The city's published records show little recorded distress here in the last three years. Less recorded distress than 87% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 1.3. In ZIP 11354, 86% of residential buildings hold an A and
2% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
2 heat or hot-water complaints in the last three years (winter 2025–26: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
21 service requests in the last three years. Most common: Smoking or Vaping (13) · Street Sign (2) · Drinking (1) · Dirty Condition (1) · Noise (1) · General Construction/Plumbing (1).
Filed construction activity
$57,000 in permitted construction work filed since
2016 (13 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2020)
Yes
Six or more residential units (8)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
Tsinias Family Partnership L.P.
Head officer
Nicholas Tsinias
Managing agent
Pristine Property Solutions
Last registered
2025-12-30
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,800,000
$810,000
2026
$1,898,000
$854,100
2027
$906,000
$407,700
The city's market estimate has fallen
50% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Flushing-Main St — 7 · 0.8 mi straight-line (about a 21-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 41 Av / 150 St — Q15 · 250 ft
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
21 311 service requests from this address in the last three years — 1 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2024-06-17Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 4TH FLOOR FOR APT #1 ON 4TH FLOOR$15,000
2024-04-29Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #1 ON 3RD FLOOR$3,000
2024-04-29Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 2ND FLOOR FOR APT #3 ON 2ND FLOOR$3,000
2024-04-29Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR$3,000
2024-04-29Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 4TH FLOOR FOR APT #1 ON 4TH FLOOR$15,000
2024-04-29Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 2ND FLOOR FOR APT #2 ON 2ND FLOOR$3,000
2024-04-29Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #3 ON 3RD FLOOR$3,000
2024-04-29Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 4TH FLOOR FOR APT #2 ON 4TH FLOOR$3,000
2024-04-26311: Street Sign - Damaged — No Parking, Standing, Stopping
2024-04-22Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 2ND FLOOR FOR APT #1 ON 2ND FLOOR$3,000
2024-04-12Permit Boiler Equipment — Signed-off
2024-03-19Permit NB — ISSUED
2024-03-19Job filed: INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 2ND FLOOR FOR APT #1 ON 2ND FLOOR$3,000
2024-01-25FDNY inspection (CONSTR)
2023
2023-11-20FDNY inspection (CONSTR)
2023-11-17FDNY inspection (CONSTR)
2023-11-02Permit NB — ISSUED
2023-09-04FDNY inspection (CONSTR)
2023-08-08Permit PL — ISSUED
2023-07-25ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE - EXPIRED PERMIT. AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE WAS CLOSED. OBSERVED $1,280
2023-07-25ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE - EXPIRED PERMIT. AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE WAS CLOSED. OBSERVED
2023-05-30FDNY inspection (CONSTR)
2023-02-27FDNY inspection (CONSTR)
2022
2022-12-10FDNY inspection (CONSTR)
2022-09-04FDNY inspection (CONSTR)
2022-06-27FDNY inspection (CONSTR)
2022-06-06311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2022-06-06DOB complaint, category ?
2022-04-27311: Blocked Driveway — No Access
2022-04-24311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2022-04-24311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2022-04-24DOB complaint, category ?
2022-04-24DOB complaint, category ?
2022-04-13FDNY inspection (CONSTR)
2022-04-06Elevator permit: Furnish and install one (1) new passenger "Machine Roomless" elevator. All work to comply with ASME A17.1-S-2005, Part 2 as modif$131,900
2022-04-05Permit EQ — ISSUED
2022-04-05Permit NB — ISSUED
2022-02-07FDNY inspection (CONSTR)
2021
2021-12-08FDNY inspection (CONSTR)
2021-11-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-10-09Permit PL — ISSUED
2021-09-29FDNY inspection (CONSTR)
2021-08-27ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRE-SHIFT SAFETY MEETING PRIOR TO COMMENCEMENT OF WORK. NO PRE-SHIFT MEETING SINCE 0$12,500
2021-08-27DOB complaint, category ?
2021-08-03311: Noise — Noise: Jack Hammering (NC2)
2021-08-03Permit NB — ISSUED
2021-07-26FDNY inspection (CONSTR)
2021-07-21DOB violation C: BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 421482201 DUE TO SUPERINTENDENT OF CONSTRUCTION WITHDRAWAL
2021-07-20DOB complaint, category ?
2021-06-22DOB complaint, category ?
2021-04-27FDNY inspection (CONSTR)
2021-03-18FDNY inspection (CONSTR)
2021-03-10Permit FO — ISSUED
2021-03-10Permit FO — ISSUED
2021-03-10Permit NB — ISSUED
2021-03-10Permit EQ — ISSUED
2021-02-16FDNY inspection (CONSTR)
2021-02-10FDNY inspection (STRUC_INT_3)
2021-01-21FDNY inspection (CONSTR)
2020
2020-12-22FDNY inspection (CONSTR)
2020-11-20FDNY inspection (CONSTR)
2020-10-28FDNY inspection (CONSTR)
2020-10-16ECB CLASS - 2 violation: BC 3301.7 FAILURE TO PROVIDE P.E APPROVED DETAIL DESIGN DRAWING FOR STEEL PANEL STAIRCASE. AS NOTED:AT TIME OF INSPECTION ON AN AC$3,125
2020-10-16ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS. AS NOTED:AT TIME OF INSPECTION ON AN ACTIVE CONST SITE$3,125
2020-10-16DOB complaint, category ?
2020-10-16DOB complaint, category ?
2020-09-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-09-29ECB CLASS - 2 violation: BC3309.10 NO/MISSING/INADEQUATE ROOF PROTECTION NOTED:AT THE TIME OF MY INSPECTION OF A NEW 4 STORY BLDG,CONSTRUCTION IN PROGRESS
2020-09-29DOB complaint, category ?
2020-09-28FDNY inspection (CONSTR)
2020-09-21Permit PL — ISSUED
2020-09-02DOB complaint, category ?
2020-09-01FDNY inspection (CONSTR)
2020-08-06FDNY inspection (CONSTR)
2020-07-29Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2020-07-09FDNY inspection (CONSTR)
2020-07-07Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2020-07-06ECB CLASS - 1 violation: BC 3301.2 FAILURE TO INSTALL OVERHEAD PROTECTION AT THE TIME OF INSPECTION OF AN ACTIVE NEW BUILDING AT THE SECOND FLOOR LEVEL I O$2,500
2020-07-06ECB CLASS - 1 violation: SEC. 3301.7 NO DESIGN DRAWING PROVIDED FOR SHORING ON SITE AT THE TIMEOF INSPECTION OF A ACTIVE JOBSITE OF A 4 STY NEW BLDG W/CMU $2,500
2020-07-06ECB CLASS - 1 violation: SEC. 3301.13.1 NO SSP ON SITE AT TIME OF INSPECTION. AT THE TIME OF INSPECTION OF AN ACTIVE NEW BLDG IN THE SUPERSTRUCTURE PHASE E$2,500
2020-07-06ECB CLASS - 1 violation: FAILURE TO MAINTAIN DOCUMENTS ON SITE. AT THE TIME OF INSPECTION OF ANACTIVE JOBSITE OF A 4 STY NEW BLDG W/WORK BEING PERFORMED AT$1,250
2020-07-06ECB CLASS - 2 violation: SUPERINTENDENT FAILED TO PERFORM DUTIES. AT THE TIME OF INSPECTION OF AN ACTIVE NEW BLDG W/CMU BLOCK BEING INSTALLED ON THE 2ND FL$2,500
2020-07-06DOB complaint, category ?
2020-07-06DOB complaint, category ?
2020-06-30Permit Sidewalk Shed — Signed-off
2020-06-30Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2020-06-25ECB CLASS - 1 violation: SEC. 3301.1.2 FAILURE TO COMPLY W/NYC FIIRE CODE-NO FIREWATCH. NOTED: AT TIME OF MY INSPECTION OF A NEW 4 STY BLDG,CONSTRUCTION IN$2,500
2020-06-25ECB CLASS - 2 violation: SEC. 3303.7.2 INADEQUATE FIRE EXTINGUISHERS. NOTED: AT TIME OF MY INSPECTION OF A NEW 4 STY BLDG,CONSTRUCTION IN PROGRESS AT THE G
2020-06-25DOB complaint, category ?
2020-06-10FDNY inspection (CONSTR)
2020-05-13FDNY inspection (CONSTR)
2020-04-14FDNY inspection (CONSTR)
2020-03-19FDNY inspection (CONSTR)
2020-03-06Permit EQ — ISSUED
2020-03-06Permit FO — ISSUED
2020-03-06Permit NB — ISSUED
2020-03-06Permit FO — ISSUED
2019
2019-06-26Job filed: BUILDERS PAVEMENT PLAN. STREET FRONTAGE 50 FT.
2018
2018-11-02Rodent inspection: Failed for Other Reason
2018-10-01Rodent inspection: Failed for Other Reason
2018-03-19Job filed: BUILDERS PAVEMENT PLAN. STREET FRONTAGE 50 FT.
2018-01-22Job filed: ADDITIONAL FILING FOR STRUCTURAL PLANS.
2017
2017-11-08Job filed: INSTALL PLUMBING SPRINKLER AND MECHANICAL SYSTEM
2017-07-06Job filed: NB
2017-07-06Job filed: NB
2017-03-15ZONE — from TSINIAS FAMILY PARTNERSHIP, L.P.
2017-03-15CERT — from TSINIAS FAMILY PARTNERSHIP, L.P.
2017-03-15Mortgage satisfied — from TSINIAS, NICHOLAS; TSINIAS, CHRYSCULA to FLUSHING SAVINGS BANK
2017-03-01Job filed: DM
1997
1997-03-06Deed — from TSINIAS, NICHOLAS; TSINIAS, CHRYSOULA to TSINIAS FAMILY PARTNERSHIP L.P.
1969
1969-07-24Deed — from SVENDSEN BESSIE to CHRYSOULA TSINIAS; NICHOLAS TSINIAS
1969-07-24Mortgage — from TSINIAS NICHOLAS TSINIAS CHRYSCULA to FLUSHING SAVINGS BK