The city's published records show little recorded distress here in the last three years. Less recorded distress than 64% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 1.7. In ZIP 11433, 78% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
4 total — 0 class C (immediately hazardous), 2 class B, 2 class A. Oldest open since 2024-06-11.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$625 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
56 service requests in the last three years. Most common: Illegal Parking (13) · Noise (11) · Smoking or Vaping (5) · UNSANITARY CONDITION (4) · Dead Animal (3) · WATER LEAK (2).
Filed construction activity
$378,000 in permitted construction work filed since
2016 (26 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2020)
Yes
Six or more residential units (315)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
ARCHER 1 LLC
Head officer
PATRICK TAYLOR
Managing agent
FirstService Residential
Last registered
2025-09-02
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$60,794,000
$27,357,300
2026
$63,117,000
$28,402,650
2027
$60,944,000
$27,424,800
The city's market estimate has risen
0% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 35YR WITH AFF HOUSING PCT
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Jamaica Center-Parsons/Archer — E J Z · 450 ft straight-line (about a 2-minute walk) · station accessibility: full Parsons Blvd — F · 0.4 mi straight-line (about a 10-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Archer Av / 160 St — Q42 Q113 Q114 · 150 ft
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
56 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $12,189,621 on
2020-06-25 (lender: East West Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2020-06-25
Mortgage $76,938,710 — from ARCHER 1 LLC to EAST WEST BANK
$76,938,710
2020-06-25
AL&R $76,938,710 — from ARCHER 1 LLC to EAST WEST BANK
$76,938,710
2020-06-25
AL&R $12,189,621 — from ARCHER 1 LLC to EAST WEST BANK
$12,189,621
2020-06-25
Mortgage $12,189,621 — from ARCHER 1 LLC to EAST WEST BANK
$12,189,621
2019-08-05
Agreement $5,632,550 — from 160 JAMAICA, LLC to ARCHER 1 LLC
$5,632,550
2018-08-27
Mortgage $24,900,000 — from ARCHER 1 LLC to ARCHER STRATEGIC VENTURE LLC
$24,900,000
2018-08-27
Deed $19,008,112 — from JOSEPH COVELLO to ARCHER 1 LLC
$19,008,113
1995-04-06
Mortgage $105,000 — from CORNER 160 ASSOCIATES, INC to BENAR HOLDING COMPANY
$105,000
Ten-year activity
100500
2017
2018
2019
83
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
3
0
0
3
2018
0
0
11
6
0
17
2019
24
19
19
8
0
70
2020
36
30
11
4
2
83
2021
18
23
11
0
3
55
2022
19
24
5
0
2
50
2023
24
7
27
1
7
66
2024
6
5
29
0
4
44
2025
3
8
30
0
4
45
2026
5
2
19
0
6
32
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-07-29Certificate of occupancy Renewal Without Change
2025-07-27311: Dead Animal — Dog
2025-07-27311: Dead Animal — Dog
2025-07-27311: Dead Animal — Dog
2025-07-17HPD class A: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT
2025-07-17HPD class A: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1914, 20th
2025-07-10311: WATER LEAK — DAMP SPOT
2025-07-10311: UNSANITARY CONDITION — MOLD
2025-07-10Tenant complaint: WATER LEAK — DAMP SPOT
2024-06-11HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED
2024-06-11HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH AT
2024-06-03Eviction executed (1711)
2024-05-28Certificate of occupancy Renewal Without Change
2024-04-12Tenant complaint: WATER LEAK — DAMP SPOT
2024-04-12Permit NB — ISSUED
2024-04-04DOB complaint, category ?
2024-03-04Certificate of occupancy Renewal Without Change
2024-02-25311: Illegal Parking — Parking Permit Improper Use
2024-02-08311: Illegal Parking — Parking Permit Improper Use
2024-01-10Job filed: Proposed 19' wide curb cut (inclusive of splays) on 160th Street as needed to access proposed parking associated with the proposed 24-story mixed-use $1,000
2023
2023-12-15Certificate of occupancy Renewal With Change
2023-06-20Job filed: Proposed 14' wide curb cut (inclusive of splays) located on Archer Avenue associated with vehicular access to the proposed 24-story mixed-use (commerc$1,000
2023-06-16Certificate of occupancy Renewal With Change
2023-06-12Permit FO — ISSUED
2023-06-12Permit FO — ISSUED
2023-06-12Permit NB — ISSUED
2023-06-05Permit Structural — Signed-off
2023-06-04311: Dirty Condition — Trash
2023-06-02FDNY inspection (CONSTR)
2023-06-02Permit Curb Cut — Signed-off
2023-05-31Rodent inspection: Passed
2023-05-23311: Rodent — Rat Sighting
2023-05-22311: Street Condition — Plate Condition - Noisy
2023-05-21311: Street Condition — Plate Condition - Noisy
2023-05-21311: Street Condition — Plate Condition - Noisy
2023-05-21311: Street Condition — Plate Condition - Noisy
2023-05-12Certificate of occupancy Renewal With Change
2023-05-10Elevator permit: Install of (3)traction pass and (1)traction pass/service elevs. All work to comply w/ASME A17.1 2000-2003 NYC Bldg Code App K. *P1$335,600
2023-04-28Certificate of occupancy Renewal Without Change
2023-04-24Certificate of occupancy Renewal With Change
2023-04-18DOB complaint, category ?
2023-04-18DOB complaint, category ?
2023-04-17ECB CLASS - 2 violation: THE SCAFFOLD WAS FOUND TO HAVE NO GUARDRAIL, TOE BOARD, AND UNTIED PLANKS DURING INSPECTION, VIOLATING SAFETY REGULATIONS UNDER C
2023-04-17ECB CLASS - 2 violation: DURING INSPECTION, FOUND THAT THE SSM WAS NOT PRESENT AT AN ACTIVE SITE WITH 79 WORKERS, VIOLATING CODE SECTION 3310.5.2. ADDITION$1,250
2023-04-05Permit Construction Fence — Signed-off
2023-03-30311: Street Condition — Plate Condition - Noisy
2023-03-29Permit NB — ISSUED
2023-03-27Certificate of occupancy Renewal With Change
2023-03-17Bedbug filing: 0 infested units
2023-02-27Certificate of occupancy Renewal With Change
2023-02-24Permit Sidewalk Shed — Signed-off
2023-02-16Permit General Construction — Signed-off
2023-02-06Job filed: This application is filed for a Temporary Use Permit for a sale office pursuant to section AC 28-111 and Buildings Bulleyion 2010-002$1,000
2023-01-30Certificate of occupancy Renewal With Change
2022-11-23Certificate of occupancy Renewal With Change
2022-11-09Certificate of occupancy Initial
2022-10-20Rodent inspection: Passed
2022-10-18DOB complaint, category ?
2022-10-11DOB complaint, category ?
2022-09-12Permit NB — ISSUED
2022-08-23FDNY inspection (CDA-90-DRILL)
2022-08-19Permit Supported Scaffold — Signed-off
2022-08-16Permit PL — ISSUED
2022-08-04ECB CLASS - 2 violation: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS.RESPONDENT FAILED TO COMPLY W$625
2022-08-04ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT.AT TIME OF INSPECTION ON ACTIVE JOB SITE OBSERVED PERMIT HOLDER $6,250
2022-08-04ECB CLASS - 1 violation: UNSAFE MATERIALS STORAGE DURING CONSTRUCTION OR DEMOLITION.AT TIME OF INSPECTION ON ACTIVE JOB SITE OBSERVED MATERIALS STORED AT R$6,250
2022-08-04ECB CLASS - 2 violation: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS.RESPONDENT FAILED TO COMPLY W$625
2022-08-04DOB complaint, category ?
2022-07-21Permit NB — RE-ISSUED
2022-07-08Permit EW — ISSUED
2022-06-29311: Rodent — Rat Sighting
2022-06-28Permit NB — ISSUED
2022-06-22ECB CLASS - 1 violation: AT THE TIME OF INSPECTION I OBSERVED AN ACTIVE CONSTRUCTION SITE UNDER PSWO, FROM REVIEW OF DEPARTMENT RECORDS I OBSERVED THAT THE$5,000
2022-06-22DOB complaint, category ?
2022-06-17Permit Construction Fence — Signed-off
2022-06-10Permit NB — ISSUED
2022-05-25DOB complaint, category ?
2022-05-25DOB complaint, category ?
2022-05-24ECB CLASS - 2 violation: MIRRORS AT BLIND SPOTS-MISSING.AT TIME OF INSPECTION OF ACTIVE JOB SITE OBSERVED PERMIT HOLDER FAILED TO COMPLY WITH CODE AT TIME
2022-05-24ECB CLASS - 2 violation: DRAINAGE-WATER ACCUMULATION/STANDING WATER.AT TIME OF INSPECTION OF ACTIVE JOB SITE OBSERVED ON 4TH FLOOR LEVEL SETBACK ON EXP #1-
2022-05-24ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AT TIME OF INSPECTION OF ACTIVE JOB SITE OBSERVED PERMIT HOLDER$2,500
2022-05-24ECB CLASS - 1 violation: UNSAFE STORAGE OF MATERIALS DURING CONSTRUCTION OR DEMOLITION:AT TIME OF INSPECTION OF ACTIVE JOB SITE ON BULKHEAD LEVEL PERMIT HO$2,500
2022-05-24ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS-SSP.AT TIME OF INSPECTION OF ACTIVE JOB SITE O$625
2022-05-24ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-MISSING & INADEQUATE GUARDRAILS.AT TIME OF INSPE$625
2022-05-17FDNY inspection (CDA-90-DRILL)
2022-05-05Job filed: Install support scaffold for construction of new building. No change in use, Occupancy, Egress.$60,000
2022-04-23311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-04-14Permit Construction Fence — Signed-off
2022-03-25Permit NB — ISSUED
2022-03-23Permit EQ — ISSUED
2022-03-12DOB complaint, category ?
2022-03-10ECB CLASS - 2 violation: FAILURE TO COMPLY W/MANUFACTURER SPECIFICATIONS CUT/MODIFIED PIPE FRAMES EXP#4(2FT FRAMES). AT TIME OF INSPECTION AT A 24 STY NB,I$625
2022-02-27311: Encampment — N/A
2022-02-19Permit Sidewalk Shed — Signed-off
2022-02-08FDNY inspection (CDA-90-DRILL)
2022-01-24Elevator permit: Installation of three (3) traction passenger and one (1) traction passenger/service elevators. All work to comply with ASME A17.1 $335,600
2022-01-04Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2022-01-03Permit NB — ISSUED
2021
2021-12-28Job filed: APPLICATION FOR SPRINKLER STANDPIPE WORK FILED IN CONJUNCTION WITH NB#420665541$10,000
2021-12-23Job filed: This application is filed for a Temporary Use Permit for a sale office pursuant to section AC 28-111 and Buildings Bulleyion 2010-002$1,000
2021-12-16311: Street Light Condition — Street Light Out
2021-12-07Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-11-29Permit Sprinklers — Signed-off
2021-11-29Permit Standpipe — Signed-off
2021-11-05DOB complaint, category ?
2021-11-04ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO CONSTRUCTION DOCUMENT/AND OR APPROVED AMENDMENTS.AT TIME OF INSPECTION OF AN ACTIVE JOBSITE WITH ABOUT 16$2,400
2021-11-04ECB CLASS - 2 violation: WORK DOES NOT CONDFORM TO CONSTRUCTION DOCUMENTS/AND OR APPROVED AMENDMENTS.AT TIME OF INSPECTION OF AN ACTIVE JOBSITE WITH ABOUT $625
2021-11-04ECB CLASS - 2 violation: DOCUMENTS TO BE KEPT ONSITE.AT TIME OF INSPECTION OF AN ACTIVE JOBSITEI OBSERVED PULLEY'S ON THE BULKHEAD OF AN ELEVATOR ROOM.CONN$625
2021-10-27Permit Standpipe — Signed-off
2021-09-30Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-09-29Job filed: This application is filed for a Temporary Use Permit for a sale office pursuant to section AC 28-111 and Buildings Bulleyion 2010-002$1,000
2021-09-02Permit PL — ISSUED
2021-08-02Permit Supported Scaffold — Signed-off
2021-07-19FDNY inspection (CDA-90-DRILL)
2021-06-29311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2021-06-29311: COVID-19 Non-essential Construction — Construction
2021-06-29311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-06-29311: General Construction/Plumbing — Safety Netting/Guard Rails - Damaged/Inadequate/None (6 Stories/75 Feet Or Less)
2021-06-29DOB complaint, category ?
2021-06-29DOB complaint, category ?
2021-06-29DOB complaint, category ?
2021-06-14Permit Construction Fence — Signed-off
2021-06-11DOB complaint, category ?
2021-06-11DOB complaint, category ?
2021-06-10ECB CLASS - 1 violation: FAILURE TO PROVIDE SAFETY EQUIPMENT OR INFORM WORKERS OF DANGERS AFFECTED BY CONSTRUCTION OPERATIONS-FAILURE TO PROVIDE CAZ,GUARDR$10,000
2021-06-10ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKERS ATTENDED PRE-SHIFT MEETINGS. ATTIME OF INSPECTION ON AN ACTIVE 24 STORY NB JOB SITE I OBSER$1,250
2021-06-10ECB CLASS - 1 violation: 28-105.12.8 WORK CONTRARY TO APPROVED CONSTRUCTION DOCUMENTS. AT TIME OF INSPECTION ON AN ACTIVE 24 STORY NB JOB SITE I OBSERVED S$625
2021-06-10ECB CLASS - 1 violation: HOUSEKEEPING. AT TIME OF INSPECTION ON AN ACTIVE 24 STORY NB JOB SITE I OBSERVED LARGE PILES OF DEBRIS AT THE END OF DAY,TRIPPING $625
2021-06-04311: COVID-19 Non-essential Construction — Construction
2021-06-04DOB complaint, category ?
2021-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-05-03311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-05-03DOB complaint, category ?
2021-04-28Permit PL — ISSUED
2021-04-13FDNY inspection (CDA-90-DRILL)
2021-04-01Permit Construction Fence — Signed-off
2021-03-30Permit FO — ISSUED
2021-03-25Permit EQ — ISSUED
2021-03-23Permit Supported Scaffold — Signed-off
2021-02-26Permit Plumbing — Signed-off
2021-02-24Permit Sidewalk Shed — Signed-off
2021-02-22DOB complaint, category ?
2021-02-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-02-13311: COVID-19 Non-essential Construction — Construction
2021-02-13311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-02-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-02-11Elevator permit: Installation of two (2) new holeless hydraulic freight elevators. Serving Floors 1-2. All work to comply with NYC DOB Building Cod$154,121
2021-02-11Elevator permit: Installation of one (1) new holeless hydraulic passenger elevator. Serving Floors C and 1. All work to comply with NYC DOB Buildin$43,913
2021-02-11Elevator permit: Install of (3)traction pass and (1)traction pass/service elevs. All work to comply w/ASME A17.1 2000-2003 NYC Bldg Code App K. *P1$335,600
2020
2020-12-21DOB complaint, category ?
2020-12-21Permit Supported Scaffold — Signed-off
2020-12-02Permit Standpipe — Signed-off
2020-12-02Permit Sprinklers — Signed-off
2020-12-01Permit Sprinklers — Signed-off
2020-12-01Permit Standpipe — Signed-off
2020-11-25Permit Standpipe — Signed-off
2020-11-20Permit NB — RE-ISSUED
2020-11-17311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2020-11-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-11-17ECB CLASS - 1 violation: SEC. 28-401.4 ILLEGALLY ENGAGING IN ANY BUSINESS OR OCCUPATION W/O A REQUIRED LICENSE OR OTHER AUTHORIZATION. NOTE: AT THE TIME OF$5,000
2020-11-17ECB CLASS - 1 violation: SEC. 3310.7 CONTRACTOR SHALL INFORM PERSONEEL. NOTE: AT THE TIME OF MYINSPECTION OF ON 24 STY BLDG AT 10 FLOOR LEVEL CONSTRUCTION $625
2020-11-17ECB CLASS - 1 violation: SEC. 3310.9 ADDITIONAL SITE SAFETY PERSONNEL. NOTE: AT THE TIME OF MY INSPECTION OF AN A24 STY BLDG AT 10 FLOOR LEVEL CONSTRUCTION$625
2020-11-17DOB complaint, category ?
2020-10-26ECB CLASS - 2 violation: BC3306.9.10.3 UNCOVERED HOLE AT THE TIME OF MY INSPECTION OF A 24 STORIES NB JOBSITE AT THE FLOOR LEVEL I OBSERVED UNCOVERED HOLE
2020-09-29Job filed: Install support scaffold for construction of new building. No change in use, Occupancy, Egress.$60,000
2020-09-25DOB complaint, category ?
2020-09-25DOB complaint, category ?
2020-09-24ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS AT THE TIME OF MY INSPECTION OF A PROPOSED 2$2,500
2020-09-24ECB CLASS - 1 violation: FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED AT THE TIME OF MY INSPECTION OF A PROPSOED 24 STORY NEW BUILDING I OBSERVED APPROX$2,500
2020-09-04Job filed: INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-09-02Permit NB — ISSUED
2020-08-19Job filed: PLUMBING SCOPE IN CONJUNCTION WITH NB JOB NO. 420665541$5,000
2020-08-06311: COVID-19 Non-essential Construction — Construction
2020-08-06311: COVID-19 Non-essential Construction — Construction
2020-08-06311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-08-06ECB CLASS - 1 violation: WORK W/O A PERMIT. NOTE: @THE TIME OF MY INSPECTION OF AN 22 STY BLDG WITH WORK IN PROGRESS ON 6 FLOOR, I OBSERVED CARPENTERS & RE$2,500
2020-08-06ECB CLASS - 1 violation: MANUFACTURE SPECIFIACTION NOTE: @THE THEM OF MY INSPECTION OF A 22 STY BLDG ON 6 FLOOR WITH WORK IN PROGRESS. WITH CONSIST CARPENT$625
2020-08-06ECB CLASS - 1 violation: OVERHEAD PROTECTION NOTE: @THE TIME OF MY INSPECTION OF AN 22 STY BLDGWITH WORK IN PROVES, I OBSERVED @EXP 2 & SCAFFOLD CONST IN P
2020-08-06ECB CLASS - 1 violation: 28-105.12.2 WORK NOT CONFORM TO DESIGN DRAWING NOTE: @THE TIME OF MY INSPECTION 08 22 STY BLDG WITH ACTIVE WORK ON SECOND FLOOR EX$625
2020-08-06ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.NOTE: @THE TIME OF MY INSPECTION OR AN 22 STY BLDG ON 6 FLOOR W$625
2020-08-06DOB complaint, category ?
2020-08-06DOB complaint, category ?
2020-07-15Elevator permit: PROPOSED INSTALLATION OF DUAL 7000 LBS. ALIMAK SCANDO HOIST AS PER PLANS IN CONJUNCTION WITH DOB JOB #420665541 WHICH IS FOR PROPO$20,000
2020-07-08Job filed: Reinforced concrete two way slabs supported by reinforced concrete columns and ordinary reinforced concrete shear walls supported on a reinforced conc$5,000
2020-06-26DOB complaint, category ?
2020-06-25Mortgage $76,938,710 — from ARCHER 1 LLC to EAST WEST BANK$76,938,710
2020-06-25AL&R $76,938,710 — from ARCHER 1 LLC to EAST WEST BANK$76,938,710
2020-06-25AL&R $12,189,621 — from ARCHER 1 LLC to EAST WEST BANK$12,189,621
2020-06-25Mortgage $12,189,621 — from ARCHER 1 LLC to EAST WEST BANK$12,189,621
2020-06-25311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2020-06-25311: General Construction/Plumbing — Adjacent Buildings Not Protected
2020-06-25ECB CLASS - 1 violation: SEC. BC 3301.2 FAILURE TO MAINTAIN SAFETY MEASURES MEANS OF EGRESS. NOTE: AT TIME OF MY INSPECTION OF A 24 STY NEW BLDG AT 3RD FL $2,500
2020-06-25ECB CLASS - 2 violation: FAILURE TO PROVIDE SAFETY MEASURE ALL PERSON & PROPERTY EFFECTED BY CONSTRUCTION-OVERHEAD PROTECTION. NOTE: AT TIME OF MY INSPECTI$5,000
2020-06-25DOB complaint, category ?
2020-06-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-06-17DOB complaint, category ?
2020-06-12Permit Construction Fence — Signed-off
2020-06-10Permit FO — ISSUED
2020-06-10Permit FO — ISSUED
2020-04-13FDNY inspection (CDA-90-DRILL)
2020-04-10Elevator permit: PROPOSED INSTALLATION OF DUAL 7000 LBS. ALIMAK SCANDO HOIST AS PER PLANS IN CONJUNCTION WITH DOB JOB #420665541 WHICH IS FOR PROPO$20,000
2020-03-31311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-03-31DOB complaint, category ?
2020-03-27Permit Construction Fence — Signed-off
2020-03-25Permit EQ — ISSUED
2020-03-24Job filed: INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-03-24Job filed: INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-03-24Job filed: INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-03-18Job filed: Proposed 19' wide curb cut (inclusive of splays) on 160th Street as needed to access proposed parking associated with the proposed 24-story mixed-use $1,000
2020-02-24Permit Sidewalk Shed — Signed-off
2020-02-24Permit EQ — ISSUED
2020-02-21Permit Structural — Signed-off
2020-02-21Job filed: Reinforced concrete two way slabs supported by reinforced concrete columns and ordinary reinforced concrete shear walls supported on a reinforced conc$5,000
2020-02-21Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-02-21Job filed: INSTALLATION OF NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-01-28Permit Plumbing — Signed-off
2020-01-23Job filed: UNDERGROUND PLUMBING SCOPE IN CONJUNCTION WITH NB JOB NO. 420665541$5,000
2020-01-16DOB complaint, category ?
2020-01-12FDNY inspection (CDA-90-DRILL)
2020-01-02Permit Standpipe — Signed-off
2020-01-02Permit Sprinklers — Signed-off
2019
2019-12-27Permit FO — ISSUED
2019-12-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-12-15DOB complaint, category ?
2019-11-26ECB CLASS - 2 violation: FAILUER TO SAFEGUARD PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION.NOTEAT TIME OF INSPECTION OF A 24 STORY BUILDING AT FOUNDATION L$5,000
2019-11-20Permit FO — ISSUED
2019-11-19311: General Construction/Plumbing — Adjacent Buildings Not Protected
2019-11-19DOB complaint, category ?
2019-11-11311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2019-11-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-11-11311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2019-11-11DOB complaint, category ?
2019-11-11DOB complaint, category ?
2019-11-11DOB complaint, category ?
2019-10-24FDNY inspection (CONSTR)
2019-10-24311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-10-24DOB complaint, category ?
2019-10-23311: General Construction/Plumbing — Adjacent Buildings Not Protected
2019-10-23DOB complaint, category ?
2019-10-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-10-22DOB complaint, category ?
2019-10-18311: General Construction/Plumbing — Adjacent Buildings Not Protected
2019-10-18311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2019-10-18DOB complaint, category ?
2019-10-18DOB complaint, category ?
2019-10-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-10-13DOB complaint, category ?
2019-10-10311: General Construction/Plumbing — Working Contrary To Stop Work Order
2019-10-10311: General Construction/Plumbing — Working Contrary To Stop Work Order
2019-10-10DOB complaint, category ?
2019-10-10DOB complaint, category ?
2019-10-09FDNY inspection (CONSTR)
2019-10-09ECB CLASS - 2 violation: MONITORING.NOTE:AT TIME OF MY INSPECTION OF A 24 STORY NEW BUILDING ATEXCAVATION LEVEL UNDER CONSTRUCTION I OBSERVED THAT SHORING $312
2019-10-07311: Sidewalk Condition — Blocked - Construction
2019-10-04311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-07-30Mortgage satisfied — from ARCHER 1 LLC to ARCHER STRATEGIC VENTURE LLC
2019-06-11Deed — from ARCHER 1, LLC to ARCHER 1, LLC
2019-05-31Deed transfer (nominal price)
2019-05-23Job filed: Proposed 14' wide curb cut (inclusive of splays) located on Archer Avenue associated with vehicular access to the proposed 24-story mixed-use (commerc$1,000
2019-05-21Job filed: Proposed 18' wide curb cut (inclusive of splays) on 160th Street as needed to access proposed parking associated with the proposed 24-story mixed-use $1,000
2019-05-14Job filed: HEREWITH FILING FOR CIVIL SITE AND PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2019-05-01Job filed: APPLICATION FOR BPP FILED IN CONJUNCTION WITH NB #420665541 206LF.ON ARCHER AVE. 136.2 LF. ON 160 STREET. TOTAL 342.2LF.
2019-04-19Job filed: APPLICATION FILED FOR 24 STORY NB
2019-04-19Job filed: SUBSEQUENT FILING FOR STRUCTURAL SCOPE
2019-04-19Job filed: SUBSEQUENT FILING FOR SOE SCOPE
2019-04-19Job filed: SUBSEQUENT FILING FOR MEP SCOPE
2019-04-15Job filed: NB
2019-03-17311: Street Light Condition — Street Light Out
2015-11-13Rodent inspection: Failed for Other Reason
2015-11-13Rodent inspection: Passed
2015-07-17Rodent inspection: Passed
2015-06-09Rodent inspection: Failed for Other Reason
2014
2014-12-03Rodent inspection: Failed for Other Reason
2014-11-13Rodent inspection: Failed for Other Reason
2014-11-13Rodent inspection: Passed
2014-01-27311: Graffiti — Graffiti
2013
2013-10-31Rodent inspection: Failed for Other Reason
2013-10-31Rodent inspection: Passed
2013-08-30Rodent inspection: Passed
2013-06-12Rodent inspection: Failed for Other Reason
2013-01-14311: Graffiti — Graffiti
2012
2012-08-03ECB CLASS - 2 violation: OWNER FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO FILE A C/C W/THEDOB FOR ECB VIOLATIONS #34944972Y, 34946458K, 34931034P, 349$4,000
2012-07-12311: Graffiti — Graffiti
2012-05-18DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-04-18DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-02-17ECB CLASS - 2 violation: OWNER FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A C OF C W/THE DEPPT OF BUILDINGS FOR ECB VIOLATION #34931034P & DOB #102711C12$800
2012-02-17ECB CLASS - 1 violation: OPEN LOT OCCUPIED W/O VALID C OF O. NOTED: PREMISES FILE JOB PERMIT #420377247 FOR DEMOLITION OF 1 STORY COMMERCIAL BRICK BUILDING$1,000
2012-01-27ECB CLASS - 1 violation: OPEN LOT BEING USED AS A FLEA MARKET & COMMERCIAL PARKING LOT. ORGINALBUILDING DEMOLISHED APP #420377247 & SIGNED OFF 10/20/11. TH$2,500
2012-01-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011
2011-10-27ECB CLASS - 1 violation: OPEN LOT OCCUPIED W/O A VALID C OF O. NOTED: DEMOLITION JOB PERMIT #420377247 HAS APPROVED ON 7/6/11 & SIGNED OFF ON 10/20/11. AT $1,000
2011-09-19ECB CLASS - 2 violation: BC3301.10 OBSCURED LAWFUL SIGNS AT THE THE TIME OF MY INSP BLDG DEMOLISHED DOWN TO GRADE I OBSERVED A SIDEWALK SHED ERECTED AROUND$400
2011-09-16ECB CLASS - 2 violation: 3304.4.4MISC.VIO.FAILURE TO PROVIDE 3FT 6" GUARDRAILS AROUND OPEN EXCAVATION.NOTED:DEMO WORK DONE VIA JOB #420377247 EXP.10/02/201
2011-09-16ECB CLASS - 2 violation: 304.4.4MISC.VIO.FAILURE TO PROVIDE 3'FT 6" GUARDRAIL AROUND OPEN EXCAVATION.NOTED:DEMO WORK DONE VIA JOB3420377247 EXP. 10/02/11.N$400
2011-07-26Job filed: DOC.2 FILED FOR SIDEWALK SHED DURING DEMOLITION SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO STORAGE PERMITTED ON SIDEWALK
2011-07-06Job filed: DM
2011-06-08Rodent inspection: Passed
2011-05-06Rodent inspection: Passed
2011-05-06Rodent inspection: Failed for Other Reason
2011-04-29Rodent inspection: Passed
2011-04-04Rodent inspection: Failed for Other Reason