The city's published records show little recorded distress here in the last three years. Less recorded distress than 91% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 0.7. In ZIP 11231, 56% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
6 total — 1 class C (immediately hazardous), 3 class B, 2 class A. Oldest open since 2001-06-02.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
44 service requests in the last three years. Most common: Noise (12) · Water System (12) · Illegal Parking (5) · Snow or Ice (4) · Lead (3) · General Construction/Plumbing (2).
Filed construction activity
$2,275,780 in permitted construction work filed since
2016 (34 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1930)
Yes
Six or more residential units (70)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
ARIANA CONDOMINIUM
Head officer
Arnesa Cekic
Managing agent
CENTURY MANAGEMENT
Last registered
2026-07-27
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$17,479
$7,866
2026
$240,489
$108,220
2027
$439,727
$197,878
The city's market estimate has risen
2416% between tax years 2025 and 2027.
Tax exemptions on the roll: CHARITABLE · CHARITABLE HOUSING · SENIOR CITIZEN HOMEOWNER
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2021 estimate: gross income $2,655,558 a year
($33.59 per sq ft), operating expenses $932,094
($11.79 per sq ft), net operating income $1,723,464. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Heating fuel
NATURALGAS
Facade (Local Law 11)
SAFE (cycle 10)
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Carroll St — F G · 0.5 mi straight-line (about a 13-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Columbia St / Kane St — B61 · 600 ft
Citi Bike
Columbia St & Degraw St · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
44 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2025-09-09Deed — from TORRES, EFRAIN; TORRES, ESTHER M. to EFRAIN TORRES IRREVOCABLE TRUST; EFRAIN TORRES, JR., TRUSTEE; ESTHER TORRES IRREVOCABLE TR
2025-09-09Mortgage satisfied — from NUCULAJ, JUSTE; HESLIN, JOHN to WEBSTER BANK, N.A.; ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA; STERLING NATIONAL BANK
2025-09-03Deed transfer (nominal price)
2025-09-03Deed transfer (nominal price)
2025-08-08Mortgage satisfied — from HESLIN, JOHN; NUCULAJ, JUSTE to WEBSTER BANK, N.A.; STERLING NATIONAL BANK; ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2025-07-24Mortgage $500,000 — from HESLIN, JOHN; HESLIN, JUSTE to ROCKET MORTGAGE LLC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$500,000
2025-07-03ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT OF SERVICE. REMEDY: RESTORE
2025-07-01311: Elevator — Elevator - Multiple Devices On Property
2025-07-01DOB complaint, category ?
2025-06-30FDNY inspection (RISK)
2025-06-30FDNY inspection (RISK)
2025-03-26Facade (LL11) filing, cycle 9: SAFE
2025-03-14LOCC — from PHILLIPS, AMANDA to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2025-02-07Permit General Construction — Signed-off
2025-02-03311: Water Quality — Cloudy Or Milky Water (QB1)
2025-01-15Mortgage assigned — from NATIONSTAR MORTGAGE LLC to US BANK TRUST NATIONAL ASSOCIATION
2025-01-13Rodent inspection: Passed
2025-01-08Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CASTLE POINT MORTGAGE INC to COUNTRYWIDE HOME LOANS SERVICING LP; BANK OF AMERICA NA; BAC HOME LOANS SERVICING LP
2025-01-08311: Illegal Parking — Blocked Hydrant
2024
2024-12-16Facade (LL11) filing, cycle 9: SAFE
2024-12-16Bedbug filing: 0 infested units
2024-12-11Mortgage satisfied — from GARAY, DIEGO; GARAY, JODIE L to FIRST SECURITY FINANCIAL SERVICES, INC.; CITIBANK
2024-11-19311: Lead — Lead Kit Request (Residential) (L10)
2024-09-25Mortgage $300,000 — from WALLACE, GABRIELLE; WALLACE, JUSTIN to CITIZENS BANK NA$300,000
2024-09-25Mortgage $300,000 — from WALLACE, GABRIELLE; WALLACE, JUSTIN to CITIZENS BANK NA$300,000
2024-09-16311: New Tree Request — For One Address
2024-08-29Job filed: FACADE REPAIRS, BRICK MASONRY REPAIRS, WINDOW SILL REPAIRS,/REPLACEMENT, COPING STONE REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$295,415
2024-08-15PAT — from PALMER, AMY; PALMER, ENOCH to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2024-08-15Deed $140,000 — from TIFFANY PLACE 1L, LLC to PALMER, ENOCH; PALMER, AMY$140,000
2024-08-08Sold for $140,000$140,000
2024-08-08Deed — from FARINA JR, ANTONIO; FARINA, CARMEN to ANTONIO FARINA, TRUSTEE; CARMEN FARINA, TRUSTEE; CARMEN FARINA REVOCABLE TRUST; ANTONIO FA
2024-08-06Deed — from FARINA JR., ANTONIO; FARINA, CARMEN to CARMEN FARINA, TRUSTEE; ANTONIO FARINA, TRUSTEE; ANTONIO FARINA REVOCABLE TRUST; CARMEN FA
2024-08-02Deed transfer (nominal price)
2024-08-02Deed transfer (nominal price)
2024-08-02311: Water System — Fire Hydrant Emergency (FHE)
2024-08-02311: Water System — Fire Hydrant Emergency (FHE)
2024-07-16Deed — from RUSSELL, LEO B B to LEO BARRINGTON RUSSELL LIVING TRUST; LEO BARRINGTON RUSSELL, TRUSTEE
2024-07-16Boiler inspection
2024-07-16Boiler inspection
2024-07-16Boiler inspection
2024-07-16Boiler inspection
2024-07-09Deed transfer (nominal price)
2024-06-19311: Water System — Fire Hydrant Emergency (FHE)
2024-06-08311: Air Quality — Air: Dust, Other (Use Comments) (AE5)
2024-06-07Mortgage satisfied — from TRICARDO, KIM to WELLS FARGO BANK, N.A.
2024-06-03311: Water System — Hydrant Running (WC3)
2024-06-03311: Water System — Dirty Water (WE)
2024-06-03311: Water System — Dirty Water (WE)
2024-06-03311: Water System — Dirty Water (WE)
2024-06-03311: Water System — Dirty Water (WE)
2024-06-03311: Water System — Dirty Water (WE)
2024-05-28FDNY inspection (RISK)
2024-05-09311: Lead — Lead Kit Request (Residential) (L10)
2024-04-24311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-04-24DOB complaint, category ?
2024-04-12Mortgage satisfied — from MARTINEZ, RICHARDO; MARTINEZ, VILMA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CITIBANK
2023-11-01DOB violation FISPFCS: FAILURE TO CORRECT SWARMP CONDITIONS
2023-10-16311: Noise — Noise: Jack Hammering (NC2)
2023-10-07311: Noise - Residential — Loud Talking
2023-10-06Job filed: FACADE REPAIRS, BRICK MASONRY REPAIRS, WINDOW SILL REPAIRS,/REPLACEMENT, COPING STONE REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$295,415
2023-10-04Agreement $2,028 — from BROWN, O MICHAY to WELLS FARGO BANK N.A.$2,028
2023-10-04Mortgage $2,028 — from BROWN, O MICHAY to WELLS FARGO BANK N.A.$2,028
2023-09-23311: Noise — Noise: Construction Before/After Hours (NM1)
2023-07-18Permit Protection and Mechanical Methods — Signed-off
2023-07-11Job filed: Installation of a temporary vertical netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o$2,500
2023-04-18Permit General Construction — Permit Issued
2023-04-12Mortgage assigned — from U.S BANK, N.A. to U.S. BANK, N.A.
2023-04-05311: Noise - Helicopter — Other
2023-03-21FDNY inspection (RISK)
2023-03-19311: Illegal Parking — Blocked Hydrant
2023-03-17Job filed: BUILDING MAINTENANCE ACCESS GATE INSTALLATION TO AN EXISTING FREE STANDING BRICK WALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2023-03-10DOB complaint, category ?
2023-03-09ECB CLASS - 1 violation: FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED,NETTING,ETC,WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUMENTED$10,000
2023-03-09DOB violation C: EMERGENCY WORK ORDER DUE TO STEP CRACKS AND HORIZONTAL CRACKS AT FACADEMASONRY BRICK AT SOUTH ELEVATION.REMEDY:TAKE AND PROVI
2023-03-06DOB complaint, category ?
2023-02-21Facade (LL11) filing, cycle 9: SAFE
2023-02-21Mortgage satisfied — from SHADLETSKY, FLORENCE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; COUNTRYWIDE BANK, N.A.
2023-02-08311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2023-02-08DOB complaint, category ?
2023-01-26CORRM $527,995 — from KALMUSS-KATZ, JONATHAN; POWERS, KATHERINE to WELLS FARGO BANK, N.A.$527,995
2023-01-13Bedbug filing: 0 infested units
2023-01-07Permit Sidewalk Shed — Signed-off
2023-01-06Job filed: INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC$5,000
2022
2022-12-20Mortgage $150,115 — from WALLACE, GABRIELLE; WALLACE, JUSTIN to UBS BANK USA; MERS$150,115
2022-12-20Agreement $700,000 — from WALLACE, GABRIELLE; WALLACE, JUSTIN to MERS; UBS BANK USA$700,000
2022-12-20Agreement $700,000 — from WALLACE, GABRIELLE; WALLACE, JUSTIN to MERS; UBS BANK USA$700,000
2022-12-20Mortgage $150,115 — from WALLACE, GABRIELLE; WALLACE, JUSTIN to UBS BANK USA; MERS$150,115
2022-11-14HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-11-01Mortgage satisfied — from FARINA JR, ANTONIO; FARINA, CARMEN to SIGNATURE BANK
2022-09-04311: New Tree Request — For One Address
2022-09-02Agreement $889,000 — from KALMUSS-KATZ, JONATHAN; POWERS, KATHERINE to WELLS FARGO BANK, N.A.$889,000
2022-08-18FDNY inspection (RISK)
2022-08-12M&CON $175,000 — from LEWIN, STEPHANIE; FERRONE, DOMINIC to MANUFACTURERS AND TRADERS TRUST COMPANY$175,000
2022-07-11Boiler inspection
2022-07-11Boiler inspection
2022-07-11Boiler inspection
2022-07-11Boiler inspection
2022-06-15311: Water System — Dirty Water (WE)
2022-06-05311: New Tree Request — For One Address
2022-05-13Mortgage $100,000 — from FERRONE, DOMINIC; LEWIN, STEPHANIE to MANUFACTURERS AND TRADERS TRUST COMPANY$100,000
2022-05-13311: Water System — Dirty Water (WE)
2022-05-13311: Water System — Dirty Water (WE)
2022-05-13311: Water System — Dirty Water (WE)
2022-05-06Elevator permit: Furnish and Install new GAL power door operator (8.7.2.12). We will also replace all GAL tracks, hangers and interlocks. All work $4,875
2022-04-18Mortgage satisfied — from LEWIN, STEPHANIE; FERRONE, DOMINIC to BANK OF AMERICA, N.A.
2022-04-11PAT — from KOTLUS, BRETT S to ROTH, KURT L; ESTRADA, TARYN
2022-04-11Agreement $1,176,000 — from AICHELE, ANDREW; KYLE, CHELSEA to LOANDEPOT.COM, LLC$1,176,000
2022-04-11Deed $1,470,000 — from KOTLUS, BRETT S; KOTLUS, STEPHANIE to KYLE, CHELSEA; AICHELE, ANDREW$1,470,000
2022-04-11Mortgage $313,964 — from AICHELE, ANDREW; KYLE, CHELSEA to LOANDEPOT.COM, LLC$313,964
2022-04-11Mortgage assigned — from BANK OF AMERICA, N.A. to LOANDEPOT.COM, LLC
2022-04-11Mortgage $313,964 — from AICHELE, ANDREW; KYLE, CHELSEA to LOANDEPOT.COM, LLC$313,964
2022-04-11Mortgage assigned — from BANK OF AMERICA, N.A. to LOANDEPOT.COM, LLC
2022-04-11PAT — from KYLE, CHELSEA; AICHELE, ANDREW to CONDOMINIUM BOARD
2022-04-11PAT — from KOTLUS, STEPHANIE to ESTRADA, TARYN; ROTH, KURT L
2022-04-11PAT — from KOTLUS, BRETT S to ROTH, KURT L; ESTRADA, TARYN
2022-04-11PAT — from KYLE, CHELSEA; AICHELE, ANDREW to CONDOMINIUM BOARD
2022-04-11PAT — from KOTLUS, STEPHANIE to ESTRADA, TARYN; ROTH, KURT L
2022-04-11Agreement $1,176,000 — from AICHELE, ANDREW; KYLE, CHELSEA to LOANDEPOT.COM, LLC$1,176,000
2022-04-11Deed $1,470,000 — from KOTLUS, BRETT S; KOTLUS, STEPHANIE to KYLE, CHELSEA; AICHELE, ANDREW$1,470,000
2022-03-25Sold for $1,470,000$1,470,000
2022-03-25Sold for $1,470,000$1,470,000
2022-03-15FDNY inspection (RISK)
2022-02-23CORRD — from POST, NICHOLAS; OH, MICHELE to THE NICHOLAS H. POST REVOCABLE TRUST DTD; THE REVOCABLE TRUST OF MICHELE OH DTD 6/; MICHEL
2022-02-23Agreement $2,206,693 — from OH, MICHELE C; POST, NICHOLAS H; THE REVOCABLE TRUST OF MICHELE C. OH DTD; THE NICHOLAS H. to WELLS FARGO BANK, N.A.$2,206,693
2022-02-23SUBM — from U.S. BANK NATIONAL ASSOCIATION to WELLS FARGO BANK, N.A.
2022-02-23SUBM — from U.S. BANK NATIONAL ASSOCIATION to WELLS FARGO BANK, N.A.
2022-02-23CORRD — from POST, NICHOLAS; OH, MICHELE to THE NICHOLAS H. POST REVOCABLE TRUST DTD; THE REVOCABLE TRUST OF MICHELE OH DTD 6/; MICHEL
2022-02-23Mortgage $60,442 — from THE REVOCABLE TRUST OF MICHELE C. OH DTD; POST, NICHOLAS H; THE NICHOLAS H. POST REVOCABLE to WELLS FARGO BANK, N.A.$60,442
2022-02-23Agreement $2,206,693 — from OH, MICHELE C; POST, NICHOLAS H; THE REVOCABLE TRUST OF MICHELE C. OH DTD; THE NICHOLAS H. to WELLS FARGO BANK, N.A.$2,206,693
2022-02-23Mortgage $60,442 — from THE REVOCABLE TRUST OF MICHELE C. OH DTD; POST, NICHOLAS H; THE NICHOLAS H. POST REVOCABLE to WELLS FARGO BANK, N.A.$60,442
2022-02-09311: Missed Collection — Bulky Trash
2022-02-09311: Missed Collection — Bulky Trash
2022-02-09311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2022-02-09311: Graffiti — Police Report Not Requested
2022-02-08Mortgage satisfied — from WALSH, LISA; WALSH, KEVIN to BETHPAGE FEDERAL CREDIT UNION; STANDARD FEDERAL BANK; FIRST SECURITY FINANCIAL SERVICES, I
2022-02-03311: Dirty Condition — Trash
2022-02-01311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2022-01-26Mortgage $200,000 — from WALSH, LISA; WALSH, KEVIN to BETHPAGE FEDERAL CREDIT UNION$200,000
2022-01-25311: Dirty Condition — Trash
2022-01-03311: Graffiti — Graffiti
2021
2021-12-27Boiler inspection
2021-12-27Boiler inspection
2021-12-27Boiler inspection
2021-12-27Boiler inspection
2021-12-22Bedbug filing: 0 infested units
2021-12-21Mortgage satisfied — from REDMOND, LORETTA; SCAVUZZO, STEVEN to WELLS FARGO BANK, N.A.
2021-12-15Agreement $950,000 — from CONNOLLY, LOUISE; YANCHYSHYN, MATTHEW to CITIBANK, N.A.$950,000
2021-12-15Mortgage assigned — from MERS, INC; CITIBANK, N.A. to CITIBANK, N.A.
2021-12-15Mortgage $11,572 — from YANCHYSHYN, MATTHEW; CONNOLLY, LOUISE to CITIBANK, N.A.$11,572
2021-12-14PAT — from KOTLUS, STEPHANIE; KOTLUS, BRETT S to THE ARIANNA CONDOMINIUM
2021-12-14Mortgage $1,878,000 — from KOTLUS, STEPHANIE; KOTLUS, BRETT S to BANK OF AMERICA, NA; MERS$1,878,000
2021-12-14Deed $2,347,500 — from REDMOND, LORETTA; SCAVUZZO, STEVEN to KOTLUS, BRETT S; KOTLUS, STEPHANIE$2,347,500
2021-12-14PAT — from KOTLUS, STEPHANIE; KOTLUS, BRETT S to THE ARIANNA CONDOMINIUM
2021-12-14Mortgage $1,878,000 — from KOTLUS, STEPHANIE; KOTLUS, BRETT S to BANK OF AMERICA, NA; MERS$1,878,000
2021-12-14Deed $2,347,500 — from REDMOND, LORETTA; SCAVUZZO, STEVEN to KOTLUS, BRETT S; KOTLUS, STEPHANIE$2,347,500
2021-12-08Mortgage $247,000 — from SORRA, MARTHA CATALINA to MERS$247,000
2021-12-07Mortgage assigned — from CITIBANK; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to NEW RESIDENTIAL MORTGAGE, LLC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2021-12-07Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; NEW RESIDENTIAL MORTGAGE, LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; NATIONSTAR MORTGAGE LLC; MR COOPER
2021-12-07Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; NEW RESIDENTIAL MORTGAGE, LLC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; NATIONSTAR MORTGAGE LLC; MR COOPER
2021-12-07M&CON $685,000 — from SUSSMAN, ADAM C; SUSSMAN, VANESSA A to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MR COOPER; NATIONSTAR MORTGAGE LLC$685,000
2021-12-07Mortgage $208,404 — from SUSSMAN, VANESSA A; SUSSMAN, ADAM C to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MR COOPER; NATIONSTAR MORTGAGE LLC$208,404
2021-12-07Mortgage $208,404 — from SUSSMAN, VANESSA A; SUSSMAN, ADAM C to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MR COOPER; NATIONSTAR MORTGAGE LLC$208,404
2021-12-07M&CON $685,000 — from SUSSMAN, ADAM C; SUSSMAN, VANESSA A to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MR COOPER; NATIONSTAR MORTGAGE LLC$685,000
2021-12-07Mortgage assigned — from CITIBANK; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to NEW RESIDENTIAL MORTGAGE, LLC; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2021-12-01311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-11-29Sold for $2,347,500$2,347,500
2021-11-29Sold for $2,347,500$2,347,500
2021-11-26311: Illegal Parking — Blocked Sidewalk
2021-11-17PAT — from JADOTTE, ROLANDE A to TRACY MAKOW; GOLDMAN, SARA; HOWARD BRICKNER
2021-11-17PAT — from EBLE, ERIC; SCHWARTZ, MOLLY to THE BOARD OF MANAGERS OF THE ARIANNA CON
2021-11-17Mortgage $1,132,000 — from SCHWARTZ, MOLLY; EBLE, ERIC to WELLS FARGO BANK, N.A.$1,132,000
2021-11-17Deed $1,415,000 — from TANGNEY, NICHOLAS J; JADOTTE, ROLANDE A to EBLE, ERIC; SCHWARTZ, MOLLY$1,415,000
2021-11-17PAT — from EBLE, ERIC; SCHWARTZ, MOLLY to THE BOARD OF MANAGERS OF THE ARIANNA CON
2021-11-17Deed $1,415,000 — from TANGNEY, NICHOLAS J; JADOTTE, ROLANDE A to EBLE, ERIC; SCHWARTZ, MOLLY$1,415,000
2021-11-17Mortgage $1,132,000 — from SCHWARTZ, MOLLY; EBLE, ERIC to WELLS FARGO BANK, N.A.$1,132,000
2021-10-26311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-10-19Agreement $764,000 — from MAYER, ELIZABETH A; COOPER, JASON M to CITIBANK, N.A.$764,000
2021-10-19Agreement $764,000 — from MAYER, ELIZABETH A; COOPER, JASON M to CITIBANK, N.A.$764,000
2021-10-19Mortgage $6,850 — from COOPER, JASON M; MAYER, ELIZABETH A to CITIBANK, N.A.$6,850
2021-10-19Mortgage $6,850 — from COOPER, JASON M; MAYER, ELIZABETH A to CITIBANK, N.A.$6,850
2021-10-07Mortgage satisfied — from CATALINA SORRA, MARTHA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2021-08-27311: Illegal Parking — Blocked Sidewalk
2021-08-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-08-16FDNY inspection (RISK)
2021-08-14311: Water System — Hydrant Running (WC3)
2021-08-10Mortgage satisfied — from REDMOND, LORETTA; SCAVUZZO, STEVEN to FIRST AMERICAN MORTGAGE SOLUTIONS, LLC; BANK OF AMERICA NA; FLEET NATIONAL BANK
2021-07-16311: Water System — Fire Hydrant Emergency (FHE)
2021-07-15Bedbug filing: 0 infested units
2021-07-14Agreement $580,000 — from MARTIN, ANNA; GROSSMAN, ELLIOT to JPMORGAN CHASE BANK, N.A.$580,000
2021-07-14Mortgage assigned — from ALLY BANK; MERS to JPMORGAN CHASE BANK, N.A.
2021-07-14Mortgage assigned — from ALLY BANK; MERS to JPMORGAN CHASE BANK, N.A.
2021-07-14Mortgage $13,554 — from GROSSMAN, ELLIOT; MARTIN, ANNA to JPMORGAN CHASE BANK, N.A.$13,554
2021-07-14Agreement $580,000 — from MARTIN, ANNA; GROSSMAN, ELLIOT to JPMORGAN CHASE BANK, N.A.$580,000
2021-07-14Mortgage $13,554 — from GROSSMAN, ELLIOT; MARTIN, ANNA to JPMORGAN CHASE BANK, N.A.$13,554
2021-07-02Mortgage $770,000 — from REEVES, HOPE to MERS$770,000
2021-07-02PAT — from COHEN, ELIZABETH to BRICKNER, HOWARD
2021-07-02PAT — from REEVES, HOPE to THE BOARD OF MANAGERS
2021-07-02Deed $1,295,000 — from COHEN, ELIZABETH to REEVES, HOPE$1,295,000
2021-06-29Mortgage satisfied — from COHEN, ELIZABETH; COHEN, RICHARD to CITIZENS BANK, N.A.
2021-06-09PAT — from MCCARTHY, REBECCA; SONTAG, SAMUEL to THE ARIANA CONDOMINIUM
2021-06-09Deed $855,000 — from POWERS, KATHERINE; KALMUSS-KATZ, JONATHAN to MCCARTHY, REBECCA; SONTAG, SAMUEL$855,000
2021-06-07Agreement $687,250 — from LUNA, KENNETH; BLANCHOT, ANNE CECILE to JPMORGAN CHASE BANK, N.A.$687,250
2021-06-07Mortgage assigned — from CITIZENS BANK, N.A. to JPMORGAN CHASE BANK, N.A.
2021-06-07Agreement $687,250 — from LUNA, KENNETH; BLANCHOT, ANNE CECILE to JPMORGAN CHASE BANK, N.A.$687,250
2021-06-07Mortgage $12,250 — from BLANCHOT, ANNE CECILE; LUNA, KENNETH to JPMORGAN CHASE BANK, N.A.$12,250
2021-06-07Mortgage assigned — from CITIZENS BANK, N.A. to JPMORGAN CHASE BANK, N.A.
2021-06-07Mortgage $12,250 — from BLANCHOT, ANNE CECILE; LUNA, KENNETH to JPMORGAN CHASE BANK, N.A.$12,250
2021-06-04Sold for $1,295,000$1,295,000
2021-05-18Elevator permit: Replace traction sheave and install new cables. Section code 8.7.2.25.1 All work in compliance with ASME A17.1, As Modified by Ap$11,900
2021-05-01LOCC — from PHILIP, AMANDA to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2021-04-21Deed — from POST, NICHOLAS H to NICHOLAS H. POST REVOCABLE TRUST; THE REVOCABLE TRUST OF MICHELE C. OH
2021-04-21Deed — from POST, NICHOLAS H to NICHOLAS H. POST REVOCABLE TRUST; THE REVOCABLE TRUST OF MICHELE C. OH
2021-04-20Deed — from BOWERS, HOLLY to HOLLY BOWERS LIVING TRUST; HOLLY BOWERS AS TRUSTEE
2021-04-13HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-08Deed transfer (nominal price)
2021-04-05FDNY inspection (RISK)
2021-03-24311: New Tree Request — For One Address
2021-03-15Deed — from POST, NICHOLAS; OH, MICHELE to THE REVOCABLE TRUST OF MICHELE C. OH; NICHOLAS H. POST REVOCABLE TRUST
2021-03-15Deed — from POST, NICHOLAS; OH, MICHELE to THE REVOCABLE TRUST OF MICHELE C. OH; NICHOLAS H. POST REVOCABLE TRUST
2021-01-25PAT — from PATEL, SEOLHEE KIM to COOPER, CHRISTINA S ESQ.
2021-01-25PAT — from PATEL, SANJAY to COOPER, CHRISTINA S ESQ.
2021-01-25PAT — from PATEL, SEOLHEE KIM to COOPER, CHRISTINA S ESQ.
2021-01-25Agreement $766,000 — from HIRSCH, JULIA; HIRSCH, LOGAN to WELLS FARGO BANK, N.A.$766,000
2021-01-25Mortgage assigned — from CITIZENS HOME LOANS; CITIZENS BANK, N.A. to WELLS FARGO BANK, N.A.
2021-01-25PAT — from PATEL, SANJAY to COOPER, CHRISTINA S ESQ.
2021-01-25PAT — from HIRSCH, JULIA; HIRSCH, LOGAN to BOARD OF MANAGERS; THE ARIANA CONDOMINIUM
2021-01-25Deed $1,358,750 — from PATEL, SEOLHEE KIM; PATEL, SANJAY to HIRSCH, LOGAN; HIRSCH, JULIA$1,358,750
2021-01-25Mortgage assigned — from CITIZENS HOME LOANS; CITIZENS BANK, N.A. to WELLS FARGO BANK, N.A.
2021-01-25Agreement $766,000 — from HIRSCH, JULIA; HIRSCH, LOGAN to WELLS FARGO BANK, N.A.$766,000
2021-01-25Deed $1,358,750 — from PATEL, SEOLHEE KIM; PATEL, SANJAY to HIRSCH, LOGAN; HIRSCH, JULIA$1,358,750
2021-01-25PAT — from HIRSCH, JULIA; HIRSCH, LOGAN to BOARD OF MANAGERS; THE ARIANA CONDOMINIUM
2021-01-13Mortgage satisfied — from POWERS, KATHERINE JORDAN; KALMUSS-KATZ, JONATHAN to CITIBANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORTGAGE ELECTRONIC REGISTRATION
2021-01-12311: Blocked Driveway — Partial Access
2021-01-07Sold for $1,358,750$1,358,750
2021-01-07Sold for $1,358,750$1,358,750
2020
2020-12-24Mortgage satisfied — from LASNER, MATTHEW GORDON; GOLDSTEIN, DANIEL JENNINGS to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; QUICKEN LOANS INC
2020-06-02Agreement $1,120,000 — from PATEL, SANJAY; PATEL, SEOLHEE KIM to CITIZENS BANK, N.A.$1,120,000
2020-05-21Mortgage satisfied — from BRITTON, CAROL L; HITCHMAN, ONECA J to US BANK NA; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2020-05-19Boiler inspection
2020-05-19Boiler inspection
2020-05-19Boiler inspection
2020-05-19Boiler inspection
2020-04-30Mortgage assigned — from U.S. BANK, N.A. to CITIBANK, N.A
2020-04-30Mortgage $125,914 — from HITCHMAN, ONECA J to CITIBANK, N.A$125,914
2020-04-30Deed — from HITCHMAN, ONECA J; BRITTON, CAROL L to HITCHMAN, ONECA J
2020-04-30Agreement $429,000 — from HITCHMAN, ONECA J to CITIBANK, N.A$429,000
2020-04-21Deed transfer (nominal price)
2020-04-13Job filed: plumbing work proposed as per plans filed herewith.$8,000
2020-03-26Job filed: FILING ALT-2 FOR MINOR RENOVATION OF AN EXISTING APARTMENT AS PER ARCHITECTURAL PLANS FILED HEREWITH. PLUMBING WORK WILL BE FILED WITH DOB NOW. THERE $19,600
2020-03-26Job filed: FILING ALT-2 FOR MINOR RENOVATION OF AN EXISTING APARTMENT AS PER ARCHITECTURAL PLANS FILED HEREWITH. PLUMBING WORK WILL BE FILED WITH DOB NOW. THERE $19,600
2020-03-26Job filed: FILING ALT-2 FOR MINOR RENOVATION OF AN EXISTING APARTMENT AS PER ARCHITECTURAL PLANS FILED HEREWITH. PLUMBING WORK WILL BE FILED WITH DOB NOW. THERE $19,600
2020-03-26Job filed: FILING ALT-2 FOR MINOR RENOVATION OF AN EXISTING APARTMENT AS PER ARCHITECTURAL PLANS FILED HEREWITH. PLUMBING WORK WILL BE FILED WITH DOB NOW. THERE $19,600
2020-03-23Job filed: FILING ALT-2 FOR MINOR RENOVATION OF AN EXISTING APARTMENT AS PER ARCHITECTURAL PLANS FILED HEREWITH. PLUMBING WORK WILL BE FILED WITH DOB NOW. THERE $19,600
2020-03-23Job filed: FILING ALT-2 FOR MINOR RENOVATION OF AN EXISTING APARTMENT AS PER ARCHITECTURAL PLANS FILED HEREWITH. PLUMBING WORK WILL BE FILED WITH DOB NOW. THERE $19,600
2020-03-11Mortgage satisfied — from KAPLAN, SHIRLEY to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2020-03-11Mortgage satisfied — from KAPLAN, SHIRLEY to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2020-03-09Mortgage satisfied — from MADUENO, MARIA LUCIA; DOMINGUEZ, JUAN PABLO; SILVA, MARIA LUISA to JPMORGAN CHASE BANK, N.A.
2020-03-09Mortgage satisfied — from MADUENO, MARIA LUCIA; DOMINGUEZ, JUAN PABLO; SILVA, MARIA LUISA to JPMORGAN CHASE BANK, N.A.
2020-02-26Deed $1,811,000 — from ROSS, VALERIE BREA; KAPLAN, SHIRLEY to MADUENO, MARIA LUCIA; DOMINGUEZ, JUAN PABLO$1,811,000
2020-02-26Deed — from KAPLAN, SHIRLEY to DOMINGUEZ, JUAN PABLO; MADUENO, MARIA LUCIA
2020-02-26PAT — from DOMINGUEZ, JUAN PABLO; MADUENO, MARIA LUCIA to THE BOARD MEMBERS OF THE ARIANA CONDOMIN
2020-02-26Mortgage $150,000 — from MADUENO, MARIA LUCIA; DOMINGUEZ, JUAN PABLO to CITIZENS BANK, N.A.$150,000
2020-02-24Agreement $1,670,000 — from PAUQUETTE, LISA J to WELLS FARGO BANK, N.A.$1,670,000
2020-02-24Agreement $1,670,000 — from PAUQUETTE, LISA J to WELLS FARGO BANK, N.A.$1,670,000
2020-02-19Deed $1,450,000 — from MADUENO, MARIA LUCIA; SILVA, MARIA LUISA; DOMINGUEZ, JUAN PABLO to KHASHU, ANITA$1,450,000
2020-02-19PAT — from KHASHU, ANITA to THE BOARD OF MANAGERS OF THE ARIANA COND
2020-02-19Mortgage $765,600 — from KHASHU, ANITA to MERS$765,600
2020-02-19Mortgage $765,600 — from KHASHU, ANITA to MERS$765,600
2020-02-19PAT — from KHASHU, ANITA to THE BOARD OF MANAGERS OF THE ARIANA COND
2020-02-19Deed $1,450,000 — from MADUENO, MARIA LUCIA; SILVA, MARIA LUISA; DOMINGUEZ, JUAN PABLO to KHASHU, ANITA$1,450,000
2019-08-14Mortgage $250,000 — from SINGER, JENNIFER; RICHTER, CHRISTOPHER to WEBSTER BANK N.A.$250,000
2019-07-26Deed — from BOWERS, MARIE-LOUISE to BOWERS, HOLY
2019-07-24Deed — from BOWERS TRUSTEE, HOLLY; GEORGE AND MARIE-LOUISE BOWERS LIVING TR to BOWERS, MARIE-LOUISE
2019-07-19Deed transfer (nominal price)
2019-06-28Boiler inspection
2019-06-28Boiler inspection
2019-06-28Boiler inspection
2019-06-28Boiler inspection
2019-06-20Mortgage $200,000 — from WHIDDEN, CHRISTIE S; WHIDDEN, MICHAEL J to TD BANK NA$200,000
2019-06-18Elevator permit: Furnish and install modifications to the existing controller that will enable the controller to comply with the NYC Appendix K Sec$22,200
2019-06-17Job filed: RENOVATION OF EXISTING RESIDENTIAL APARTMENT LOCATED ON THE 6TH,7TH AND 8TH FLOOR. MECHANICAL, PLUMBING, AND SPRINKLER WORK. NO CHANGE TO USE EGRESS O$38,000
2019-06-17Job filed: RENOVATION OF EXISTING RESIDENTIAL APARTMENT LOCATED ON THE 6TH,7TH AND 8TH FLOOR. MECHANICAL, PLUMBING, AND SPRINKLER WORK. NO CHANGE TO USE EGRESS O$38,000
2019-06-17Job filed: A2$195,000
2019-05-06Permit EW — ISSUED
2019-04-30PAT — from YOSHIKAWA, YASUO to WEISSER, JENNIFER
2019-04-30PAT — from YOSHIKAWA, YASUO to WEISSER, JENNIFER
2019-04-30Deed $2,100,000 — from KOYAMA, MIKAKO; YOSHIKAWA, YASUO to LUNA, KENNETH; BLANCHOT, ANNE-CECILE$2,100,000
2019-04-30Mortgage $675,000 — from BLANCHOT, ANNE-CECILE; LUNA, KENNETH to CITIZENS BANK, N.A.$675,000
2019-04-30Mortgage $675,000 — from BLANCHOT, ANNE-CECILE; LUNA, KENNETH to CITIZENS BANK, N.A.$675,000
2019-04-30PAT — from LUNA, KENNETH; BLANCHOT, ANNE-CECILE to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2019-04-30Deed $2,100,000 — from KOYAMA, MIKAKO; YOSHIKAWA, YASUO to LUNA, KENNETH; BLANCHOT, ANNE-CECILE$2,100,000
2019-04-30PAT — from LUNA, KENNETH; BLANCHOT, ANNE-CECILE to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2019-04-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-04-18311: Street Condition — Pothole
2019-04-17Job filed: JOB FILED FOR APARTMENT 1H INTERIORS RENOVATION: TO DEMO EXISTING INTERIOR PARTITIONS, TO RECEIVE NEW PARTITIONS, WALL/FLOOR FINISH, ELECTRICAL WORK, $60,000
2019-04-11FDNY inspection (RISK)
2019-04-11FDNY inspection (RISK)
2019-04-10Deed — from MYERS, ROSLYN to GATLIN HOLDING TRUST
2019-04-10Deed — from MYERS, ROSLYN to GATLIN HOLDING TRUST
2019-04-03Deed transfer (nominal price)
2019-04-03Deed transfer (nominal price)
2019-04-01Job filed: PARKING LOT REPAIR, COURTYARD ENHANCEMENT AND INSTALLATION OF STORM WATER DRAINAGE IN PARKING LOT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRE$223,290
2019-04-01Job filed: PARKING LOT REPAIR, COURTYARD ENHANCEMENT AND INSTALLATION OF STORM WATER DRAINAGE IN PARKING LOT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRE$223,290
2019-02-27Mortgage assigned — from WELLS FARGO BANK, N.A. to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2019-02-27Mortgage assigned — from WELLS FARGO BANK, N.A. to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2019-02-25Bedbug filing: 0 infested units
2019-02-19Mortgage satisfied — from KENKEL, BETH to DITECH FINANCIAL LLC; GREEN TREE SERVICING LLC
2019-02-13Deed — from SHADLETSKY, FLORENCE to THE FLORENCE SHADLETSKY REVOCABLE TRUST; FLORENCE SHADLETSKY, TRUSTEE
2019-02-13Mortgage satisfied — from KENKEL, BETH to PNC BANK NATIONAL ASSOCIATION
2019-02-13Deed — from SHADLETSKY, FLORENCE to THE FLORENCE SHADLETSKY REVOCABLE TRUST; FLORENCE SHADLETSKY, TRUSTEE
2019-02-04Sold for $2,100,000$2,100,000
2019-02-04Sold for $2,100,000$2,100,000
2019-01-30Deed $980,000 — from KENKEL, BETH to LEWIS, JAY R; CHENG, CECILIA$980,000
2019-01-30Mortgage $784,000 — from CHENG, CECILIA; LEWIS, JAY RUSSELL to MERS; BANK OF AMERICA,NA$784,000
2019-01-30PAT — from CHENG, CECILIA; LEWIS, JAY RUSSELL to THE ARIANA CONDOMINIUM
2019-01-23Sold for $980,000$980,000
2019-01-23Permit PL — ISSUED
2019-01-11Deed transfer (nominal price)
2019-01-11Deed transfer (nominal price)
2019-01-11311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-01-02311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-12-20ADEC — from THE ARIANA CONDOMINIUM
2018-11-28Permit PL — ISSUED
2018-11-20Mortgage satisfied — from WARRINGTON WILLIAMS, KATHERINE S to MERS
2018-11-20Mortgage satisfied — from WARRINGTON WILLIAMS, KATHERINE S to MERS
2018-11-14Mortgage satisfied — from SHARIF, HOOSHANG to ABN AMRO MORTGAGE GROUP, INC.; CITIMORTGAGE, INC
2018-11-01Mortgage $600,000 — from GROSSMAN, ELLIOTT; MARTIN, ANNA to MERS$600,000
2018-11-01PAT — from THE ARIANA CONDOMINIUM to MARTIN, ANNA; GROSSMAN, ELLIOTT
2018-11-01Deed $1,480,000 — from AMERICAN INTERNATIONAL RELOCATION SOLUTI to MARTIN, ANNA; GROSSMAN, ELLIOTT$1,480,000
2018-11-01Deed $1,480,000 — from WARRINGTON WILLIAMS, KATHERINE S; SHARP, WILLIAM M to AMERICAN INTERNATIONAL RELOCATION SOLUTI$1,480,000
2018-11-01Mortgage satisfied — from SCIBETTA, STACY A to BANKBOSTON, N.A.; BANK OF AMERICA, N.A.; FIRST AMERICAN MORTGAGE SOLUTIONS, LLC; FLEET NAT
2018-11-01PAT — from THE ARIANA CONDOMINIUM to MARTIN, ANNA; GROSSMAN, ELLIOTT
2018-11-01Deed $1,480,000 — from WARRINGTON WILLIAMS, KATHERINE S; SHARP, WILLIAM M to AMERICAN INTERNATIONAL RELOCATION SOLUTI$1,480,000
2018-11-01Mortgage $600,000 — from GROSSMAN, ELLIOTT; MARTIN, ANNA to MERS$600,000
2018-11-01Deed $1,480,000 — from AMERICAN INTERNATIONAL RELOCATION SOLUTI to MARTIN, ANNA; GROSSMAN, ELLIOTT$1,480,000
2018-10-30Deed transfer (nominal price)
2018-10-30Sold for $1,480,000$1,480,000
2018-10-25Permit EW — ISSUED
2018-10-17DOB violation E:
2018-10-17DOB violation E:
2018-09-26Mortgage satisfied — from WALLACE, GABRIELLE K; WALLACE, JUSTIN M to MERS AS NOMINEE FOR UBS BANK USA
2018-09-26Mortgage satisfied — from WALLACE, GABRIELLE K; WALLACE, JUSTIN M to MERS AS NOMINEE FOR UBS BANK USA
2018-09-05PAT — from SCIBETTA, STACY A to ROTH, ERIK M
2018-09-05Deed $650,000 — from SCIBETTA, STACY A to BALTERS, DEBORAH$650,000
2018-09-05PAT — from BALTERS, DEBORAH to THE ARIANA CONDOMINIUM
2018-09-05Mortgage $455,000 — from BALTERS, DEBORAH to WELLS FARGO BANK, N.A.$455,000
2018-09-05Permit EW — ISSUED
2018-09-05Permit EW — ISSUED
2018-09-04Mortgage satisfied — from SCIBETTA, STACY A to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; HOME LOAN CENTER INC; LENDING TREE LOANS
2018-08-22Sold for $650,000$650,000
2018-08-16Deed $125,000 — from SCIBETTA, STACY A to SUSSMAN, VANESSA; SUSSMAN, ADAM$125,000
2018-08-16PAT — from SUSSMAN, VANESSA; SUSSMAN, ADAM to BOM THE ARIANA CONDOMINIUM
2018-08-09Job filed: THE PURPOSE OF THIS PROJECT IS TO RELOCATE ONE SPRINKLER HEAD TO EXISTING SPRINKLER SYSTEM AT EXISTING APARTMENT (5J) IN CONJUNCTION WITH JOB # 34061$500
2018-08-07Sold for $125,000$125,000
2018-08-01Boiler inspection
2018-08-01Boiler inspection
2018-08-01Boiler inspection
2018-08-01Boiler inspection
2018-07-27Mortgage satisfied — from LOVETT, EDWARD R to WASHINGTON MUTUAL BANK; JPMORGAN CHASE BANK NATIONAL ASSOCIATION; THE FEDERAL DEPOSIT INSU
2018-07-25Mortgage satisfied — from LOVETT, ERIN E; LOVETT, EDWARD T to USAA FEDERAL SAVING BANK
2018-07-25Mortgage satisfied — from LOVETT, EDWARD R to USAA FEDERAL SAVING BANK
2018-07-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-07-18Deed $1,200,000 — from LOVETT, EDWARD R to MCENERY, THORNTON CORMAC; CROFOOT, KRISTEN LYNN$1,200,000
2018-07-18PAT — from MCENERY, THORNTON CORMAC; CROFOOT, KRISTEN LYNN to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2018-07-18Mortgage $840,000 — from CROFOOT, KRISTEN LYNN; MCENERY, THORNTON CORMAC to WELLS FARGO BANK, N.A.$840,000
2018-07-16Mortgage $100,000 — from WALLACE, GRABRIELLE; WALLACE, JUSTIN to MERS; UBS BANK USA$100,000
2018-07-16Agreement — from WALLACE, GABRIELLE; WALLACE, JUSTIN to MERS; UBS BANK USA, AN INDUSTRIAL BANK
2018-07-16Mortgage $100,000 — from WALLACE, GRABRIELLE; WALLACE, JUSTIN to MERS; UBS BANK USA$100,000
2018-07-16Agreement — from WALLACE, GABRIELLE; WALLACE, JUSTIN to MERS; UBS BANK USA, AN INDUSTRIAL BANK
2018-07-10Sold for $1,200,000$1,200,000
2018-07-07Job filed: THE PURPOSE OF THIS PROJECT IS TO ADD A PARTITION WALL, DOOR CLOSETS AT EXISTING APARTMENT (5J). NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,500
2018-07-07Job filed: THE PURPOSE OF THIS PROJECT IS TO ADD A PARTITION WALL, DOOR CLOSETS AT EXISTING APARTMENT (5J). NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,500
2018-07-03Job filed: THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING APARTMENT (5J) AND ADD ONE SPRINKLER HEAD TO EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS$5,000
2018-07-02Mortgage satisfied — from JADOTTE, ROLANDE A; TANGNEY, NICHOLAS J to JPMORGAN CHASE BANK
2018-06-20Mortgage $53,000 — from PREZIOSI, LISA C; PREZIOSI, DOMINIC; PREZIOSI, LISA CATANZARO to CITIBANK NA$53,000
2018-06-20Agreement $250,000 — from PREZIOSI, LISA C; PREZIOSI, DOMINIC; PREZIOSI, LISA CATANZARO to CITIBANK NA$250,000
2018-06-11Mortgage $385,000 — from OH, MICHELE; POST, NICHOLAS to U.S. BANK NATIONAL ASSOCIATION$385,000
2018-06-11Mortgage $385,000 — from OH, MICHELE; POST, NICHOLAS to U.S. BANK NATIONAL ASSOCIATION$385,000
2018-04-24Permit Sidewalk Shed — Signed-off
2018-04-23Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 42'LONG AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS $5,000
2018-04-17Permit EW — ISSUED
2018-04-10Mortgage satisfied — from LASNER, MATTHEW G; GOLDSTEIN, DANIEL J to TD BANK, N.A.
2018-03-29FDNY inspection (RISK)
2018-02-14Deed $1,351,000 — from KIM, LEONORE S to YANCHYSHYN, MATTHEW; CONNOLLY, LOUISE$1,351,000
2018-02-14Mortgage $1,013,250 — from CONNOLLY, LOUISE; YANCHYSHYN, MATTHEW to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$1,013,250
2018-02-14PAT — from CONNOLLY, LOUISE; YANCHYSHYN, MATTHEW to BD OF MRG OF THE ARIANA CONDO
2018-01-30FDNY inspection (RISK)
2018-01-03Sold for $1,351,000$1,351,000
2017
2017-12-13Mortgage assigned — from LASALLE BANK MIDWEST NATIONAL ASSOCIATIO; STANDARD FEDERAL BANK NATIONAL ASSOCIATI; BANK O to CITIMORTGAGE, INC.
2017-12-11311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017-11-28Mortgage satisfied — from SHADLETSKY, FLORENCE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2017-11-27Boiler inspection
2017-11-27Boiler inspection
2017-11-27Boiler inspection
2017-11-27Boiler inspection
2017-10-17Mortgage satisfied — from E*TRADE BANK to SHARIF, HOOSHANG
2017-10-04Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC.; NEW YORK CITY INDUSTRIAL DEVELOPEMENT AG to THE BANK OF NEW YORK MELLON; ACA FINANCIAL GUARANTY CORPORATION; THE BANK OF NEW YORK
2017-10-04Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC.; NEW YORK CITY INDUSTRIAL DEVELOPEMENT AG to THE BANK OF NEW YORK MELLON; ACA FINANCIAL GUARANTY CORPORATION; THE BANK OF NEW YORK
2017-10-04Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC.; NEW YORK CITY INDUSTRIAL DEVELOPEMENT AG to THE BANK OF NEW YORK MELLON; ACA FINANCIAL GUARANTY CORPORATION; THE BANK OF NEW YORK
2017-09-09311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017-09-08Mortgage satisfied — from PREZIOSI, DOMINIC; PREZIOSI, LISA C to FIRST SECURITY FINANCIAL SERVICES, INC.; CITIMORTGAGE, INC.
2017-09-04311: Derelict Vehicle — With License Plate
2017-08-11Job filed: INTERIOR ALTERATION INCLUDING RECONFIGURATION OF NON-LOADBEARING PARTITIONS, NEW PLUMBING FIXTURES, AND FINISHES. NEW INFILL FLOOR AT BULKHEAD AND RE$150,000
2017-08-11Job filed: INTERIOR ALTERATION INCLUDING RECONFIGURATION OF NON-LOADBEARING PARTITIONS, NEW PLUMBING FIXTURES, AND FINISHES. NEW INFILL FLOOR AT BULKHEAD AND RE$150,000
2017-08-11Job filed: INTERIOR STRUCTURAL WORK, INCLUDING PARTIAL REMOVAL OF EXISTING FRAMED FLOOR, NEW FLOOR FRAMING, AND NEW CONVENIENCE STAIR IN CONJUNCTION WITH SEPARAT$20,000
2017-08-09Mortgage assigned — from CITIMORTGAGE., INC.; ABN AMRO MORTGAGE GROUP INC to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2017-08-09Permit EW — ISSUED
2017-07-28Mortgage assigned — from SBM STANDARD FEDERAL SAVINGS BANK; SBM TO THE NATIONAL BANK OF SOUTH CAROLI; SBM STANDARD to CITIMORTGAGE INC
2017-07-19Deed — from ANDERSON , THOMAS to ROUSTAYI, MINA
2017-06-27Mortgage assigned — from STANDARD FEDERAL SAVINGS BANK to ABN AMRO MORTGAGE GROUP INC
2017-06-26Deed transfer (nominal price)
2017-06-21Permit EW — ISSUED
2017-06-21Permit PL — ISSUED
2017-06-19Mortgage satisfied — from ANDERSON, THOMAS to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2017-06-12Mortgage assigned — from CITIMORTGAGE, INC. to NATIONSTAR MORTGAGE LLC
2017-06-12Mortgage assigned — from BANK OF AMERICA, N.A. to CITIMORTGAGE, INC.
2017-05-12311: Street Condition — Cave-in
2017-05-12311: Water System — Leak (Use Comments) (WA2)
2017-05-12Permit PL — ISSUED
2017-05-11311: Water System — Leak (Use Comments) (WA2)
2017-05-11311: Water System — Leak (Use Comments) (WA2)
2017-05-09311: Water System — Leak (Use Comments) (WA2)
2017-05-09311: Water System — Possible Water Main Break (Use Comments) (WA1)
2017-05-07311: Water System — Leak (Use Comments) (WA2)
2017-05-06311: Water System — Possible Water Main Break (Use Comments) (WA1)
2017-05-03311: Water System — Leak (Use Comments) (WA2)
2017-05-02Mortgage $74,550 — from SINGER, JENNIFER; RICHTER, CHRISTOPHER to WELLS FARGO BANK, NA$74,550
2017-05-02Agreement $315,000 — from SINGER, JENNIFER; RICHTER, CHRISTOPHER to WELLS FARGO BANK, NA$315,000
2017-04-27311: Water System — Leak (Use Comments) (WA2)
2017-04-27311: Water System — Leak (Use Comments) (WA2)
2017-03-29Mortgage satisfied — from VENOKUR, SHERRI; SUTAK, KENNETH to BANK OF AMERICA, N.A.
2017-03-29Mortgage satisfied — from VENOKUR, SHERRI; SUTAK, KENNETH to BANK OF AMERICA, N.A.
2017-03-24Mortgage $971,250 — from KOTLUS, STEPHANIE; KOTLUS, BRETT S to MERS$971,250
2017-03-24Mortgage $971,250 — from KOTLUS, STEPHANIE; KOTLUS, BRETT S to MERS$971,250
2017-03-24Deed $1,295,000 — from VENOKUR, SHERRI; SUTAK, KENNETH to KOTLUS, BRETT S; KOTLUS, STEPHANIE$1,295,000
2017-03-24PAT — from KOTLUS, BRETT S; KOTLUS, STEPHANIE to THE ARIANA CONDOMINIUM
2017-03-24Deed $1,295,000 — from VENOKUR, SHERRI; SUTAK, KENNETH to KOTLUS, BRETT S; KOTLUS, STEPHANIE$1,295,000
2017-03-24PAT — from KOTLUS, BRETT S; KOTLUS, STEPHANIE to THE ARIANA CONDOMINIUM
2017-03-22DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-03-21Mortgage $31,679 — from CATANZARO PREZIOSI, LISA; PREZIOSI, DOMINIC; PREZIOSI, LISA C to CITIBANK, N.A.$31,679
2017-03-21Agreement $216,982 — from PREZIOSI, LISA C; PREZIOSI, DOMINIC; CATANZARO PREZIOSI, LISA to CITIBANK, N.A.$216,982
2017-03-21SUBM — from CITIBANK NA; PREZIOSI, DOMINIC; CATANZARO PREZIOSI, LISA; PREZIOSI, DOMINIC M; PREZIOSI, L to CITIBANK, N.A.
2017-03-21Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; CATANZARO, LISA; PREZIOSI, LISA C; CITIMORTGAGE to CITIBANK, N.A.
2017-03-16Sold for $1,295,000$1,295,000
2017-03-16Deed transfer (nominal price)
2017-03-01Mortgage satisfied — from WALSH, KEVIN; WALSH, LISA to BETHPAGE FEDERAL CREDIT UNION
2017-02-27Mortgage satisfied — from HERPER, MATTHEW; RYAN, PAMELA to METLIFE BANK, N.A.; METLIFE HOME LOANS; MERS
2017-02-21Mortgage $72,916 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, N.A.$72,916
2017-02-21Agreement $2,360,000 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, N.A.$2,360,000
2017-02-21Mortgage $72,916 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, N.A.$72,916
2017-02-21Agreement $2,360,000 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, N.A.$2,360,000
2017-02-21Agreement $2,360,000 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, N.A.$2,360,000
2017-02-21Agreement $2,360,000 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, N.A.$2,360,000
2017-02-21Mortgage $72,916 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, N.A.$72,916
2017-02-21Mortgage $72,916 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, N.A.$72,916
2017-02-15PAT — from COHEN, ELIZABETH; COHEN, RICHARD to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2017-02-14LOCC — from PHILIP, AMANDA D to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2017-02-13Mortgage $930,000 — from COHEN, RICHARD; COHEN, ELIZABETH to CITIZENS BANK, N.A.$930,000
2017-02-13Deed $1,230,000 — from RYAN, PAMELA; HERPER, MATTHEW to COHEN, ELIZABETH; COHEN, RICHARD$1,230,000
2017-02-07Mortgage satisfied — from RYAN, PAMELA; HERPER, MATTHEW to TD BANK, N.A.
2017-02-06Facade (LL11) filing, cycle 8: SWARMP
2017-02-06Mortgage satisfied — from RYAN, PAMELA; HERPER, MATTHEW to TD BANK, N.A.
2017-02-06Sold for $1,230,000$1,230,000
2017-02-02TOLCC — from PHILIP, AMANDA D to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2017-01-25Mortgage satisfied — from WALSH, KEVIN; WALSH, LISA to BETHPAGE FEDERAL CREDIT UNION
2017-01-25Mortgage $10,016 — from EAGLE, ELIZABETH B; EAGLE, ANTONY M to JPMORGAN CHASE BANK, N.A$10,016
2017-01-25Agreement $409,000 — from EAGLE, ANTONY M; EAGLE, ELIZABETH B to JPMORGAN CHASE BANK, N.A$409,000
2017-01-25Mortgage $10,016 — from EAGLE, ELIZABETH B; EAGLE, ANTONY M to JPMORGAN CHASE BANK, N.A$10,016
2017-01-25Agreement $409,000 — from EAGLE, ANTONY M; EAGLE, ELIZABETH B to JPMORGAN CHASE BANK, N.A$409,000
2017-01-17Agreement $816,000 — from PATEL, SEOLHEE K; PATEL, SANJAY to WELLS FARGO BANK, N.A.$816,000
2017-01-17Mortgage $2,134 — from PATEL, SEOLHEE K; PATEL, SANJAY to WELLS FARGO BANK, N.A.$2,134
2017-01-17SUBM — from WELLS FARGO BANK, N.A. to WELLS FARGO BANK, N.A.
2016
2016-12-27ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSON AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTED:AT TIME OF INSPECTION FOUND ON THE 8TH FLR $1,200
2016-12-23DOB complaint, category ?
2016-12-14Mortgage $365,493 — from WALSH, KEVIN; WALSH, LISA to BETHPAGE FEDERAL CREDIT UNION$365,493
2016-12-14Agreement $720,000 — from WALSH, LISA; WALSH, KEVIN to BETHPAGE FEDERAL CREDIT UNION$720,000
2016-12-14PAT — from WALSH, LISA to WALSH, KEVIN
2016-12-13311: Graffiti — Graffiti
2016-10-21Permit EW — ISSUED
2016-10-18PAT — from SQUIRES, JOHN to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2016-10-18Deed $605,000 — from WALKER, PAUL; WHEARY, JENNIFER to SQUIRES, JOHN$605,000
2016-10-18PAT — from WHEARY, JENNIFER to WALKER, PAUL
2016-10-18Permit EW — ISSUED
2016-10-17Mortgage satisfied — from HOCKLEY, TREVOR; GWARADAZIMBA, FADZI to UNITED NATIONS FEDERAL CREDIT UNION
2016-10-17Mortgage satisfied — from HOCKLEY, TREVOR; GWARADAZIMBA, FADZI to UNITED NATIONS FEDERAL CREDIT UNION
2016-10-13Sold for $605,000$605,000
2016-09-29PAT — from DILAWARI, MARIAM ALI to THE BOARD OF MANAGERS FOR THE ARIANA CON
2016-09-29PAT — from DILAWARI, MARIAM ALI to THE BOARD OF MANAGERS FOR THE ARIANA CON
2016-09-29Deed $1,275,000 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN A to DILAWARI, MARIAM ALI$1,275,000
2016-09-29Deed $1,275,000 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN A to DILAWARI, MARIAM ALI$1,275,000
2016-09-29Mortgage $815,000 — from DILAWARI, MARIAM ALI to BANK OF AMERICA, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$815,000
2016-09-29Mortgage $815,000 — from DILAWARI, MARIAM ALI to BANK OF AMERICA, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$815,000
2016-09-27311: Noise — Noise: Construction Before/After Hours (NM1)
2016-09-21Deed transfer (nominal price)
2016-09-21Sold for $1,275,000$1,275,000
2016-09-15311: Noise — Noise: Construction Before/After Hours (NM1)
2016-09-15311: Noise — Noise: Construction Before/After Hours (NM1)
2016-07-19Job filed: APPLICATION FILED HEREWITH FOR MECHANICAL WORK AND MINOR SPRINKLER WORK AS PER DRAWINGS. THERE IS NO CHANGE IN EGRESS, USE OR OCCUPANCY.$60,000
2016-07-19Job filed: APPLICATION FILED HEREWITH FOR MECHANICAL WORK AND MINOR SPRINKLER WORK AS PER DRAWINGS. THERE IS NO CHANGE IN EGRESS, USE OR OCCUPANCY.$60,000
2016-07-08Agreement $250,000 — from KAPLAN, SHIRLEY; ROSS, VALERIE BREA to CITIBANK NA$250,000
2016-07-08Mortgage $56,000 — from ROSS, VALERIE BREA; KAPLAN, SHIRLEY to CITIBANK NA$56,000
2016-07-06Permit EW — ISSUED
2016-06-28Agreement $428,000 — from WHIDDEN, CHRISTIE S; WHIDDEN, MICHAEL J; CHRISTIE SHAW WHIDDEN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$428,000
2016-06-28Mortgage assigned — from TD BANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORGAN STANLEY PRIVATE BANK, NATIONAL AS
2016-06-28Agreement $428,000 — from WHIDDEN, CHRISTIE S; WHIDDEN, MICHAEL J; CHRISTIE SHAW WHIDDEN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$428,000
2016-06-28Mortgage $8,261 — from WHIDDEN, MICHAEL J; WHIDDEN, CHRISTIE S; CHRISTIE SHAW WHIDDEN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$8,261
2016-06-28Mortgage assigned — from TD BANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORGAN STANLEY PRIVATE BANK, NATIONAL AS
2016-06-28Mortgage $8,261 — from WHIDDEN, MICHAEL J; WHIDDEN, CHRISTIE S; CHRISTIE SHAW WHIDDEN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$8,261
2016-06-27Mortgage $150,000 — from HERPER, MATTHEW; RYAN, PAMELA to TD BANK N.A.$150,000
2016-06-24Permit EW — ISSUED
2016-06-24Permit EW — ISSUED
2016-06-08Mortgage satisfied — from ROUSTAYI, MINA to JPMORGAN CHASE BANK NA
2016-05-26Mortgage assigned — from BANK OF AMERICA, N.A. SUCCESSOR BY MERGE; HOME LOANS SERVICING LP FKS COUNTRYWIDE to NATIONSTAR MORTGAGE LLC
2016-05-13LOCC — from PHILIP, AMANDA D to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2016-05-11Mortgage $75,000 — from CORDERO, JACQUELINE CABRERA; CORDERO, EDGAR to MUNICIPAL CREDIT UNION$75,000
2016-05-09TERL — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2016-05-09TERL — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2016-05-09Deed $2,400,000 — from ROUSTAYI , MINA to MYERS, ROSLYN$2,400,000
2016-05-09TERL — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2016-05-09Deed $2,400,000 — from ROUSTAYI , MINA to MYERS, ROSLYN$2,400,000
2016-05-09PAT — from MYERS, ROSLYN to BOARD OF MANAGERS THE ARIANA CONDOMINIUM
2016-05-09PAT — from MYERS, ROSLYN to BOARD OF MANAGERS THE ARIANA CONDOMINIUM
2016-05-02Deed transfer (nominal price)
2016-05-02Sold for $2,400,000$2,400,000
2016-04-06Permit EW — ISSUED
2016-04-06Permit PL — ISSUED
2016-04-04311: Lead — Lead Kit Request (Residential) (L10)
2016-04-01Permit PL — ISSUED
2016-04-01Permit EW — ISSUED
2016-03-31Job filed: HEREWITH TO PROPOSE INTERIOR RENOVATION TO APARTMENT 3K. NO CHANGES IN OCCUPANCY,USE,GROUP OR EGRESS UNDER THIS APPLICATION$11,000
2016-03-31Permit EW — ISSUED
2016-03-30Mortgage satisfied — from POST, NICHOLAS; OH, MICHELE to WELLS FARGO BANK NA
2016-03-25311: Lead — Lead Kit Request (Residential) (L10)
2016-03-24Permit PL — ISSUED
2016-03-21Mortgage $488,000 — from OH, MICHELLE; POST, NICHOLAS to WELLS FARGO BANK NA$488,000
2016-03-17Permit EW — ISSUED
2016-03-15Mortgage $500,000 — from WALSH, KEVIN; WALSH, LISA to BETHPAGE FEDERAL CREDIT UNION$500,000
2016-03-14Permit EW — ISSUED
2016-03-14Permit PL — ISSUED
2016-03-01Permit EW — ISSUED
2016-02-24Job filed: HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT AND SPRINKLER HEADS. ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE OCCUPANCY OR EGRESS.$12,900
2016-02-24Job filed: HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT AND SPRINKLER HEADS. ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE OCCUPANCY OR EGRESS.$12,900
2016-02-24Job filed: HEREBY FILING FOR HE INTERIOR RENOVATION TO EXISTING APARTMENT 1E ON THE FIRST FLOOR. WORK TO INCLUDE NEW PARTITIONS, PLUMBING WORK. ALL AS PER PLANS $95,970
2016-02-11Permit EW — ISSUED
2016-02-11Permit EW — ISSUED
2016-01-29Deed — from BRITTON , CAROL L; HITCHMAN, ONECA J to BRITTON , CAROL L; HITCHMAN, ONECA J
2016-01-22Job filed: THE JOB INVOLVES REPLACEMENT OF KITCHEN APPLIANCES, PLUMBING FIXTURES MILLWORK AND LIGHTING. THERE WILL BE NON-STRUCTURAL DEMOLITION OF PARTITIONS AN$25,000
2016-01-20Job filed: APPLICATION FILED HEREWITH TO RENOVATE EXTG. KITCHEN AND MASTER BATHROOM. WORK AT 7TH & 8TH FLOORS. REVISE EXISTING CONVENIENCE STAIR. MINOR PARTI$150,000
2016-01-08Mortgage satisfied — from KILBY, THOMAS E; KILBY, LISA D to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; BANK OF AMERICA N.A.; GREENPOINT MORTGAGE FUNDIN
2016-01-05DTL — from THE BANK OF NEW YORK MELLON
2016-01-04Mortgage satisfied — from KILBY, THOMAS E; KILBY, LISA D to PNC BANK
2016-01-03311: Street Light Condition — Street Light Out
2015
2015-12-24Job filed: MECHANICAL, PLUMBING AND SPRINKLER WORK FILED IN CONJUNCTION WITH APARTMENT RENOVATION AND FULL RENOVATION.$105,000
2015-12-24Job filed: MECHANICAL, PLUMBING AND SPRINKLER WORK FILED IN CONJUNCTION WITH APARTMENT RENOVATION AND FULL RENOVATION.$105,000
2015-12-18PAT — from SULLIVAN, PATRICK J; SMITH-SULLIVAN, STEPHANIE R to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2015-12-18PAT — from SMITH-SULLIVAN, STEPHANIE R. to SULLIVAN, PATRICK J.
2015-12-18Mortgage $1,425,100 — from SMITH-SULLIVAN, STEPHANIE R; SULLIVAN, PATRICK J to WAVERLY GROUP, LP$1,425,100
2015-12-18Deed $1,155,000 — from KILBY, LISA D; KILBY, THOMAS E to SULLIVAN, PATRICK J; SMITH-SULLIVAN, STEPHANIE R$1,155,000
2015-12-16Job filed: APPLICATION FILED FOR GENERAL CONSTRUCTION ASSOCIATED WITH THE COMBINING OF TWO APARTMENTS AS PER TPPN3/97. APARTMENTS 6J AND 6H ARE BEING COMBINED.$260,000
2015-11-23Mortgage assigned — from CITIMORTGAGE to DITECH FINANCIAL LLC
2015-11-10Permit EW — ISSUED
2015-11-10Permit PL — ISSUED
2015-11-09Mortgage satisfied — from MARTINEZ, VILMA; MARTINEZ, RICARDO SR to SIGNATURE BANK; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2015-11-09311: New Tree Request — For One Address
2015-11-04Mortgage $160,000 — from MARTINEZ, RICARDO; MARTINEZ, VILMA to CITIBANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$160,000
2015-11-02TOLCC — from KILBY, LISA D; KILBY, THOMAS E to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2015-10-21Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK MELLON
2015-10-21Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK MELLON
2015-10-21Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK MELLON
2015-10-20Permit EW — ISSUED
2015-10-13Mortgage satisfied — from WARRINGTON WILLIAMS, KATHERINE S; SHARP, WILLIAM M to HSBC MORTGAGE CORPORATION (USA)
2015-10-06Job filed: INTERIOR ALTERATIONS OF EXISTING DWELLING UNIT INCLUDING MINOR NON-LOAD BEARING PARTITION WORK, RELOCATION AND REPLACEMENT OF EXISTING PLUMBING FIXTUR$48,700
2015-10-01Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORTGA to GUARDHILL FINANCIAL CORP.
2015-10-01Mortgage assigned — from GUARDHILL FINANCIAL CORP. to THE FIRST NATIONAL BANK OF LONG ISLAND
2015-10-01Mortgage assigned — from GUARDHILL FINANCIAL CORP. to THE FIRST NATIONAL BANK OF LONG ISLAND
2015-10-01Mortgage $62,148 — from SHARP, WILLIAM M; WARRINGTON WILLIAMS, KATHERINE S to GUARDHILL FINANCIAL CORP.$62,148
2015-10-01Agreement $445,000 — from SHARP, WILLIAM M; WARRINGTON WILLIAMS, KATHERINE S to GUARDHILL FINANCIAL CORP.$445,000
2015-10-01Mortgage $62,148 — from SHARP, WILLIAM M; WARRINGTON WILLIAMS, KATHERINE S to GUARDHILL FINANCIAL CORP.$62,148
2015-10-01Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; MORTGA to GUARDHILL FINANCIAL CORP.
2015-10-01Agreement $445,000 — from SHARP, WILLIAM M; WARRINGTON WILLIAMS, KATHERINE S to GUARDHILL FINANCIAL CORP.$445,000
2015-09-15SAGE — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; YOUNG ADULT INSTITUTE, INC.
2015-09-15SAGE — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; YOUNG ADULT INSTITUTE, INC.
2015-09-15SAGE — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; YOUNG ADULT INSTITUTE, INC.
2015-08-25TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2015-08-20M&CON $197,000 — from PREZIOSI, DOMINIC M; PREZIOSI, LISA C to CITIBANK NA$197,000
2015-08-20Mortgage $97,000 — from PREZIOSI, DOMINIC; PREZIOSI, LISA C to CITIBANK NA$97,000
2015-08-11PAT — from PATEL, SANJAY to COOPER, CHRISTINA S; CARMODY, MICHAEL
2015-08-11PAT — from PATEL, SEOLHEE KIM to CARMODY, MICHAEL; COOPER, CHRISTINA S
2015-08-11Deed $100,000 — from KILBY, THOMAS E; KILBY, LISA D to PATEL, SANJAY; PATEL, SEOLHEE KIM$100,000
2015-08-11PAT — from PATEL, SEOLHEE KIM; PATEL, SANJAY to THE ARIANA CONDOMINIUM
2015-08-11PAT — from KILBY, LISA D to RUBIN, YANA
2015-08-11PAT — from KILBY, THOMAS E to RUBIN, YANA
2015-08-07311: Street Condition — Failed Street Repair
2015-08-03Mortgage $100,000 — from SEOLHEE KIM PATEL; PATEL, SANJAY to WELLS FARGO BANK NA$100,000
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-28ADEC — from THE ARIANA CONDOMINIUM
2015-07-16311: Blocked Driveway — No Access
2015-07-02LOCC — from KILBY, LISA D; KILBY, THOMAS E to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2015-06-18Agreement $330,000 — from CABRERA CORDERO, JACQUELINE; CORDERO, EDGAR to MUNICIPAL CREDIT UNION$330,000
2015-06-18Mortgage $48,310 — from CORDERO, EDGAR; CABRERA CORDERO, JACQUELINE to MUNICIPAL CREDIT UNION$48,310
2015-06-17Mortgage $4,809 — from BIEN, ANNIE; MERWIN, PAUL to WELLS FARGO BANK, NA$4,809
2015-06-17Agreement $95,000 — from MERWIN, PAUL; BIEN, ANNIE to WELLS FARGO BANK, NA$95,000
2015-06-04Mortgage $450,000 — from WALLACE, JUSTIN M; WALLACE, GABRIELLE K to MERS, INC.$450,000
2015-06-04Mortgage $450,000 — from WALLACE, JUSTIN M; WALLACE, GABRIELLE K to MERS, INC.$450,000
2015-06-01Mortgage satisfied — from CHAUDHRY, SERENA; HALPERIN, JASON to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2015-05-18Permit EW — ISSUED
2015-04-29Deed $821,000 — from CHAUDHRY, SERENA; HALPERIN , JASON to POWERS , KATHERINE J; KALMUSS-KATZ, JONATHAN$821,000
2015-04-29PAT — from CHAUDHRY, SERENA to HALPERIN, JASON
2015-04-29PAT — from KALMUSS-KATZ, JONATHAN; POWERS, KATHERINE JORDAN to THE ARIANA CONDOMINIUM
2015-04-29Mortgage $370,000 — from POWERS, KATHERINE JORDAN; KALMUSS-KATZ, JONATHAN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$370,000
2015-04-16Job filed: APRTMENT RENOVATION INLCUDING MINOR CARPENTRY WORK FOR PARTITION AND GYP.BD. CEILING AND FLOOR TILE, LIGHTING FIXTURES @APT #2H. NO CHANGE IN USE, EGR$12,720
2015-03-18Mortgage satisfied — from SEMBLER, FREDERICK M to OCWEN LOAN SERVICING LLC
2015-03-18Mortgage assigned — from AMERICAN HOME MORTGAGE CORP to OCWEN LOAN SERVICING LLC
2015-03-07311: Noise - Residential — Loud Talking
2015-02-27Mortgage satisfied — from SAPIRSTEIN, RAY J to LEE, JOCELYN
2015-02-27Mortgage satisfied — from SAPIRSTEIN, RAY J to LEE, JOCELYN
2015-02-23Mortgage satisfied — from SEMBLER, FREDERICK M to JPMORGAN CHASE BANK, N.A.
2015-02-19Mortgage satisfied — from SEMBLER, FREDERICK M to JPMORGAN CHASE BANK; JPMORGAN CHASE BANK NA
2015-02-12Mortgage $300,000 — from POST, NICHOLAS; OH, MICHELE to WELLS FARGO BANK NA$300,000
2015-02-10Deed $1,150,000 — from SEMBLER, FREDERICK M to POST, NICHOLAS$1,150,000
2015-02-10Mortgage $747,500 — from POST, NICHOLAS to WELLS FARGO BANK, N.A.$747,500
2015-02-10PAT — from POST, NICHOLAS to THE ARIANA CONDOMINIUM
2015-02-10PAT — from POST, NICHOLAS to THE ARIANA CONDOMINIUM
2015-02-10Mortgage $747,500 — from POST, NICHOLAS to WELLS FARGO BANK, N.A.$747,500
2015-02-10Deed $1,150,000 — from SEMBLER, FREDERICK M to POST, NICHOLAS$1,150,000
2015-01-22Deed $950,000 — from SAPIRSTEIN, RAY J to BOSCHETTO, JONATHAN W$950,000
2015-01-22Deed $950,000 — from SAPIRSTEIN, RAY J to BOSCHETTO, JONATHAN W$950,000
2015-01-22PAT — from BOSCHETTO, JONATHAN W to THE ARIANA CONDOMINIUM
2015-01-22PAT — from BOSCHETTO, JONATHAN W to THE ARIANA CONDOMINIUM
2015-01-22Mortgage $617,500 — from BOSCHETTO, JONATHAN W to WELLS FARGO BANK, N.A.$617,500
2015-01-22Mortgage $617,500 — from BOSCHETTO, JONATHAN W to WELLS FARGO BANK, N.A.$617,500
2015-01-04311: Noise — Noise: Alarms (NR3)
2014
2014-12-31PAT — from BROPHY, LAURA J to BRICKNER, HOWARD M; MAKOW, TRACEY E; LAIRD, EDWARD; BROPHY, THOMAS A
2014-12-31Deed $801,000 — from BROPHY, LAURA J; BROPHY, THOMAS A to THORNTON, ADAM; MATESICH, NICOLE$801,000
2014-12-31Mortgage $289,000 — from MATESICH, NICOLE; THORNTON, ADAM to MERS$289,000
2014-12-31PAT — from MATESICH, NICOLE; THORNTON, ADAM to THE ARIANA CONDIMINIUM
2014-12-26Mortgage satisfied — from BROPHY, LAURA J; BROPHY, THOMAS A to CHARLES SCHWA ANK NA
2014-03-04Job filed: APARTMENT RENOVATION AND LIGHTING INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$120,000
2014-03-03Job filed: APARTMENT RENOVATION AND LIGHTING INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$20,000
2014-01-22PAT — from JUDITH MARIE RITCHIE to AMI WHELAN; RICHARD SUTTON; HAYLEY WATERS; ANDREW LUFTIG
2014-01-22Deed $2,500,000 — from RITCHIE, JUDITH MARIE to PAUQUETTE, LISA J$2,500,000
2014-01-22Mortgage $1,875,000 — from PAUQUETTE, LISA J to WELLS FARGO BANK, N.A.$1,875,000
2014-01-22Deed $2,500,000 — from RITCHIE, JUDITH MARIE to PAUQUETTE, LISA J$2,500,000
2014-01-22Mortgage $1,875,000 — from PAUQUETTE, LISA J to WELLS FARGO BANK, N.A.$1,875,000
2014-01-22PAT — from PAUQUETTE, LISA J to THE ARIANA CONDOMINIUM
2014-01-22PAT — from JUDITH MARIE RITCHIE to AMI WHELAN; RICHARD SUTTON; HAYLEY WATERS; ANDREW LUFTIG
2014-01-22PAT — from PAUQUETTE, LISA J to THE ARIANA CONDOMINIUM
2013
2013-12-27ATL — from THE BANK OF NEW YORK MELLON to THE BANK OF NEW YORK MELLON
2013-12-11Agreement $194,000 — from KAPLAN, SHIRLEY; ROSS, VALERIE BEA to CITIBANK, NA$194,000
2013-11-20LOCC — from KILBY, LISA D; KILBY, THOMAS E to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2013-11-13311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2013-10-31Mortgage $6,141 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN A to WELLS FARGO BANK NA$6,141
2013-10-31Agreement $606,000 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN A to WELLS FARGO BANK NA$606,000
2013-10-31Mortgage $6,141 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN A to WELLS FARGO BANK NA$6,141
2013-10-31Agreement $606,000 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN A to WELLS FARGO BANK NA$606,000
2013-10-22Mortgage $325,000 — from CHAUDHRY, SERENA; HALPERIN, JASON to MERS$325,000
2013-10-17Mortgage assigned — from DE CAPITAL MORTGAGE, LLC to WELLS FARGO BANK, N.A.
2013-10-11Mortgage $200,000 — from MATHEW, LASNER to TD BANK,N.A$200,000
2013-10-05TOLCC — from KILBY, THOMAS E; KILBY, LISA D to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2013-09-18Mortgage $150,000 — from TRICARDO, KIM to WELLS FARGO BANK, N.A.$150,000
2013-09-18Permit PL — ISSUED
2013-09-13Job filed: REARRANGE NON-BEARING PARTITIONS, PERFORM GENERAL CONSTRUCTION WORK INCLUDING PLUMBING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2013-09-13Permit EW — ISSUED
2013-09-09311: Noise — Noise, Barking Dog (NR5)
2013-09-06Mortgage satisfied — from HOROWITZ, JASON H; MARDIROSSIAN, ANOUCHE to CITIMORTGAGE, INC.
2013-09-04Agreement $146,102 — from TORRES, ESTHER M; TORRES, EFRAIN to JPMORGAN CHASE BANK, N.A.$146,102
2013-09-04Mortgage $651 — from TORRES, ESTHER M; TORRES, EFRAIN to JPMORGAN CHASE BANK, N.A.$651
2013-08-27Mortgage $94,000 — from ROSS, VALERIE B; KAPLAN, SHIRLEY to CITIBANK, NA$94,000
2013-08-21Mortgage $868,000 — from PATEL, SEOLHEE KIM; PATEL, SANJAY to DE CAPITAL MORTGAGE LLC$868,000
2013-08-21PAT — from PATEL, SANJAY; PATEL, SEOLHEE KIM to THE BOARD OF MANAGERS OF THE ARIANA COND
2013-08-21Deed $1,085,000 — from HOROWITZ, JASON H; MARDIROSSIAN, ANOUCHE to PATEL, SEOLHEE KIM; PATEL, SANJAY$1,085,000
2013-08-13TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2013-07-16Agreement $857,000 — from ESTEROV, ANA; CREAN, TIMOTHY C to WELLS FARGO BANK, N.A.$857,000
2013-07-16Agreement $857,000 — from ESTEROV, ANA; CREAN, TIMOTHY C to WELLS FARGO BANK, N.A.$857,000
2013-07-10Mortgage $540,000 — from JENNINGS GOLDSTEIN, DANIEL; GORDON LASNER, MATTHEW to MERS INC$540,000
2013-07-09Agreement $500,000 — from SUTAK, KENNETH; VENOKUR, SHERRI to BANK OF AMERICA, N. A.$500,000
2013-06-26Permit PL — ISSUED
2013-06-24Mortgage $13,209 — from ESTEROV, ANA; CREAN, TIMOTHY C to WELLS FARGO BANK, N.A.$13,209
2013-06-24Mortgage assigned — from CITIBANK, N.A. to WELLS FARGO BANK, N.A.
2013-06-24PAT — from ESTEROV, ANA to CREAN, TIMOTHY C
2013-06-24Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to WELLS FARGO BANK, N.A.
2013-06-24Mortgage $13,209 — from ESTEROV, ANA; CREAN, TIMOTHY C to WELLS FARGO BANK, N.A.$13,209
2013-06-24PAT — from ESTEROV, ANA to CREAN, TIMOTHY C
2013-06-24Permit PL — ISSUED
2013-06-21Permit EW — ISSUED
2013-06-18Permit EW — ISSUED
2013-06-13Job filed: APARTMENT RENOVATION CONSISTING OF GENERAL CONSTRUCTION AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$30,000
2013-05-17Job filed: INSTALLATION OF NEW WASHER & DRYER IN EXISTING APARTMENT # 3L WITH MINOR PARTITIONS. NO CHANGE IN USE,EGRESS & OCCUPANCY.$3,400
2013-05-17Job filed: INSTALLATION OF NEW WASHER & DRYER IN EXISTING APARTMENT # 3L WITH MINOR PARTITIONS. NO CHANGE IN USE,EGRESS & OCCUPANCY.$3,400
2013-05-14Mortgage satisfied — from LASKER, ZEPHRIN; SAJOR, JENNIFER to CITIBANK, N.A.
2013-05-09Mortgage satisfied — from LASKER, ZEPHERIN I to JPMORGAN CHASE BANK, N.A.
2013-05-07PAT — from LASNER, MATTHEW GORDON; GOLDSTEIN, DANIEL JENNINGS to BOARD OF THE ARIANA CONDOMINIUM
2013-05-07Deed $1,075,000 — from SAJOR, JENNIFER; LASKER, ZEPHRIN; SAJOR LASKER, JENNIFER to LASNER, MATTHEW GORDON; GOLDSTEIN, DANIEL JENNINGS$1,075,000
2013-05-02Mortgage satisfied — from MARINO, LOUIS M; MILLER, TRENTE A to USAA FEDERAL SAVINGS BANK
2013-05-01Mortgage satisfied — from MILLER, TRENTE A; MARINO, LOUIS M to WELLS FARGO BANK, N.A.
2013-04-30PAT — from BUNAI HARBER, MARIA; HARBER, JONATHAN D to THE BOARD OF MANAGERS OF THE ARIANA COND
2013-04-30PAT — from HARBER, JONATHAN D to ROTH, ERIK M
2013-04-30Deed $1,750,000 — from MARINO, LOUIS M; MILLER, TRENTE A to HARBER, JONATHAN D; BUNAI HARBER, MARIA$1,750,000
2013-04-30PAT — from BUNAI HARBER, MARIA; HARBER, JONATHAN D to THE BOARD OF MANAGERS OF THE ARIANA COND
2013-04-30Deed $1,750,000 — from MARINO, LOUIS M; MILLER, TRENTE A to HARBER, JONATHAN D; BUNAI HARBER, MARIA$1,750,000
2013-04-30PAT — from BUNAI HARBER, MARIA to ROTH, ERIK M
2013-04-30PAT — from BUNAI HARBER, MARIA to ROTH, ERIK M
2013-04-30PAT — from HARBER, JONATHAN D to ROTH, ERIK M
2013-04-17Mortgage satisfied — from OBRIEN, MARISA to LASALLE BANK, N.A.
2013-04-05Agreement $253,017 — from GARAY, DIEGO to CITIBANK NA$253,017
2013-04-05Mortgage $11,945 — from GARAY, DIEGO to CITIBANK NA$11,945
2013-04-05Mortgage assigned — from CITIMORTGAGE INC to CITIBANK NA
2013-04-04Permit EW — ISSUED
2013-04-04Permit PL — ISSUED
2013-03-28Mortgage satisfied — from GARAY, JODIE L; GARAY, DIEGO to BANK OF AMERICA, NA
2013-03-27Agreement $1,180,000 — from POST, NICHOLAS; OH, MICHELE to WELLS FARGO BANK$1,180,000
2013-03-27Agreement $1,180,000 — from POST, NICHOLAS; OH, MICHELE to WELLS FARGO BANK$1,180,000
2013-03-15Permit EW — ISSUED
2013-03-12Mortgage satisfied — from DE JESUS, JOSE; DE JESUS, ANDREA to WELLS FARGO BANK NA
2013-03-04Job filed: PROPOSE TO REMOVE SOME INTERIOR NON BEARING PARTITIONS, INSTALL NEW NON BEARING PARTITIONS, INSTALL NEW PLUMBING, REPLACE PLUMBING FIXTURES, INSTALL S$50,000
2013-03-04Job filed: PROPOSE TO REMOVE SOME INTERIOR NON BEARING PARTITIONS, INSTALL NEW NON BEARING PARTITIONS, INSTALL NEW PLUMBING, REPLACE PLUMBING FIXTURES, INSTALL S$50,000
2013-02-28Mortgage satisfied — from DEJESUS, ANDREA; DEJESUS, JOSE to WELLS FARGO BANK N A
2013-02-19Deed $641,500 — from DEJESUS, ANDREA; DEJESUS, JOSE to HALPERIN, JASON; CHAUDHRY, SERENA$641,500
2013-02-19PAT — from HALPERIN, JASON; CHAUDHRY, SERENA to THE ARIANA CONDOMINIUM
2013-01-24Permit EW — ISSUED
2013-01-08311: Graffiti — Graffiti
2012
2012-12-30311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2012-12-30DOB complaint, category ?
2012-12-28DOB violation E:
2012-12-28DOB violation E:
2012-12-28DOB violation E:
2012-12-28DOB violation E:
2012-12-03Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to BANK OF AMERICA
2012-12-03Agreement $612,000 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN to WELLS FARGO BANK NA$612,000
2012-12-03Agreement $612,000 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN to WELLS FARGO BANK NA$612,000
2012-11-16Agreement — from REDMOND, LORETTA; SCAVUZZO, STEVEN to MERS AS NOMINEE FOR NATIONSTAR
2012-11-16311: Blocked Driveway — No Access
2012-11-15Deed — from MARTIN, JEAN-MARIE; WEINTRAUB, FREDDI to SCIBETTA, STACY A
2012-11-15Permit PL — ISSUED
2012-11-07311: Damaged Tree — Entire Tree Has Fallen Down
2012-11-01Mortgage assigned — from WELLS FARGO BANK NA to MERS AS NOMINEE FOR NATIONSTAR
2012-11-01Mortgage $277,117 — from REDMOND, LORETTA; SCAVUZZO, STEVEN to MERS AS NOMINEE FOR NATIONSTAR$277,117
2012-11-01SUBM — from BANK OF AMERICA to NATIONSTAR MORTGAGE
2012-10-17311: Graffiti — Graffiti
2012-10-03Permit EW — ISSUED
2012-10-02Mortgage assigned — from CASTLE POINT MORTGAGE, INC.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to BAC HOME LOAN SERVICING LP; BANK OF AMERICA, N.A.; COUNTRYWIDE HOME LOANS SERVICING LP
2012-09-26Agreement $98,565 — from RUSSELL, LEO B to JP MORGAN CHASE BANK NA$98,565
2012-09-26SUBM — from JP MORGAN CHASE BANK NA to JP MORGAN CHASE BANK NA
2012-09-22311: Blocked Driveway — No Access
2012-09-21Mortgage satisfied — from SCHRODER, PHYLLIS A to JPMORGAN CHASE BANK, N.A.
2012-09-18Mortgage satisfied — from SCHRODER, PHYLLIS A to JPMORGAN CHASE BANK, N.A.
2012-09-06Mortgage assigned — from WELL FARGO BANK, N.A. to CITIBANK, N.A.
2012-09-06Mortgage $17,331 — from MAYER, JASON M; MAYER, ELISABETH A to CITIBANK, N.A.$17,331
2012-09-06Agreement $930,000 — from MAYER, JASON M; MAYER, ELISABETH A to CITIBANK, N.A.$930,000
2012-09-06Agreement $930,000 — from MAYER, JASON M; MAYER, ELISABETH A to CITIBANK, N.A.$930,000
2012-09-06Mortgage $17,331 — from MAYER, JASON M; MAYER, ELISABETH A to CITIBANK, N.A.$17,331
2012-09-06Mortgage assigned — from WELL FARGO BANK, N.A. to CITIBANK, N.A.
2012-08-28LOCC — from KILBY, THOMAS E; KILBY, LISA D to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2012-08-28PAT — from KIM, LEONORE S to THE ARIANA CONDOMINIUM
2012-08-28Deed $836,500 — from SCHRODER, PHYLISS A; SCHRODER, PHYLLIS A; SCHRODER, PHYLLISS A to KIM, LEONORE S$836,500
2012-08-21Facade (LL11) filing, cycle 7: SAFE
2012-08-14DOB complaint, category ?
2012-07-31Mortgage satisfied — from LIPPMANN, KENNETH JR to JPMORGAN CHASE BANK, N.A.
2012-07-31Mortgage satisfied — from LIPPMANN, KENNETH JR to JPMORGAN CHASE BANK, N.A.
2012-07-31Agreement $350,000 — from YOSHIKAWA, YASUO; KOYAMA, MIKAKO to MERS$350,000
2012-07-31Mortgage assigned — from WELLS FARGO BANK, N.A. to FLAGSTAR BANK
2012-07-31Mortgage assigned — from WELLS FARGO BANK, N.A. to FLAGSTAR BANK
2012-07-31Agreement $350,000 — from YOSHIKAWA, YASUO; KOYAMA, MIKAKO to MERS$350,000
2012-07-25Mortgage satisfied — from LIPPMAN, KENNETH JR to JP MORGAN CHASE BANK, N.A.
2012-07-25Permit EW — ISSUED
2012-07-24Mortgage satisfied — from MOORE, PATRICK H; MICHAEL, MICHELE L to CITIMORTGAGE, INC.
2012-07-17Job filed: APARTMENT RENOVATIONS IN APARTMENT 2G CONSISTING OF GENERAL CONSTRUCTION AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR O$17,000
2012-07-17Job filed: APARTMENT RENOVATIONS IN APARTMENT 2G CONSISTING OF GENERAL CONSTRUCTION AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR O$17,000
2012-07-11PAT — from ROBERT A. COHEN to BRUCE LIEBER
2012-07-11PAT — from COHEN, ROBERT A; COHEN, MARY to THE ARIANA CONDOMINIUM
2012-07-11PAT — from MARY COHEN to BRUCE LIEBER
2012-07-11Deed $1,195,000 — from MOORE, PATRICK H; MICHAEL, MICHELE L to COHEN, ROBERT A; COHEN, MARY$1,195,000
2012-07-11Deed $826,000 — from LIPPMAN, KENNETH C JR. to SILVA , MARIA LUISA; MADUENO, MARIA LUCIA; DOMINGUEZ, JUAN PABLO$826,000
2012-07-11PAT — from DOMINGUEZ, JUAN PABLO; MADUENO, MARIA LUCIA; SILVA, MARIA LUISA to BOARD OF THE ARIANA CONDOMINIUM
2012-07-11Mortgage $526,000 — from SILVA, MARIA LUISA; DOMINGUEZ, JUAN PABLO; MADUENO, MARIA LUCIA$526,000
2012-07-11PAT — from DOMINGUEZ, JUAN PABLO; MADUENO, MARIA LUCIA; SILVA, MARIA LUISA to BOARD OF THE ARIANA CONDOMINIUM
2012-07-11Mortgage $526,000 — from SILVA, MARIA LUISA; DOMINGUEZ, JUAN PABLO; MADUENO, MARIA LUCIA$526,000
2012-07-11Deed $1,195,000 — from MOORE, PATRICK H; MICHAEL, MICHELE L to COHEN, ROBERT A; COHEN, MARY$1,195,000
2012-07-11Deed $826,000 — from LIPPMAN, KENNETH C JR. to SILVA , MARIA LUISA; MADUENO, MARIA LUCIA; DOMINGUEZ, JUAN PABLO$826,000
2012-07-11PAT — from SILVA, MARIA LUISA to MADUENO, MARIA LUCIA
2012-07-11PAT — from SILVA, MARIA LUISA to MADUENO, MARIA LUCIA
2012-07-10Permit PL — ISSUED
2012-07-03Job filed: SELECTIVE INTERIOR RENOVATION COSMETIC WORK IN APT 1K KITCHEN & BATHROOMS. NO CHANGE TO EGRESS, OCCUPANCY OR USE.$56,200
2012-07-03Permit EW — ISSUED
2012-06-26Mortgage satisfied — from BODNER, ALEXANDRA; CARROLL, ALEXANDRA; CARROLL, DAVID to WELLS FARGO BANK, N.A.
2012-06-22Mortgage assigned — from WACHOVIA BANK, NATIONAL ASSOCIATION to WELLS FARGO BANK, NA
2012-06-22Agreement $1,200,000 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, NA$1,200,000
2012-06-22Mortgage assigned — from WACHOVIA BANK, NATIONAL ASSOCIATION to WELLS FARGO BANK, NA
2012-06-22Agreement $1,200,000 — from OH, MICHELE; POST, NICHOLAS to WELLS FARGO BANK, NA$1,200,000
2012-06-20Mortgage satisfied — from FARINA, ANTONIO JR; FARINA, CARMEN to HSBC BANK USA, N.A; HSBC MORTGAGE CORPORATION (USA); MORTGAGE ELECTRONIC REGISTRATION SYST
2012-06-18PAT — from TIFFANY PLACE 1L LLC to THE BOARD OF MANAGERS OF
2012-06-18Deed $450,000 — from FARINA, ANTONIO JR; FARINA, ANTHONIO JR; FARINA, CARMEN to TIFFANY PLACE 1L LLC$450,000
2012-06-18PAT — from TIFFANY PLACE 1L LLC to THE BOARD OF MANAGERS OF
2012-06-18Deed $450,000 — from FARINA, ANTONIO JR; FARINA, ANTHONIO JR; FARINA, CARMEN to TIFFANY PLACE 1L LLC$450,000
2012-06-14Mortgage assigned — from WELLS FARGO HOME MORTGAGE INC; WELLS FARGO BANK, NA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; TD BANK, NA
2012-06-14Mortgage $7,054 — from WHIDDEN, MICHAEL J; WHIDDEN, CHRISTIE SHAW to MERS AS NOMINEE FOR TD BANK, NA$7,054
2012-06-14Mortgage $7,054 — from WHIDDEN, MICHAEL J; WHIDDEN, CHRISTIE SHAW to MERS AS NOMINEE FOR TD BANK, NA$7,054
2012-06-14Agreement $452,000 — from WHIDDEN, CHRISTIE SHAW; WHIDDEN, MICHAEL J to MERS AS NOMINEE FOR TD BANK, NA$452,000
2012-06-14Mortgage assigned — from WELLS FARGO HOME MORTGAGE INC; WELLS FARGO BANK, NA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; TD BANK, NA
2012-06-13Mortgage $459,000 — from CARROLL, DAVID; BODNER, ALEXANDRA to WELLS FARGO BANK, N.A.$459,000
2012-05-29311: Water System — Dirty Water (WE)
2012-05-22Mortgage satisfied — from SINGER, JENNIFER; RICHTER, CHRISTOPHER to BANK OF AMERICA, N.A.
2012-05-22Mortgage satisfied — from SINGER, JENNIFER; RICHTER, CHRISTOPHER to JPMORGAN CHASE BANK, N.A.
2012-05-22Mortgage satisfied — from RICHTER, CHRISTOPHER; SINGER, JENNIFER to BANK OF AMERICA, N.A.
2012-05-04Mortgage $1,096 — from HOM, ALICE to JPMORGAN CHASE BANK, N.A.$1,096
2012-05-04Agreement $262,139 — from HOM, ALICE to JPMORGAN CHASE BANK, N.A.$262,139
2012-04-30Mortgage $263,800 — from RICHTER, CHRISTOPHER D; SINGER, JENNIFER to WELLS FARGO BANK, N.A.$263,800
2012-04-16Mortgage satisfied — from JAMIESON, WENDELL; STAPINSKI, HELENE to JPMORGAN CHASE BANK, N.A.
2012-04-11Mortgage satisfied — from STAPINSKI, HELENE; JAMIESON, WENDELL to JPMORGAN CHASE BANK, N.A.
2012-04-10DTL — from THE BANK OF NEW YORK MELLON
2012-03-29Agreement — from KAPLAN, SHIRLEY; KAPLAN, VALERIE R to CITIBANK NA
2012-03-29Mortgage $51,000 — from KAPLAN, SHIRLEY; KAPLAN, VALERIE R to CITIBANK NA$51,000
2012-03-21Mortgage satisfied — from HOCKLEY, TREVOR; GWARDZIMBA, FADZAI to UNITED NATIONS FEDERAL CREDIT UNION
2012-03-19Mortgage $625,500 — from SUSSMAN, VANESSA ANN; SUSSMAN, ADAM CHARLES to MERS$625,500
2012-03-19Deed $1,360,000 — from JAMIESON, WENDELL; STAPINSKI, HELENE to SUSSMAN, VANESSA ANN; SUSSMAN, ADAM CHARLES$1,360,000
2012-03-19Mortgage $625,500 — from SUSSMAN, VANESSA ANN; SUSSMAN, ADAM CHARLES to MERS$625,500
2012-03-19Deed $1,360,000 — from JAMIESON, WENDELL; STAPINSKI, HELENE to SUSSMAN, VANESSA ANN; SUSSMAN, ADAM CHARLES$1,360,000
2012-03-19PAT — from SUSSMAN, ADAM CHARLES; SUSSMAN, VANESSA ANN to THE BOARD OF MANAGERS OF
2012-03-19Deed $50,000 — from MINGEY, DAVID to WALSH, LISA; WALSH, KEVIN$50,000
2012-03-19PAT — from SUSSMAN, ADAM CHARLES; SUSSMAN, VANESSA ANN to THE BOARD OF MANAGERS OF
2012-03-16Mortgage satisfied — from YOSHIKAWA, YASUO; KOYAMA, MIKAKO to KOYAMA, SETSUKO; KOYAMA, YUZO
2012-03-16Mortgage satisfied — from YOSHIKAWA, YASUO; KOYAMA, MIKAKO to KOYAMA, SETSUKO; KOYAMA, YUZO
2012-03-13PAT — from SORRA, MARTHA CATALINA to CONDOMINIUM BOARD
2012-03-13Mortgage $225,000 — from SORRA, MARTHA CATALINA to MERS$225,000
2012-03-13Deed $670,000 — from MINGEY, DAVID C to SORRA, MARTHA CATALINA$670,000
2012-03-08Mortgage satisfied — from MINGEY, DAVID C to JPMORGAN CHASE BANK, N.A.
2012-03-08Mortgage satisfied — from MINGEY, DAVID C to JPMORGAN CHASE BANK, N.A.
2012-02-29Mortgage $260,740 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN to WELLS FARGO BANK, N.A.$260,740
2012-02-29Mortgage assigned — from UNITED NATIONS FEDERAL CREDIT UNION to WELLS FARGO BANK, N.A.
2012-02-29Deed $765,000 — from HOCKLEY, TREVOR; GWARADZIMBA, FADZAI to STOJANOVIC, VLADIMIR; RYAN, JACLYN A$765,000
2012-02-29PAT — from GWARADZIMBA, FADZAI to PUGATCH, LEONARD J
2012-02-29PAT — from HOCKLEY, TREVOR to PUGATCH, LEONARD J
2012-02-29PAT — from HOCKLEY, TREVOR to PUGATCH, LEONARD J
2012-02-29PAT — from GWARADZIMBA, FADZAI to PUGATCH, LEONARD J
2012-02-29Deed $765,000 — from HOCKLEY, TREVOR; GWARADZIMBA, FADZAI to STOJANOVIC, VLADIMIR; RYAN, JACLYN A$765,000
2012-02-29Mortgage assigned — from UNITED NATIONS FEDERAL CREDIT UNION to WELLS FARGO BANK, N.A.
2012-02-29PAT — from RYAN, JACLYN to BOARD MANAGERS OF THE ARIANA CONDOMINIUM
2012-02-29PAT — from RYAN, JACLYN to BOARD MANAGERS OF THE ARIANA CONDOMINIUM
2012-02-29Agreement $612,000 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN to WELLS FARGO BANK, N.A.$612,000
2012-02-29Mortgage $260,740 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN to WELLS FARGO BANK, N.A.$260,740
2012-02-29Agreement $612,000 — from STOJANOVIC, VLADIMIR; RYAN, JACLYN to WELLS FARGO BANK, N.A.$612,000
2012-02-13Mortgage satisfied — from HARBER, MARIA; HARBER, JONATHAN D. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2012-02-13Mortgage satisfied — from POST, NICHOLAS; OH, MICHELE to WACHOVIA BANK, NA
2012-02-13Mortgage satisfied — from POST, NICHOLAS; OH, MICHELE to WACHOVIA BANK, NA
2012-02-13Mortgage satisfied — from HARBER, MARIA; HARBER, JONATHAN D. to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2012-02-09Agreement $222,000 — from KIM, TRICARDO to WELLS FARGO BANK, N.A.$222,000
2012-02-09Agreement $222,000 — from KIM, TRICARDO to WELLS FARGO BANK, N.A.$222,000
2012-02-08Mortgage $600,000 — from TING, RICHARD; GOTTLIEB, CHLOE to MERS$600,000
2012-02-08PAT — from GOTTLIEB, CHLOE; TING, RICHARD to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2012-02-08PAT — from ROEST, NILS to BIANCHI, LARA
2012-02-08PAT — from GOTTLIEB, CHLOE to TING, RICHARD
2012-02-08Mortgage $600,000 — from TING, RICHARD; GOTTLIEB, CHLOE to MERS$600,000
2012-02-08Deed $1,179,000 — from SHADE, SCOTT; ROEST, NILS to TING, RICHARD; GOTTLIEB, CHLOE$1,179,000
2012-02-08PAT — from SHADE, SCOTT to BIANCHI, LARA
2012-02-08PAT — from ROEST, NILS to BIANCHI, LARA
2012-02-08PAT — from SHADE, SCOTT to BIANCHI, LARA
2012-02-08Deed $1,179,000 — from SHADE, SCOTT; ROEST, NILS to TING, RICHARD; GOTTLIEB, CHLOE$1,179,000
2012-02-08PAT — from GOTTLIEB, CHLOE; TING, RICHARD to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2012-02-08PAT — from GOTTLIEB, CHLOE to TING, RICHARD
2012-01-26Mortgage $5,804 — from TRICARDO, KIM to WELLS FARGO BANK, N.A.$5,804
2012-01-26Mortgage assigned — from MERS to WELLS FARGO BANK, N.A.
2012-01-26Mortgage $5,804 — from TRICARDO, KIM to WELLS FARGO BANK, N.A.$5,804
2012-01-26Mortgage assigned — from MERS to WELLS FARGO BANK, N.A.
2012-01-24Mortgage $50,000 — from WALSH, LISA; WALSH, KEVIN to BETHPAGE FEDERAL CREDIT UNION$50,000
2012-01-05311: Graffiti — Graffiti
2011
2011-12-29Job filed: RELOCATION OF (1) SPRINKLER HEAD AND INSTALLATION OF (3) NEW HEADS RELATED TO THE COMBINATION OF APARTMENT 5E AND 5F. SPRINKLERS CONFORM WITH 2008 BUI$2,000
2011-12-13SUBM — from CITIBANK,N.A; EAB to MERS AS NOMINEE; CITIMORTGAGE ,INC
2011-11-30ATL — from THE BANK OF NEW YORK to THE BANK OF NEW YORK
2011-11-23TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2011-11-23TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2011-11-07Mortgage satisfied — from PETERSEN, TERRI LYNN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2011-11-07Mortgage satisfied — from PETERSEN, TERRI LYNN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2011-10-18Mortgage $5,514 — from SAJOR, JENNIFER; LASKER, ZEPHRIN; LASKER F/K/A, JENNIFER to CITIBANK, N.A$5,514
2011-10-18Agreement $296,625 — from LASKER F/K/A, JENNIFER; SAJOR, JENNIFER; LASKER, ZEPHRIN to CITIBANK, N.A$296,625
2011-10-18SUBM — from JPMORGAN CHASE BANK, N.A. to CITIBANK, N.A
2011-10-18Mortgage assigned — from ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA to CITIBANK, N.A
2011-09-30Permit EW — ISSUED
2011-09-29311: Graffiti — Graffiti
2011-09-09Job filed: RENOVATION OF AN EXISTING DUPLEX APARTMENT #PH4 ON THE 8TH FLOOR AND PENTHOUSE. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE OF USE, OCCUPANCY, OR EGRES$13,000
2011-09-09Job filed: RENOVATION OF AN EXISTING DUPLEX APARTMENT #PH4 ON THE 8TH FLOOR AND PENTHOUSE. ARCHITECTURAL AND PLUMBING WORK. NO CHANGE OF USE, OCCUPANCY, OR EGRES$13,000
2011-09-02Mortgage satisfied — from PETERSEN, TERRI LYNN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2011-09-02Mortgage assigned — from HSBC MORTGAGE CORPORATION (USA) to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; HSBC BANK USA, N.A.
2011-09-02Mortgage satisfied — from PETERSEN, TERRI LYNN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2011-08-22PAT — from VENOKUR, SHERRI; SUTAK, KENNETH to THE ARIANA CONDOMINIUM
2011-08-22Deed $1,050,000 — from PETERSEN, TERRI LYNN to SUTAK, KENNETH; VENOKUR, SHERRI$1,050,000
2011-08-22PAT — from VENOKUR, SHERRI; SUTAK, KENNETH to THE ARIANA CONDOMINIUM
2011-08-22Mortgage $500,000 — from SUTAK, KENNETH; VENOKUR, SHERRI to BANK OF AMERICA, N.A.$500,000
2011-08-22Deed $1,050,000 — from PETERSEN, TERRI LYNN to SUTAK, KENNETH; VENOKUR, SHERRI$1,050,000
2011-08-22Mortgage $500,000 — from SUTAK, KENNETH; VENOKUR, SHERRI to BANK OF AMERICA, N.A.$500,000
2011-07-25Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to E*TRADE BANK
2011-07-12Mortgage satisfied — from KLOTZ, JOSEPH; HARVEY, GISELLAH to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2011-07-12Permit PL — ISSUED
2011-06-09Deed $679,000 — from HARVEY, GISELLAH; KLOTZ, JOSEPH to SAPIRSTEIN, RAY J$679,000
2011-06-09Deed $679,000 — from HARVEY, GISELLAH; KLOTZ, JOSEPH to SAPIRSTEIN, RAY J$679,000
2011-06-09Mortgage $300,000 — from SAPIRSTEIN, RAY J to LEE, JOCELYN$300,000
2011-06-09Mortgage $300,000 — from SAPIRSTEIN, RAY J to LEE, JOCELYN$300,000
2011-05-11Permit EW — ISSUED
2011-05-05Mortgage satisfied — from PINHO, TATIANA to ING BANK, FSB
2011-05-04Mortgage assigned — from SIGNATURE BANK to MORTGAGE SELECT
2011-05-04Agreement $421,000 — from FARINA, ANTONIO JR; FARINA, CARMEN to WELLS FARGO BANK NA$421,000
2011-05-04Mortgage $8,061 — from FARINA, CARMEN; FARINA, ANTONIO JR to WELLS FARGO BANK NA$8,061
2011-05-04Mortgage assigned — from MORTGAGE SELECT to WELLS FARGO BANK NA
2011-04-07Job filed: A2$120,000
2011-04-07Job filed: A2$120,000
2011-04-06Mortgage satisfied — from FARINA JR., ANTONIO to SIGNATURE BANK
2011-03-31Mortgage $279,500 — from SCAVUZZO, STEVEN; REDMOND, LORETTA to WELLS FARGO BANK, N.A.$279,500
2011-03-31SUBM — from BANK OF AMERICA, NA to WELLS FARGO BANK, N.A.
2011-03-25Mortgage $100,000 — from SHARP, WILLIAM M; WARRINGTON WILLIAMS, KATHERINE S to HSBC MORTGAGE CORPORATION (USA)$100,000
2011-03-23Mortgage satisfied — from SCAVUZZO, STEVEN; REDMOND, LORETTA to WELLS FARGO BANK, N.A.
2011-03-23Mortgage $205,800 — from PREZIOSI, DOMINIC; CATANZARO, LISA; PREZIOSI, LISA C to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$205,800
2011-03-23Mortgage satisfied — from SCAVUZZO, STEVEN; REDMOND, LORETTA to WELLS FARGO BANK, N.A.
2011-03-23PAT — from WHEARY, JENNIFER to WALKER, PAUL
2011-03-23PAT — from THE ARIANA CONDOMINIUM to THE BOARD
2011-03-23Deed $440,000 — from PINHO, TATIANA to WALKER , PAUL; WHEARY, JENNIFER$440,000
2011-03-21DOB complaint, category ?
2011-03-03Permit PL — ISSUED
2011-02-23Mortgage $49,000 — from KAPLAN, SHIRELY; ROSS, VALERIE BREA to CITIBANK, N.A.$49,000
2011-02-23Job filed: INSTALLATION OF NEW GAS DRYER$3,000
2011-02-23Job filed: INSTALLATION OF NEW GAS DRYER$3,000
2011-01-18Mortgage satisfied — from REILLY, KATHLEEN to JPMORGAN CHASE BANK, N.A.
2011-01-14Mortgage satisfied — from REILLY, KATHLEEN to CITIMORTGAGE, INC.
2011-01-07Job filed: RENOVATE KITCHEN AND BATHROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$56,000
2011-01-07Job filed: RENOVATE KITCHEN AND BATHROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$56,000
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2011-01-04ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010
2010-12-29Deed $850,000 — from REILLY, KATHLEEN; REILLY, KATHLEEN to SHARP, WILLIAM M; WARRINGTON WILLIAMS, KATHERINE S; WARRINGTON WILLIAMS, KATHERINE S; SHA$850,000
2010-12-29Deed $850,000 — from REILLY, KATHLEEN; REILLY, KATHLEEN to SHARP, WILLIAM M; WARRINGTON WILLIAMS, KATHERINE S; WARRINGTON WILLIAMS, KATHERINE S; SHA$850,000
2010-12-29Mortgage $417,000 — from WARRINGTON WILLIAMS, KATHERINE S; WARRINGTON WILLIAMS, KATHERINE S; SHARP, WILLIAM M; SHAR to MERS; MERS$417,000
2010-12-29Mortgage $417,000 — from WARRINGTON WILLIAMS, KATHERINE S; WARRINGTON WILLIAMS, KATHERINE S; SHARP, WILLIAM M; SHAR to MERS; MERS$417,000
2010-12-29PAT — from WARRINGTON WILLIAMS, KATHERINE S; SHARP, WILLIAM M to THE CONDOMINIUM BOARD
2010-12-29Mortgage $417,000 — from WARRINGTON WILLIAMS, KATHERINE S; WARRINGTON WILLIAMS, KATHERINE S; SHARP, WILLIAM M; SHAR to MERS; MERS$417,000
2010-12-29Deed $850,000 — from REILLY, KATHLEEN; REILLY, KATHLEEN to SHARP, WILLIAM M; WARRINGTON WILLIAMS, KATHERINE S; WARRINGTON WILLIAMS, KATHERINE S; SHA$850,000
2010-12-16Agreement $406,000 — from LEWIN, STEPHANIE; FERRONE, DOMINIC to CITIMORTGAGE, INC.$406,000
2010-12-16Mortgage $116,193 — from FERRONE, DOMINIC; LEWIN, STEPHANIE to CITIMORTGAGE, INC.$116,193
2010-12-16PAT — from LEWIN, STEPHANIE to FERRONE, DOMINIC
2010-12-13Mortgage satisfied — from FERRONE, DOMINIC; LEWIN, STEPHANIE to BANK OF AMERICA, N.A.
2010-12-08311: Other Enforcement — E2A Storage Of Receptacles
2010-12-01DTL — from THE BANK OF NEW YORK MELLON
2010-11-12Permit EW — ISSUED
2010-11-08Mortgage satisfied — from HOROWITZ, JASON; MARDIROSSIAN, ANOUCHE to CITIBANK, N.A.
2010-10-28Job filed: MINOR ALTERATION BY MEANS OF REMOVING AND ERECTING NON-STRUCTURAL PARTITIONS.$1,000
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-07ADEC — from THE BOARD OF MANAGERS OF THE ARIANA COND
2010-10-03Tenant complaint: HEATING — HEAT RELATED
2010-10-03311: HEATING — HEAT
2010-09-30Mortgage satisfied — from MINSKY, MAURA S to THE BANK OF NEW YORK
2010-09-21Mortgage satisfied — from MINSKY, MAURA S to CITIMORTGAGE, INC.
2010-09-21Agreement $350,000 — from HOROWITZ, JASON H; MARDIROSSIAN, ANOUCHE to CITIMORTGAGE, INC.$350,000
2010-09-21Mortgage $82,753 — from MARDIROSSIAN, ANOUCHE; HOROWITZ, JASON H to CITIMORTGAGE, INC.$82,753
2010-09-16311: Blocked Driveway — No Access
2010-09-14PAT — from RYAN , PAMELA; HERPER , MATTHEW to ARIANA CONDOMINIUM BOARD
2010-09-14Deed $785,000 — from MINSKY , MAURA S to HERPER , MATTHEW; RYAN , PAMELA$785,000
2010-09-14Mortgage $115,000 — from HERPER , MATTHEW; RYAN , PAMELA to MERS$115,000
2010-09-14PAT — from MINSKY, MAURA S to GOODMAN, ZERLINE ESQ.
2010-08-30Job filed: DEMOLITION OF INTERIOR NON-LOADBEARING PARTITONS; CONSTRUCTION OF NEW PARTITIONS; CONSTRUCTION OF PLATFORM ON THE 8TH FLOOR; NO CHANGE TO USE, EGRESS $25,000
2010-08-30Job filed: DEMOLITION OF INTERIOR NON-LOADBEARING PARTITONS; CONSTRUCTION OF NEW PARTITIONS; CONSTRUCTION OF PLATFORM ON THE 8TH FLOOR; NO CHANGE TO USE, EGRESS $25,000
2010-08-30Permit EW — ISSUED
2010-08-23Mortgage satisfied — from RUSSELL, LEO B to STANDARD FEDERAL BANK, FSB
2010-08-23311: Noise - Vehicle — Engine Idling
2010-08-18Mortgage satisfied — from SEMBLER, FREDERICK M to JPMORGAN CHASE BANK
2010-08-18Mortgage satisfied — from SEMBLER, FREDERICK M to JPMORGAN CHASE BANK
2010-08-18TLS — from THE CITY OF NEW YORK to THE BANK OF NEW YORK MELLON
2010-08-18Job filed: INSTALLATION OF NEW AUTOMATIC, SMOKE DETECTION & SPRINKLER ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$31,800
2010-08-17Mortgage satisfied — from MARTIN, JEAN-MARIE; WEINTRAUB, FREDDI to WELLS FARGO BANK NA
2010-08-17Mortgage satisfied — from MARTIN, JEAN-MARIE; WEINTRAUB, FREDDI to WELLS FARGO BANK NA
2010-08-11PAT — from COOPER, JASON M; MAYER, ELISABETH A to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2010-08-11Deed $1,250,000 — from WEINTRAUB, FREDDI; MARTIN, JEAN-MARIE to COOPER, JASON M; MAYER, ELISABETH A$1,250,000
2010-08-11Mortgage $937,500 — from MAYER, ELISABETH A; COOPER, JASON M to WELLS FARGO BANK, N.A.$937,500
2010-08-11Mortgage $937,500 — from MAYER, ELISABETH A; COOPER, JASON M to WELLS FARGO BANK, N.A.$937,500
2010-08-11Deed $1,250,000 — from WEINTRAUB, FREDDI; MARTIN, JEAN-MARIE to COOPER, JASON M; MAYER, ELISABETH A$1,250,000
2010-08-11PAT — from COOPER, JASON M; MAYER, ELISABETH A to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2010-06-24311: Graffiti — Graffiti
2010-06-17311: New Tree Request — For Whole Block
2010-05-14Permit EQ — ISSUED
2010-05-06311: Damaged Tree — Tree Alive - in Poor Condition
2010-05-06DOB violation E:
2010-05-06DOB violation E:
2010-04-12Permit EW — ISSUED
2010-03-25311: Taxi Complaint — Driver Complaint
2010-02-08Tenant complaint: HEATING — HEAT RELATED
2010-02-08311: HEATING — HEAT
2010-02-05Tenant complaint: HEATING — HEAT RELATED
2010-02-05311: HEATING — HEAT
2010-01-31Tenant complaint: HEATING — HEAT RELATED
2010-01-28Mortgage satisfied — from SONG, RANDI; SCHLICHTING, LARS to BANK OF AMERICA, NA
2010-01-25Mortgage satisfied — from SCHLICHTING, LARS; SONG, RANDI to JPMORGAN CHASE BANK, N.A.
2010-01-22Mortgage $72,777 — from CORDERO, EDGAR; CABRERA CORDERO, JACQUELINE to MUNICIPAL CREDIT UNION, ISAOA$72,777
2010-01-22Agreement $72,777 — from CABRERA CORDERO, JACQUELINE; CORDERO, EDGAR to MUNICIPAL CREDIT UNION, ISAOA$72,777
2010-01-14PAT — from HARBER, MARIA; HARBER, JONATHAN D to BOARD OF MANAGERS ARIANA CONDOMINIUM
2010-01-14Deed $1,750,000 — from SCHLICHTING , LARS; SONG, RANDI S to HARBER , MARIA; HARBER , JONATHAN D$1,750,000
2010-01-14Deed $1,750,000 — from SCHLICHTING , LARS; SONG, RANDI S to HARBER , MARIA; HARBER , JONATHAN D$1,750,000
2010-01-14PAT — from SONG, RANDI to SCHLICHTING, LARS L; SCHLICHTING, LARS
2010-01-14PAT — from HARBER, MARIA; HARBER, JONATHAN D to BOARD OF MANAGERS ARIANA CONDOMINIUM
2010-01-14Mortgage $700,000 — from HARBER, MARIA; HARBER, JONATHAN D to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$700,000
2010-01-14PAT — from SONG, RANDI to SCHLICHTING, LARS L; SCHLICHTING, LARS
2010-01-14Mortgage $700,000 — from HARBER, MARIA; HARBER, JONATHAN D to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$700,000
2009
2009-12-24Tenant complaint: NONCONST — SIGNAGE
2009-12-24DOB complaint, category ?
2009-12-23Tenant complaint: HEATING — HEAT RELATED
2009-12-11Tenant complaint: HEATING — HEAT RELATED
2009-12-11Tenant complaint: HEATING — HEAT RELATED
2009-11-23ECB CLASS - 2 violation: 71Q3.40R9.40M7.40R NON ELEVATOR MATERIAL 40M FIRE EXTINGUISHER
2009-11-23ECB CLASS - 2 violation: 10J1.17H11.39Q3.17D6.
2009-11-18Mortgage satisfied — from CORDERO, JACQUELINE CABRERA; CORDERO, EDGAR to JPMORGAN CHASE BANK, N.A.
2009-11-06Mortgage $100,000 — from PALMER, AMY P; PALMER, ENOCH A to WELLS FARGO BANK, N.A.$100,000
2009-10-27Mortgage satisfied — from DIFIORE, JENNIFER L; DIFIORE, PHILIP D to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2009-10-21Mortgage assigned — from WASHINGTON MUTUAL BANK, FA; JPMORGAN CHASE BANK, N.A. to JPMORGAN HCASE BANK, N.A.
2009-10-21Mortgage satisfied — from MINGEY, DAVID C to JPMORGAN CHASE BANK, N.A.
2009-10-21Mortgage assigned — from WASHINGTON MUTUAL BANK, FA; JPMORGAN CHASE BANK, N.A. to JPMORGAN HCASE BANK, N.A.
2009-10-21Mortgage $10,950 — from MINGEY, DAVID C to JPMORGAN HCASE BANK, N.A.$10,950
2009-10-21Agreement $509,700 — from MINGEY, DAVID C to JPMORGAN HCASE BANK, N.A.$509,700
2009-10-21Agreement $509,700 — from MINGEY, DAVID C to JPMORGAN HCASE BANK, N.A.$509,700
2009-10-21Mortgage $10,950 — from MINGEY, DAVID C to JPMORGAN HCASE BANK, N.A.$10,950
2009-10-08Deed $535,000 — from DIFIORE, PHILIP D; DIFIORE, JENNIFER L to BAGOT, ELIZABETH; HUH, ARTHUR$535,000
2009-10-08PAT — from DIFIORE, PHILIP D to DUBNO, ROBERT
2009-10-08PAT — from DIFIORE, JENNIFER L to DUBNO, ROBERT
2009-10-08Mortgage $285,000 — from HUH, ARTHUR; BAGOT, ELIZABETH to MUNICIPAL CREDIT UNION$285,000
2009-10-08PAT — from HUH, ARTHUR; BAGOT, ELIZABETH to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2009-09-28Mortgage $41,187 — from PREZIOSI, LISA C; CATANZARO PREZIOSI, LISA; PREZIOSI, DOMINIC to CITIMORTGAGE, INC.; STANDARD FEDERAL SAVINGS BANK$41,187
2009-09-28Agreement $172,650 — from PREZIOSI, LISA C; CATANZARO PREZIOSI, LISA; PREZIOSI, DOMINIC to CITIMORTGAGE, INC.; STANDARD FEDERAL SAVINGS BANK$172,650
2009-09-28SUBM — from CITIBANK, N.A. to CITIMORTGAGE, INC.
2009-08-26Mortgage satisfied — from CREAN, TIMOTHY C; ESTEROV, ANA to CITIBANK, N.A.
2009-08-25TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2009-08-06Agreement $545,000 — from CREAN, TIMOTHY C; ESTEROV, ANA to CITIMORTGAGE, INC.$545,000
2009-08-06Mortgage $47,829 — from ESTEROV, ANA; CREAN, TIMOTHY C to CITIMORTGAGE, INC.$47,829
2009-07-27Mortgage $496 — from WALSH, LISA; WALSH, KEVIN to BETHPAGE FEDERAL CREDIT UNION$496
2009-07-27PAT — from WALSH, LISA to WALSH, KEVIN
2009-07-27Agreement $406,000 — from WALSH, LISA; WALSH, KEVIN to BETHPAGE FEDERAL CREDIT UNION$406,000
2009-07-24Agreement $600,000 — from BREA ROSS, VALERIE; KAPLAN, SHIRLEY to JPMORGAN CHASE BANK, NA$600,000
2009-07-24Mortgage $120,377 — from KAPLAN, SHIRLEY; BREA ROSS, VALERIE to JPMORGAN CHASE BANK, NA$120,377
2009-07-24Deed — from KAPLAN, SHIRLEY to BREA ROSS, VALERIE; KAPLAN, SHIRLEY
2009-07-21Mortgage satisfied — from MILLER, TRENTE A; MARINO, LOUIS M to WELLS FARGO BANK, N.A.
2009-07-16ECB CLASS - 2 violation: 12Q3.34O2.77X10.12Q INSTALL COVERS 61G UNREADABLE FUSES 05X DOOR ZONE RESTRICTOR 70Z EVIDENCE OF WATER IN PIT CHECK ALL SW'S 34O B
2009-07-09Mortgage $390,643 — from MILLER, TRENTE A; MARINO, LOUIS M to WELLS FARGO BANK, N.A.$390,643
2009-07-01ECB CLASS - 1 violation: SEC. 3314.15.5 NOT MORE THAN 2 WORKERS SHALL BE PERMITTED TO WORK ON 1SCAFFOLD. AT ON TIME EXCEPT WHERE THE SCAFFOLD IS DESIGNED T$1,600
2009-06-24PAT — from WEINTRAUB, FREDDI to MARTIN, JEAN-MARIE
2009-06-24Mortgage $3,531 — from MARTIN, JEAN-MARIE; WEINTRAUB, FREDDI to WELLS FARGO BANK, NA$3,531
2009-06-24PAT — from WEINTRAUB, FREDDI to MARTIN, JEAN-MARIE
2009-06-24Mortgage $3,531 — from MARTIN, JEAN-MARIE; WEINTRAUB, FREDDI to WELLS FARGO BANK, NA$3,531
2009-06-24Agreement $370,000 — from MARTIN, JEAN-MARIE; WEINTRAUB, FREDDI to WELLS FARGO BANK, NA$370,000
2009-06-18Permit EW — ISSUED
2009-06-12Mortgage $130,000 — from MARINO, LOUIS M; MILLER, TRENTE A to USAA FEDERAL SAVINGS BANK$130,000
2009-04-28Job filed: ERECT A TOTAL OF 87 LINEAR FEET BY 8 FEET APPROXIMATE HIGH HEAVY DUTY SIDEWALK SHED,PER DRAWINGS,RATED FOR 300 LBS PER SQUARE FOOT. INSTALLATION SHAL
2009-04-28Job filed: ERECT A TOTAL OF 87 LINEAR FEET BY 8 FEET APPROXIMATE HIGH HEAVY DUTY SIDEWALK SHED,PER DRAWINGS,RATED FOR 300 LBS PER SQUARE FOOT. INSTALLATION SHAL
2009-04-28Job filed: ERECT A TOTAL OF 87 LINEAR FEET BY 8 FEET APPROXIMATE HIGH HEAVY DUTY SIDEWALK SHED,PER DRAWINGS,RATED FOR 300 LBS PER SQUARE FOOT. INSTALLATION SHAL
2009-04-28Permit EQ — ISSUED
2009-04-27Permit PL — ISSUED
2009-04-24Permit EW — ISSUED
2009-04-21Mortgage satisfied — from BROWN, O MICHAY to SUCCESSOR BY MERGER TO; WELLS FARGO HOME MORTGAGE, INC. F/K/A; NORWEST MORTGAGE, INC.; WEL
2009-04-07Mortgage $90,712 — from BROWN, O M to WELLS FARGO BANK, N.A.$90,712
2009-04-03Job filed: FACADE & TERRACE REPAIRS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.$145,025
2009-03-30Permit EW — ISSUED
2009-03-27Job filed: REMODEL EXISTING APARTMENT, REPLACE KITCHEN APPLIANCES AND FIXTURES,ENLARGE BATH ROOM, REPLACE BATH ROOM FIXTURES, NO CHANGE IN OCCUPANCY, USE OR EGRE$130,000
2009-03-27Job filed: REMODEL EXISTING APARTMENT, REPLACE KITCHEN APPLIANCES AND FIXTURES,ENLARGE BATH ROOM, REPLACE BATH ROOM FIXTURES, NO CHANGE IN OCCUPANCY, USE OR EGRE$130,000
2009-03-02Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to WELLS FARGO BANK, N.A.
2009-03-02Agreement $417,000 — from KOYAMA, MIKAKO; YOSHIKAWA, YASUO to WELLS FARGO BANK, N.A.$417,000
2009-03-02Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to WELLS FARGO BANK, N.A.
2009-03-02Mortgage $75,062 — from YOSHIKAWA, YASUO; KOYAMA, MIKAKO to WELLS FARGO BANK, N.A.$75,062
2009-03-02PAT — from YOSHIKAWA, YASUO to KOYAMA, MIKAKO
2009-03-02Mortgage $75,062 — from YOSHIKAWA, YASUO; KOYAMA, MIKAKO to WELLS FARGO BANK, N.A.$75,062
2009-03-02Agreement $417,000 — from KOYAMA, MIKAKO; YOSHIKAWA, YASUO to WELLS FARGO BANK, N.A.$417,000
2009-03-02Agreement — from KOYAMA, YUZO to WELLS FARGO BANK, N.A.
2009-03-02Agreement — from KOYAMA, YUZO to WELLS FARGO BANK, N.A.
2009-03-02PAT — from YOSHIKAWA, YASUO to KOYAMA, MIKAKO
2009-01-21Mortgage satisfied — from TOBASE, SHUICHI F; TOBASE, CAROLINE to JPMORGAN CHASE BANK, N.A.
2009-01-14Mortgage assigned — from NEW CENTURY MORTGAGE CORPORATION to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2009-01-14Mortgage satisfied — from TOBASE, CAROLINE; TOBASE, SHUICHI to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2009-01-14Mortgage satisfied — from TOBASE, CAROLINE; TOBASE, SHUICHI to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2009-01-14Mortgage assigned — from NEW CENTURY MORTGAGE CORPORATION to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2009-01-06Deed $753,800 — from TOBASE, SHUICHI; TOBASE, CAROLINE to PETERSEN, TERRI LYNN$753,800
2009-01-06Mortgage $417,000 — from PETERSEN, TERRI LYNN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$417,000
2009-01-06Mortgage $100,000 — from PETERSEN, TERRI LYNN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$100,000
2009-01-06PAT — from PETERSEN, TERRI LYNN to THE ARIANA CONDOMINIUM BOARD OF MANAGERS
2009-01-06Mortgage $100,000 — from PETERSEN, TERRI LYNN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$100,000
2009-01-06Mortgage $417,000 — from PETERSEN, TERRI LYNN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$417,000
2009-01-06Deed $753,800 — from TOBASE, SHUICHI; TOBASE, CAROLINE to PETERSEN, TERRI LYNN$753,800
2009-01-06PAT — from PETERSEN, TERRI LYNN to THE ARIANA CONDOMINIUM BOARD OF MANAGERS
2008
2008-12-26PAT — from BRITTON, CAROL L; HITCHMAN, ONECA J to THE ARIANA CONDOMINIUM
2008-12-26Mortgage $44,950 — from HITCHMAN, ONECA J; BRITTON, CAROL L to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$44,950
2008-12-26Mortgage $374,250 — from HITCHMAN, ONECA J; BRITTON, CAROL L to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$374,250
2008-12-26Deed $499,000 — from ZIFF, STEWART to HITCHMAN, ONECA J; BRITTON, CAROL L$499,000
2008-12-23Mortgage satisfied — from WHIDDEN, CHRISTIE S; WHIDDEN, MICHAEL J to WELLS FARGO BANK, N.A.
2008-11-21Mortgage satisfied — from DIFIORE, JENNIFER L; DI FIORE, PHIL to WACHOVIA BANK, NATIONAL ASSOCIATION
2008-11-20Mortgage $57,772 — from WHIDDEN, MICHAEL J; SHAW WHIDDEN, CHRISTIE J to WELLS FARGO BANK, N.A.$57,772
2008-11-20Agreement $466,482 — from WHIDDEN, MICHAEL J; SHAW WHIDDEN, CHRISTIE J to WELLS FARGO BANK, N.A.$466,482
2008-11-20Agreement $466,482 — from WHIDDEN, MICHAEL J; SHAW WHIDDEN, CHRISTIE J to WELLS FARGO BANK, N.A.$466,482
2008-11-20Mortgage $57,772 — from WHIDDEN, MICHAEL J; SHAW WHIDDEN, CHRISTIE J to WELLS FARGO BANK, N.A.$57,772
2008-11-19DOB complaint, category ?
2008-11-06M&CON $120,000 — from SCIBETTA, STACY A to BANK OF AMERICA$120,000
2008-10-14Mortgage satisfied — from BLASKO, BRIANA; WALKER, JESS to CITIMORTGAGE, INC
2008-10-10Mortgage satisfied — from BLASKO, BRIANA; WALKER, JESS to CITIBANK, N.A.
2008-09-30Mortgage satisfied — from HSIAO, HWEI CHING to REPUBLIC CONSUMER LENDING GROUP, INC.; HSBC MORTGAGE CORPORATION (USA)
2008-09-30Mortgage satisfied — from HSIAO, HWEI CHING to REPUBLIC CONSUMER LENDING GROUP, INC.; HSBC MORTGAGE CORPORATION (USA)
2008-09-26PAT — from BLASKO, BRIANA to DOHERTY, BRIAN
2008-09-26Mortgage $351,000 — from STEEL, LAUREN to STEEL, JOHN$351,000
2008-09-26Deed $475,000 — from BLASKO, BRIANA; WALKER, JESS to STEEL, LAUREN$475,000
2008-09-26PAT — from STEEL, LAUREN to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2008-09-25Permit EW — ISSUED
2008-09-16Job filed: RENOVATE APT. #6C AT 6TH FLOOR GENERAL CONSTRUCTION AND PLUMBING WORK INDICATED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDE$8,000
2008-09-16Job filed: RENOVATE APT. #6C AT 6TH FLOOR GENERAL CONSTRUCTION AND PLUMBING WORK INDICATED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDE$8,000
2008-09-16Job filed: RENOVATE APT. #6C AT 6TH FLOOR GENERAL CONSTRUCTION AND PLUMBING WORK INDICATED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDE$8,000
2008-09-11Tenant complaint: HEATING — HEAT RELATED
2008-08-28Tenant complaint: HEATING — HEAT RELATED
2008-08-17DOB complaint, category ?
2008-08-14Agreement $417,000 — from CARROLL, DAVID; CARROLL, ALEXANDRA to WELLS FARGO BANK, N.A.$417,000
2008-08-08Tenant complaint: HEATING — HEAT-PLANT
2008-07-11Mortgage satisfied — from JONES, BRADFORD W to FIRST SECURITY FINANCIAL SERVICES, INC.
2008-07-09Mortgage satisfied — from JONES, BRADFORD W to BANK OF AMERICA, NA
2008-06-27Deed $650,000 — from JONES, BRADFORD W to MARTINEZ, RICARDO; MARTINEZ, VILMA R$650,000
2008-06-27Mortgage $125,000 — from MARTINEZ, RICARDO; MARTINEZ, VILMA to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$125,000
2008-06-27PAT — from MARTINEZ, RICARDO; MARTINEZ, VILMA to THE ARIANA CONDOMINIUM
2008-06-24Mortgage satisfied — from COBURN, CHRISTOPHER to JPMORGAN CHASE BANK, N.A.
2008-06-24Mortgage satisfied — from COBURN, CHRISTOPHER to JPMORGAN CHASE BANK, N.A.
2008-06-21DOB violation E:
2008-06-21DOB violation E:
2008-06-17CORRM $417,000 — from PHILIP, AMANDA to MERS, INC.$417,000
2008-06-17Mortgage satisfied — from JONES, BRADFORD W to BANK OF AMERICA, N.A.
2008-06-13Tenant complaint: HEATING — HEAT RELATED
2008-06-05Deed $1,595,000 — from COBURN , CHRISTOPHER to POST , NICHOLAS; OH, MICHELE$1,595,000
2008-06-05PAT — from OH, MICHELE; POST, NICHOLAS to THE ARIANA CONDOMINIUM
2008-06-05Mortgage $1,342,337 — from OH, MICHELE; POST, NICHOLAS to WACHOVIA BANK, NATIONAL ASSOCIATION$1,342,337
2008-06-05Deed $1,595,000 — from COBURN , CHRISTOPHER to POST , NICHOLAS; OH, MICHELE$1,595,000
2008-06-05Mortgage $164,146 — from OH, MICHELE; POST, NICHOLAS to WACHOVIA BANK, NATIONAL ASSOCIATION$164,146
2008-06-05Mortgage $1,342,337 — from OH, MICHELE; POST, NICHOLAS to WACHOVIA BANK, NATIONAL ASSOCIATION$1,342,337
2008-06-05PAT — from COBURN, CHRISTOPHER to COODMAN, ZERLINE L
2008-06-05PAT — from OH, MICHELE; POST, NICHOLAS to THE ARIANA CONDOMINIUM
2008-06-05Mortgage $164,146 — from OH, MICHELE; POST, NICHOLAS to WACHOVIA BANK, NATIONAL ASSOCIATION$164,146
2008-06-05PAT — from COBURN, CHRISTOPHER to COODMAN, ZERLINE L
2008-05-28Mortgage $70,000 — from RUSSELL, LEO B to WASHINGTON MUTUAL BANK$70,000
2008-05-02Mortgage satisfied — from PHILIP, AMANDA to OPTION ONE MORTGAGE CORPORATION
2008-04-02Mortgage $417,000 — from PHILIP, AMANDA to MERS, INC.$417,000
2008-03-24DOB complaint, category ?
2008-03-14Tenant complaint: HEATING — HEAT RELATED
2008-03-12M&CON $300,000 — from SCHRODER, PHYLISS A; SCHRODER, PHYLLIS A to JP MORGAN CHASE BANK NA$300,000
2008-02-08Agreement $150,000 — from TOBASE, CAROLINE; TOBASE, SHUICHI to JP MORGAN CHASE BANK NA$150,000
2008-02-08Mortgage $50,000 — from TOBASE, SHUICHI; TOBASE, CAROLINE to JP MORGAN CHASE BANK NA$50,000
2008-01-08Mortgage satisfied — from ANDERSON, THOMAS to GREENPOINT MORTGAGE FUNDING, INC.
2008-01-04Tenant complaint: HEATING — HEAT RELATED
2007
2007-12-17Tenant complaint: HEATING — HEAT RELATED
2007-11-20Mortgage $118,990 — from HOCKLEY, TREVOR; GWARADZIMBA, FADZAI to UNITED NATIONS FEDERAL CREDIT UNION$118,990
2007-11-09Mortgage $178,000 — from REILLY, KATHLEEN to JP MORGAN CHASE BANK NA$178,000
2007-10-29Mortgage satisfied — from ZIFF, STEWART to WASHINGTON MUTUAL BANK, FA
2007-10-28Tenant complaint: HEATING — HEAT RELATED
2007-10-28Tenant complaint: PLUMBING — WATER SUPPLY
2007-10-26Agreement $100,000 — from PREZIOSI, LISA CATANZARO; PREZIOSI, LISA C; PREZIOSI, DOMINIC to CITIBANK, N.A.$100,000
2007-10-26Mortgage $28,000 — from PREZIOSI, LISA C; PREZIOSI, DOMINIC; PREZIOSI, LISA CATANZARO to CITIBANK, N.A.$28,000
2007-10-15Mortgage $252,000 — from SHARIF, HOOSHANG to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$252,000
2007-09-28Mortgage satisfied — from BURNS, JENNIFER; STUART, JOHANNES J to CITICORP MORTGAGE, INC.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2007-09-13Mortgage satisfied — from ESTEROV, ANA; CREAN, TIMOTHY C to CITIMORTGAGE INC.
2007-09-11PAT — from ESTEROV, ANA; CREAN, TIMOTHY C to THE ARIANA CONDOMINIUM
2007-09-11Mortgage $361,875 — from ESTEROV, ANA; CREAN, TIMOTHY C to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$361,875
2007-09-11Deed $482,500 — from POST, NICHOLAS; OH, MICHELE; OH, KYOUNG to ESTEROV, ANA; CREAN, TIMOTHY$482,500
2007-09-11PAT — from OH, KYOUNG to DONG, DAVID
2007-09-11PAT — from CREAN, TIMOTHY C to JOAN L. GREENBERG, ESQ
2007-09-07Agreement $575,000 — from WEINTRAUB, FREDDIE; MARTIN, JEAN MARIE to WELLS FARGO BANK, NA$575,000
2007-09-07Agreement $575,000 — from WEINTRAUB, FREDDIE; MARTIN, JEAN MARIE to WELLS FARGO BANK, NA$575,000
2007-09-07Agreement $575,000 — from WEINTRAUB, FREDDIE; MARTIN, JEAN MARIE to WELLS FARGO BANK, NA$575,000
2007-09-06Mortgage satisfied — from OH, KYOUNG; POST, NICHOLAS; OH, MICHELE to WELLS FARGO BANK N.A.
2007-09-05Mortgage satisfied — from POST, NICHOLAS; OH, MICHELE; OH, KYOUNG to ABN AMRO MORTGAGE GROUP INC
2007-08-13Mortgage $200,000 — from LASKER, ZEPHRIN I; SAJOR, JENNIFER to JP MORGAN CHASE BANK NA$200,000
2007-08-08Mortgage $73,500 — from DI FIORE, JENNIFER L; DI FIORE, PHIL to WACHOVIA BANK NATIONAL ASSOCIATION$73,500
2007-08-08Mortgage satisfied — from STUART, JOHANNES J; BURNS, JENNIFER to MORTGAGE ELECTRONIC REGISTERATION SYSTEM
2007-08-03Mortgage $268,561 — from WEINTRAUB, FREDDI; MARTIN, JEAN-MARIE to WELLS FARGO BANK, NA$268,561
2007-08-03Mortgage assigned — from MERS to WELLS FARGO BANK, NA
2007-08-03Mortgage assigned — from MERS to WELLS FARGO BANK, NA
2007-08-03Mortgage $268,561 — from WEINTRAUB, FREDDI; MARTIN, JEAN-MARIE to WELLS FARGO BANK, NA$268,561
2007-08-03Mortgage assigned — from MERS to WELLS FARGO BANK, NA
2007-08-03Mortgage $268,561 — from WEINTRAUB, FREDDI; MARTIN, JEAN-MARIE to WELLS FARGO BANK, NA$268,561
2007-07-24PAT — from RITCHIE, JUDITH MARIE to HENRY, YOLANDA K; MINIKES, JONATHAN Z
2007-07-24PAT — from BURNS, A/K/A JENNIFER ANN; BURNS, JENNIFER A to MAKOW, TRACY E; BRICKNER, HOWARD M
2007-07-24PAT — from RITCHIE, JUDITH MARIE to THE BOARD OF THE
2007-07-24PAT — from STUART, JOHANNES JOSEPHUS MARINUS to MAKOW, TRACY E; BRICKNER, HOWARD M
2007-07-24PAT — from BURNS, A/K/A JENNIFER ANN; BURNS, JENNIFER A to MAKOW, TRACY E; BRICKNER, HOWARD M
2007-07-24PAT — from RITCHIE, JUDITH MARIE to THE BOARD OF THE
2007-07-24PAT — from STUART, JOHANNES JOSEPHUS MARINUS to MAKOW, TRACY E; BRICKNER, HOWARD M
2007-07-24Deed $1,845,000 — from BURNS, JENNIFER; STUART, JOHANNES J.M. to RITCHIE, JUDITH MARIE$1,845,000
2007-07-24Deed $1,845,000 — from BURNS, JENNIFER; STUART, JOHANNES J.M. to RITCHIE, JUDITH MARIE$1,845,000
2007-07-24PAT — from RITCHIE, JUDITH MARIE to HENRY, YOLANDA K; MINIKES, JONATHAN Z
2007-07-23Mortgage satisfied — from MARTIN, JEAN M; WEINTRAUB, FREDDI to BANK OF AMERICA, NA
2007-06-29Mortgage $63,000 — from LOVETT, EDWARD R; LOVETT, ERIN E to USAA FEDERAL SAVINGS BANK$63,000
2007-06-27Mortgage $209,179 — from GARAY, DIEGO to ABN AMRO MORTGAGE GROUP, INC.$209,179
2007-06-27SUBM — from LASALLE BANK, NA to ABN AMRO MORTGAGE GROUP, INC.
2007-06-27Deed — from GARAY, JODIE L; GARAY, DIEGO to GARAY, DIEGO
2007-06-27Mortgage assigned — from STANDARD FEDERAL BANK, FSB to ABN AMRO MORTGAGE GROUP, INC.
2007-06-27Agreement $417,000 — from GARAY, DIEGO to ABN AMRO MORTGAGE GROUP, INC.$417,000
2007-06-21Mortgage satisfied — from BROWN, O MICHAY to JPMORGAN CHASE BANK NA
2007-06-13Mortgage satisfied — from LASKER, ZEPHRIN; SAJOR, JENNIFER to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA
2007-06-05Mortgage assigned — from WASHINGTON MUTUAL BAKNK, F/K/A to WELLS FARGO BANK, NA
2007-06-05Mortgage assigned — from WASHINGTON MUTUAL BAKNK, F/K/A to WELLS FARGO BANK, NA
2007-05-25HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING & EAST AND NORTH WALL AT PUBLIC HALL
2007-05-25HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 6th STORY
2007-05-25HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE FOYER LOCATED AT APT 6B, 3rd STORY
2007-05-25HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF WATER LEAK AT THE WEST WALL IN THE 1st ROOM FROM EAST AT NORTH
2007-05-25HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM EAST AT NOR
2007-05-25HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY
2007-05-25HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT N
2007-05-25HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING & EAST WALL AT PUBLIC HALL, 6th STORY
2007-05-25HPD class B: § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW A
2007-05-25HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 3rd STORY
2007-03-20Mortgage $308,358 — from WALSH, LISA to BETHPAGE FEDERAL CREDIT UNION$308,358
2007-03-20Agreement $417,000 — from WALSH, LISA; WALSH, KEVIN to BETHPAGE FEDERAL CREDIT UNION$417,000
2007-03-20Mortgage $110,000 — from JONES, BRADFORD W to BANK OF AMERICA, N.A.$110,000
2007-03-20PAT — from WALSH, LISA to WALSH, KEVIN
2007-03-10Tenant complaint: HEATING — HEAT RELATED
2007-03-09CORRM $332,500 — from GROSSI, JOSEPH; GROSSI, JOANNA to MERS$332,500
2007-03-09Permit EW — ISSUED
2007-03-09Permit EW — ISSUED
2007-02-21Mortgage satisfied — from DE JESUS, ANDREA; DE JESUS, JOSE to WELLS FARGO BANK, N.A.
2007-02-16Mortgage satisfied — from GROSSI, JOANNA; GROSSI, JOSEPH to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2007-02-02Facade (LL11) filing, cycle 6: SWARMP
2007-01-26Agreement $700,000 — from COBURN, CHRISTOPHER to JPMORGAN CHASE BANK, N.A.$700,000
2007-01-26Mortgage $508,924 — from COBURN, CHRISTOPHER to JPMORGAN CHASE BANK, N.A.$508,924
2007-01-26Mortgage assigned — from WASHINGTON MUTUAL BANK to JPMORGAN CHASE BANK, N.A.
2007-01-25TERL — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to YOUNG ADULT INSTITUTE, INC.
2007-01-25TERL — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2007-01-25TERL — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to YOUNG ADULT INSTITUTE, INC.
2007-01-25TERL — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to YOUNG ADULT INSTITUTE, INC.
2007-01-25TERL — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2007-01-25TERL — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2007-01-22Tenant complaint: ELECTRIC — LIGHTING
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-19Mortgage satisfied — from YOUNG ADULT INSTITUTE, INC. to THE BANK OF NEW YORK
2007-01-18PAT — from PINHO, TATIANA to BOARD OF MANAGERS OF THE ARIANA CONDOMIN
2007-01-18Mortgage $360,000 — from PINHO, TATIANA to ING BANK, FSB$360,000
2007-01-18Deed $450,000 — from GROSSI, JOANNA; GROSSI, JOSEPH to PINHO, TATIANA$450,000
2007-01-11Mortgage $10,000 — from DE JESUS, JOSE; DE JESUS, ANDREA to WELLS FARGO BANK, N.A.$10,000
2006
2006-12-26Mortgage satisfied — from GERENA, MARC; GERENA, JESSICA to JPMORGAN CHASE BANK
2006-12-21Mortgage satisfied — from GERENA, JESSICA; GERENA, MARC to NATIONAL CITY BANK
2006-12-12Mortgage $10,000 — from DEJESUS, ANDREA; DEJESUS, JOSE to WELLS FARGO BANK, N.A.$10,000
2006-12-12Mortgage $490,000 — from DEJESUS, ANDREA; DEJESUS, JOSE to WELLS FARGO BANK, N.A.$490,000
2006-12-12PAT — from DEJESUS, JOSE; DEJESUS, ANDREA to THE BOARD OF MANAGERS OF THE ARIANA COND
2006-12-12PAT — from GERENA, JESSICA to GERENA, MARC
2006-12-12Deed $615,000 — from GERENA, JESSICA; GERENA, MARC to DEJESUS, JOSE; DEJESUS, ANDREA$615,000
2006-12-07Job filed: Filing to recreate/replace convenience stairs as per plans filed herewit change to use, egress, or occupancy under this application.$60,000
2006-12-05Job filed: FILING TO RENOVATE DUPLEX APT.WITH REMOVAL/INSTALLATION OF NON-LOAD BEA RING PARTITIONS AS WELL AS MINOR PLUBINGMODIFICATIONS AS PER PLANS FILED HEREW$213,000
2006-11-16Mortgage $4,605,000 — from YOUNG ADULT INSTITUTE, INC.; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK; ACA FINANCIAL GUARANTY CORPORATION$4,605,000
2006-11-16Mortgage $4,605,000 — from YOUNG ADULT INSTITUTE, INC.; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK; ACA FINANCIAL GUARANTY CORPORATION$4,605,000
2006-11-16LEAS — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2006-11-16Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to YOUNG ADULT INSTITUTE, INC.
2006-11-16Mortgage $4,605,000 — from YOUNG ADULT INSTITUTE, INC.; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK; ACA FINANCIAL GUARANTY CORPORATION$4,605,000
2006-11-16LEAS — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2006-11-16Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to YOUNG ADULT INSTITUTE, INC.
2006-11-16LEAS — from YOUNG ADULT INSTITUTE, INC. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2006-11-16Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to YOUNG ADULT INSTITUTE, INC.
2006-11-15Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK
2006-11-15Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK
2006-11-15Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK
2006-11-15Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK
2006-11-15Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK
2006-11-15Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE BANK OF NEW YORK
2006-11-14Mortgage $100,000 — from SHADLETSKY, FLORENCE to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$100,000
2006-10-30DOB violation E:
2006-10-16HPD class B: § 27-2005 ADMIN. CODE: PROVIDE BRACKETS FOR AIR CONDITIONER WINDOW UNITS OVER NORTH WALK-IN TO BUILDING ENTRANCE,AT 1ST AND 5TH STORY WINDOW
2006-10-16HPD class B: § 27-2005 ADMIN. CODE: PROVIDE BRACKETS FOR HEAVY AIR CONDITIONER WINDOW UNITS OVER ENTRANCE TO BUILDING AT 3RD,5TH AND 6TH STORIES
2006-10-13Tenant complaint: HEATING — HEAT RELATED
2006-10-06Deed $712,500 — from DE FINA, GINA M to MINGEY, DAVID C$712,500
2006-10-06Mortgage $498,750 — from MINGEY, DAVID C to WASHINGTON MUTUAL BANK, FA$498,750
2006-10-06PAT — from MINGEY, DAVID C to THE ARIANA CONDOMINIUM
2006-10-06Mortgage $498,750 — from MINGEY, DAVID C to WASHINGTON MUTUAL BANK, FA$498,750
2006-10-06Deed $712,500 — from DE FINA, GINA M to MINGEY, DAVID C$712,500
2006-10-06PAT — from MINGEY, DAVID C to THE ARIANA CONDOMINIUM
2006-10-05Mortgage satisfied — from DE FINA, GINA M to WASHINGTON MUTUAL BANK, FA
2006-10-03Mortgage $332,500 — from GROSSI, JOANNA; GROSSI, JOSEPH to MERS$332,500
2006-10-03Deed — from CATAPANO, JOANNA to GROSSI, JOANNA; GROSSI, JOSEPH
2006-09-27Mortgage $50,000 — from SCIBETTA, STACY A to BANK OF AMERICA, N.A.$50,000
2006-09-15Mortgage satisfied — from CATAPANO, JOANNA to EAB MORTGAGE COMPANY, INC.
2006-09-12Agreement $250,000 — from PHYLISS A SCHRODER; SCHRODER, PHYLLIS A to JP MORGAN CHASE BANK NA$250,000
2006-09-12Mortgage $200,000 — from PHYLISS A SCHRODER; SCHRODER, PHYLLIS A to JP MORGAN CHASE BANK NA$200,000
2006-08-29DOB complaint, category ?
2006-08-24Mortgage $100,000 — from TOBASE, SHUICHI; TOBASE, CAROLINE to JP MORGAN CHASE BANK NA$100,000
2006-08-18Mortgage satisfied — from PHILIP, AMANDA to CITIMORTGAGE, INC.
2006-08-16HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM SOUT
2006-08-12Tenant complaint: HEATING — HEAT RELATED
2006-08-08Mortgage satisfied — from FARINA, ANTONIO JR.; FARINA, CARMEN to EAB MORTGAGE COMPANY INC.
2006-08-08Mortgage satisfied — from FARINA, ANTONIO JR.; FARINA, CARMEN to EAB MORTGAGE COMPANY INC.
2006-08-03Mortgage $399,000 — from PHILIP, AMANDA to OPTION ONE MORTGAGE CORPORATION$399,000
2006-08-03Deed — from PHILIP, AMANDA; ROBINSON, COLIN to PHILIP, AMANDA
2006-07-26Mortgage satisfied — from NAPOLITANO, CHRISTOPHER S; ROSS, SARAH M to JPMORGAN CHASE BANK, N.A.
2006-07-26Mortgage satisfied — from NAPOLITANO, CHRISTOPHER S; ROSS, SARAH M to JPMORGAN CHASE BANK, N.A.
2006-07-18Mortgage $435,000 — from FARINA, CARMEN; FARINA, ANTONIO JR to SIGNATURE BANK$435,000
2006-07-18SUBM — from SIGNATURE BANK to SIGNATURE BANK
2006-07-01Mortgage $75,000 — from KENKEL, BETH to NATIONAL CITY BANK$75,000
2006-07-01M&CON $150,000 — from NUCCULAJ, JUSTE; HESLIN, JOHN; HESLIN, JUSTE to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$150,000
2006-06-14Mortgage $20,000 — from MINSKY, MAURA S to THE BANK OF NEW YORK$20,000
2006-06-14Agreement $70,000 — from MINSKY, MAURA S to THE BANK OF NEW YORK$70,000
2006-06-12Mortgage $250,000 — from CORDERO, EDGAR; CORDERO, JACQUELINE C to JP MORGAN CHASE BANK NA$250,000
2006-05-30Deed $830,000 — from FULLER, WILLIAM; FULLER, ARISA to PRUDENTIAL RESIDENTIAL SERVICES$830,000
2006-05-30Deed $830,000 — from PRUDENTIAL RESIDENTIAL SERVICES LIMITED to YOSHIKAWA, YASUO; KOYAMA, MIKAKO$830,000
2006-05-30Deed $830,000 — from FULLER, WILLIAM; FULLER, ARISA to PRUDENTIAL RESIDENTIAL SERVICES$830,000
2006-05-30PAT — from YASHIKOWA, YASUO; KOYAMA, MIKAKO to ARIANA CONDOMINIUM BOARD OF MANAGERS
2006-05-30Mortgage $365,000 — from KOYAMA, MIKAKO; YOSHIKAWA, YASUO to WASHINGTON MUTUAL BANK, FA$365,000
2006-05-30PAT — from YASHIKOWA, YASUO; KOYAMA, MIKAKO to ARIANA CONDOMINIUM BOARD OF MANAGERS
2006-05-30Mortgage $365,000 — from KOYAMA, MIKAKO; YOSHIKAWA, YASUO to WASHINGTON MUTUAL BANK, FA$365,000
2006-05-30Deed $830,000 — from PRUDENTIAL RESIDENTIAL SERVICES LIMITED to YOSHIKAWA, YASUO; KOYAMA, MIKAKO$830,000
2006-05-18Mortgage satisfied — from STRATFORD, SARA; STRATFORD, TRAVIS to OCWEN LOAN SERVICING, LLC.
2006-05-18Mortgage assigned — from FAIRBANKS CAPITAL CORP to OCWEN LOAN SERVICING, LLC.
2006-05-04Mortgage $417,000 — from DIFIORE, PHILIP D; DIFIORE, JENNIFER L to MERS$417,000
2006-04-27Deed — from SEARES, JOYCE; SEARES, PHILIP to SEARES, ELIZABETH B; EAGLE, ANTONY M
2006-04-27Deed — from SEARES, JOYCE; SEARES, PHILIP to SEARES, ELIZABETH B; EAGLE, ANTONY M
2006-04-21Mortgage satisfied — from STRATFORD, SARA; STRATFORD, TRAVIS to CHASE MANHATTAN MTG CORP.
2006-04-17Deed $599,000 — from STRATFORD, TRAVIS; STRATFORD, SARA to DIFIORE, PHILIP D; DIFIORE, JENNIFER L$599,000
2006-04-17PAT — from DIFIORE, JENNIFER L; DIFIORE, PHILIP D to THE BOARD FOR THE ARIANA CONDOMINIUM
2006-04-07Mortgage $350,000 — from SEMBLER, FREDERICK M to JP MORGAN CHASE BANK NA$350,000
2006-04-04Agreement $330,000 — from HARVEY, GISELLAH; KLOTZ, JOSEPH to WASHINGTON MUTUAL BANK, FA$330,000
2006-04-04Mortgage $77,934 — from KLOTZ, JOSEPH; HARVEY, GISELLAH to WASHINGTON MUTUAL BANK, FA$77,934
2006-04-04Agreement $330,000 — from HARVEY, GISELLAH; KLOTZ, JOSEPH to WASHINGTON MUTUAL BANK, FA$330,000
2006-04-04Mortgage $77,934 — from KLOTZ, JOSEPH; HARVEY, GISELLAH to WASHINGTON MUTUAL BANK, FA$77,934
2006-03-10Mortgage $100,000 — from BROWN, O. MICHAY to JPMORGAN CHASE BANK, N.A.$100,000
2006-03-08Mortgage assigned — from AMERICAN HOME MORTGAGE to CHASE HOME FINANCE LLC
2006-03-08Mortgage satisfied — from WEINTRAUB, FREDDI; MARTIN, JEAN-MARIE to AMERICAN HOME MORTGAGE
2006-03-08Mortgage assigned — from AMERICAN HOME MORTGAGE to CHASE HOME FINANCE LLC
2006-03-08Mortgage satisfied — from WEINTRAUB, FREDDI; MARTIN, JEAN-MARIE to AMERICAN HOME MORTGAGE
2006-03-07Mortgage satisfied — from GOLDIN, MIRA; GOLDIN, ALEKSANDER to CITIMORTGAGE, INC
2006-02-27Agreement $110,000 — from CREAN, TIMOTHY C; ESTEROV, ANA to CITIBANK, N.A.$110,000
2006-02-27Mortgage $43,500 — from CREAN, TIMOTHY C; ESTEROV, ANA to CITIBANK, N.A.$43,500
2006-02-21Permit PL — ISSUED
2006-02-21Permit EW — ISSUED
2006-02-09CORR — from GARAY, JODIE; GARAY, DIEGO to ABN AMRO MORTGAGE GROUP, INC.
2006-02-01Permit EW — ISSUED
2005
2005-12-19Job filed: Propose to install a fire alarm system as per plans filed herewith. No change of use egress or occupancy is proposed under this application.$10,000
2005-12-19Job filed: Propose to remove some interior non-bearing partitions, install new interior non bearing partitions, install plumbing fixtures and modify existing spr$60,000
2005-12-09Mortgage $350,000 — from GARAY, DIEGO; GARAY, JODIE L to LASALLE BANK$350,000
2005-12-05Mortgage satisfied — from LUI, CLARENCE; HEWWING, SAMANTHA to JPMORGAN CHASE BANK
2005-11-10Mortgage $337,000 — from NAPOLITANO, CHRISTOPHER S; ROSS, SARAH M to JPMORGAN CHASE BANK, N.A.$337,000
2005-11-10Mortgage $337,000 — from NAPOLITANO, CHRISTOPHER S; ROSS, SARAH M to JPMORGAN CHASE BANK, N.A.$337,000
2005-11-07Agreement $327,600 — from ROBINSON, COLIN; PHILIP, AMANDA to CITIMORTGAGE, INC$327,600
2005-11-07Mortgage $84,508 — from ROBINSON, COLIN; PHILIP, AMANDA to CITIMORTGAGE, INC$84,508
2005-11-07Deed — from PHILIP, AMANDA to PHILIP, AMANDA; ROBINSON, COLIN
2005-11-04Mortgage satisfied — from MELLON, JONATHAN B to CITIMORTGAGE, INC.
2005-10-25Mortgage $200,000 — from YOSHIKAWA, YASUO; KOYAMA, MIKAKO to KOYAMA, YUZO$200,000
2005-10-25Mortgage $200,000 — from YOSHIKAWA, YASUO; KOYAMA, MIKAKO to KOYAMA, YUZO$200,000
2005-10-24Mortgage $70,000 — from LIPPMAN, KENNETH JR. to WASHINGTON MUTUAL BANK, FA$70,000
2005-10-19DOB violation E:
2005-10-19DOB violation E:
2005-09-22Mortgage $60,000 — from BROPHY, THOMAS A; BROPHY, LAURA J to CHARLES SCHWAB BANK, N.A.$60,000
2005-09-19Mortgage $356,000 — from ZIFF, STEWART to WASHINGTON MUTUAL BANK, FA$356,000
2005-09-19PAT — from ZIFF, STEWART to BOARD OF THE ARIANA CONDOMINIUM
2005-09-19Deed $475,000 — from MELLON, JONATHAN B to ZIFF, STEWART$475,000
2005-09-15Mortgage satisfied — from RICHTER, CHRISTOPHER; SINGER, JENNIFER to FLEET NATIONAL BANK
2005-09-12Mortgage $160,000 — from WEINTRAUB, FREDDI; MARTIN, JEAN MARIE to FLEET NATIONAL BANK$160,000
2005-08-25Mortgage $80,000 — from RICHTER, CHRISTOPHER; SINGER, JENNIFER to BANK OF AMERICA, N.A.$80,000
2005-08-19Mortgage $147,763 — from KAPLAN, SHIRLEY to JPMORGAN CHASE BANK, NA$147,763
2005-08-19Agreement $505,000 — from KAPLAN, SHIRLEY to JPMORGAN CHASE BANK, NA$505,000
2005-08-19Mortgage $147,763 — from KAPLAN, SHIRLEY to JPMORGAN CHASE BANK, NA$147,763
2005-08-19Agreement $505,000 — from KAPLAN, SHIRLEY to JPMORGAN CHASE BANK, NA$505,000
2005-08-17Mortgage $238,250 — from SCHLICHTING, LARS; SONG, RANDI to FLEET NATIONAL BANK$238,250
2005-08-14HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WATER DAMAGE CEILING AND WALL IN THE B