Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

162 East 80 Street · Manhattan · BBL 1015080046 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP2
Structural & safetyDOB violations, ECB/OATH violations by class8
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 77% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 3.8. In ZIP 10075, 82% of residential buildings hold an A and 2% grade D or F. How grades work

this building
A
B
C

Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

Open HPD violations3 total — 3 class C (immediately hazardous), 0 class B, 0 class A. Oldest open since 1988-12-08.

status snapshot refreshed weekly from HPD records

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

8 service requests in the last three years. Most common: Lead (2) · UNSANITARY CONDITION (1) · DOOR/WINDOW (1) · WATER LEAK (1) · PAINT/PLASTER (1) · OUTSIDE BUILDING (1).

Filed construction activity

$2,443,585 in permitted construction work filed since 2016 (17 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1926)
YesSix or more residential units (26)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)162 EAST 80TH TENANTS INC.
Head officerMichael Donuk
Managing agentCENTURY MANAGEMENT SERVICES INC
Last registered2026-07-31

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$11,527,000 $5,187,150
2026$13,314,000 $5,991,300
2027$13,076,000 $5,884,200

The city's market estimate has risen 13% between tax years 2025 and 2027.

Tax exemptions on the roll: COLD WAR VETERAN - DISABILITY

For property tax, the Department of Finance values this co-op as if it were a rental building. Its 2021 estimate: gross income $2,031,284 a year ($41.09 per sq ft), operating expenses $777,118 ($15.72 per sq ft), net operating income $1,254,166. These are the city's estimates from comparable rentals, not the building's actual budget, rents or maintenance charges.

Building systems

Energy grade (LL33)C — ENERGY STAR score 66/100 (2022 disclosure cycle)
Heating fuelNATURALGAS
Facade (Local Law 11)SAFE (cycle 9)

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway77 St — 6 · 750 ft straight-line (about a 4-minute walk) · station accessibility: none
86 St — Q · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: full
BusNearest boarding stop: E 79 St / 3 Av — M79-SBS · 250 ft · Select Bus Service
Citi Bike3 Ave & E 82 St · 450 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 006 Lillie D. Blake
Middle: J.H.S. 167 Robert F. Wagner. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

162 East 80 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

8 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by CENTURY MANAGEMENT SERVICES INC — 132 buildings, 16,364 units. Grades across the portfolio: A119 · B11 · C1. See the whole portfolio

BuildingBoroughUnitsGrade
80 Gold Street MN1641 A
350 West 42 Street MN551 A
7 West 14 Street MN430 A
422 2 Avenue MN384 A
1445 1 Avenue MN369 A
116 Pinehurst Avenue MN353 A
4523 Broadway MN350 A
305 East 45 Street MN338 C
436 East 86 Street MN315 A
306 Gold Street BK302 A
225 East 36 Street MN286 A
380 Amsterdam Avenue MN272 A
130 East 18 Street MN271 A
1239 Madison Avenue MN251 A
1213 Avenue Z BK250 B
380 Rector Place MN244 A
77 Bleecker Street MN243 A
377 Rector Place MN237 A
440 East 79 Street MN219 A
429 Kent Avenue BK216 A
233 East 69 Street MN204 A
509 East 77 Street MN192 A
508 East 78 Street MN192 A
966 1 Avenue MN189 A
132 East 35 Street MN187 A
21 South End Avenue MN181 A
2427 East 29 Street BK169 A
4 Lexington Avenue MN166 A
212 Warren Street MN166 A
2 South End Avenue MN163 A
529 West 42 Street MN160 A
23 Greenwich Avenue MN150 A
339 East 74 Street MN149 A
160 3 Avenue MN147 A
2575 Palisade Avenue BX143 A
122 East 23 Street MN140 A
1966 Newbold Avenue BX139 B
157 East 72 Street MN139 A
1041 Pugsley Avenue BX133 A
2860 Broadway MN133 B
303 East 33 Street MN129 A
1237 Avenue Z BK128 B
67-76 Booth Street QN128 A
315 East 70 Street MN124 A
30 East 29th Street MN123 A
311 East 87 Street MN122 A
1720 Mayflower Avenue BX120 A
422 Avenue of the Americas MN119 A
153 Madison Avenue MN118 A
31-85 Crescent Street QN116 A
2546 East 13 Street BK115 B
5601 Riverdale Avenue BX115 A
91 Leonard Street MN111 A
90 Furman Street BK106 A
310 East 49 Street MN102 A
43 Avenue A MN100 B
172 West 79 Street MN97 A
45 Kew Gardens Road QN96 A
1 Grand Army Plaza BK94 A
102 East 22 Street MN92 A

showing 60 of 132 buildings

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $499,999 on 2022-05-11 (lender: Webster Bank, National Association). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2026-09-18RPTT&RET $2,350,000 — from PERLICK, DEBORAH to BARAJAS, ANDRES; BALACHANDRAN, MALLIKA $2,350,000
2026-09-11Sold for $2,350,000 $2,350,000 $90,385
2026-03-27RPTT&RET $2,500,000 — from JORDAN, SHEILA ANNE to THE KANE ROBBINS REVOCABLE TRUST; PATRICK D. ROBBINS, TRUSTEE; MIRANDA KANE, TRUSTEE $2,500,000
2026-03-26Sold for $2,500,000 $2,500,000 $96,154
2026-03-20RPTT&RET $2,200,000 — from WALKER FLYNN, SHARON to CHEN, JERRY; JASTI, SRAVYA $2,200,000
2026-03-12Sold for $2,200,000 $2,200,000 $84,615
2025-12-16RPTT&RET $2,350,000 — from MEYERS, ROBERT; WAGNER, LAUREN to ZHU, SIMING; FONTANA, ANDREW $2,350,000
2025-11-24Sold for $2,350,000 $2,350,000 $90,385
2025-10-03RPTT&RET $2,160,000 — from ABBOTT, AUDREY S to CONTI, MATTHEW; CONTI, MICHELLE $2,160,000
2025-09-29Sold for $2,160,000 $2,160,000 $83,077
2025-07-31RPTT&RET $1,767,500 — from SCULLY, EMMA to ROSENBLATT, ROBERT B $1,767,500
2025-07-24Sold for $1,767,500 $1,767,500 $67,981
2025-06-11RPTT&RET $1,590,000 — from BESSEY, RICHARD E to HARARI, JANE; HARARI, OLIVIER $1,590,000
2025-05-27Sold for $1,590,000 $1,590,000 $61,154
2023-08-10RPTT&RET $2,196,750 — from LEWIN-ROSS, LANA; ROSS, SCOTT R to WELLDE SMITS, ANNE; ROBERT SMITS, JAMES $2,196,750

Ten-year activity

50250
2017
28
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017001247
2018114301028
201940310522
2020001023
2021202228
202221651125
20237134318
2024202026
202500128222
20267817427
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 30 records

DateRecord
2026-09-18RPTT&RET $2,350,000 — from PERLICK, DEBORAH to BARAJAS, ANDRES; BALACHANDRAN, MALLIKA
2026-09-14Job filed: INSTALLATION OF (2) NEW DOMESTIC WATER BOOSTER PUMPS AND RELATED MODIFICATION OF EXISTING DOMESTIC WATER SYSTEM. NO CHANGE IN EGRESS OR OCCUPANCY.
2026-09-11Sold for $2,350,000
2026-08-13Air permit (REGISTRATION), fuel: NATURALGAS
2026-06-15Permit General Construction — Permit Issued
2026-06-12Air permit (REGISTRATION), fuel: NO2FUEL
2026-05-12Job filed: UNIT 5B: INTERIOR RENOVATION AND CONSTRUCTION OF 2NON-LOAD BEARING WALLS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO BUILDING ENVEL
2026-05-05Boiler inspection
2026-05-05Boiler inspection
2026-04-24RPTT&RET — from FLYNN, SHARON WALKER to CHEN, JERRY; JASTI, SRAVYA
2026-04-21DOB violation C: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #021126FEY10803AK (CONTROL #350424) WHICH REQUIRES OWNER TO
2026-04-13Permit Sidewalk Shed — Signed-off
2026-04-11Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF
2026-03-27RPTT&RET $2,500,000 — from JORDAN, SHEILA ANNE to THE KANE ROBBINS REVOCABLE TRUST; PATRICK D. ROBBINS, TRUSTEE; MIRANDA KANE, TRUSTEE
2026-03-26Sold for $2,500,000
2026-03-20RPTT&RET $2,200,000 — from WALKER FLYNN, SHARON to CHEN, JERRY; JASTI, SRAVYA
2026-03-12Sold for $2,200,000
2026-02-16311: Illegal Parking — Posted Parking Sign Violation
2026-02-13DOB complaint, category ?
2026-02-13DOB complaint, category ?
2026-02-12Permit Plumbing — Permit Issued
2026-02-11DOB violation C: STRUCTURE RENDERED NON COMPLIANT DAMAGES OBSERVED TO HAVE BEEN SUSTAIN ED DUE TO WATER MAIN BREAK AT 168TH EAST 80TH STREET CAUSING
2026-02-11DOB violation C: EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD RETAINING WALL PRTLLY CLLPSD ONTO ADJ 175 E79 REAR YRD.RETAINING WALL IS UN
2026-02-11DOB violation C: FAILURE TO MAINTAIN RETAINING WALL.AT TIME OF INSPECTION,OBSRVD RETAINING WALL PRTLLY CLLPSD ONTO ADJ 175 E79ST REAR YARD RE
2026-02-11DOB complaint, category ?
2026-02-11DOB complaint, category ?
2026-01-13Job filed: INSTALLATION OF (2) NEW DOMESTIC WATER BOOSTER PUMPS AND RELATED MODIFICATION OF EXISTING DOMESTIC WATER SYSTEM. NO CHANGE IN EGRESS OR OCCUPANCY.
2025-12-16RPTT&RET $2,350,000 — from MEYERS, ROBERT; WAGNER, LAUREN to ZHU, SIMING; FONTANA, ANDREW
2025-12-08Bedbug filing: 0 infested units
2025-11-24Sold for $2,350,000

The full timeline

2026
2026-09-18RPTT&RET $2,350,000 — from PERLICK, DEBORAH to BARAJAS, ANDRES; BALACHANDRAN, MALLIKA$2,350,000
2026-09-14Job filed: INSTALLATION OF (2) NEW DOMESTIC WATER BOOSTER PUMPS AND RELATED MODIFICATION OF EXISTING DOMESTIC WATER SYSTEM. NO CHANGE IN EGRESS OR OCCUPANCY.$134,150
2026-09-11Sold for $2,350,000$2,350,000
2026-08-13Air permit (REGISTRATION), fuel: NATURALGAS
2026-06-15Permit General Construction — Permit Issued
2026-06-12Air permit (REGISTRATION), fuel: NO2FUEL
2026-05-12Job filed: UNIT 5B: INTERIOR RENOVATION AND CONSTRUCTION OF 2NON-LOAD BEARING WALLS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO BUILDING ENVEL$133,000
2026-05-05Boiler inspection
2026-05-05Boiler inspection
2026-04-24RPTT&RET — from FLYNN, SHARON WALKER to CHEN, JERRY; JASTI, SRAVYA
2026-04-21DOB violation C: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #021126FEY10803AK (CONTROL #350424) WHICH REQUIRES OWNER TO
2026-04-13Permit Sidewalk Shed — Signed-off
2026-04-11Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2026-03-27RPTT&RET $2,500,000 — from JORDAN, SHEILA ANNE to THE KANE ROBBINS REVOCABLE TRUST; PATRICK D. ROBBINS, TRUSTEE; MIRANDA KANE, TRUSTEE$2,500,000
2026-03-26Sold for $2,500,000$2,500,000
2026-03-20RPTT&RET $2,200,000 — from WALKER FLYNN, SHARON to CHEN, JERRY; JASTI, SRAVYA$2,200,000
2026-03-12Sold for $2,200,000$2,200,000
2026-02-16311: Illegal Parking — Posted Parking Sign Violation
2026-02-13DOB complaint, category ?
2026-02-13DOB complaint, category ?
2026-02-12Permit Plumbing — Permit Issued
2026-02-11DOB violation C: STRUCTURE RENDERED NON COMPLIANT DAMAGES OBSERVED TO HAVE BEEN SUSTAIN ED DUE TO WATER MAIN BREAK AT 168TH EAST 80TH STREET CAUSING
2026-02-11DOB violation C: EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD RETAINING WALL PRTLLY CLLPSD ONTO ADJ 175 E79 REAR YRD.RETAINING WALL IS UN
2026-02-11DOB violation C: FAILURE TO MAINTAIN RETAINING WALL.AT TIME OF INSPECTION,OBSRVD RETAINING WALL PRTLLY CLLPSD ONTO ADJ 175 E79ST REAR YARD RE
2026-02-11DOB complaint, category ?
2026-02-11DOB complaint, category ?
2026-01-13Job filed: INSTALLATION OF (2) NEW DOMESTIC WATER BOOSTER PUMPS AND RELATED MODIFICATION OF EXISTING DOMESTIC WATER SYSTEM. NO CHANGE IN EGRESS OR OCCUPANCY.$134,150
2025
2025-12-16RPTT&RET $2,350,000 — from MEYERS, ROBERT; WAGNER, LAUREN to ZHU, SIMING; FONTANA, ANDREW$2,350,000
2025-12-08Bedbug filing: 0 infested units
2025-11-24Sold for $2,350,000$2,350,000
2025-10-03RPTT&RET $2,160,000 — from ABBOTT, AUDREY S to CONTI, MATTHEW; CONTI, MICHELLE$2,160,000
2025-09-29Sold for $2,160,000$2,160,000
2025-09-24311: Lead — Lead Kit Request (Residential) (L10)
2025-07-31RPTT&RET $1,767,500 — from SCULLY, EMMA to ROSENBLATT, ROBERT B$1,767,500
2025-07-24Sold for $1,767,500$1,767,500
2025-06-11RPTT&RET $1,590,000 — from BESSEY, RICHARD E to HARARI, JANE; HARARI, OLIVIER$1,590,000
2025-05-27Sold for $1,590,000$1,590,000
2025-05-26Boiler inspection
2025-05-26Boiler inspection
2025-02-25311: OUTSIDE BUILDING — ROOFING
2025-02-25311: PAINT/PLASTER — WALL
2025-02-25311: WATER LEAK — DAMP SPOT
2025-02-25311: DOOR/WINDOW — DOOR FRAME
2025-02-25311: UNSANITARY CONDITION — MOLD
2025-02-25Tenant complaint: DOOR/WINDOW — DOOR FRAME
2025-02-25Tenant complaint: OUTSIDE BUILDING — ROOFING
2025-02-25Tenant complaint: UNSANITARY CONDITION — MOLD
2025-02-25Tenant complaint: PAINT/PLASTER — WALL
2025-02-25Tenant complaint: WATER LEAK — DAMP SPOT
2024
2024-12-19Bedbug filing: 0 infested units
2024-07-23311: Lead — Lead Kit Request (Residential) (L10)
2024-06-13Permit Suspended Scaffold — Permit Issued
2024-06-08Job filed: FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor:
2024-03-12Boiler inspection
2024-03-12Boiler inspection
2023
2023-12-13Bedbug filing: 0 infested units
2023-08-22Job filed: Interior renovation of existing apartment, 2A. Remove existing non-load bearing walls, install new non-load bearing walls, new flooring, new tile work$667,643
2023-08-22Job filed: Interior renovation - Remove existing powder room and renovate existing bathrooms and kitchen in relation to DOB now Job #M00810735. No Change to sue,$57,000
2023-08-11Permit Plumbing — Signed-off
2023-08-10RPTT&RET $2,196,750 — from LEWIN-ROSS, LANA; ROSS, SCOTT R to WELLDE SMITS, ANNE; ROBERT SMITS, JAMES$2,196,750
2023-08-02Sold for $2,196,750$2,196,750
2023-07-27Permit General Construction — Signed-off
2023-07-20Permit General Construction — Signed-off
2023-07-06Boiler inspection
2023-07-06Boiler inspection
2023-06-15311: Missed Collection — Trash and Bulky Trash
2023-05-16Facade (LL11) filing, cycle 9: SAFE
2023-04-20Job filed: Interior renovation of existing apartment, 2A. Remove existing non-load bearing walls, install new non-load bearing walls, new flooring, new tile work$667,643
2023-04-20Job filed: Interior renovation - Remove existing powder room and renovate existing bathrooms and kitchen in relation to DOB now Job #M00810735. No Change to sue,$57,000
2023-03-14311: Noise — Noise: Construction Before/After Hours (NM1)
2023-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2023-01-24RPTT&RET $1,734,000 — from TUTOR, DAVID; TUTOR, WHITNEY to ALSPAUGH, MARGARET REINEY; ALSPAUGH, BRANDON CLAY$1,734,000
2023-01-06Sold for $1,734,000$1,734,000
2022
2022-12-09311: Missed Collection — Recycling - Paper
2022-12-06Bedbug filing: 0 infested units
2022-12-05Asbestos abatement: Removal — Plus Construction Services, Inc.
2022-12-05Asbestos abatement: Removal — Plus Construction Services, Inc.
2022-12-05Asbestos abatement: Removal — Plus Construction Services, Inc.
2022-11-05311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-02RPTT&RET $1,530,000 — from DAVID J. HUBBARD, AS EXECUTOR; THE ESTATE OF NANCY M. BOMONTI to FARIAS, MARIA GABRIELA; HARO, CARLOS FABIAN$1,530,000
2022-08-24Rodent inspection: Passed
2022-08-19Sold for $1,530,000$1,530,000
2022-07-22Boiler inspection
2022-07-22Boiler inspection
2022-07-21Rodent inspection: Failed for Rat Activity
2022-07-13311: Rodent — Rat Sighting
2022-06-29311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2022-06-29DOB complaint, category ?
2022-06-28Permit General Construction — Signed-off
2022-06-27311: Street Condition — Plate Condition - Noisy
2022-05-11AL&R $1,499,999 — from 162 EAST 80TH TENANTS, INC. to WEBSTER BANK, NATIONAL ASSOCIATION$1,499,999
2022-05-11Agreement $1,499,999 — from 162 EAST 80TH TENANTS, INC. to WEBSTER BANK, NATIONAL ASSOCIATION$1,499,999
2022-05-11Mortgage $499,999 — from 162 EAST 80TH TENANTS, INC. to WEBSTER BANK, NATIONAL ASSOCIATION$499,999
2022-04-25Asbestos abatement: Removal — New York Insulation, Inc.
2022-04-25Asbestos abatement: Removal — New York Insulation, Inc.
2022-04-25Asbestos abatement: Removal — New York Insulation, Inc.
2022-04-25Asbestos abatement: Removal — New York Insulation, Inc.
2022-01-19Job filed: Facade repairs to include parapet reconstruction at Penthouse. No change to use, egress, or occupancy.$65,000
2021
2021-12-30Boiler inspection
2021-12-30Boiler inspection
2021-12-14Bedbug filing: 0 infested units
2021-10-13Job filed: ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH$5,000
2021-10-13Permit Supported Scaffold — Permit Issued
2021-08-19RPTT&RET $2,171,500 — from MCKELDEN SMITH III, HERBERT; DONNELLEY SMITH, DIANA to ASHWORTH, JULIE$2,171,500
2021-08-05Sold for $2,171,500$2,171,500
2021-03-05311: Damaged Tree — Branch Cracked and Will Fall
2020
2020-12-18Boiler inspection
2020-12-18Boiler inspection
2020-12-17Bedbug filing: 0 infested units
2019
2019-12-09Bedbug filing: 0 infested units
2019-11-14Boiler inspection
2019-11-14Boiler inspection
2019-11-01Rodent inspection: Passed
2019-09-30RPTT&RET $1,862,500 — from MELKMANN, BETH ANNE; PELLEGRINO, JEFFREY J to GOMEZ, GEORGIA WINIFRED; BRISTOL, SAMUEL HILDRETH$1,862,500
2019-09-13RPTT&RET $1,912,500 — from THOMA, EDWARD D to CARNEY, THOMAS$1,912,500
2019-09-11Sold for $1,862,500$1,862,500
2019-09-04Sold for $1,912,500$1,912,500
2019-07-30RPTT&RET $2,200,000 — from O'BOYLE, LAURA K; O'BOYLE, WILLIAM to MELKMANN, BETH ANNE; PELLEGRINO, JEFFREY$2,200,000
2019-07-24Sold for $2,200,000$2,200,000
2019-06-25RPTT&RET $1,750,000 — from HALL, SARAH; HALL, CHESTER to TUTOR, WHITNEY FLESHER; TUTOR, DAVID$1,750,000
2019-06-20Sold for $1,750,000$1,750,000
2019-06-06Permit Supported Scaffold — Permit Issued
2019-06-05Job filed: INSTALLATION OF PIPE SCAFFOLD AT 162 EAST 80 STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLIC$5,000
2019-05-21Permit Sidewalk Shed — Signed-off
2019-05-14Elevator permit: Alteration of One(1) Passenger Elevator. All new work in compliance with ASME A17.1-2000/RS A17.1b-2003 with supplements Chapter $14,850
2019-04-22Permit EW — ISSUED
2019-04-08311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-03-21Facade (LL11) filing, cycle 8: SWARMP
2019-01-28RPTT&RET $2,025,000 — from SCHILLER, MARC J to METLITSKY, ELLA; METLITSKY, BORIS$2,025,000
2019-01-23Sold for $2,025,000$2,025,000
2019-01-23Bedbug filing: 0 infested units
2018
2018-12-17Rodent inspection: Passed
2018-12-14Boiler inspection
2018-12-14Boiler inspection
2018-10-09HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-10-03DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-10-01Asbestos abatement: Removal — Abatek Corp.
2018-10-01Asbestos abatement: Removal — Abatek Corp.
2018-10-01Asbestos abatement: Removal — Abatek Corp.
2018-10-01Asbestos abatement: Removal — Abatek Corp.
2018-10-01Asbestos abatement: Removal — Abatek Corp.
2018-08-08311: Facades — Facade (LL11/98)- Unsafe Notification
2018-07-13Permit AL — ISSUED
2018-07-12Job filed: INSTALLATION OF BRICK OPENING SHORING IN CONJUNCTION WITH DOB JOB NUMBER # 123388093 AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG$3,000
2018-07-11311: General Construction/Plumbing — Failure To Maintain
2018-07-11Job filed: INSTALLATION OF BRICK OPENING SHORING IN CONJUNCTION WITH DOB JOB NUMBER # 123388093 AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG$3,000
2018-07-11Job filed: INSTALLATION OF BRICK OPENING SHORING IN CONJUNCTION WITH DOB JOB NUMBER # 123388093 AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG$3,000
2018-07-11DOB complaint, category ?
2018-07-03ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NORTH FACADE, EXP#1: STACKED BRICKS,HEADERS @ WIN$1,250
2018-05-25Permit Sidewalk Shed — Signed-off
2018-05-14Permit EW — ISSUED
2018-04-24Rodent inspection: Passed
2018-03-16Permit EW — ISSUED
2018-03-15Job filed: FACADE AND LL11 REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$250,000
2018-03-15Job filed: FACADE AND LL11 REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$250,000
2018-02-19Facade (LL11) filing, cycle 8: SWARMP
2018-02-19DOB violation FISP:
2018-02-07Permit Sidewalk Shed — Signed-off
2018-02-06Job filed: INSTALLATION OF (+/-)99 L.FT NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$8,000
2017
2017-11-06HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2017-10-02RPTT&RET $2,410,000 — from ROTENSTREICH, ASHLEY to JORDAN, SHEILA ANNE$2,410,000
2017-09-26Sold for $2,410,000$2,410,000
2017-09-21Rodent inspection: Passed
2017-09-19Boiler inspection
2017-09-19Boiler inspection
2017-04-24Rodent inspection: Passed
2016
2016-10-25HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2016-10-03DOB violation E:
2016-10-03DOB violation E:
2016-09-27Rodent inspection: Passed
2016-06-27RPTT&RET $1,708,000 — from PREUX, PATRICK; PREUX, KATARINA JUHLIN to BRDAR, VISNJA; SARRABEZOLLES, FRANCK$1,708,000
2016-06-09Sold for $1,708,000$1,708,000
2016-05-26311: Curb Condition — Defacement
2016-03-01RPTT&RET $1,715,000 — from STEVENSON, STEPHANIE; STEVENSON, ELIE to HALL, SARAH; HALL, CHESTER$1,715,000
2016-01-14311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2016-01-05311: Missed Collection (All Materials) — 1 Missed Collection
2015
2015-12-08311: Indoor Sewage — Sewage Leak
2015-08-03311: Broken Muni Meter — Timer Defect - Fast/Fail
2015-05-19Permit PL — ISSUED
2015-05-14Permit EW — ISSUED
2015-04-10Job filed: INTERIOR RENOVATION AND REPLACEMENT OF PLUMBING FIXTURES FOR APARTMENT 8C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,000
2015-03-10311: Noise - Vehicle — Engine Idling
2015-02-09RPTT&RET $1,637,255 — from GEZA MARX, EXECUTOR; ESTATE OF EVELYN WILLIAMS SEMLER to SCULLY, EMMA C$1,637,255
2014
2014-09-29DOB violation E:
2014-07-21Permit EW — ISSUED
2014-07-03Permit PL — ISSUED
2014-07-02Permit EW — ISSUED
2014-05-30Job filed: RELOCATE KITCHEN AND NON BEARING PARTITIONS. REPLACE PLUMBING FIXTURES AT EXISTING LOCATIONS IN BATHROOM AND KITCHEN. NO CHANGE TO USE, EGRESS OR OCCU$56,000
2014-02-18311: Noise — Noise: Alarms (NR3)
2013
2013-11-12Mortgage satisfied — from 162 EAST 80TH TENANTS INC to NATIONAL CONSUMER COOPERATIVE BANK
2013-11-07TL&R — from NATIONAL CONSUMER COOPERATIVE BANK to 162 EAST 80TH TENANTS, INC.
2013-11-07Mortgage assigned — from WELLS FARGO BANK, N.A, AS TRUSTEE to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2013-11-07Mortgage $249,824 — from 162 EAST 80TH TENANTS, INC. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$249,824
2013-11-07TL&R — from WELLS FARGO BANK, N.A, AS TRUSTEE to 162 EAST 80TH TENANTS, INC.
2013-11-07Agreement $1,000,000 — from 162 EAST 80TH TENANTS, INC. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$1,000,000
2013-09-10RPTT&RET $2,250,000 — from REIS, KATHRYN F to MCKELDEN SMITH III, HERBERT; DONNELLEY SMITH, DIANA$2,250,000
2013-09-06RPTT $2,251,000 — from PHILLIPS, JULIE A to O'BOYLE, WILLIAM G; O'BOYLE, LAURA$2,251,000
2013-08-27Permit EW — ISSUED
2013-08-27Permit EW — ISSUED
2013-08-19DOB violation E:
2013-06-18Permit PL — ISSUED
2013-06-10Permit EW — ISSUED
2013-06-10Permit EW — ISSUED
2013-05-06RPTT&RET $1,570,000 — from MCEVILLY, MICHAEL; MCEVILLY, DENISE to THOMA, EDWARD D$1,570,000
2013-05-01RPTT&RET $1,840,000 — from CARSWELL, MARY W; CARSWELL, ROBERT to MASANI, ZAL SAROSH$1,840,000
2013-04-15HPD litigation: CONH
2013-01-24311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2013-01-24Permit EW — ISSUED
2013-01-08Job filed: RENOVATION OF AN EXISTING APARTMENT #9A ON TEH 9TH FLOOR. MECHANICAL AND PLUMBING WORK. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.$54,000
2013-01-08Job filed: RENOVATION OF AN EXISTING APARTMENT #9A ON THE 9TH FLOOR. ARCHITECTURAL WORK. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.$129,000
2012
2012-12-05RPTT $1,575,000 — from FRANK, JAMES D to STEVENSON, STEPHANIE; STEVENSON, ELIE$1,575,000
2012-10-04DOB violation E:
2012-10-04DOB violation E:
2012-10-02Permit EQ — ISSUED
2012-09-26Job filed: ERECT, MAINTAIN AND DISMANTLE 34LF OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
2012-09-14Permit EW — ISSUED
2012-08-03Rodent inspection: Passed
2012-08-01RPTT&RET $1,770,000 — from AMEN, KAREN J; AMEN, CHRISTOPHER R to ROTENSTREICH, ASHLEY W$1,770,000
2012-06-06Job filed: MASONRY AND LEAK REPAIRS$20,000
2012-06-06Job filed: MASONRY AND LEAK REPAIRS$20,000
2012-04-26Permit PL — ISSUED
2012-04-24Permit EW — ISSUED
2012-04-03Job filed: GENERAL CONSTRCUTION AND PLUMBING MODIFICATIONS AND INSTALLATION OF 3 HVAC UNITS IN APT 2B AS PER PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$186,500
2012-04-03Job filed: GENERAL CONSTRCUTION AND PLUMBING MODIFICATIONS AND INSTALLATION OF 3 HVAC UNITS IN APT 2B AS PER PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$186,500
2012-02-16311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2012-02-08Facade (LL11) filing, cycle 7: SAFE
2012-01-20RPTT&RET $1,500,000 — from ORECCHIA, EMILIO; ORECCHIA, SARAH to TAMMIK, MARIA; SCHILLER, MARC$1,500,000
2012-01-11311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2012-01-11ECB CLASS - 2 violation: 3307.5.2:FLAGPERSON:NOTED:@ TIME OF INSPECTION OBSERVED NO FLAGPERSON ON THE SIDEWALK WHILE RIGGING WAS IN USE,WORKER WAS IN BETWE$400
2012-01-11DOB complaint, category ?
2012-01-11ECB CLASS - 2 violation: SPECIAL RIGGER FAILED TO PLACE APPROPRIATE "DANGER" SIGN WHILE USING RIGGING EQUIPMENT. NOTED:NO "DANGER" SIGNS POSTED WHILE RIGGI
2011
2011-12-08Rodent inspection: Passed
2011-08-18DOB violation E:
2011-08-18DOB violation E:
2011-06-14311: Sidewalk Condition — Blocked - Construction
2011-06-14311: Noise — Noise: Construction Equipment (NC1)
2011-06-14311: Sidewalk Condition — Blocked - Construction
2011-06-01RPTT&RET $1,200,000 — from ESTATE OF ELINORE TUNICK to PREUX, PATRICK; PREUX, KATARINA J$1,200,000
2010
2010-12-21Rodent inspection: Passed
2010-11-24Rodent inspection: Failed for Rat Activity
2010-06-08311: Noise — Noise: Construction Equipment (NC1)
2010-05-11Permit EQ — ISSUED
2010-04-16Job filed: ERECTION OF 12' MAX. HIGH MEDIUM DUTY SCAFFOLDS ON THE PENTHOUSE OF A 9 STORY BLDG, AS PER BSA MINUTES #362-44-SM AND THE NYC 2008 BC CHAPTER 33.SCAFF
2010-04-16Job filed: ERECTION OF 12' MAX. HIGH MEDIUM DUTY SCAFFOLDS ON THE PENTHOUSE OF A 9 STORY BLDG, AS PER BSA MINUTES #362-44-SM AND THE NYC 2008 BC CHAPTER 33.SCAFF
2010-03-27311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2010-03-27DOB complaint, category ?
2010-03-26ECB CLASS - 1 violation: ERECTED OR INSTALL SUPPORTED SCAFFOLD 40FT OR HIGHER W/O A PERMIT.NOTED:INSTALLED SUPPORTED SCAFFOLD ON ROOF LEVEL APPROX 110FT H $1,200
2010-03-17DOB violation E:
2010-02-22311: Missed Collection (All Materials) — 2 Bulk-Missed Collection
2010-01-29311: Non-Emergency Police Matter — Other (complaint details)
2009
2009-11-25Permit EQ — ISSUED
2009-08-06Permit EW — ISSUED
2009-08-05Permit EQ — ISSUED
2009-08-04Job filed: INSTALLATION OF APPROXIMATELY 83 L.F. OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. SHED IS DESIGNED FOR A LIVE LOAD OF 300 PSF. ALL WORK SHALL BE ACCORDIN
2009-05-08Job filed: FACADE REPAIR.$150,000
2008
2008-12-18DOB violation E:
2008-12-18DOB violation E:
2008-01-24DOB violation E:
2007
2007-09-10DOB violation E:
2007-08-27Facade (LL11) filing, cycle 6: SWARMP
2007-08-15Permit EW — ISSUED
2007-08-02RPTT&RET $1,275,000 — from ESTATE OF ROBERT C. KENNEDY to FRANK, JAMES DOUGLAS$1,275,000
2007-07-19Job filed: INTERIOR RENOVATION OF EXISTING APARTMENT. NEW WOOD FLOORS, DOORS AND FINISHES. NEW FIREPLACE SURROUND. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$30,000
2007-07-06RPTT $2,395,000 — from DEJOUX, MORGAN ANDRE GRACE; DEJOUX, ELEANOR ACQUAVELLA to PERLICK, DEBORAH A$2,395,000
2007-06-25DOB violation L1198:
2007-03-20DOB violation C:
2007-03-08Permit EW — ISSUED
2007-02-28DOB complaint, category ?
2007-02-14Facade (LL11) filing, cycle 6: SWARMP
2007-02-13RPTT&RET $1,893,750 — from O.K. WEBB, JOHN-JAMES; LESSARD, STEPHANIE J to PELLEGRINO, JEFFREY; MELKMANN, BETH ANNE$1,893,750
2007-01-17DOB violation C:
2007-01-17ECB Non-Hazardous violation: FAILURE TO MAINTAIN BLDG EXTERIOR.DEFECTS NOTED:AT FACADE#1 FRONT AT 6TH FL LEVEL EAST PART OF BLDG.2 AC WINDOW UNITS ARE INSTALLE$2,500
2007-01-11DOB complaint, category ?
2006
2006-07-11RPTT&RET $1,875,000 — from GROZOVSKY, STEPHANIE L; GROZOVSKY, ILYA to CARSWELL, MARY W; CARSWELL , ROBERT$1,875,000
2006-06-21Job filed: EXTERIOR REPAIR WORK IN CONJUCTION WITHLL 11/98 INCLUDING PARAPET REBUILDING AND AC SUPPORT BRACKETS$40,000
2006-03-23Mortgage assigned — from NCB, FSB to WELLS FARGO BANK, N.A., AS TRUSTEE
2006-03-23AALR — from NCB, FSB to WELLS FARGO BANK, N.A., AS TRUSTEE
2005
2005-10-20RPTT&RET $1,700,000 — from BARNETT, STEVEN; MAGDOFF, JOANNE to JULIE , PHILLIPS A$1,700,000
2005-09-20Permit EW — ISSUED
2005-08-30ECB Non-Hazardous violation: 51A14/39I04/33I04/59Q03 51) SHORTEN HOIST ROPES 39) PATCH MOTOR ROOM WALL 33) PATCH HOLES HOISTWAY AND PROVIDE COVERS MISSING IN H$2,500
2005-08-08RPTT $1,380,000 — from BERGER, STEPHEN W to MCEVILLY, MICHAEL J; MCEVILLY, DENISE$1,380,000
2005-07-13Mortgage $400,000 — from 162 EAST 80TH TENANTS INC. to NATIONAL CONSUMER COOPERATIVE BANK$400,000
2005-07-13TL&R — from 162 EAST 80TH TENANTS INC. to NATIONAL CONSUMER COOPERATIVE BANK
2005-07-13Mortgage satisfied — from 162 EAST 80TH TENANTS INC. to NATIONAL CONSUMER COOPERATIVE BANK
2005-07-13AL&R $400,000 — from NATIONAL CONSUMER COOPERATIVE BANK to 162 EAST 80TH TENANTS INC.$400,000
2005-07-13AALR — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2005-07-13Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to NCB, FSB
2005-07-13AL&R $875,000 — from NATIONAL CONSUMER COOPERATIVE BANK to 162 EAST 80TH TENANTS INC.$875,000
2005-07-13Mortgage $875,000 — from 162 EAST 80TH TENANTS INC. to NATIONAL CONSUMER COOPERATIVE BANK$875,000
2005-06-02DOB violation E:
2005-06-02DOB violation E:
2005-05-26Permit PL — ISSUED
2005-04-20Job filed: UPGRADE EXISTING ELECTRICAL AND ELEVATOR ROOMS. REMOVE OPEN VIOLATIONS. NO CHANGE IN USE, EGRESS, FIRE SAFETY AND OCCUPANCY.$12,000
2005-04-20Job filed: UPGRADE EXISTING ELECTRICAL AND ELEVATOR ROOMS. REMOVE OPEN VIOLATIONS. NO CHANGE IN USE, EGRESS, FIRE SAFETY AND OCCUPANCY.$12,000
2005-03-31Permit EW — ISSUED
2005-02-28RPTT $1,520,000 — from IANNICELLI, NANCY; KELLY, THOMAS M to GOLUB, TORI$1,520,000
2005-02-23Job filed: REMOVAL OF NON-LOAD BEARING PARTITION, N EW SHEETROCK PARTITION, AND PLU BING WORK, O REARRANGE KITCHEN AND HOME OFFICE. NO CHANGE IN USE, EGRESS OR E$16,000
2004
2004-11-01Permit PL — ISSUED
2004-09-20RPTT $1,675,000 — from BELFORD, CECILY G; BELFORD III, RALPH J to ABBOTT, AUDREY S$1,675,000
2004-08-27RPTT $1,615,000 — from JENKINS, CHRISTINE C; JENKINS, LAWRENCE N to RANAWAT, KAREN J; AMEN, CHRISTOPHER R$1,615,000
2004-06-11Permit EW — ISSUED
2004-02-09Job filed: INTERIOR DEMO & CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2004-02-09Job filed: INTERIOR DEMO & CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2004-02-09Job filed: INTERIOR PLUMBING WORK. REMOVE & RELOCATE FIXTURE AND REPLACE WITH NEW FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2003
2003-07-31DOB violation E:
2003-07-31DOB violation E:
2003-03-19DOB violation LL6291:
2003-03-19DOB violation LL6291:
2002
2002-05-15Permit PL — ISSUED
2002-05-03Permit EW — ISSUED
2002-04-30Job filed: Relocate kitchen and combine with maids room. Relocate door of powder room and remove tub. Minor partition changes. No change in use, egress, or oc$10,000
2002-04-30Job filed: Relocate kitchen and combine with maids room. Relocate door of powder room and remove tub. Minor partition changes. No change in use, egress, or oc$10,000
2001
2001-10-31Permit EW — ISSUED
2001-10-25Permit PL — ISSUED
2001-06-27Permit EW — ISSUED
2001-06-14Job filed: RENOVE NON BEARING INTERIOR PARTITIONS. INSTALL NEW NON BEARING INTERIOR PARTITIONS AND PATCH CEILINGS AS REQ. INSTALL NEW PLUMBING FIXTURES. NO CHAN$41,000
2001-06-14Job filed: RENOVE NON BEARING INTERIOR PARTITIONS. INSTALL NEW NON BEARING INTERIOR PARTITIONS AND PATCH CEILINGS AS REQ. INSTALL NEW PLUMBING FIXTURES. NO CHAN$41,000
2001-01-04Permit PL — ISSUED
2000
2000-11-13ECB Non-Hazardous violation: WORK WITHOUT A PERMIT AT TIME OF INSPECTION PLUMBING WORK WAS DONE AND INCOMPLETE.CONSIST OF SUPPLY LINES AND WASTE LINE ON 7TH FL$500
2000-11-13DOB complaint, category ?
2000-10-30Permit EW — ISSUED
2000-10-30Permit EW — ISSUED
2000-10-12Job filed: RENOVATION TO EXISTING APARTMENT 6B ON THE 6TH FLOOR, RELOCATE PARTITIONS, REMOVE AND INSTALL NEW PLUMBING FIXTURES, INSTALL THRU THE WALL A/C UNIT, $50,000
2000-10-12Job filed: RENOVATION TO EXISTING APARTMENT 6B ON THE 6TH FLOOR, RELOCATE PARTITIONS, REMOVE AND INSTALL NEW PLUMBING FIXTURES, INSTALL THRU THE WALL A/C UNIT, $50,000
2000-08-28ECB Non-Hazardous violation: FAILUREW TO PROVIDE 10"X12" ELEVATOR LANDING SIGNS ON ALL FLOORS. FAILURE TO PROVIDE 3" ELEVATOR I.D SIGNS ON ALL FLOORS. REMEDY: $400
2000-08-28ECB Non-Hazardous violation: FAILURE TO MAINTAIN FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84, CERTIFYING TO THE INSTALLATION OF REQUIREED FIRE PROTECTION
2000-08-14DOB violation E: 1P14799
2000-08-14DOB violation E: 1P14800
2000-03-16Permit PL — ISSUED
2000-03-15Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
2000-03-15Mortgage assigned — from NATIONAL CONSUMER COOPERATIVE BANK to FEDERAL NATIONAL MORTGAGE ASSOCIATION
2000-03-14Permit EW — ISSUED
2000-02-17Job filed: DEMOLITION OF NON BEARING PARTITIONS, CONSTRUCT NEW PARTITIONS, RE- LATED PLUMBING AND FINISH WORK AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$75,000
2000-02-17Job filed: DEMOLITION OF NON BEARING PARTITIONS, CONSTRUCT NEW PARTITIONS, RE- LATED PLUMBING AND FINISH WORK AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$75,000
1999
1999-11-05DOB violation E: 1P14800
1999-11-05DOB violation E: 1P14799
1999-04-05Permit EW — ISSUED
1999-03-18ECB Hazardous violation: OPERATION OF HOISTING EQUIPMENT IN A UNSAFE MANNER 1) OUTRIGGER BEAMSAND HOIST NOT FILED WITH OUR DEPT. 2) INSUFFICIENT COUNTERW$4,000
1999-01-26Permit PL — ISSUED
1998
1998-12-03Permit EW — ISSUED
1998-11-24Mortgage $700,000 — from 162 EAST 80TH TENANTS, INC. to NATIONAL CONSUMER COOPERATIVE BANK$700,000
1998-11-24Mortgage assigned — from 162 EAST 80TH TENANTS, INC. to NATIONAL CONSUMER COOPERATIVE BANK
1998-10-29Permit EW — ISSUED
1998-05-04DOB violation LL6291:
1998-05-04DOB violation LL6291:
1998-05-04DOB violation LL6291:
1998-05-04DOB violation LL6291:
1998-04-14SAGE — from BANK OF AMERICA NT &SA
1998-04-14Mortgage $700,000 — from 162 EAST 80TH TENANTS, INC. to NATIONAL CONSUMER COOPERATIVE BANK$700,000
1998-04-14Mortgage assigned — from 162 EAST 80TH TENANTS, INC. to NATIONAL CONSUMER COOPERATIVE BANK
1998-04-14Mortgage satisfied — from 162 EAST 80TH TENANTS, INC. to NATIONAL CONSUMER COOPERATIVE BANK
1996
1996-10-02Permit EW — ISSUED
1996-10-02Permit PL — ISSUED
1996-10-02Permit EW — ISSUED
1996-10-02Permit EW — ISSUED
1996-10-02Permit EW — ISSUED
1994
1994-03-29DOB violation E:
1993
1993-03-30ECB Non-Hazardous violation: 75U,36W
1993-03-30ECB Non-Hazardous violation: 73M,36W,22W
1991
1991-12-30ECB Non-Hazardous violation: 50Y$375
1991-12-30ECB Non-Hazardous violation: 28H;50Q;35R; 35. REMOVE ILLEGAL WIRE SHAFTWAY TO MOTOR ROOM.$375
1991-04-15DOB violation E: DEVICE #1P14799
1991-04-15DOB violation E: DEVICE #1P14800
1991-04-15ECB Non-Hazardous violation: 22D;11M;37O;37I;05O;15L;18L;21L;28L;34I; 11.COVER. 37.CONTROLLER CONTACTS.$150
1991-04-15ECB Non-Hazardous violation: 28H;18M;37O;37I;05L;15L;21L;33L;31L;50Y;50Y;35R;18.COVERS.37.CONTACTS IN CONTROLLER/SELECT.31.COVERS.35.ILLEGAL WIRE.$150
1990
1990-08-01Mortgage assigned — from NATIONAL CNSMR COOPBANK to SECURITY PACIFIC NTLETC
1990-08-01Mortgage assigned — from NATIONAL CNSMR COOPBK to SECURITY PACF NTL TRCO
1990-03-07DOB violation E: 02 PROPERLY IDENTIFY SWITCH 03 CAPACITY PLATE 03 COVER FRAME OUT OF SHAPE (WARP) AND LOOSE 31 REMOVE ILLEGALL WIRING FROM
1990-03-06DOB violation E: 15)MAKE SHAFTWAY DOORS TO COMPLY WITH CODE OPERABLE ON A SAFE AND RELIABLE MANNER, INCLUDING REPLACING ALL DOOR CHECKS THAT AR
1989
1989-10-23Mortgage $650,000 — from 162 EAST 80TH TENANTS IN to NATIONAL CONSUMER COP BK$650,000
1989-10-23Mortgage assigned — from 162 E. 80TH TENANTSINC to NATIONAL CONSUMER ETAL
1989-10-23SAGE — from FIRST TRUST SAVINGSBK
1989-10-23SAGE — from RIVER BANK AMERICA
1989-10-23Mortgage satisfied — from 162 E. 80TH TNTS INC to NATIONAL CONSMR COOPBK
1989-10-23Mortgage satisfied — from SEWDEN RLTY CORP; 162 E. 80TH TNTS INC; 162 E 80TH TNTS INC to NATIONAL CONSMR COOPBK; ERIC, FRANCOISE; DRY DOCK SVGS BANK; GREENWALD, JACOB; NEW YORK LF
1989-01-12DOB violation E: 51)WITH TAMPERPROOF FASTENINGS PIN FASTENS TOPS BOTTOM OF SWING SECTION OF HOISTWAY DOORS 52)ELIMINATE SCRAPING IN SHAFT DUR
1988
1988-12-08HPD class C: SECTION 27-2029 ADM CODE DEVICE PRESENT ON CENTRAL HEATING SYSTEM WHICH IS CAPABLE OF CAUSING AN OTHERWISE OPERABLE SYSTEM TO BECOME INOPERA
1988-12-08HPD class C: SECTION 27-2029 ADM CODE DEVICE PRESENT ON CENTRAL HEATING SYSTEM WHICH IS CAPABLE OF CAUSING AN OTHERWISE OPERABLE SYSTEM TO BECOME INOPERA
1988-12-08HPD class C: SECTION 27-2029 ADM CODE DEVICE PRESENT ON CENTRAL HEATING SYSTEM WHICH IS CAPABLE OF CAUSING AN OTHERWISE OPERABLE SYSTEM TO BECOME INOPERA
1986
1986-10-03Mortgage assigned — from NATIONAL CNSMR COOPTV BK to FIRSTRUST SAVGS BK
1986-03-05Mortgage $150,000 — from 162 EAST 80 TENANTSINC to NATIONAL CONSMR COOPBK$150,000
1986-03-05Mortgage assigned — from 162 EAST 80 TENANTS,INC. to NATIONAL CONSUMR COOP BK
1985
1985-09-04Mortgage assigned — from MERRILL LYNCH MTGE ETC to EAST RIVER SAVINGS BK
1985-08-15Mortgage assigned — from NATIONAL CNSR COOP BK to MERRILL LYCH MTG CPTL IN
1985-08-15Mortgage assigned — from MERRILL LYCH MTG CPTL,IN to EAST RIVER SAVINGS BANK
1985-07-17Mortgage assigned — from NATIONAL CONSMR COOPBK to MERRILL LYN MTGE CAPINC
1984
1984-11-07Agreement — from 162 E. 80TH TENANTS,INC to NATIONAL CNSMR COOPTV BK
1984-11-07Mortgage assigned — from 162 E. 80TH TENANTS,INC to NATIONAL CONSUMR COOP BK
1984-11-07Mortgage assigned — from DRY DOCK SV BK/NEW YORK to NATIONAL CONSUMER ETC
1984-11-07Mortgage $100,000 — from 162 E. 80TH TENANTS,INC to NATIONAL CONSM COOPBANK$100,000
1979
1979-10-04Mortgage — from 162 E 80TH TENANTS INC to DRY DOCK SAVINGS BANK
1979-10-04Mortgage assigned — from BOWERY SAVINGS BANK to DRY DOCK SAVINGS BANK
1971
1971-08-17Agreement — from 162 EAST 80 TENANTSINC to BOWERY SAVINGS BANK
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL

Support this site Back to the building page