The city's published records show little recorded distress here in the last three years. Less recorded distress than 70% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 6. In ZIP 11222, 66% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$5,000 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
6 service requests in the last three years. Most common: Special Projects Inspection Team (SPIT) (2) · Curb Condition (1) · Dirty Condition (1) · Sidewalk Condition (1) · Dead/Dying Tree (1).
Filed construction activity
$212,700 in permitted construction work filed since
2016 (16 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2018)
Yes
Six or more residential units (15)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
19 Hausman Street Condominium HOA Inc
Head officer
Hasnaa Rkhami
Managing agent
PROREALTY TEAM LLC
Last registered
2025-12-16
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$16,461
$7,407
2026
$375,989
$169,195
2027
$18,600
$8,370
The city's market estimate has risen
13% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Nassau Av — G · 0.6 mi straight-line (about a 16-minute walk) · station accessibility: none Graham Av — L · 0.7 mi straight-line (about a 19-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Cherry St / Vandervoort Av — B24 · 500 ft
Citi Bike
Van Dam St & Meeker Ave · 700 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
6 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Mortgage $992,750 — from ACOBA, SUET YING CARMEN; ACOBA, KRISTOFFERSEN ASPREC to VALLEY NATIONAL BANK
2026-09-11
Deed $1,045,000 — from HAUSMAN VILLA LLC to ACOBA, KRISTOFFERSEN ASPREC; ACOBA, SUET YING CARMEN
2026-09-11
PAT — from ACOBA, SUET YING CARMEN; ACOBA, KRISTOFFERSEN ASPREC to THE VILLAS AT HAUSMAN CONDOMINIUM
2026-09-08
Sold for $1,045,000
2026-08-01
311: Dead/Dying Tree — Planted More Than 2 Years Ago
2026-06-12
311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2026-06-12
DOB complaint, category ?
2026-05-28
Mortgage satisfied — from FREEMAN, ANGELO; WINKLER, MALGORZATA to GUARANTEED RATE INC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2026-05-19
Mortgage $744,000 — from FREEMAN, ANGELO; WINKLER, MALGORZATA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; ONITY MORTGAGE CORPORATION; PHH MORTGAGE CORPORA
2026-03-17
ECB CLASS - 2 violation: PERMANENT DWELLING CONVERTED/USED FOR OTHER THAN PERMANENT-RESIDENTIALPURPOSES. DEPARTMENT OF BUILDINGS RECORDS INDICATE BUILDING
2026-03-17
ECB CLASS - 1 violation: BC 907.2.8. FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. FAILURE TO PROVIDE A FIRE ALARM SYSTEM FOR TRANSIENT USE AT 2
2026-01-18
311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2026-01-18
DOB complaint, category ?
2025-12-21
Bedbug filing: 0 infested units
2025-11-20
Mortgage satisfied — from CHEAITO, MOHAMAD to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; UNMB HOME LOANS, INC.
2025-11-20
Mortgage satisfied — from CHEAITO, MOHAMAD to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; UNMB HOME LOANS, INC.
The full timeline
2026
2026-10-01DOB complaint, category ?
2026-09-11Mortgage $992,750 — from ACOBA, SUET YING CARMEN; ACOBA, KRISTOFFERSEN ASPREC to VALLEY NATIONAL BANK$992,750
2026-09-11Deed $1,045,000 — from HAUSMAN VILLA LLC to ACOBA, KRISTOFFERSEN ASPREC; ACOBA, SUET YING CARMEN$1,045,000
2026-09-11PAT — from ACOBA, SUET YING CARMEN; ACOBA, KRISTOFFERSEN ASPREC to THE VILLAS AT HAUSMAN CONDOMINIUM
2026-09-08Sold for $1,045,000$1,045,000
2026-08-01311: Dead/Dying Tree — Planted More Than 2 Years Ago
2026-06-12311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2026-06-12DOB complaint, category ?
2026-05-28Mortgage satisfied — from FREEMAN, ANGELO; WINKLER, MALGORZATA to GUARANTEED RATE INC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2026-05-19Mortgage $744,000 — from FREEMAN, ANGELO; WINKLER, MALGORZATA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; ONITY MORTGAGE CORPORATION; PHH MORTGAGE CORPORA$744,000
2026-03-17ECB CLASS - 2 violation: PERMANENT DWELLING CONVERTED/USED FOR OTHER THAN PERMANENT-RESIDENTIALPURPOSES. DEPARTMENT OF BUILDINGS RECORDS INDICATE BUILDING $2,500
2026-03-17ECB CLASS - 1 violation: BC 907.2.8. FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. FAILURE TO PROVIDE A FIRE ALARM SYSTEM FOR TRANSIENT USE AT 2$2,500
2026-01-18311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2026-01-18DOB complaint, category ?
2025
2025-12-21Bedbug filing: 0 infested units
2025-11-20Mortgage satisfied — from CHEAITO, MOHAMAD to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; UNMB HOME LOANS, INC.
2025-11-20Mortgage satisfied — from CHEAITO, MOHAMAD to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; UNMB HOME LOANS, INC.
2025-09-15FDNY inspection (RISK)
2025-09-15FDNY inspection (E-CIDS)
2025-09-02311: Sidewalk Condition — Blocked - Construction
2025-08-07311: Dirty Condition — Broken Glass
2025-07-01FDNY inspection (CONSTR)
2025-04-30Deed — from CHEAITO, MOHAMAD to CHEAITO BROTHERS REALTY INC.
2025-04-30Deed — from CHEAITO, MOHAMAD to CHEAITO BROTHERS REALTY INC.
2025-04-16Deed transfer (nominal price)
2025-04-16Deed transfer (nominal price)
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-04-14Mortgage satisfied — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC
2025-03-28Bedbug filing: 0 infested units
2025-03-10Mortgage satisfied — from HOUSMAN VILLA LLC to CHAMPIONS FUNDING LLC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2025-03-07FDNY inspection (CONSTR)
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25PAT — from SEIFERTH, KAITLIN; SCHEINMAN, SCOTT to CONDOMINIUM BOARD OF THE VILLAS AT HAUSM
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25Mortgage $565,000 — from SEIFERTH, KAITLIN; SCHEINMAN, SCOTT to PENNYMAC LOAN SERVICES, LLC; MERS$565,000
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25Deed $1,065,000 — from HAUSMAN VILLA LLC to SCHEINMAN, SCOTT; SEIFERTH, KAITLIN$1,065,000
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25TL&R — from GOLDEN BRIDGE R1 LLC; D/B/A GOLDEN BRIDGE FUNDING to HOUSMAN VILLA LLC
2025-02-25311: Curb Condition — Broken Curb
2025-02-06Sold for $1,065,000$1,065,000
2025-02-05PAT — from FOSTER, LILLIAN WOJCIK; FOSTER, BLAKE to THE VILLAS AT HAUSMAN BOARD OF MANAGERS
2025-02-05Deed $1,085,000 — from HOUSMAN VILLA LLC to FOSTER, LILLIAN WOJCIK; FOSTER, BLAKE$1,085,000
2025-02-05Mortgage $976,390 — from FOSTER, BLAKE; FOSTER, LILLIAN WOJCIK to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; HSBC BANK USA, N.A.$976,390
2025-02-05PAT — from FOSTER, LILLIAN WOJCIK; FOSTER, BLAKE to THE VILLAS AT HAUSMAN BOARD OF MANAGERS
2025-02-05Deed $1,085,000 — from HOUSMAN VILLA LLC to FOSTER, LILLIAN WOJCIK; FOSTER, BLAKE$1,085,000
2025-02-05Mortgage $976,390 — from FOSTER, BLAKE; FOSTER, LILLIAN WOJCIK to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; HSBC BANK USA, N.A.$976,390
2025-01-15Sold for $1,085,000$1,085,000
2025-01-15Sold for $1,085,000$1,085,000
2025-01-06Agreement $749,250 — from HAUSMAN VILLA LLC to MERS$749,250
2024
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $682,500 — from HAUSMAN VILLA LLC; HAUSMAN VILLA LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$682,500
2024-12-09Agreement $749,250 — from HAUSMAN VILLA LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$749,250
2024-12-09Mortgage $32,500 — from HAUSMAN VILLA LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$32,500
2024-12-09Mortgage assigned — from GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2024-12-09Deed — from HOUSMAN VILLA LLC to MYHOME 18 CORP
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09Mortgage $650,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$650,000
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $742,500 — from HAUSMAN VILLA LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$742,500
2024-12-09Mortgage $17,500 — from HAUSMAN VILLA LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$17,500
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Deed — from HOUSMAN VILLA LLC to HAUSMAN VILLA LLC
2024-12-09Mortgage $725,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$725,000
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage $113,016 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$113,016
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage assigned — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $682,500 — from HAUSMAN VILLA LLC; HAUSMAN VILLA LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$682,500
2024-12-09Mortgage $24,250 — from HAUSMAN VILLA LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$24,250
2024-12-09Mortgage assigned — from GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2024-12-09Deed — from HOUSMAN VILLA LLC to HAUSMAN VILLA LLC
2024-12-09Mortgage $725,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$725,000
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09TL&R — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-12-09Agreement $4,700,000 — from HOUSMAN VILLA LLC to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE$4,700,000
2024-12-09Mortgage satisfied — from WEBSTER BUSINESS CREDIT CORPORATION to GOLDEN BRIDGE R1 LLC D/B/A GOLDEN BRIDGE
2024-11-19FDNY inspection (CONSTR)
2024-10-25DOB complaint, category ?
2024-08-01Bedbug filing: 0 infested units
2024-07-12PAT — from WINKLER, MALGORZATA; FREEMAN, ANGELO to THE VILLAS AT HAUSMAN CONDOMINIUM
2024-07-12Mortgage $743,750 — from FREEMAN, ANGELO; WINKLER, MALGORZATA to MERS$743,750
2024-07-12Deed $1,062,500 — from HOUSMAN VILLA LLC to WINKLER, MALGORZATA; FREEMAN, ANGELO$1,062,500
2024-06-26Sold for $1,062,500$1,062,500
2024-06-25Deed transfer (nominal price)
2024-06-25Deed transfer (nominal price)
2024-06-25Deed transfer (nominal price)
2024-06-24PAT — from CHOI, HYUN to BOARD OF MANAGERS OF THE VILLAS AT HAUSM; HOUSMAN VILLA LLC
2024-06-24Deed $725,000 — from HOUSMAN VILLA LLC to CHOI, HYUN$725,000
2024-06-20Deed $720,000 — from HOUSMAN VILLA LLC to TANG, CHRISTOPHER; LIU, FLORA$720,000
2024-06-20Mortgage $350,000 — from LIU, FLORA; TANG, CHRISTOPHER to JPMORGAN CHASE BANK, N.A.$350,000
2024-06-20PAT — from LIU, FLORA; TANG, CHRISTOPHER to HOUSMAN VILLA LLC; THE VILLAS AT HAUSMAN CONDOMINIUM
2024-05-31Sold for $720,000$720,000
2024-05-30Sold for $725,000$725,000
2024-03-26Mortgage $832,000 — from BELDERRAIN, IGNACIO to MERS; TD BANK, N.A.$832,000
2024-03-26Deed $1,040,000 — from HOUSMAN VILLA LLC to BELDERRAIN, INA MAINETTI; BELDERRAIN, IGNACIO$1,040,000
2024-03-26PAT — from BELDERRAIN, IGNACIO; BELDERRAIN, INA MAINETTI to HOUSMAN VILLA LLC; BOARD OF MANAGERS OF THE VILLAS AT HAUSM
2024-03-26Mortgage $832,000 — from BELDERRAIN, IGNACIO to MERS; TD BANK, N.A.$832,000
2024-03-26Deed $1,040,000 — from HOUSMAN VILLA LLC to BELDERRAIN, INA MAINETTI; BELDERRAIN, IGNACIO$1,040,000
2024-03-26PAT — from BELDERRAIN, IGNACIO; BELDERRAIN, INA MAINETTI to HOUSMAN VILLA LLC; BOARD OF MANAGERS OF THE VILLAS AT HAUSM
2024-03-19Mortgage $616,000 — from RKHAMI, HASNAA to NAVY FEDERAL CREDIT UNION$616,000
2024-03-19PAT — from RKHAMI, HASNAA to BOARD OF MANAGERS OF THE VILLAS AT HAUSM
2024-03-19Mortgage $616,000 — from RKHAMI, HASNAA to NAVY FEDERAL CREDIT UNION$616,000
2024-03-19PAT — from RKHAMI, HASNAA to BOARD OF MANAGERS OF THE VILLAS AT HAUSM
2024-03-19Deed $770,000 — from HOUSMAN VILLA LLC to RKHAMI, HASNAA$770,000
2024-03-19Deed $770,000 — from HOUSMAN VILLA LLC to RKHAMI, HASNAA$770,000
2024-03-08Sold for $770,000$770,000
2024-03-08Sold for $770,000$770,000
2024-03-04Sold for $1,040,000$1,040,000
2024-03-04Sold for $1,040,000$1,040,000
2024-02-07FDNY inspection (CONSTR)
2023
2023-10-30FDNY inspection (CONSTR)
2023-10-10PAT — from WOHL, DANIEL M; WALLACE, MARISA NICOLE to HOUSMAN VILLA LLC; BRD OF MANAGERS OF THE VILLAS AT HAUSMAN
2023-10-10Mortgage $540,000 — from WOHL, DANIEL M; WALLACE, MARISA NICOLE to MERS$540,000
2023-10-10Deed $1,040,000 — from HOUSMAN VILLA LLC to WALLACE, MARISA NICOLE; WOHL, DANIEL M$1,040,000
2023-10-10Deed $1,040,000 — from HOUSMAN VILLA LLC to WALLACE, MARISA NICOLE; WOHL, DANIEL M$1,040,000
2023-10-10Mortgage $540,000 — from WOHL, DANIEL M; WALLACE, MARISA NICOLE to MERS$540,000
2023-10-10PAT — from WOHL, DANIEL M; WALLACE, MARISA NICOLE to HOUSMAN VILLA LLC; BRD OF MANAGERS OF THE VILLAS AT HAUSMAN
2023-10-06PAT — from CHEAITO, MOHAMAD to THE VILLAS AT HAUSMAN CONDOMINIUM
2023-10-06Mortgage $726,000 — from CHEAITO, MOHAMAD to UNMB HOME LOANS INC.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$726,000
2023-10-06Deed $835,000 — from HOUSMAN VILLA LLC to CHEAITO, MOHAMAD$835,000
2023-10-06PAT — from CHEAITO, MOHAMAD to THE VILLAS AT HAUSMAN CONDOMINIUM
2023-10-06Deed $835,000 — from HOUSMAN VILLA LLC to CHEAITO, MOHAMAD$835,000
2023-10-06Mortgage $726,000 — from CHEAITO, MOHAMAD to UNMB HOME LOANS INC.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$726,000
2023-10-02Deed $999,000 — from HOUSMAN VILLA LLC to NEWLAND, BENJAMIN; NEWLAND, JESSICA$999,000
2023-10-02PAT — from NEWLAND, BENJAMIN; NEWLAND, JESSICA to THE VILLAS AT HAUSMAN CONDO BOARD
2023-10-02Mortgage $899,100 — from NEWLAND, JESSICA; NEWLAND, BENJAMIN to MOVEMENT MORTGAGE LLC; MERS, AS NOMINEE$899,100
2023-10-02Mortgage $899,100 — from NEWLAND, JESSICA; NEWLAND, BENJAMIN to MOVEMENT MORTGAGE LLC; MERS, AS NOMINEE$899,100
2023-10-02PAT — from NEWLAND, BENJAMIN; NEWLAND, JESSICA to THE VILLAS AT HAUSMAN CONDO BOARD
2023-10-02Deed $999,000 — from HOUSMAN VILLA LLC to NEWLAND, BENJAMIN; NEWLAND, JESSICA$999,000
2023-09-26PAT — from RIES, RANDAL to BOARD OF MANAGERS OF THE VILLAS AT HAUSM
2023-09-26Deed $740,000 — from HOUSMAN VILLA LLC to RIES, RANDAL$740,000
2023-09-26PAT — from RIES, RANDAL to BOARD OF MANAGERS OF THE VILLAS AT HAUSM
2023-09-26Mortgage $666,000 — from RIES, RANDAL to MOVEMENT MORTGAGE, LLC; MERS$666,000
2023-09-26Deed $740,000 — from HOUSMAN VILLA LLC to RIES, RANDAL$740,000
2023-09-26Mortgage $666,000 — from RIES, RANDAL to MOVEMENT MORTGAGE, LLC; MERS$666,000
2023-09-21Sold for $835,000$835,000
2023-09-21Sold for $835,000$835,000
2023-09-14Sold for $1,040,000$1,040,000
2023-09-14Sold for $1,040,000$1,040,000
2023-09-13Sold for $999,000$999,000
2023-09-13Sold for $999,000$999,000
2023-09-13FDNY inspection (CONSTR)
2023-09-07Sold for $740,000$740,000
2023-09-07Sold for $740,000$740,000
2023-08-29PAT — from DITCHFIELD, ALEXANDER RANDELL to BOARD OF MANAGERS OF THE VILLAS AT HAUSM
2023-08-29Mortgage $960,000 — from HERMOSO, JORGE PABLO to MERS$960,000
2023-08-29Deed $1,600,000 — from HOUSMAN VILLA LLC to HERMOSO, JORGE PABLO$1,600,000
2023-08-29Mortgage $559,300 — from DITCHFIELD, ALEXANDER RANDELL to JPMORGAN CHASE BANK, N.A.$559,300
2023-08-29PAT — from DITCHFIELD, ALEXANDER RANDELL to BOARD OF MANAGERS OF THE VILLAS AT HAUSM
2023-08-29Deed $799,000 — from HOUSMAN VILLA LLC to DITCHFIELD, ALEXANDER RANDELL$799,000
2023-08-29Deed $799,000 — from HOUSMAN VILLA LLC to DITCHFIELD, ALEXANDER RANDELL$799,000
2023-08-29Mortgage $559,300 — from DITCHFIELD, ALEXANDER RANDELL to JPMORGAN CHASE BANK, N.A.$559,300
2023-08-23Sold for $1,600,000$1,600,000
2023-08-14Sold for $799,000$799,000
2023-08-14Sold for $799,000$799,000
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03CDEC — from HOUSMAN VILLA LLC
2023-08-03MAPS — from THE VILLAS AT HAUSMAN
2023-07-11FDNY inspection (CONSTR)
2023-06-08Certificate of occupancy Final
2023-06-08Certificate of occupancy Final
2023-03-24FDNY inspection (CONSTR)
2023-03-15Job filed: SUBDIVISION CONDOMINIUM HEREWITH FILED LOT NO. 35 TENTATIVE LOT NOS. 1401-1425. SEE COMMENTS FOR DETAILS.
2023-01-20FDNY inspection (CONSTR)
2022
2022-12-07Permit Sprinklers — Signed-off
2022-12-07Permit Plumbing — Signed-off
2022-12-06DOB complaint, category ?
2022-11-29Rodent inspection: Passed
2022-11-15FDNY inspection (CONSTR)
2022-10-24Job filed: Proposed plumbing and sprinkler work type filed in conjunction with NB, job number 321313388.$2,000
2022-09-13FDNY inspection (CONSTR)
2022-09-07Permit Mechanical Systems — Signed-off
2022-08-15Job filed: Proposed plumbing and sprinkler work type filed in conjunction with NB, job number 321313388.$2,000
2022-08-04ECB CLASS - 2 violation: I OBSERVED ACTIVE CONSTRUCTION SITE WORKERS BLOCKING OF STREET AND SIDEWALK WITH A VALID D O T PERMIT UPON REVIEW OF SUPERINTENDEN$625
2022-08-03DOB complaint, category ?
2022-07-15DOB complaint, category ?
2022-06-23ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED CONSTRUCTION DOCUMENTS AT JOB SITE; NOTED: OBSERVED NEW CONCRETE RETAINING WALL THAT WAS BUIL
2022-06-14DOB complaint, category ?
2022-06-01FDNY inspection (CONSTR)
2022-05-25Job filed: FILED BPP APPLICATION FOR 50' FRONTAGE
2022-05-20Rodent inspection: Failed for Rat Activity and Other Reason
2022-05-19FDNY inspection (DAY-CARE)
2022-04-19Rodent inspection: Failed for Rat Activity and Other Reason
2022-03-10ECB CLASS - 1 violation: FAILURE TO PROVIDE SWS WHERE REQUIRED.ATOI,CONST SITE WAS ACTIVE&PERFORMING INTERIOR FINISHING WORK.I OBSERVED BLDG HT WAS 5STY& >$10,000
2022-03-10ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES-NO HANDRAILS ATOI CONST SITE WAS ACTIVE&PERFORMING INTERIOR FRAMING&FINISH$2,500
2022-03-10ECB CLASS - 2 violation: BC3307.4.3 FAILURE TO COMPLY W/DOT REG&STIPS ATOI,CONST SITE WAS ACTIVE&PERFORMING INTERIOR FRAMING&FINISHING WORK.I OBSERVED YODO
2022-03-10ECB CLASS - 2 violation: FAILURE TO MAINTAIN CONST FENCE.ATOI,CONST SITE WAS ACTIVE&PERFORMING INTERIOR FRAMING&FINISHING WORK.I OBSERVED CONST FENCE WASNT
2022-03-08DOB complaint, category ?
2022-03-02Job filed: Proposed plumbing and sprinkler work type filed in conjunction with NB, job number 321313388.$2,000
2022-02-28FDNY inspection (CONSTR)
2022-01-30Permit NB — ISSUED
2022-01-30Permit EQ — ISSUED
2021
2021-12-17DOB complaint, category ?
2021-11-18DOB complaint, category ?
2021-11-05Permit Sprinklers — Signed-off
2021-11-05Permit Plumbing — Signed-off
2021-11-01Permit Plumbing — Signed-off
2021-11-01Permit Sprinklers — Signed-off
2021-10-21DOB complaint, category ?
2021-10-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-09-23FDNY inspection (CONSTR)
2021-09-13Permit Supported Scaffold — Signed-off
2021-09-10Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 3$5,000
2021-07-20ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATION AT THE TIME OF MY INSPECTION OF A NB AT THE 4TH LEVEL CONST$2,500
2021-07-19DOB complaint, category ?
2021-07-15Rodent inspection: Passed
2021-06-22DOB complaint, category ?
2021-06-21Job filed: Proposed plumbing and sprinkler work type filed in conjunction with NB, job number 321313388.$2,000
2021-06-09ECB CLASS - 2 violation: JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.NOTE:I OBSERVED THE CONSTRUCTION FENCE WAS BUILT AROUND PROPERT
2021-06-07DOB complaint, category ?
2021-06-01FDNY inspection (CONSTR)
2021-06-01DOB complaint, category ?
2021-05-27DOB complaint, category ?
2021-05-18Rodent inspection: Failed for Other Reason
2021-05-18FDNY inspection (CONSTR)
2021-04-14DOB complaint, category ?
2021-04-08Job filed: Mechanical work type filed in conjunction with NB, job number 321313388.$1,000
2021-04-06FDNY inspection (CONSTR)
2021-03-26Permit NB — ISSUED
2021-03-12DOB complaint, category ?
2021-03-12ECB CLASS - 1 violation: SEC. 3301.13.1 NO SITE SAFETY PLAN. AT THE TIME OF INSPECTION OF A 5 STY NB,ACTIVE JOBSITE W/DESIGNATED CONSTRUCTION SUPERINTENDEN$2,500
2021-03-12ECB CLASS - 1 violation: SEC. 3301.2 FAILURE TO PROVIDE OVERHEAD PROTECTION FOR ADJACENT PROPERTY. AT THE TIME OF INSPECTION OF A 5 STY NB CURRENTLY A 3RD $2,500
2021-03-12ECB CLASS - 1 violation: SEC. 3307.4.7 WORK OR STORAGE ZONES. AT THE TIME OF INSPECTION I OBSERVED WORK/STORAGE ZONE AT EXP#1 ADJACENT TO SIDEWALK SHED W/O$625
2021-03-12ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKERS RECEIVE SITE SAFETY ORIENTATION. AT THE TIME OF INSPECTION OF A 5 STY NB ACTIVE JOB SITE. A$5,000
2021-02-18Permit NB — ISSUED
2021-02-11Permit Sidewalk Shed — Signed-off
2021-02-03Permit EW — ISSUED
2021-02-03Permit NB — ISSUED
2021-01-26DOB complaint, category ?
2021-01-22Permit EQ — ISSUED
2021-01-21DOB complaint, category ?
2021-01-20Permit EW — ISSUED
2021-01-20ECB CLASS - 2 violation: FAILURE TO POST OR PROPERLY POST PERMIT FOR WORK AT PREMISES. AT TIME OF INSPECTION AT A NEW BLDG CONSTRUCTION JOBSITE. I OBSERVED$625
2021-01-20ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE/EXP PERMIT/SIDEWALK SHED. AT TIME OF INSPECTION AT A NEW BLDG CONSTRUCTION JOBSITE. I OBS$625
2021-01-20ECB CLASS - 2 violation: SEC. 3307.6.3 SIDEWALK SHED EXTENSION. AT TIME OF INSPECTION AT A NEW BLDG CONSTRUCTION SITE,I OBSERVED SIDEWALK SHED WAS NOT EXTE$1,250
2020
2020-12-29DOB complaint, category ?
2020-12-24DOB complaint, category ?
2020-09-21Permit EW — ISSUED
2020-09-21Permit NB — ISSUED
2020-09-16DOB complaint, category ?
2020-09-11Permit EQ — ISSUED
2020-09-11Permit EQ — ISSUED
2020-08-21DOB complaint, category ?
2020-08-21DOB complaint, category ?
2020-08-20ECB CLASS - 2 violation: TEMPORARY CONSTRUCTING EQUIPMENT ON SITE EXPIRED PERMIT:AS NOTED AT TIME OF INSPECTION OBSERVED THAT FENCE PERMIT 321313388 EXP. 0$625
2020-08-20ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE EXPIRED PERMIT.AS NOTED AT TIME OF INSPECTION OBSERVED ABOUT SIDEWALK SHED #X00056820 I15$1,250
2020-08-04Permit NB — ISSUED
2020-03-17ECB CLASS - 2 violation: SIDEWALK SHED ERECTED VIA DOB APPLICATION# X00056820. OBSERVED ELECTRICAL LIGHT FIXTURE AND CONDUIT TIGHT TO SHED WITH ROPE AND HA
2020-03-16DOB complaint, category ?
2020-02-26ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION #3307.6.4.8. NOTE: AT THE TIME AT 6:50PM I OBSERVED SIDEWALK SHED AT EXP#1 $5,000
2020-02-21Rodent inspection: Failed for Rat Activity
2020-02-17DOB complaint, category ?
2020-01-27FDNY inspection (CONSTR)
2020-01-16ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS#3307.6.4.8. NOTE: AT THE TIME OF MY INSPECTION,I OBSERVED A SIDEWALK SHED $2,400
2020-01-15DOB complaint, category ?
2020-01-02DOB complaint, category ?
2020-01-02ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE EXPIRED PERMIT AS NOTED AT TIME OF MY INSPECTION OBSERVED THA FENCE PERMIT #321500826 EXP$3,125
2020-01-02ECB CLASS - 2 violation: WORK PERMIT EXPIRED AS NOTED AT TIME OF INSPECTION OF MY INSPECTION OBSERVED NO NEW BUIDLING PEMRIT POSTED AND ON FURTHER RESEARCH
2019
2019-11-07DOB complaint, category ?
2019-10-18FDNY inspection (CONSTR)
2019-10-16ECB CLASS - 2 violation: WORK WITHOUT A PERMIT CONSTRUCTION PLYWOOD FENCE PERMIT EXPIRED AS NOTED AT TIME FO INSPECTIONC OSNRTCUION SIET WAS CLOSED OBSERVE$3,125
2019-08-08FDNY inspection (CONSTR)
2019-06-14FDNY inspection (CONSTR)
2019-05-03FDNY inspection (CONSTR)
2019-03-25Permit Sidewalk Shed — Signed-off
2019-01-25FDNY inspection (CONSTR)
2019-01-11FDNY inspection (CONSTR)
2019-01-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-01-03DOB complaint, category ?
2018
2018-12-26ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION #3307.6.4.8.NOTE:OBSERVED SIDEWAK SHED LIGHTS ARE NOT OPERATING AT TIME OF $5,000
2018-12-20DOB complaint, category ?
2018-11-29DOB violation C: STGOP ALL WORK IMMEDIATELY AND MAKE SITE SAFGE CONTACT THE BOROUGH COM M. OFFICE AT 718 802-3677
2018-11-26DOB complaint, category ?
2018-10-20DOB complaint, category ?
2018-10-16DOB complaint, category ?
2018-10-15ECB CLASS - 2 violation: FAILURE TO PROVIDE/MAINTAIN ON SITE DOCUMENTS REQUIRED BY CHAPTER 33. AT TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTOR FA$1,250
2018-10-15ECB CLASS - 1 violation: BC 3309.1 FAILURE TO PROTECT OR ADEQUATELY PROTECT ADJOINING PROPERTIES DURING CONSTRUCTION OR DEMOLITION OPERATIONS. AT THE TIME $2,500
2018-10-01FDNY inspection (CONSTR)
2018-09-28DOB complaint, category ?
2018-09-05DOB complaint, category ?
2018-08-15Permit Sidewalk Shed — Signed-off
2018-08-13Job filed: INSTALLATION OF SIDEWLAK SHED AS SHOWN ON DRAWINGS. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C$2,500
2018-08-02DOB complaint, category ?
2018-08-01ECB CLASS - 2 violation: SEC. 3301.13.12 CONSTRUCTION SUPERINTENDENT FAILS TO DESIGRATE &/OR HAVE COMPETENT PERSON PRESENT AT JOB SITE AS REQUIRED. AT TIME
2018-08-01ECB CLASS - 1 violation: SEC. 28-104.2.2 FAILURE TO PROVIDE APPROVED PLANS FOR CONSTRUCTION OPERATION AT JOB SITE. AT TIME OF INSPECTION OF A NEW 5 STY BLD$250
2018-08-01ECB CLASS - 1 violation: SEC. 3307.1 JOB SITE FENCE MISSING/INADEQUATE. AT TIME OF INSPECTION OF A NEW 5 STY BLDG UNDER CONSTRUCTION AT 1ST FL LEVEL,I OBSE$400
2018-08-01ECB CLASS - 1 violation: SEC. 3301.7 NO DESIGN DRAWING PROVIDED ON SITE FOR WOOD RAMP AT EXP#3.AT TIME OF INSPECTION OF A NEW 5 STY BLDG UNDER CONSTRUCTION$2,500
2018-08-01ECB CLASS - 1 violation: SEC. 3314.8.1 FAILURE TO PROVIDE GUARDRAIL/TOE BOARD ON SUPPORTED SCAFFOLD. AT TIME OF INSPECTION OF A 5 STY BLDG NEW BLDG UNDER C$625
2018-08-01ECB CLASS - 1 violation: CONSTRUCTION SUPERINTENDENT FAILS TO PROFORM DUTIES. THE FOLLOWING(CONNECTIONS)UNSAFE WERE OBSERVED AT THE CONSTRUCTION SITE ON TH$10,000
2018-08-01ECB CLASS - 2 violation: SEC. 3301.13.13 INADEQUATE JOBSITE LOGS PROVIDED. AT TIME OF INSPECTION OF A 5 STY NEW BLDG AT 1ST FL LEVEL & STEEL CO;UMNS ERECTI
2018-07-31Elevator permit: INSTALL ONE NEW 2:1 UNDERSLUNG MRL PASSENGER ELEVATOR.$175,000
2018-07-27FDNY inspection (CONSTR)
2018-06-13DOB complaint, category ?
2018-06-12FDNY inspection (CONSTR)
2018-05-29FDNY inspection (CONSTR)
2018-05-14FDNY inspection (CONSTR)
2018-05-08FDNY inspection (STRUC_INT_6)
2018-05-04FDNY inspection (CONSTR)
2018-04-09Permit FO — ISSUED
2018-04-09Permit EQ — ISSUED
2018-04-09Permit FO — ISSUED
2018-04-09Permit NB — ISSUED
2018-04-04Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR NEW BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED $6,000
2018-04-04Permit Sidewalk Shed — Signed-off
2018-03-16Rodent inspection: Bait applied
2018-03-04DOB complaint, category ?
2018-02-20Rodent inspection: Failed for Rat Activity
2018-02-09FDNY inspection (STRUC_INT_3)
2018-01-31DOB complaint, category ?
2018-01-30Rodent inspection: Failed for Rat Activity
2018-01-18Permit EQ — ISSUED
2018-01-18Permit EW — ISSUED
2018-01-17Permit EW — ISSUED
2017
2017-12-15ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.CONSTRUCTION MATERIAL AND DEBRIS NOT PROPERLY STORED OR REMOVED$2,400
2017-12-15ECB CLASS - 2 violation: FAILURE TO PROVIDE 3FT 6 INCH GUARDRAILS OR EQUIVALENT AROUND ALL FLOOR AND PERIMETER OPENINGS.AT TIME OF INSPECTION IT WAS OBSERV
2017-12-13DOB complaint, category ?
2017-11-21ECB CLASS - 2 violation: BC3707.7:MISC VIOLATION:FAILURE TO PROVIDE ADEQUATE CONSTRUCTION FENCEINADEQUACIES NOTED:AT EXP#1 FENCE IS OUT OF PLUMB,W/PANNELS,$400
2017-11-09Job filed: MECHANICAL PLANS
2017-10-26Permit PL — ISSUED
2017-10-25Job filed: PLUMBING WORK IN CONJUNCTION WITH NB #321313388$1,000
2017-10-25Job filed: PLUMBING WORK IN CONJUNCTION WITH NB #321313388$1,000
2017-10-20DOB complaint, category ?
2017-10-20DOB complaint, category ?
2017-09-20DOB complaint, category ?
2017-08-05DOB complaint, category ?
2017-07-14ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.@ TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTOR DID NOT INSTALL $1,250
2017-07-12DOB complaint, category ?
2017-05-26Permit EW — ISSUED
2017-05-25Permit EW — ISSUED
2017-03-03DOB complaint, category ?
2017-03-03DOB complaint, category ?
2017-03-03Permit DM — ISSUED
2017-03-03Permit DM — ISSUED
2017-03-03Permit EQ — ISSUED
2017-03-02Permit EQ — ISSUED
2017-02-03Job filed: EXCAVATION WITH NEW FOUNDATION, UNDERPINNING AND STRUCTURAL PLANS IN CONJUNCTI ON WITH NB APPLICATION 321313388.$50,000
2017-02-03Job filed: EXCAVATION WITH NEW FOUNDATION, UNDERPINNING AND STRUCTURAL PLANS IN CONJUNCTI ON WITH NB APPLICATION 321313388.$50,000
2017-01-26Job filed: FULL HAND DEMOLITION OF ONE STORY CAR GARAGE
2017-01-26Job filed: FULL HAND DEMOLITION OF ONE STORY CAR GARAGE
2017-01-26Job filed: PROPOSED CURB CUT
2016
2016-11-09Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION.$6,600
2016-11-09Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION.$6,600
2016-11-02Job filed: BPP 50' FRONTAGE IN CONJUNCTION WITH NB 321313388
2016-11-02Job filed: INSTALLATION OF A MANUAL, AUTOMATIC SMOKE/HEAT CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM AS PER PLANS SUBMITTED HEREWITH, IN CONJUNCTION WITH NB$20,000
2016-11-02Job filed: BPP 50' FRONTAGE IN CONJUNCTION WITH NB 321313388
2016-11-02Job filed: FILING FOR THE INSTALLATION OF NEW SPRINKLER SYSTEM, IN CONJUNCTION WITH NB$55,000
2016-08-25Permit EQ — ISSUED
2016-08-24Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR DEMOLITION OF BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEW
2016-08-05Job filed: INSTALL TEMP CONSTRUCTION FENCE
2016-08-05Permit EQ — ISSUED
2016-07-12Job filed: PROPOSED DEMOLITION OF 2 STORY WITH CELLAR FRAME BUILDING.
2016-07-12Job filed: PROPOSED DEMOLITION OF 2 STORY WITH CELLAR FRAME BUILDING.