Job filed: INSTALLATION OF SPRINKLER SYSTEM FOR NEW SEVEN STORY BUILDING AS PER PLANS FIL ED HEREWITH. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION.$200,000
2018-09-06Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER ALARM HEREWITH.$50,000
2018-09-06Job filed: SUBSEQUENT APPLICATION FOR STRUCTURAL AND FOUNDATION WORK AS PER PLANS FILED HEREWITH.
2018-09-06Job filed: SUBSEQUENT APPLICATION FOR MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH.
2018-09-06Job filed: CONSTRUCTION OF SEVEN STORY NEW BUILDING AS PER PLANS FILED HEREWITH.
2018-09-06Job filed: CONSTRUCTION OF SEVEN STORY NEW BUILDING AS PER PLANS FILED HEREWITH.
2018-05-24Rodent inspection: Passed
2017
2017-12-26Rodent inspection: Passed
2017-10-04311: Water System — Hydrant Running (WC3)
2017-09-05311: Water System — Hydrant Defective (WC2)
2017-08-24311: Water System — Hydrant Running (WC3)
2017-07-28Mortgage satisfied — from ARNOLD, GOOMATTIE; ARNOLD, DEVANAND to HOME EQUITY LOAN TRUST SERIES 2006-CWI; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; HSBC BAN
2017-07-17Deed $995,000 — from ARNOLD , GOOMATTIE; ARNOLD, DEVANAND to NFW MARION LLC$995,000
2017-07-17Mortgage $1,327,500 — from NFW MARION LLC to LOW INCOME INVESTMENT FUND$1,327,500
2015-01-06Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-01-06311: HEAT/HOT WATER — APARTMENT ONLY
2014
2014-10-30Rodent inspection: Passed
2014-07-17311: Street Light Condition — Street Light Out
2014-07-14311: Street Light Condition — Street Light Out
2014-05-07Rodent inspection: Passed
2013
2013-09-26Rodent inspection: Passed
2013-06-03Rodent inspection: Passed
2012
2012-09-17Rodent inspection: Passed
2011
2011-09-16Rodent inspection: Passed
2010
2010-10-04Mortgage assigned — from AMERICA'S WHOLESALE LENDER; MERS to HSBC BANK USA NA
2010-10-04Mortgage assigned — from COUNTRYWIDE HOME LOANS INC; MERS to COUNTRYWIDE HOME LOANS INC
2010-10-04Mortgage assigned — from COUNTRYWIDE HOME LOANS INC to MERS
2010-09-03Rodent inspection: Passed
2010-07-21Tenant complaint: NONCONST — RUBBISH
2010-07-21Tenant complaint: GENERAL — WINDOWS
2010-07-21311: Asbestos — N/A
2010-07-21311: GENERAL CONSTRUCTION — WINDOWS
2010-07-21311: NONCONST — RUBBISH
2010-07-09Tenant complaint: NONCONST — RUBBISH
2010-07-09Tenant complaint: GENERAL — FIRE-ESCAPE
2010-07-09Tenant complaint: GENERAL — WINDOWS
2010-07-09311: NONCONST — RUBBISH
2010-07-09311: GENERAL CONSTRUCTION — FIRE-ESCAPE
2010-07-09311: GENERAL CONSTRUCTION — WINDOWS
2009
2009-08-22Tenant complaint: NONCONST — RUBBISH
2009-08-22Tenant complaint: PAINT/PLASTER — WALL
2006
2006-05-12Mortgage $164,156 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to MERS$164,156
2006-05-12Agreement $467,500 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to MERS$467,500
2006-04-27Mortgage satisfied — from ARNOLD, GOOMATTIE; ARNOLD, DEVANAND to COUNTRYWIDE HOME LOANS, INC.
2004
2004-08-17Agreement $311,000 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to MERS$311,000
2004-08-17Mortgage $73,390 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to COUNTRYWIDE HOME LOANS, INC.$73,390
2004-08-17Mortgage $8,466 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to COUNTRYWIDE HOME LOANS, INC.$8,466
2003
2003-11-03Mortgage assigned — from MORTGAGE ELECTRONICS REGISTRATION SYSTEM to FLEET NATIONAL BANK
2003-11-03Mortgage satisfied — from ARNOLD, GOOMATTIE; ARNOLD, DEVANAND to COASTAL CAPITAL CORP. D/B/A THE MORTGAGE
2003-09-12Mortgage $315,000 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to MERS$315,000
2002
2002-08-22Mortgage $5,452 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to WASHINGTON MUTUAL BANK, FA$5,452
2002-08-22Agreement — from ARNOLD, GOOMATTIE; ARNOLD, DEVANAND to WASHINGTON MUTUAL BANK, F.A.
2002-08-22Mortgage assigned — from FLEET NATIONAL BANK to WASHINGTON MUTUAL BANK, F.A.
2002-03-13Mortgage assigned — from FLEET NATIONAL BANK to MORTGAGE ELECTRONICREGISTRATION SYSTEMS,
2001
2001-10-26DOB complaint, category ?
2001-08-14Permit EW — ISSUED
2001-08-10Job filed: OBTAIN NEW CERTIFICATE OF OCCUPANCY, EXISTING 2 FAMILY DWELLING. NO WORK TO BE DONE.$7,800
2001-08-10Job filed: OBTAIN NEW CERTIFICATE OF OCCUPANCY, EXISTING 2 FAMILY DWELLING. NO WORK TO BE DONE.$7,800
2001-08-09Mortgage satisfied — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to REPUBLIC CONSUMER LENDING GROUP, INC.
2001-07-16Mortgage assigned — from COASTAL CAPITAL CORP.; MORTGAGE SHOP to FLEET NATIONAL BANK
2001-05-21Job filed: LEGALIZING REPAIRS TO EXISTIN GARAGE, ACCESSORY USE TO DWELLING. NO WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,500
2001-05-21Job filed: LEGALIZING REPAIRS TO EXISTIN GARAGE, ACCESSORY USE TO DWELLING. NO WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,500
2001-04-05ECB Non-Hazardous violation: WORK WITHOUT A PERMIT.WORK NOTED/SOUTH FOUNDATION WALL OF GARAGE RECONSTRUCTED WITH NEW POUR CONCRETE FOOTINGS & CONCRETE BLOCK FO$250
2001-03-26DOB complaint, category ?
2001-03-02Mortgage satisfied — from ARNOLD, GOOMATTIE; ARNOLD, DEVANAND to RIDGEWOOD SAVINGS BANK
2001-02-16Mortgage $237,250 — from ARNOLD, DEVANAND to MORTGAGE SHOP; COASTAL CAPITAL CORP.$237,250
2001-02-16Mortgage satisfied — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to HARTFORD FUNDING LTD.
1994
1994-07-19Mortgage satisfied — from ARNOLD, GOOMATTIE; ARNOLD, DEWANAND to CENTRAL FEDERAL SAVINGS BANK
1994-02-17Mortgage $131,250 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to RIDGEWOOD SAVINGS BANK$131,250
1992
1992-12-08Mortgage assigned — from CENTRAL FED S&L ASN/FKA; CENTRAL FED S BK/RC&CN/; RESOLUTION TR CP/REC&CON to FRANKLIN CRDT RECVRYFND
1987
1987-09-24Mortgage satisfied — from BHOOPSINGH, JAI MANGAL; BHOOPSINGH, JAI RAM; ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to MID ISLAND EQUITIESCORP
1987-03-10Mortgage assigned — from LEND-MOR CORPORATION to FEDERAL HOME LOAN MTGE C
1987-02-17Mortgage $7,000 — from ARNOLD, GOOMATTIE; ARNOLD, DEVANAND to CENTRAL FEDERAL SVGSFSB$7,000
1987-02-03Mortgage $96,000 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE to HARTFORD FUNDING LTD$96,000
1987-02-03Mortgage assigned — from HARTFORD FUNDING LTD to LEND-MOR CORP
1987-01-09Deed — from ARNOLD, GOOMATTIE; ARNOLD, DEVANAND; BHOOPSINGH, JAI MANGAL; BHOOPSINGH, JAI RAM to ARNOLD, DEVANAND; ARNOLD, GOOMATTIE
1985
1985-10-11Deed — from ALEXANIAN, EDWARD/EXE.OF; ALEXANIAN, GRACE/EXECUTO to ARNOLD, DEVANAND; BHOOPSINGH, JAI RAM; BHOOPSINGH, JAI MANGAL; ARNOLD, GOOMATTIE
1985-10-11Mortgage $86,450 — from ARNOLD, DEVANAND; ARNOLD, GOOMATTIE; BHOOPSINGH, JAI MANGAL; BHOOPSINGH, JAI RAM to MID-ISLAND EQUITIESCORP$86,450
1985-06-27Mortgage satisfied — from ALEXANIAN, YERVANT to HOME OWNERS' LOAN CORP.