The city's published records show little recorded distress here in the last three years. Less recorded distress than 70% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 6. In ZIP 10011, 68% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$2,850 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
6 service requests in the last three years. Most common: Missed Collection (1) · Street Sign (1) · Blocked Driveway (1) · Encampment (1) · Graffiti (1) · Street Condition (1).
Filed construction activity
$3,591,871 in permitted construction work filed since
2016 (36 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2007)
Yes
Six or more residential units (15)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
200 ELEVENTH AVENUE CONDOMINIUM
Head officer
LEONARD STEINBERG
Managing agent
DOUGLAS ELLIMAN PROPERTY MANAGEMENT
Last registered
2025-07-18
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,149,879
$517,445
2026
$1,375,006
$618,753
2027
$0
$0
The city's market estimate has fallen
100% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 10 YR NO CAP
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $3,721,852 a year
($61.05 per sq ft), operating expenses $1,116,860
($18.32 per sq ft), net operating income $2,604,992. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Facade (Local Law 11)
SAFE (cycle 10)
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
34 St-Hudson Yards — 7 · 0.5 mi straight-line (about a 12-minute walk) · station accessibility: full 23 St — C E · 0.5 mi straight-line (about a 12-minute walk) · station accessibility: none
Bus
Nearest boarding stop: W 23 St / 11 Av — M23-SBS · 150 ft · Select Bus Service
Citi Bike
11 Ave & W 27 St · 850 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
6 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Job filed: WINDOW INSPECTION AND MAINTENANCE VIA INDUSTRIAL ROPE ACCESS
2026-05-15
Rodent inspection: Passed
2026-04-27
Certificate of occupancy Renewal Without Change
2026-04-20
Job filed: Plumbing work is proposed in the existing unit #5S on the 5th and 6th floors. The initial general construction application will be filed. All work is
2026-02-11
Job filed: Modification to existing gas meter room as per plans. No change to use, egress, or occupancy.
2026-02-10
Permit Plumbing — Signed-off
2026-02-03
Certificate of occupancy Renewal Without Change
2026-01-16
Permit General Construction — Signed-off
2025-12-19
Bedbug filing: 0 infested units
2025-12-08
Deed — from STEINBERG, LEONARD to 200ELEVENTH LLC
2025-11-26
Mortgage satisfied — from PREMIER BUSINESS HOLDINGS LIMITED to CITIBANK
2025-11-19
Facade (LL11) filing, cycle 10: SAFE
2025-11-18
PAT — from STEINBERG, LEONARD to 200ELEVENTH LLC
2025-11-13
Deed transfer (nominal price)
2025-11-13
Deed transfer (nominal price)
2025-11-13
Job filed: 9th Cycle FISP Repairs. No change to use, egress or occupancy.
2025-11-13
Job filed: ADDITION OF ONE SHOWER UNIT IN LOCATION OF AN EXISTING CLOSET LOCATED WITHIN AN EXISTING POWDER ROOM. NO CHANGE IN USE OCCUPANCY OR EGRESS. WORK LIMI
2025-11-10
Certificate of occupancy Renewal Without Change
2025-10-22
Job filed: ADDITION OF ONE SHOWER UNIT IN LOCATION OF AN EXISTING CLOSET LOCATED WITHIN AN EXISTING POWDER ROOM. NO CHANGE IN USE OCCUPANCY OR EGRESS. WORK LIMI
The full timeline
2026
2026-10-13Certificate of occupancy Renewal Without Change
2026-09-15311: Street Condition — Defective Hardware
2026-08-14311: Graffiti — Graffiti
2026-08-07Permit Structural — Permit Issued
2026-08-02311: Encampment — N/A
2026-07-20Certificate of occupancy Renewal Without Change
2026-05-20Job filed: WINDOW INSPECTION AND MAINTENANCE VIA INDUSTRIAL ROPE ACCESS
2026-05-15Rodent inspection: Passed
2026-04-27Certificate of occupancy Renewal Without Change
2026-04-20Job filed: Plumbing work is proposed in the existing unit #5S on the 5th and 6th floors. The initial general construction application will be filed. All work is $51,216
2026-02-11Job filed: Modification to existing gas meter room as per plans. No change to use, egress, or occupancy.$30,000
2026-02-10Permit Plumbing — Signed-off
2026-02-03Certificate of occupancy Renewal Without Change
2026-01-16Permit General Construction — Signed-off
2025
2025-12-19Bedbug filing: 0 infested units
2025-12-08Deed — from STEINBERG, LEONARD to 200ELEVENTH LLC
2025-11-26Mortgage satisfied — from PREMIER BUSINESS HOLDINGS LIMITED to CITIBANK
2025-11-19Facade (LL11) filing, cycle 10: SAFE
2025-11-18PAT — from STEINBERG, LEONARD to 200ELEVENTH LLC
2025-11-13Deed transfer (nominal price)
2025-11-13Deed transfer (nominal price)
2025-11-13Job filed: 9th Cycle FISP Repairs. No change to use, egress or occupancy.$224,095
2025-11-13Job filed: ADDITION OF ONE SHOWER UNIT IN LOCATION OF AN EXISTING CLOSET LOCATED WITHIN AN EXISTING POWDER ROOM. NO CHANGE IN USE OCCUPANCY OR EGRESS. WORK LIMI$5,000
2025-11-10Certificate of occupancy Renewal Without Change
2025-10-22Job filed: ADDITION OF ONE SHOWER UNIT IN LOCATION OF AN EXISTING CLOSET LOCATED WITHIN AN EXISTING POWDER ROOM. NO CHANGE IN USE OCCUPANCY OR EGRESS. WORK LIMI$10,000
2025-10-19311: Blocked Driveway — No Access
2025-10-03DOB complaint, category ?
2025-09-13311: Street Sign - Damaged — Other/Unknown
2025-08-18Certificate of occupancy Renewal Without Change
2025-07-30DOB complaint, category ?
2025-07-30DOB complaint, category ?
2025-07-17Cooling tower inspection
2025-07-11ECB CLASS - 2 violation: OBSERVED NO DOB APPROVED PLANS, (JOB APPLICATION NO.M01204203-I1-GC) ON SITE AT TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOC$1,250
2025-07-11ECB CLASS - 1 violation: OBSERVED ELECTRICAL WORK DONE, (EXPOSED ELECTRICAL WIRES, BX CABLES, AND POWER OUTLETS) INSTALLED WITHOUT PERMITS LOCATED THROUGHO$1,600
2025-07-11DOB complaint, category ?
2025-07-10DOB complaint, category ?
2025-07-10DOB complaint, category ?
2025-06-25Permit Plumbing — Signed-off
2025-06-25Permit Plumbing — Permit Issued
2025-06-25Permit General Construction — Signed-off
2025-06-25Permit General Construction — Permit Issued
2025-05-29Permit Structural — Permit Issued
2025-05-29Certificate of occupancy Renewal Without Change
2025-04-15Job filed: General construction work is proposed in the existing unit #5S on the 5th and 6th floors. A subsequent plumbing application will be filed. All work is$58,200
2025-04-15Job filed: Plumbing work is proposed in the existing unit #5S on the 5th and 6th floors. The initial general construction application will be filed. All work is $51,216
2025-04-14FDNY inspection (RISK)
2025-03-04Certificate of occupancy Renewal Without Change
2025-02-21Job filed: HEREWITH FILING FOR NEW MECHANICAL EQUIPMENT PLATFORM/CATWALK ABOVE THE 11TH FLOOR$40,000
2025-01-23Mortgage satisfied — from ENGELBERT, OSCAR to HSBC BANK USA, N.A.,; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2024
2024-12-19Bedbug filing: 0 infested units
2024-12-09Certificate of occupancy Renewal Without Change
2024-11-18Permit Suspended Scaffold — Signed-off
2024-10-29Job filed: FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervi
2024-10-01Bedbug filing: 0 infested units
2024-09-26Rodent inspection: Passed
2024-09-16Certificate of occupancy Renewal With Change
2024-07-01Boiler inspection
2024-07-01Boiler inspection
2024-04-10Permit Suspended Scaffold — Signed-off
2024-03-24Job filed: WINDOW INSPECTION VIA INDUSTRIAL ROPE ACCESS
2024-03-14Certificate of occupancy Renewal Without Change
2024-03-11Deed $6,900,000 — from ENGELBERT, OSCAR to SELF, OWAIN$6,900,000
2024-03-11PAT — from SELF, OWAIN to GAIA HOUSE, LLC
2024-03-11Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to HSBC BANK USA, N.A.
2024-03-11Mortgage assigned — from HSBC BANK USA, N.A. to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2024-03-11Agreement $3,450,000 — from SELF, OWAIN to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$3,450,000
2024-03-11PAT — from ENGELBERT, OSCAR to WARD, ANDREW; KRAUSS, SANDOR; GORDON, SAMANTHA; ISAACSON, RACHEL
2024-03-11TOLCC — from BOARD OF MANAGERS OF THE 200 ELEVENTH AV to ENGELBERT, OSCAR
2024-02-28Sold for $6,900,000$6,900,000
2024-01-18DOB complaint, category ?
2023
2023-12-21Bedbug filing: 0 infested units
2023-12-21Certificate of occupancy Renewal Without Change
2023-11-23Job filed: SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK.
2023-11-01311: Missed Collection — Trash
2023-10-04Certificate of occupancy Renewal Without Change
2023-09-24311: Missed Collection — Trash
2023-08-14Job filed: Addition of three (3) new sprinkler heads to existing system.$7,500
2023-08-10Boiler inspection
2023-08-10Boiler inspection
2023-08-09LOCC — from ENGELBERT, OSCAR to THE 200 ELEVENTH AVENUE CONDOMINIUM
2023-07-11Certificate of occupancy Renewal Without Change
2023-06-08Permit General Construction — Permit Issued
2023-05-30Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCC$1,000
2023-05-30Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2023-05-30Permit Supported Scaffold — Signed-off
2023-05-30Permit Sidewalk Shed — Signed-off
2023-04-25Certificate of occupancy Renewal Without Change
2023-04-07Job filed: 9th Cycle FISP Repairs. No change to use, egress or occupancy.$224,095
2023-04-05Job filed: Addition of three (3) new sprinkler heads to existing system.$7,500
2023-03-10FDNY inspection (RISK)
2023-02-06Certificate of occupancy Renewal Without Change
2022
2022-12-16Bedbug filing: 0 infested units
2022-11-14Certificate of occupancy Renewal Without Change
2022-10-16311: Blocked Driveway — No Access
2022-10-15311: Blocked Driveway — No Access
2022-10-05PAT — from MICHELE MULROONEY, TRUSTEE; NK QPRT NO. 2; NK QPRT NO.1 to BOARD OF MANAGERS OF THE 200 ELEVENTH; GAIA HOUSE, LLC
2022-10-05Deed — from NK QPRT NO. 2; MICHELE MULROONEY, SUCCESSOR TRUSTEE; NK QPRT NO.1 to NK QPRT NO. 2; NK QPRT NO.1; MICHELE MULROONEY, TRUSTEE
2022-09-28Job filed: RENOVATION/ALTERATION & REPLACEMENT OF SINK AT KITCHEN, AT (1) BATH ON 6TH FLR, AT (2) BATHS ON 7TH FLR. CAP AND REMOVE POWDER ROOM AT 6TH FLR. REPLAC$24,000
2022-09-19Job filed: Renovation of Duplex Apartment 6H, located on the 6th and 7th Floors, including Kitchen and 3 Bathrooms. No change in use, Egress, or Occupancy.$506,275
2022-09-06Deed transfer (nominal price)
2022-08-29Job filed: Removal and replacement of Boiler Vent.$384,400
2022-08-18Boiler inspection
2022-08-18Boiler inspection
2022-08-15Permit Sprinklers — Signed-off
2022-08-08Certificate of occupancy Renewal Without Change
2022-07-29Job filed: Addition of three (3) new sprinkler heads to existing system.$7,500
2022-07-17311: Street Sign - Missing — Other/Unknown
2022-06-23Cooling tower inspection
2022-06-19311: Blocked Driveway — No Access
2022-06-08Permit General Construction — Signed-off
2022-06-07DOB complaint, category ?
2022-06-06Permit Plumbing — Signed-off
2022-06-06DOB complaint, category ?
2022-05-26DOB violation C: VACATE ORDER DUE TO UNSTABLE GLASS RAILINGS ON 4FL ROOF TERRACE, WEST ELEVATION. OBSERVED UNSTABLE GLASS RAILINGS ON 4FL TERRACE A
2022-05-23DOB complaint, category ?
2022-05-23Certificate of occupancy Renewal Without Change
2022-05-20Permit Sidewalk Shed — Signed-off
2022-05-19Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2022-04-11Job filed: RENOVATION/ALTERATION & REPLACEMENT OF SINK AT KITCHEN, AT (1) BATH ON 6TH FLR, AT (2) BATHS ON 7TH FLR. CAP AND REMOVE POWDER ROOM AT 6TH FLR. REPLAC$24,000
2022-04-06Job filed: Renovation of Duplex Apartment 6H, located on the 6th and 7th Floors, including Kitchen and 3 Bathrooms. No change in use, Egress, or Occupancy.$506,275
2022-03-20311: Blocked Driveway — No Access
2022-03-10Bedbug filing: 0 infested units
2022-03-09HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-23Certificate of occupancy Renewal Without Change
2022-01-03Mortgage assigned — from UBS BANK USA to MERS; UBS BANK USA
2022-01-03Agreement $5,000,000 — from 200 ELEVENTH 6N OWNER LLC to UBS BANK USA; MERS$5,000,000
2022-01-03Mortgage assigned — from BANK OF AMERICA to UBS BANK USA
2021
2021-12-19311: Missed Collection — Trash
2021-11-29Facade (LL11) filing, cycle 9: SWARMP
2021-11-26Certificate of occupancy Renewal Without Change
2021-10-27Permit Structural — Signed-off
2021-09-17Permit Sidewalk Shed — Signed-off
2021-09-15Job filed: HEREWITH FILING FOR MODIFICATION ASSOCIATED WITH THE INSTALLATION OF A CAT WALK$157,000
2021-08-23Boiler inspection
2021-08-23Boiler inspection
2021-07-20Job filed: HEREWITH FILING FOR MODIFICATION ASSOCIATED WITH THE INSTALLATION OF A CAT WALK$157,000
2021-07-09311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-06-05Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2021-05-09311: Noise - Helicopter — Other
2021-03-25Permit Sidewalk Shed — Signed-off
2021-03-17Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2021-01-15Certificate of occupancy Temporary
2020
2020-12-20Bedbug filing: 0 infested units
2020-12-11Permit Mechanical Systems — Signed-off
2020-12-10Permit EW — ISSUED
2020-10-26Certificate of occupancy Temporary
2020-09-18Permit Mechanical Systems — Signed-off
2020-09-16Permit EW — ISSUED
2020-09-08311: Blocked Driveway — No Access
2020-09-07311: Blocked Driveway — No Access
2020-08-07Cooling tower inspection
2020-08-05Certificate of occupancy Temporary
2020-07-21ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED ONGOING CONSTRUCTION ACTIVITIES CONTRARY TO MAYORS EMERGENCY EXECUTIVE ORDER 120 & SEBSEQUENT ORDER$5,000
2020-07-21DOB complaint, category ?
2020-06-29Boiler inspection
2020-06-29Boiler inspection
2020-05-28311: Blocked Driveway — No Access
2020-04-29Certificate of occupancy Temporary
2020-04-23Permit Mechanical Systems — Signed-off
2020-03-23Mortgage assigned — from MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to JPMORGAN CHASE BANK, N.A.
2020-03-23Agreement $1,500,000 — from STEINBERG, LEONARD to JPMORGAN CHASE BANK, N.A.$1,500,000
2020-03-19Permit EW — ISSUED
2020-02-05Certificate of occupancy Temporary
2020-01-15Job filed: Removal and replacement of Boiler Vent.$384,400
2019
2019-12-20Job filed: REMOVAL/RECONSTRUCTION OF INTERIOR WALL & CEILING SURFACES AND INSTALLATION OF NEW FIRE-RATED DOOR; ASSOCIATED MECHANICAL WORK TO BE FILED UNDER S$18,800
2019-12-20Job filed: REMOVAL/RECONSTRUCTION OF INTERIOR WALL & CEILING SURFACES AND INSTALLATION OF NEW FIRE-RATED DOOR; ASSOCIATED MECHANICAL WORK TO BE FILED UNDER S$25,100
2019-12-07Bedbug filing: 0 infested units
2019-11-07Certificate of occupancy Temporary
2019-08-28Mortgage satisfied — from SOHN, YOUNG A to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; PHH MORGAGE CORPORATION; GOLDMAN SACHS BANK USA
2019-08-13DOB complaint, category ?
2019-08-13Certificate of occupancy Temporary
2019-07-24Permit PL — ISSUED
2019-07-11Permit EW — ISSUED
2019-07-11Permit EW — ISSUED
2019-07-10Cooling tower inspection
2019-06-11311: Borough Office — Construction Enforcement Work Order (DOB)
2019-06-11DOB complaint, category ?
2019-05-31Job filed: RENOVATION OF DUPLEX APARTMENT ON THE 10TH AND 11TH FLOOR OF AN EXISTING RESIDENTIAL BUILDING. ARCHITECTURAL AND PLUMBING WORK TYPES. NO CHANGE TO USE$86,000
2019-04-26Boiler inspection
2019-04-26Boiler inspection
2019-04-03Rodent inspection: Passed
2019-04-01311: Street Sign - Missing — One Way
2019-02-25Certificate of occupancy Temporary
2019-02-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-02-10DOB complaint, category ?
2019-02-08Bedbug filing: 0 infested units
2019-01-15DOB violation E:
2019-01-15DOB violation E:
2018
2018-12-14Certificate of occupancy Temporary
2018-12-05311: Blocked Driveway — No Access
2018-10-15Deed $8,500,000 — from ATLANTIC NICOLE LLC to CATHRIN M. STICKNEY LIVING TRUST; MARK P. GORENBERG REVOCABLE TRUST DATED ; MARK P. GORENB$8,500,000
2018-10-15PAT — from MARK P. GORENBERG, AS TRUSTEE; CATHRIN M. STICKNEY, AS TRUSTEE to BOARD OF MGRS OF THE 200 ELEVENTH AVENUE
2018-10-10Sold for $8,500,000$8,500,000
2018-10-05Deed — from YANOVICK DORNQUAST, DIANA to AD GLORIAM DEI LLC
2018-09-26Certificate of occupancy Temporary
2018-09-21Deed transfer (nominal price)
2018-08-27Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter
2018-08-17Agreement $4,700,000 — from PERDITA REAL ESTATE, LLC to JPMORGAN CHASE BANK, N.A.$4,700,000
2018-07-03Rodent inspection: Passed
2018-06-30311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-03-13Job filed: RENOVATION OF APT. #9S. WORK TO INCLUDE MINOR INTERIOR DEMOLITION OF MASTER BATHROOM FINISHES AND FIXTURES. RELOCATION OF AND INSTALLATION OF NEW PLUM$38,900
2018-03-09Job filed: RENOVATION OF APT. #9S. WORK TO INCLUDE MINOR INTERIOR DEMOLITION OF MASTER BATHROOM FINISHES AND FIXTURES. RELOCATION OF AND INSTALLATION OF NEW PLUM$38,900
2018-03-09Job filed: RENOVATION OF APT. #9S. WORK TO INCLUDE MINOR INTERIOR DEMOLITION OF MASTER BATHROOM FINISHES AND FIXTURES. RELOCATION OF AND INSTALLATION OF NEW PLUM$38,900
2018-01-24Job filed: RENOVATION OF APT. #9S. WORK TO INCLUDE MINOR INTERIOR DEMOLITION OF MASTER BATHROOM FINISHES AND FIXTURES. RELOCATION OF AND INSTALLATION OF NEW PLUM$38,900
2018-01-24Job filed: RENOVATION OF APT. #9S. WORK TO INCLUDE MINOR INTERIOR DEMOLITION OF MASTER BATHROOM FINISHES AND FIXTURES. RELOCATION OF AND INSTALLATION OF NEW PLUM$38,900
2017-06-22ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000004326 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$2,000
2017-06-21Certificate of occupancy Temporary
2017-06-06Facade (LL11) filing, cycle 8: SAFE
2017-05-18Permit EW — ISSUED
2017-04-19Mortgage assigned — from CATHAY BANK to CITIBANK, N.A.
2017-04-19Mortgage assigned — from CATHAY BANK to CITIBANK, N.A.
2017-04-19Agreement $8,950,000 — from 1300 FEDERAL, L.L.C.; LEE, MARGARETTE; WOO, YOUNG to CITIBANK, N.A.$8,950,000
2017-04-19TL&R — from CATHAY BANK to 1300 FEDERAL, L.L.C.
2017-04-19TL&R — from CATHAY BANK to 1300 FEDERAL, L.L.C.
2017-04-04Job filed: RENOVATION OF APT. #9S. WORK TO INCLUDE MINOR INTERIOR DEMOLITION OF NON-BEARING WALLS, KITCHEN CABINETS AND DOORS. INSTALLATION OF NEW KITCHEN CABINE$200,000
2017-04-04Job filed: RENOVATION OF APT. #9S. WORK TO INCLUDE MINOR INTERIOR DEMOLITION OF NON-BEARING WALLS, KITCHEN CABINETS AND DOORS. INSTALLATION OF NEW KITCHEN CABINE$200,000
2015-02-05PAT — from 200 ELEVENTH 6N OWNER LLC to BOARD OF MANAGERS OF 200 ELEVENTH AVENUE
2015-02-05Mortgage $5,000,000 — from 200 ELEVENTH 6N OWNER LLC to BANK OF AMERICA, N.A.$5,000,000
2015-02-05Deed $8,125,000 — from DEKEYSER, ROBERT MARC HENRI PAUL to 200 ELEVENTH 6N OWNER LLC$8,125,000
2015-02-05PAT to DOUGHERTY, ELLEN
2015-01-16Mortgage $4,840,000 — from ENGELBERT, OSCAR to JP MORGAN CHASE BANK NA$4,840,000
2015-01-16Deed — from OSCAR ENGELBERT A NEW YORK LIMITED COMPA to ENGELBERT, OSCAR
2014
2014-12-15Certificate of occupancy Temporary
2014-12-01311: Street Condition — Plate Condition - Noisy
2014-11-23311: Street Condition — Plate Condition - Noisy
2014-11-13DOB complaint, category ?
2014-10-17FDNY inspection (FORTH)
2014-10-10FDNY inspection (SPECIAL-OTH)
2014-10-10Mortgage satisfied — from ENGELBERT, OSCAR to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; HSBC BANK USA, N.A.; HSBC MORTGAGE CORPORATION (
2014-09-13DOB complaint, category ?
2014-09-12Certificate of occupancy Temporary
2014-09-02311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2014-09-02DOB complaint, category ?
2014-07-28Permit EQ — ISSUED
2014-07-25Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-07-03Permit EW — ISSUED
2014-06-19Certificate of occupancy Temporary
2014-06-03Permit PL — ISSUED
2014-05-15AL&R $3,900,000 — from 1300 FEDERAL, L.L.C. to CATHAY BANK$3,900,000
2014-05-15Mortgage $3,900,000 — from 1300 FEDERAL, L.L.C. to CATHAY BANK$3,900,000
2014-05-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-05-10DOB complaint, category ?
2014-03-25Certificate of occupancy Temporary
2014-03-20311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-20DOB complaint, category ?
2014-03-14311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-13311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-08311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-06311: Noise — Noise: Construction Before/After Hours (NM1)
2014-03-06DOB complaint, category ?
2014-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2014-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2014-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2014-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2014-02-11311: Noise — Noise: Construction Before/After Hours (NM1)
2014-02-06Mortgage satisfied — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK & TRUST
2014-01-31Permit EW — ISSUED
2014-01-31Permit EW — ISSUED
2014-01-31Permit EW — ISSUED
2014-01-21311: Missed Collection (All Materials) — 1RG Missed Recycling Paper
2014-01-14Mortgage $4,592,500 — from PREMIER BUSINESS HOLDINGS LIMITED to CITIBANK, N.A.$4,592,500
2014-01-14PAT — from PREMIER BUSINESS HOLDINGS LIMITED to BOARD OF MGRS OF THE 200 ELEVENTH AVENUE
2014-01-13Agreement $2,075,000 — from SOHN, YOUNG A to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS; PHH MORTGAGE CORPORATION$2,075,000
2014-01-10Deed $8,850,000 — from THE BIG WEDNESDAY TRUST; DENNIS DUBAN, TRUSTEE; CONRAD, HAYLYNN to PREMIER BUSINESS HOLDINGS LIMITED$8,850,000
2013-09-11TL&R — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK AND TRUST
2013-09-11Mortgage satisfied — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK AND TRUST
2013-09-11TL&R — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK AND TRUST
2013-09-10Certificate of occupancy Temporary
2013-08-30Deed $8,200,000 — from RIVERVIEW 11, LLC to PICASSO, DIANA WIDMAIER$8,200,000
2013-08-30PAT — from PICASSO, DIANA WIDMAIER to BOARD OF MANAGERS OF 200 ELEVENTH AVENUE
2013-08-30PAT — from WIDMAIER PICASSO, DIANA to RHEEM, UEL; SMITH, CASEY; BELL, CHRISTINE; GRAHAM, ADELINA
2013-08-28Mortgage satisfied — from SCOTTLAND MANAGEMENT, LLC to LENZ CAPITAL GROUP, LLC; S & P PRINCIPAL, LLC
2013-08-27Permit EW — ISSUED
2013-08-27Permit EW — ISSUED
2013-08-27Permit EW — ISSUED
2013-07-11Job filed: MODIFICATION OF SPRINKLER HEADS ON 12TH & 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$14,000
2013-06-18Permit PL — ISSUED
2013-06-14Permit EW — ISSUED
2013-06-14Permit EW — ISSUED
2013-06-14Permit EW — ISSUED
2013-06-14Certificate of occupancy Temporary
2013-06-12Permit EW — ISSUED
2013-06-06Job filed: INTERIO DEMO & INSTALLATION OF PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2013-06-06Job filed: MODIFICATIONO F MECHANICAL WORK AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2013-06-06Job filed: INTERIO DEMO & INSTALLATION OF PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2013-06-06Job filed: REMOVE PORTION OF FLOOR AND INSTALL NEW GLASS FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2013-06-06Job filed: MODIFICATIONO F MECHANICAL WORK AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2013-05-13Job filed: RENOVATION OF EXISTING APARTMENT 4NS ON THE 4TH FLOOR. SCOPE OF WORK TO INCLUDE THE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, FLOORS, AND PLUMBIN$68,000
2013-05-13Job filed: RENOVATION OF EXISTING APARTMENT 4NS ON THE 4TH FLOOR. SCOPE OF WORK TO INCLUDE THE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, FLOORS, AND PLUMBIN$68,000
2013-05-13Job filed: RENOVATION OF EXISTING APARTMENT 4NS ON THE 4TH FLOOR. SCOPE OF WORK TO INCLUDE THE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, FLOORS, AND PLUMBIN$68,000
2013-05-08Permit PL — ISSUED
2013-05-06TL&R — from 200 11TH 11S LLC to DORAL BANK; DORAL BANK, FSB
2013-05-06Mortgage satisfied — from 200 11TH 11S LLC to DORAL BANK; DORAL BANK, FSB
2013-05-06Mortgage satisfied — from 24TH STREET CAPITAL GROUP 1 LLC to DORAL BANK; DORAL BANK, FSB
2013-05-06PREL — from DORAL BANK; DORAL BANK, FSB to 24TH STREET CAPITAL GROUP 1 LLC
2013-05-06TL&R — from 24TH STREET CAPITAL GROUP 1 LLC to DORAL BANK; DORAL BANK, FSB
2013-05-06PREL — from DORAL BANK; DORAL BANK, FSB to 200 11TH 11S LLC
2013-05-06REL — from 200 11TH 11S LLC; 200 11TH WEST SKY LLC; 24TH STREET CAPITAL GROUP 1 LLC; WEST SKY, LLC to DORAL BANK; DORAL BANK, FSB
2013-05-06REL — from 200 11TH WEST SKY LLC; 200 11TH 11S LLC; 24TH STREET CAPITAL GROUP 1 LLC; WEST SKY, LLC to DORAL BANK, FSB; DORAL BANK
2013-05-03Permit EW — ISSUED
2013-04-26Permit PL — ISSUED
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-04-18ZONE — from NY ART RESIDENCES LLC
2013-03-25Certificate of occupancy Temporary
2013-03-14TL&R — from DORAL BANK, FSB; DORAL BANK to 24TH STREET CAPITAL GROUP I, LLC
2013-03-14Mortgage satisfied — from 200 11TH WEST SKY LLC; WEST SKY, LLC; 24TH STREET CAPITAL GROUP 1 LLC; 200 11TH 11S LLC to DORAL BANK, FSB; DORAL BANK
2013-03-14TL&R — from DORAL BANK, FSB; DORAL BANK to 24TH STREET CAPITAL GROUP I, LLC
2013-03-14Mortgage satisfied — from 200 11TH WEST SKY LLC; WEST SKY, LLC; 24TH STREET CAPITAL GROUP 1 LLC; 200 11TH 11S LLC to DORAL BANK, FSB; DORAL BANK
2013-03-14Mortgage satisfied — from 24TH STREET CAPITAL GROUP I, LLC to DORAL BANK; DORAL BANK, FSB
2013-03-14TL&R — from DORAL BANK, FSB; DORAL BANK to 24TH STREET CAPITAL GROUP I, LLC
2013-03-14TL&R — from DORAL BANK, FSB; DORAL BANK to 24TH STREET CAPITAL GROUP I, LLC
2013-03-14Mortgage satisfied — from 200 11TH WEST SKY LLC; WEST SKY, LLC; 24TH STREET CAPITAL GROUP 1 LLC; 200 11TH 11S LLC to DORAL BANK, FSB; DORAL BANK
2013-02-28TL&R — from WEST SKY, LLC; 24TH STREET CAPITAL GROUP 1 LLC; 200 1TH 11S LLC; 200 11TH WEST SKY LLC to DORAL BANK
2013-02-28AL&R $8,125,000 — from 1300 FEDERAL, L.L.C. to CATHAY BANK$8,125,000
2013-02-28Agreement $8,125,000 — from 1300 FEDERAL, L.L.C. to CATHAY BANK$8,125,000
2013-02-28Mortgage $2,775,000 — from 1300 FEDERAL, L.L.C. to CATHAY BANK$2,775,000
2013-02-28Mortgage assigned — from DORAL BANK to CATHAY BANK
2013-02-25311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2013-02-25DOB complaint, category ?
2013-02-21Agreement $1,250,000 — from SCOTTLAND MANAGEMENT, LLC to S & P PRINCIPAL, LLC; LENZ CAPITAL GROUP, LLC$1,250,000
2013-02-05Mortgage assigned — from HSBC MORTGAGE CORPORATION (USA); MORTGAGE ELECTRONIC REGISTRATION SYSTEMS to HSBC BANK USA, N.A.
2013-01-16TL&R — from DORAL BANK, FSB to 200 11TH 11S LLC
2013-01-16TL&R — from DORAL BANK, FSB to 200 11TH 11S LLC
2013-01-16PREL — from DORAL BANK, FSB to 200 11TH 11S LLC
2012
2012-12-27Certificate of occupancy Temporary
2012-12-18311: Noise — Noise: Construction Equipment (NC1)
2012-11-21Deed $11,000,000 — from WEST SKY LLC to 1300 FEDERAL, L.L.C.$11,000,000
2012-11-21PAT — from 1300 FEDERAL, L.L.C. to THE CONDOMINIUM BOARD
2012-11-08Mortgage satisfied — from FIELDPOINT PRIVATE BANK & TRUST to FIELDPOINT PRIVATE BANK & TRUST
2012-10-31Mortgage assigned — from ING BANK, FSB to GUARDHILL FINANCIAL CORP.; MERS
2012-10-31Agreement $1,500,000 — from STEINBERG, LEONARD to GUARDHILL FINANCIAL CORP.; MERS$1,500,000
2012-10-14311: Blocked Driveway — No Access
2012-10-05Permit EW — ISSUED
2012-10-05Permit EW — ISSUED
2012-10-05Permit EW — ISSUED
2012-10-05Permit EW — ISSUED
2012-10-05Permit EW — ISSUED
2012-10-03PAT — from DUBAN, AS TRUSTEE, DENNIS; CONRAD, HAYLYNN; THE BIG WEDNESDAY TRUST U/D/T APRIL 19, to 200 ELEVENTH AVENUE CONDOMINIUM
2012-10-03Deed $6,873,188 — from 24TH STREET CAPITAL GROUP 1, LLC to CONRAD, HAYLYNN; DUBAN, AS TRUSTEE, DENNIS; THE BIG WEDNESDAY TRUST U/D/T APRIL 19, $6,873,188
2012-10-03PAT — from CONRAD, HAYLYNN to WOLF,, EMILY B ESQ.
2012-10-02Certificate of occupancy Temporary
2012-09-25Permit PL — ISSUED
2012-09-11Rodent inspection: Passed
2012-09-10Permit EQ — ISSUED
2012-09-10Permit EQ — ISSUED
2012-08-31Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2012-08-20Mortgage $30,000 — from PERDITA REAL ESTATE LLC to FIELDPOINT PRIVATE BANK & TRUST$30,000
2012-08-20Agreement $4,650,000 — from PERDITA REAL ESTATE LLC to FEILDPOINT PRIVATE BANK & TRUST$4,650,000
2012-08-03Mortgage satisfied — from MAROMA PROPERTY LLC. to CITIMORTGAGE, INC.
2012-07-17PAT — from DEKEYSER, ROBERT MARC HENRI PAUL to CONDO BOARD OF MANAGERS
2012-07-17Deed $6,600,000 — from MAROMA PROPERTY LLC to DEKEYSER, ROBERT MARC HENRI PAUL$6,600,000
2012-06-28Deed — from THE CLIENT 2318 LIVING TRUST; BARBARA CARSWELL AS SPECIAL TRUSTEE to NK QPRT NO. 1; NK QPRT NO. 2; BARBARA CARSWELL AS SPECIAL TRUSTEE
2012-06-27Mortgage $600,000 — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK & TRUST$600,000
2012-06-27AL&R — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK & TRUST
2012-06-27Agreement $600,000 — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK & TRUST$600,000
2012-06-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-06-11311: Street Condition — Defective Hardware
2012-06-07DOB violation E:
2012-06-07DOB violation E:
2012-06-07DOB violation E:
2012-05-16PAT — from DORNQUAST, DIANNE YANOVICK to BOYD, RODERIC D; STEIFMAN, SETH P
2012-05-16PAT — from DORNQUAST, MATTHEW DURAND to STEIFMAN, SETH P; BOYD, RODERIC D
2012-05-16Deed $6,750,000 — from 200 11TH 11S LLC to DORNQUAST, MATTHEW DURAND; DORNQUAST, DIANNE YANOVICK$6,750,000
2012-05-16PAT — from DORNQUAST, DIANNE YANOVICK; DORNQUAST, MATTHEW DURAND to BOARD OF MANAGERS OF 200 ELEVENTH AVE CO
2012-05-03Deed — from GAIA HOUSE, LLC to THE CLIENT 2318 LIVING TRUST; BARBARA CARSWELL AS SPECIAL TRUSTEE
2012-04-17Permit EW — ISSUED
2012-04-13Permit EW — ISSUED
2012-04-13Permit AL — ISSUED
2012-04-13Permit EW — ISSUED
2012-04-13Permit EW — ISSUED
2012-04-13Permit EW — ISSUED
2012-04-13Permit EW — ISSUED
2012-04-12Permit EW — ISSUED
2012-04-10DOB complaint, category ?
2012-04-06Permit EW — ISSUED
2012-03-28Permit EW — ISSUED
2012-03-28Permit EW — ISSUED
2012-03-21311: Construction Safety Enforcement — SST Tracking Complaint
2012-03-21DOB complaint, category ?
2012-03-20ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED PLANS. SUPPORTED SCAFFOLDS INSTALLEDON OUTRIGGERS BEAM AT EXPOSURE 3/4 EXTENDED ONE FT BEHIND BU
2012-03-06Permit PL — ISSUED
2012-02-27Permit AL — ISSUED
2012-02-23Job filed: INSTALLING TEMPORARY STEEL HOIST BEAMS AT ROOF LEVEL AS PER THE PLAN, FOR STAIR INSTALLATION. THIS JOB IS BEING FILED IN CONJUNCTION WITH DOB JOB NO$5,000
2012-02-14Mortgage $1,250,000 — from SCOTTLAND MANAGEMENT, LLC to LENZ CAPITAL GROUP, LLC; S & P PRINCIPAL, LLC$1,250,000
2012-02-09Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-02-09Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-02-09Permit EQ — ISSUED
2012-01-18Permit EW — ISSUED
2011
2011-12-22Job filed: INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL
2011-12-22Job filed: INSTALLATION OF A PROTECTION PLATFORM AT PENTHOUSE 002 AS PER DRAWINGS DURING NEW BUILING CONSTRUCTION, FILED SEPARATELY. PROTECTION PLATFORM SHALL CO
2011-12-22Job filed: INSTALLATION OF A PROTECTION PLATFORM AT PENTHOUSE 002 AS PER DRAWINGS DURING NEW BUILING CONSTRUCTION, FILED SEPARATELY. PROTECTION PLATFORM SHALL CO
2011-12-22Permit EQ — ISSUED
2011-12-22Permit EQ — ISSUED
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-05Permit EW — ISSUED
2011-12-01Permit EW — ISSUED
2011-12-01Permit EW — ISSUED
2011-12-01Permit EW — ISSUED
2011-12-01Permit EW — ISSUED
2011-11-30Permit EW — ISSUED
2011-11-29Permit EW — ISSUED
2011-11-15Job filed: CREATING A WALL OPENING BETWEEN 18TH & 19TH FLOOR, APPROX. 16' LONG & 5' HIGH THIS JOB IS BEING FILED IN CONJUNCTION WITH DOB JOB NO. 12058130$10,000
2011-11-15Job filed: CREATING A WALL OPENING BETWEEN 18TH & 19TH FLOOR, APPROX. 16' LONG & 5' HIGH THIS JOB IS BEING FILED IN CONJUNCTION WITH DOB JOB NO. 12058130$10,000
2011-11-10Mortgage assigned — from ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA to GUARDHILL FINANCIAL CORP
2011-11-10Mortgage $10,000 — from DRAKE, JAMIE to GUARDHILL FINANCIAL CORP$10,000
2011-11-10Agreement $810,000 — from DRAKE, JAMIE to GUARDHILL FINANCIAL CORP$810,000
2011-11-10Mortgage assigned — from GUARDHILL FINANCIAL CORP to ING BANK, FSB
2011-11-03Permit EW — ISSUED
2011-10-28Permit EW — ISSUED
2011-10-28Permit EW — ISSUED
2011-10-28Permit EW — ISSUED
2011-10-28Permit EW — RE-ISSUED
2011-10-12Job filed: APPLICATION FILED FOR FIRE PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING #104548919. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2011-10-12Job filed: APPLICATION FILED FOR FIRE PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING #104548919. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2011-09-20Permit EW — ISSUED
2011-09-20Permit PL — ISSUED
2011-09-15Job filed: STRUCTURAL WORK IN CONJUCTION WITH ALTERATION$34,544
2011-09-15Job filed: PLUMBING AND SPRINKLER IN CONJUCTION WITH APARTMENT RENOVATION.$41,240
2011-09-15Job filed: PLUMBING AND SPRINKLER IN CONJUCTION WITH APARTMENT RENOVATION.$41,240
2011-09-15Job filed: STRUCTURAL WORK IN CONJUCTION WITH ALTERATION$34,544
2011-09-15Job filed: RENOVATE EXISTING DUPLEX APARTMENT ON 14TH AND 15TH FLOOR. NEW FLOOR AREA APPROVED UNDER NB 104548919$267,500
2011-09-15Job filed: STRUCTURAL WORK IN CONJUCTION WITH ALTERATION$34,544
2011-09-07Mortgage assigned — from STATE STREET BANK AND TRUST COMPANY to DORAL BANK FSB
2011-09-07AL&R $3,050,000 — from 200 11TH 11S LLC to DORAL BANK FSB$3,050,000
2011-09-07Deed $7,600,000 — from GAIA HOUSE LLC to WEST SKY LLC DBA 200 11TH WEST SKY LLC$7,600,000
2011-09-07PAT — from WEST SKY LLC, DBA 200 11TH WEST SKY LLC to MEMBERS OF THE BD OF MAN OF THE 200 ELEV
2011-09-07Mortgage assigned — from STATE STREET BANK AND TRUST COMPANY to DORAL BANK FSB
2011-09-07Mortgage $1,242,731 — from WEST SKY LLC DBA 200 11TH WEST SKY, LLC; 24TH STREET CAPITAL GROUP 1 LLC to DORAL BANK FSB$1,242,731
2011-09-07Agreement $5,350,000 — from WEST SKY LLC DBA, 200 11TH WEST SKY LLC; 24TH STREET CAPITAL GROUP 1, LLC; 200 11TH 11S LL to DORAL BANK, FSB$5,350,000
2011-09-07AL&R $5,350,000 — from WEST SKY LLC DBA, 200 11TH WEST SKY LLC to DORAL BANK FSB$5,350,000
2011-09-07Deed $4,520,000 — from GAIA HOUSE LLC to 24TH STREET CAPITAL GROUP 1, LLC$4,520,000
2011-09-07Mortgage $3,050,000 — from 200 11TH 11S LLC to DORAL BANK FSB$3,050,000
2011-09-07PAT — from 24TH STREET CAPITAL GROUP 1, LLC to BD OF MANAGERS OF THE 200 ELEVENTH AVE C
2011-09-07Mortgage assigned — from STATE STREET BANK AND TRUST COMPANY to DORAL BANK FSB
2011-09-07PAT — from 200 11TH 11S LLC to MEMBERS OF THE BD OF MAN OF 200 ELEVENTH
2011-09-07Mortgage assigned — from STATE STREET BANK AND TRUST COMPANY to DORAL BANK FSB
2011-09-07Deed $4,640,000 — from GAIA HOUSE LLC to 200 11TH 11S LLC$4,640,000
2011-09-07Mortgage assigned — from STATE STREET BANK AND TRUST COMPANY to DORAL BANK FSB
2011-09-07Mortgage $1,242,731 — from WEST SKY LLC DBA 200 11TH WEST SKY, LLC; 24TH STREET CAPITAL GROUP 1 LLC to DORAL BANK FSB$1,242,731
2011-09-07Agreement $5,350,000 — from WEST SKY LLC DBA, 200 11TH WEST SKY LLC; 24TH STREET CAPITAL GROUP 1, LLC; 200 11TH 11S LL to DORAL BANK, FSB$5,350,000
2011-09-07AL&R $5,350,000 — from WEST SKY LLC DBA, 200 11TH WEST SKY LLC to DORAL BANK FSB$5,350,000
2011-09-07AL&R $5,350,000 — from WEST SKY LLC DBA, 200 11TH WEST SKY LLC to DORAL BANK FSB$5,350,000
2011-09-07Mortgage $2,950,000 — from 24TH STREET CAPITAL GROUP 1, LLC to DORAL BANK FSB$2,950,000
2011-09-07AL&R $2,950,000 — from 24TH STREET CAPITAL GROUP 1, LLC to DORAL BANK FSB$2,950,000
2011-09-07Agreement $5,350,000 — from WEST SKY LLC DBA, 200 11TH WEST SKY LLC; 24TH STREET CAPITAL GROUP 1, LLC; 200 11TH 11S LL to DORAL BANK, FSB$5,350,000
2011-09-07Mortgage assigned — from STATE STREET BANK AND TRUST COMPANY to DORAL BANK FSB
2011-09-07Mortgage assigned — from STATE STREET BANK AND TRUST COMPANY to DORAL BANK FSB
2011-09-07Mortgage $1,242,731 — from WEST SKY LLC DBA 200 11TH WEST SKY, LLC; 24TH STREET CAPITAL GROUP 1 LLC to DORAL BANK FSB$1,242,731
2011-08-22Permit EW — ISSUED
2011-08-22Permit EW — ISSUED
2011-08-18Job filed: MODIFICATION OF SPRINKLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2011-08-18Job filed: MODIFICATION OF SPRINKLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2011-08-04Permit PL — ISSUED
2011-07-30311: Blocked Driveway — No Access
2011-07-28Permit EW — ISSUED
2011-07-28Permit EW — ISSUED
2011-07-27311: Derelict Vehicle — With License Plate
2011-07-05Agreement — from STEINBERG, LEONARD to ING BANK, FSB
2011-07-05Mortgage assigned — from ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA to ING BANK, FSB
2011-06-23Job filed: PLUMBING AND SPRINKLER IN CONJUCTION WITH APARTMENT RENOVATION.$49,979
2011-06-23Job filed: PLUMBING AND SPRINKLER IN CONJUCTION WITH APARTMENT RENOVATION.$49,979
2011-06-23Job filed: PLUMBING AND SPRINKLER IN CONJUCTION WITH APARTMENT RENOVATION.$49,979
2011-06-23Job filed: RENOVATE EXISTING DUPLEX APARTMENT ON 14TH AND 15TH FLOOR.$398,013
2011-06-15Permit AL — ISSUED
2011-06-15Permit AL — ISSUED
2011-06-09Rodent inspection: Passed
2011-06-03Job filed: INSTALLATION OF TEMPORARY SHORES FOR REMOVAL OF PARTIAL CONCRETE SLAB ON THE 18TH FLOOR. THIS JOB IS BEING FILED IN CONJUNCTION WITH DOB JOB NO. 1205$7,399
2011-06-03Job filed: INSTALLATION OF TEMPORARY SHORES FOR REMOVAL OF PARTIAL CONCRETE SLAB ON THE 18TH FLOOR. THIS JOB IS BEING FILED IN CONJUNCTION WITH DOB JOB NO. 1205$7,399
2011-05-24Job filed: INSTALLATION OF TEMPORARY SHORES FOR REMOVAL OF PARTIAL CONCRETE SLAB ON ROOF. THIS JOB IS BEING FILED IN CONJUNCTION WITH DOB JOB NO. 120581307.$4,670
2011-05-13Permit AL — ISSUED
2011-05-07311: Blocked Driveway — No Access
2011-05-06Job filed: INSTALLATION OF TEMPORARY STEEL SHED ON ROOF. THIS JOB IS BEING FILED IN CONJUNCTION WITH DOB JOB NO. 120581307.$13,628
2011-05-06Job filed: INSTALLATION OF TEMPORARY STEEL SHED ON ROOF. THIS JOB IS BEING FILED IN CONJUNCTION WITH DOB JOB NO. 120581307.$13,628
2011-05-05Permit PL — ISSUED
2011-04-13Job filed: STRUCTURAL WORK IN CONJUCTION WITH ALTERATION$40,000
2011-04-13Job filed: STRUCTURAL WORK IN CONJUCTION WITH ALTERATION$40,000
2011-04-13Job filed: INSTALL FLOOR OVER DOUBLE HEIGHT SPACE IN STORAGE GARAGE. NO CHANGE IN USE EGRESS OR OCCUPANCY, ZONING AND ADDITIONAL FLOOR AREA APPROVED UNDER APPLIC$36,200
2011-04-11Permit EQ — ISSUED
2011-04-08Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 20' LONG DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH C
2011-04-06Permit EW — ISSUED
2011-04-06Permit EW — ISSUED
2011-04-06Permit EW — ISSUED
2011-04-06Permit EW — ISSUED
2011-04-06Permit EW — ISSUED
2011-03-24Permit NB — ISSUED
2011-02-17Permit EW — ISSUED
2011-01-28Deed $5,498,550 — from GAIA HOUSE, LLC to ENGELBERT, OSCAR$5,498,550
2011-01-28Mortgage $3,240,000 — from ENGELBERT, OSCAR to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$3,240,000
2011-01-28PAT — from ENGELBERT, OSCAR to BOARD OF MANAGERS
2011-01-25Permit EW — ISSUED
2011-01-25Permit EW — ISSUED
2011-01-24PREL — from STATE STREET BANK AND TRUST COMPANY to GAIA HOUSE, LLC
2011-01-19Job filed: INTERIOR RENOVATIONS INCLUDING MECHANICAL & PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,380,000
2011-01-19Job filed: INTERIOR RENOVATIONS INCLUDING MECHANICAL & PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,380,000
2011-01-19Job filed: NEW FRAMING FOR CONVENIENCE STAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$490,000
2011-01-06Deed $14,000,000 — from GAIA HOUSE, LLC to RJH INVESTMENT PARTNERS LP$14,000,000
2011-01-06PAT — from RJH INVESTMENT PARTNERS LP to THE CONDOMINIUM'S BOARD OF MANAGERS
2010
2010-12-23Permit EW — ISSUED
2010-12-10Permit EW — ISSUED
2010-11-09PAT — from MAROMA PROPERTY LLC to 200 ELEVENTH AVENUE CONDOMINIUM
2010-11-09Deed $5,498,550 — from GAIA HOUSE, LLC to MAROMA PROPERTY LLC$5,498,550
2010-11-09Mortgage $4,000,000 — from MAROMA PROPERTY LLC to CITIMORTGAGE, INC.$4,000,000
2010-11-09PREL — from STATE STREET BANK AND TRUST COMPANY to GAIA HOUSE, LLC
2010-11-05Permit EW — ISSUED
2010-11-04Permit EW — ISSUED
2010-11-01Job filed: INTERIOR DEMO AND INSTALLATION OF PARTITIONS INLUDING PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$225,000
2010-10-07PREL — from STATE STREET BANK AND TRUST COMPANY to GAIA HOUSE LLC
2010-10-06Permit PL — ISSUED
2010-10-06Permit EW — ISSUED
2010-10-06Permit EW — ISSUED
2010-10-05Job filed: A2$13,000
2010-09-23Job filed: DEMOLITION OF CEILING ASSOCIATED WITH PLUMBING PIPING ON FLOORS 15 & 16 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2010-09-23Job filed: DEMOLITION OF CEILING ASSOCIATED WITH PLUMBING PIPING ON FLOORS 15 & 16 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2010-09-21Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION..
2010-09-21Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION..
2010-09-21Permit EQ — ISSUED
2010-09-14ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS! UPON INSPECTION AS NOTED ON ACTIVE CONSTRUCTIO$1,000
2010-09-14ECB CLASS - 1 violation: WORK W/O A PERMIT: UPON INSPECTION AS NOTED ON ACTIVE CONSTRUCTION SITE UP TO ROOFTOP (20TH) THERE WERE PIPE SCAFFOLDS ERECTED ON $1,600
2010-09-14DOB complaint, category ?
2010-09-14ECB CLASS - 2 violation: SEC. 3308.3. FAILURE TO PROVIDE REQUIRED VERTICAL NETTING. UPON INSPECTION AS NOTED ON ACTIVE CONSTRUCTION SITE UP TO ROOFTOP (20T
2010-09-03DOB complaint, category ?
2010-08-24Deed $4,662,158 — from GAIA HOUSE, LLC to DRAKE, JAMIE$4,662,158
2010-08-24PAT — from DRAKE, JAMIE to BOARD OF MANAGERS OF 200 ELEVENTH CONDOM
2010-08-24Mortgage $800,000 — from DRAKE, JAMIE to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$800,000
2010-08-16ECB CLASS - 2 violation: FAIL TO MAINTAIN SIDEWALK. UPON INSPECTION AS NOTED ON ACTIVE CONST SITE UP TO 19TH FLOOR THERE SIDEWALK ON BOTH PERIMETERS 24TH S
2010-08-11REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-11Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS, LLC
2010-08-11REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-11REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-11Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS, LLC
2010-08-11Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS, LLC
2010-08-11REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-11Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS, LLC
2010-08-11REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-11Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS, LLC
2010-08-11REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-11Deed $9,673,375 — from GAIA HOUSE, LLC to THE CLIENT 2318 LIVING TRUST; NOEL BLAIR AS SPECIAL TRUSTEE$9,673,375
2010-08-11Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS, LLC
2010-08-11Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS, LLC
2010-08-11REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-11REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-11PAT — from THE CLIENT 2318 LIVING TRUST; NOEL BLAIR AS SPECIAL TRUSTEE to CONDOMINIUM BOARD OF MANAGERS
2010-08-11Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS, LLC
2010-08-10TL&R — from ISTAR FM LOANS, LLC
2010-08-10Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-10TL&R — from ISTAR FM LOANS, LLC
2010-08-10Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-10TL&R — from ISTAR FM LOANS, LLC
2010-08-10Mortgage $22,780,533 — from GAIA HOUSE, LLC to STATE STREET BANK AND TRUST COMPANY$22,780,533
2010-08-10TL&R — from ISTAR FM LOANS, LLC
2010-08-10Mortgage $22,780,533 — from GAIA HOUSE, LLC to STATE STREET BANK AND TRUST COMPANY$22,780,533
2010-08-10TL&R — from ISTAR FM LOANS, LLC
2010-08-10Mortgage $22,780,533 — from GAIA HOUSE, LLC to STATE STREET BANK AND TRUST COMPANY$22,780,533
2010-08-10Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-10Mortgage $22,780,533 — from GAIA HOUSE, LLC to STATE STREET BANK AND TRUST COMPANY$22,780,533
2010-08-10TL&R — from ISTAR FM LOANS, LLC
2010-08-10TL&R — from ISTAR FM LOANS, LLC
2010-08-10Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-10Mortgage $22,780,533 — from GAIA HOUSE, LLC to STATE STREET BANK AND TRUST COMPANY$22,780,533
2010-08-10Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-10Mortgage $22,780,533 — from GAIA HOUSE, LLC to STATE STREET BANK AND TRUST COMPANY$22,780,533
2010-08-10Mortgage $22,780,533 — from GAIA HOUSE, LLC to STATE STREET BANK AND TRUST COMPANY$22,780,533
2010-08-10Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-10Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-10Mortgage satisfied — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-08-10TL&R — from ISTAR FM LOANS, LLC
2010-07-19Permit EW — ISSUED
2010-07-14DOB complaint, category ?
2010-06-14Job filed: REMOVAL OF INSTALLATION OF INTERIOR PARTITIONS ON FLOORS 16-20 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$72,000
2010-06-14Job filed: REMOVAL OF INSTALLATION OF INTERIOR PARTITIONS ON FLOORS 16-20 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$72,000
2010-06-07Rodent inspection: Passed
2010-06-07Permit AL — ISSUED
2010-05-26Job filed: INSTALLATION OF ONE DOOR IN APARTMENT 7S AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2010-05-26Job filed: INSTALLATION OF ONE DOOR IN APARTMENT 7S AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2010-05-25PAT — from RIVERVIEW 11, LLC to CONDOMIUNIUM BOARD OF MANAGERS
2010-05-25AL&R $3,000,000 — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK & TRUST$3,000,000
2010-05-25Mortgage $3,000,000 — from RIVERVIEW 11, LLC to FIELDPOINT PRIVATE BANK & TRUST$3,000,000
2010-05-25Deed $6,007,675 — from GAIA HOUSE, LLC to RIVERVIEW 11, LLC$6,007,675
2010-05-25REL — from ISTAR FM LOANS LLC to GAIA HOUSE LLC
2010-05-25PREL — from ISTAR FM LOANS LLC to GAIA HOUSE LLC
2010-05-21Job filed: HEREWITH FILING TENANT SAFETY PLAN. FILED IN CONJUNCTION WITH NEW BUILDING #120075694. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2010-05-21Job filed: HEREWITH FILING TENANT SAFETY PLAN. FILED IN CONJUNCTION WITH NEW BUILDING #120075694. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2010-05-18Job filed: INSTALLATION OF ONE DOOR IN APARTMENT 7S AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2010-05-05Rodent inspection: Failed for Other Reason
2010-05-05PAT — from PERDITA REAL ESTATE LLC to BOARD OF MANAGERS OF 200 ELEVENTH CONDOM
2010-05-05Deed $5,525,000 — from GAIA HOUSE, LLC to PERDITA REAL ESTATE LLC$5,525,000
2010-05-05REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-05-05PREL — from ISTAR FM LOANS LLC to GAIA HOUSE, LLC
2010-05-05Mortgage $4,620,000 — from PERDITA REAL ESTATE LLC to FIELDPOINT PRIVATE BANK & TRUST$4,620,000
2010-04-30PAT — from STEINBERG, LEONARD to THE BOARD OF MANAGERS
2010-04-30Deed $2,760,739 — from GAIA HOUSE, LLC to STEINBERG, LEONARD$2,760,739
2010-04-30PREL — from ISTAR FM LOANS, LLC C/O ISTAR FINANCIAL, to GAIA HOUSE, LLC C/O YOUNGOO AND ASSOCIAT
2010-04-30REL — from GAIA HOUSE, LLC C/O YOUNGOO AND ASSOCIAT to ISTAR FM LOANS, LLC C/O ISTAR FINANCIAL,
2010-04-30Mortgage $1,500,000 — from STEINBERG, LEONARD to ASTORIA FEDERAL SAVINGS AND LOAN ASSOCIA$1,500,000
2010-04-19Deed $5,600,375 — from GAIA HOUSE, LLC to SCOTTLAND MANAGEMENT, LLC$5,600,375
2010-04-19PREL — from ISTAR FM LOANS LLC to GAIA HOUSE, LLC
2010-04-19REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2010-04-19PAT — from SCOTLAND MANAGEMENT, LLC to THE 200 ELEVENTH AVENUE CONDOMINUM
2010-03-25Permit EQ — ISSUED
2010-03-20Permit EQ — ISSUED
2010-03-20Permit EQ — ISSUED
2010-03-10Permit EQ — ISSUED
2010-02-03Permit EQ — ISSUED
2010-02-03Permit NB — ISSUED
2010-02-02DOB complaint, category ?
2010-02-02ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST. OPERATIONS NOTED @ TIME OF INSP. ON ACTIVE JOB SITE. OBSERVED STREE
2010-02-02ECB CLASS - 2 violation: WORK W/O A PERMIT. EXPIRED PERMIT: PERMIT # 104548919 NB EXPIRED ON 01/31/2010 NOTED @ TIME OF INSPECTION ON ACTIVE JOB SITE W/ EX
2010-02-02ECB CLASS - 1 violation: SEC. BC 3310.8.1 SITE SAFETY MANAGER & COORDINATOR RESPONSIBILITY ( MONITOR COMPLIANCE) NOTED. NOTED @ TIME OF INSPECTION ON ACTIV
2010-02-02ECB CLASS - 2 violation: WORK W/O PERMIT: EXPIRED PERMIT NOTED @ TIME OF INSP. ON ACTIVE JOB SITE W/ FACADE STONE WORK & INTERIOR TRADE MEN WORKING, OBSERV
2010-02-02ECB CLASS - 2 violation: SEC. BC3301.9 FAILURE TO PROVIDE & POST REQUIRED SIGN(S) @ JOB PURSUANT TO SUB SECTION. NOTED @ TIME OF INSP. ON ACTIVE JOB SITE W
2010-02-02ECB CLASS - 2 violation: SEC. BC 3301.9 FAILURE TO PROVIDE & POST REQUIRED SIGN(S) @ JOB PURSUANT TO SUB SECTION. NOTED @ TIME OF INSP. ON ACTIVE JOB SIGN
2010-02-02DOB violation C:
2010-01-14DOB complaint, category ?
2010-01-13ECB CLASS - 1 violation: SEC. 3314.9. SUPPORTED SCAFFOLD DOES NOT MEET BLDG CODE SPECIFICATIONS. NOTED: SCAFFOLD ERECTED AT EXP #'S 1,2,3,4 ARE MISSING GUA$1,600
2009
2009-12-07PAT — from SOHN, YOUNG A to BOARD OF MANAGERS OF THE 200 ELEVENTH AV
2009-12-03ECB CLASS - 2 violation: 3314.4.2 ALL SCAFFOLDS SHALL BE MAINTAINED IN A SAFE CONDITION. NOTED:UNTIED SUPPORTED SCAFFOLD MESH @ SOUTHEAST SIDE OF THE BUILD$400
2009-11-30Deed $5,040,338 — from GAIA HOUSE, LLC to SOHN, YOUNG A$5,040,338
2009-11-30Mortgage $2,075,000 — from SOHN, YOUNG A to MERS$2,075,000
2009-11-30PREL — from ISTAR FM LOANS LLC to GAIA HOUSE, LLC
2009-11-30REL — from GAIA HOUSE, LLC to ISTAR FM LOANS LLC
2009-11-30PAT — from SOHN, YOUNG A to KLEE, RICHARD
2009-11-23ECB CLASS - 1 violation: USE OF SUPPORTED SCAFFOLD W/O A SCAFFOLD USER CERTIFICATE NOTED: NO USER CERTIFICATE FOR WORKERS USED SUPPORTED SCAFFOLD @ NORTH S$1,600
2009-11-23ECB CLASS - 2 violation: DESIGN DRAWINGS FOR SIDEWALK SHED NOT KEPT ON SITE NOTED :NO APPROVED DRAWINGS FOR SIDEWALK SHED @ JOB SITE AT TIME OF INSPECTION.
2009-11-23ECB CLASS - 1 violation: SCAFFOLD DOES NOT MEET BLDG CODE STANDARDS. NOTED: SUPPORTED SCAFFOLD DOES NOT MEET BLDG CODE STANDARDS 1) MISSING CROSS-BRACES 2)$1,600
2009-11-23DOB complaint, category ?
2009-11-20DOB complaint, category ?
2009-11-19ECB CLASS - 1 violation: SUPERVISION OR USE OF RIGGING EQUIPMENT W/O A RIGGER'S LICENSE. NOTED:2 SUSPENDED SCAFFOLD FULLY OPERATIONAL AT EXP. # 3. RIGGER'S
2009-11-05ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. AS NOTED: UPON INSPECTION AT ABOVE ACTIVE CONSTR$500
2009-11-05ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION - NO GUARDRAILS. NOTED: AT TIME OF INSPECTION A$1,200
2009-10-13DOB complaint, category ?
2009-10-09ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED PLANS. AT THE TIME OF MY INSPECTION CONSTRUCTION CREW ON SITE APPROX. 50 WORK MEN ON SITE. STRUC$250
2009-10-08DOB complaint, category ?
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07SUBM — from ISTAR FM LOANS LLC; ISTAR FM LOANS LLC to GAIA HOUSE , LLC; GAIA HOUSE , LLC
2009-10-07Permit PL — ISSUED
2009-10-06Permit EW — ISSUED
2009-10-06Permit EW — ISSUED
2009-10-05DOB complaint, category ?
2009-10-02PAT — from CINQUANTOTTO LLC to BOARD OF MANAGERS
2009-10-02PREL — from ISTAR FM LOANS LLC, to GAIA HOUSE, LLC
2009-10-02Deed $11,847,875 — from GAIA HOUSE, LLC to CINQUANTOTTO LLC$11,847,875
2009-10-02REL — from GAIA HOUSE , LLC to ISTAR FM LOANS, LLC
2009-10-02PREL — from ISTAR FM LOANS LLC, to GAIA HOUSE , LLC
2009-10-02PAT — from CINQUANTOTTO LLC to BOARD OF MANAGERS
2009-10-02Deed $18,029,375 — from GAIA HOUSE, LLC to CINQUANTOTTO LLC$18,029,375
2009-10-02RPTT&RET — from JDC PROPERTIES, LLC to CINQUANTOTTO LLC
2009-10-02REL — from ISTAR FM LOANS LLC, to GAIA HOUSE , LLC
2009-09-04Permit EQ — ISSUED
2009-09-03Job filed: INSTALLATION OF MATERIAL HOIST FOR CONSTRUCTION OF NEW BUILDING, PER ATTACHED DRAWINGS. INSTALLATION SHALL COMPLY WITH BSA-362-44-SM, AND LL-52/05.
2009-09-03Job filed: INSTALLATION OF MATERIAL HOIST FOR CONSTRUCTION OF NEW BUILDING, PER ATTACHED DRAWINGS. INSTALLATION SHALL COMPLY WITH BSA-362-44-SM, AND LL-52/05.
2009-08-31DOB complaint, category ?
2009-08-28Job filed: ERECT TUBULAR STEEL PIPE SCAFFOLDING ON THE 4TH FLOOR SETBACK AND BUILDING ROOF DECK PER DRAWINGS. SCAFFOLDING SUPPORTS HOISTING EQUIPMENT FOR MATERI
2009-08-27ECB CLASS - 1 violation: DEVICE NO PROVIDED TO RAISE,LOWER AND HOLD SCAFFOLD- UPON INSPECTION CONSTRUCTION OF NB IN PROGRESS. AT TIME OF INSPECTION TWO POI$1,600
2009-08-27ECB CLASS - 1 violation: FAILURE TO MAINTAIN SUPPORTED SCAFFOLDING AS REQUIRED- UPON INSPECTION,CONSTRUCTION OF NB IN PROGRESS, BUILDING UP TO ROOF. AT TIM$1,600
2009-08-27ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPNOTE NO ENGINEERED DRAWING AVAILABLE FOR SPECIALLY RIGGED RO$250
2009-08-27ECB CLASS - 1 violation: VERTICAL SAFETY NETTING NOT PROVIDE AND NOT MAINTAINED-UPON INSEPCTION NOTED VERTICAL SAFETY NETTING NOT PROVIDED ALONG THE FLOORS$1,600
2009-08-27ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATION- UPON INSPECTION NOTED CONSTRUCTION OPERATION-UPON$2,400
2009-08-27ECB CLASS - 2 violation: FAILED TO NOTIFY DEPT OBTAIN PERMIT PRIOR TO USE INSTALLATION OF ELECTRIC MATERIAL HOISTS 3 NOTE 3 ELECTRIC MATERIAL HOISTS INSTAL$800
2009-08-27ECB CLASS - 1 violation: WELDING OPERATION WITHOUT HAVING A VALID WELDERS LICENSE-UPON INSPECITON, INSTALLATION OF INTERIOR ELEVATOR IS IN PROGRESS. AT TIM$1,600
2009-08-27ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPNOTE APPROVED C-D5 PLANS FOR ELECTRIC MATERIAL HOISTS NOT AV$250
2009-08-27DOB complaint, category ?
2009-08-23ECB CLASS - 1 violation: SEC. 3303.8 SIAMESE CONNECTION FOR STANDPIPE SYSTEM OBSTRUCTED UPON INSPECTION NOTED MAN LIFT PARKED IN FRONT OF THE SIAMESE CONNE$1,600
2009-08-23ECB CLASS - 1 violation: SEC. 3308.3 FAILURE TO MAINTAIN VERTICAL SAFETY NETTING UPON INSPECTION NOTED VERTICAL SAFETY NETTING NOT MAINTAINED AT THE NORTH $1,600
2009-08-23ECB CLASS - 2 violation: SEC. 3307.4.1 WARNING SIGNS & LIGHTS NOT PROVIDED ON THE BARRICADES UPON INSPECTION NOTED CONSTRUCTION MATERIALS & EQUIPMENT STORE$400
2009-08-23ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT NOT MEET CODE SPECIFICATION UPON INSPECTION NOTED SOME OF THE LIGHT BULBS UNDER THE SIDEWALK SHED ALONG 11T$2,400
2009-08-21Job filed: INSTALLATION OF INTERIOR SCAFFOLD AS PER PLANS SUBMITTED HEREWITH. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2008 NYC BUILDING CODE. NO CHANGE IN U
2009-08-21Job filed: INSTALLATION OF INTERIOR SCAFFOLD AS PER PLANS SUBMITTED HEREWITH. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2008 NYC BUILDING CODE. NO CHANGE IN U
2009-08-21Permit EQ — ISSUED
2009-08-13DOB complaint, category ?
2009-08-12ECB CLASS - 2 violation: WORK CONTRARY TO APPROVE PLAN AND APPL IMPROPER USE OF ELEVATOR UPON INSPECTION CONST OF NB IN PROGRESS AT TIME OF INSPECTION OBSE
2009-08-12ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS UPON INSPECTION OBSERVED DEBRIS ACCUMULATED ON PIPE SCAFFOLDING$400
2009-08-12ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONST OPERATIONS UPON INSPECTION CONST NB IN PROGRESS AT TIME OF INSPECT$2,400
2009-08-12ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONST DOCUMENTS AND OR APPROVED AMENDMENTS UPON INSPECTION OBSERVED MORE THAN 40FT HIGH PIPE SCA$250
2009-07-18ECB CLASS - 1 violation: SEC. BC 3307.5.2 FAILURE TO PROVIDE FLAG PERSON. NOTE: AT TIME OF INSPECTION AT ABOVE ACTIVE SITE,CONSTRUCTION WORK IN PROGRESS,OB$1,600
2009-07-02Permit EQ — ISSUED
2009-07-01Job filed: INSTALLATION OF PIPE SCAFFOLD 54' HIGH ON HEAVY DUTY SIDEWALK SHED.SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BC.NO CHANGE TO USE, OCCUPANCY OR MEANS O
2009-07-01Job filed: INSTALLATION OF PIPE SCAFFOLD 54' HIGH ON HEAVY DUTY SIDEWALK SHED.SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BC.NO CHANGE TO USE, OCCUPANCY OR MEANS O
2009-06-11ECB CLASS - 1 violation: WORK W/O A PERMIT. AS NOTED: AT TIME OF INSPECTION ON A NORTHSIDE OF BUILDING (EXPOSURE #2) SCAFFOLDING IS ERECT ON SIDEWALK SHED $1,600
2009-06-11ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS & OR APPROVEDAMENDMENTS. AS NOTED: AT TIME OF INSPECTION ON A ACTIVE CONS$250
2009-06-11DOB complaint, category ?
2009-06-11ECB CLASS - 2 violation: SEC. 3314.3.1 DESIGN AS NOTED: AT TIME OF INSPECTION ON A ACTIVE CONSTRUCTION SITE,BUILDING UP TO 20 STORIES,ON NORTH SIDE OF BUIL$400
2009-06-08DOB complaint, category ?
2009-05-12Permit EW — ISSUED
2009-04-23ECB CLASS - 3 violation: SEC 3307.5.2 27-1024 FLAG PERSON AS NOTED AT TIME OF INSP ON A ACTIVE CONSTRUCTION SITE BLDG UP TO 20STY A FLATBED TRUCK BACKING U$150
2009-04-23ECB CLASS - 1 violation: SEC 3314.8.1 27-1009A SCAFFOLD PROTECTIVE MESH SAFETY NETTING AS NOTED AT TIME OF INSP ON A ACTIVE CONSTRUCTION SITE BLDG UP TO 20$8,000
2009-04-23ECB CLASS - 1 violation: SEC 3308.3 27-1021(G)(2) VERTICAL SAFETY NETTING REQUIREMENT AS NOTED AT TIME OF INSP ON A ACTIVE CONSTRUCTION SITE BLDG UP TO 20S$1,600
2009-04-08Permit EQ — ISSUED
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06CDEC — from GAIA HOUSE LLC
2009-04-06MAPS — from 200 ELEVENTH AVENUE CONDOMINIUM
2009-04-06Permit EQ — ISSUED
2009-04-06Permit EQ — ISSUED
2009-04-06Permit EQ — ISSUED
2009-04-01Permit EQ — ISSUED
2009-03-25Job filed: FILING TO SUBDIV.LOT 67 INTO 15 CONDO TAX LOTS: LOTS 1801-1815.ALL LOTS ARE RES. CONDO UNITS. NO WORK, NO CHANGE TO ZONING AND NO CHANGE IN USE ,EGRES
2009-03-25Job filed: FILING TO SUBDIV.LOT 67 INTO 15 CONDO TAX LOTS: LOTS 1801-1815.ALL LOTS ARE RES. CONDO UNITS. NO WORK, NO CHANGE TO ZONING AND NO CHANGE IN USE ,EGRES
2009-03-21ECB CLASS - 1 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP CONS NO GUARDRAILS AT TIME OF INSP ON ACTIVE JOBSITE OBSERVED WO$2,400
2009-03-21ECB CLASS - 1 violation: FAILURE TO INSTITUTE MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP CONSTRNO TOE BOARDS AT TIME OF INSP ON ACTIVE JOBSITE OBSERVED WOR$1,000
2009-03-21ECB CLASS - 1 violation: SEC BC3314.4.6 & RCNY 52-05 UNQUALIFIED PERSON USING A SUPPORTED SCAFFOLD AT TIME OF INSP ON ACTIVE JOBSITE SUPPORTED SCAFFOLD SET$1,600
2009-03-13DOB complaint, category ?
2009-03-12Permit EQ — ISSUED
2009-03-10Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 211' LONG X 8'-10' HIGH DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED T
2009-03-05Job filed: APPLICATION FILED FOR FIRE PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING #104548919. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2009-03-05Permit EW — ISSUED
2009-03-03DOB complaint, category ?
2009-03-03ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. NOTED: AT TIME OF INSPECTION MEN UNLOADING TR$250
2009-02-25ECB CLASS - 2 violation: FAILED TO NOTIFY DEPT OBTAIN PERMIT PRIOR TO USE INSTALLATION C-HOOKS IN CONNECTION WITH SUSPENDED SCAFFOLD NOTED 2 SETS OF CHOOKS$800
2009-02-25ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONST DOCUMENTS AND OR APPROVED AMENDMENTS NOTED SIDEWALK SHED ON EXP 1 2 4 GO FROM 8FT TO 10FT $250
2009-02-25ECB CLASS - 1 violation: FAILURE TO PERFORM SAFE PROPER INSPECTION OF SUSPENDED SCAFFOLD NOTED INADEQUATE LIFELINES NO PROTECTION OF WIRE ROPE AND CHOOKS B$10,000
2009-02-25ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES OPERATION OF HOISTING EQUIPMENT IN UNSAFE MANNER NOTED 2 2PT SUSPENDED SCAFFOLD AT EXP 3 2LIFE LINES AR$4,800
2009-02-25DOB complaint, category ?
2009-02-24ECB CLASS - 2 violation: WORK W/O A PERMIT. NOTED AT TIME OF INSPECTION ON ACTIVE JOB SITE. BUILDING USING TEMPORARY HEATING UNITS NATURAL GAS FIRED HEATIN$800
2009-01-28Permit NB — ISSUED
2009-01-23Permit EQ — ISSUED
2009-01-21ECB CLASS - 1 violation: SEC. BC 3301.7 27-1015 REQUIRED DESIGN DRAWING,AT TIME OF INSPECTION ON ACTIVE JOB SITE WITH EXTERIOR WATER PROOFING WORK IN PROCE$1,600
2009-01-21ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP CONST.(NO TOE BOARD). AT TIME OF INSPECTION ON ACTIVE JOB SITE WIT$1,000
2009-01-21ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMP CONST (NO GUARD RAILS) AT TIME OF INSPECTION ON ACTIVE JOB SITE WI$2,400
2009-01-21DOB complaint, category ?
2008
2008-11-12ECB CLASS - 2 violation: FAILURE TO PROVIDE REQUIRED VERTICAL NETTING.UPON INSPECTION AS OBSERVED THE VERTICAL NETS WERE MISSING IN SOME LOCATIONS & IN POO$400
2008-11-10ECB CLASS - 1 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARYCONSTRUCTION-NO TOE BOARDS.UPON INSPECTION AS NOTED THERE WE$1,000
2008-11-10ECB CLASS - 1 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARYCONSTRUCTION - NO HAND RAILS.UPON INSPECTION AS OBSERVED THE$1,000
2008-11-10ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION.UPON INSPECTION AS OBSERVED THERE WERE GUARD RAI$2,400
2008-10-23ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. OBSERVED SMOKING WITHIN CONSTRUCTION SITE. IN V
2008-10-08ECB CLASS - 1 violation: SEC. BC 3314.4.7. USE OF SUSPENDED SCAFFOLD W/O A SCAFFOLD USER CERTIFICATE. AT THE TIME OF INSPECTION, A SUSPENDED SCAFFOLD IS BE$1,600
2008-10-08ECB CLASS - 1 violation: 100N10.97B07. 100N10 PERSONAL HOIST 1V21976 RUNNING WITH GATE OPEN C.U UNTIL REPAIRED CALL 212 566-5542 FOR REINSPECTION 97B07 GRE$1,000
2008-09-25DOB complaint, category ?
2008-09-10ECB CLASS - 1 violation: 06N09 06N REMOVE BYPASS DEVICE & ADJ OR REPAIR GATE SWITCHES CALL 212 566-5542 FOR RETEST BEFORE RETURNING TO SERVICE$1,000
2008-09-10DOB complaint, category ?
2008-09-08Permit PL — ISSUED
2008-09-08Permit EW — ISSUED
2008-09-08Permit EW — ISSUED
2008-09-08DOB complaint, category ?
2008-09-05ECB CLASS - 2 violation: NO DESIGN DRAWING. AS NOTED: AT TIME OF INSPECTION AT ABOVE ACTIVE CONSTRUCTION SITE THERE IS NO DESIGN DRAWING AVAILABLE FOR HANG$800
2008-09-05ECB CLASS - 2 violation: FAILURE TO PROVIDE/POST SIGNS AT JOB SITE PURSUANT TO SUBSECTION. AS NOTED: AT TIME OF INSPECTION AT ABOVE ACTIVE CONSTR SITE OBSE$800
2008-09-05ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION NO TOE BOARDS. AS NOTED: AT TIME OF INSPECTION A$1,000
2008-09-05ECB CLASS - 1 violation: SAFETY NETTING DAMAGED AND OR BROKEN. AS NOTED: AT TIME OF INSPECTION AT ABOVE CONST SITE OBSERVED VERTICAL PERIMETER NETTING ARE $1,600
2008-09-05ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION NO GUARD RAILS. AS NOTED: AT TIME OF INSPECTION $2,400
2008-08-11ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS NOTED ON FLRS 3 THRU 8 EAST SIDE OF BLDG VERTICAL$2,400
2008-07-15DOB complaint, category ?
2008-07-08DOB complaint, category ?
2008-07-08ECB CLASS - 1 violation: SEC.3308.32VERTICAL SAFETY NETTING REQUIREMENT.AS NOTED:AT PERIMETER OF SITE,FROM 8FL.THRU THE 18FL.NETS ARE LOOSE,UNSECURE,TORN,R$1,600
2008-07-08ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURE OR TEMPORARY CONSTRUCTION NO TOE BOARDS NOTED @ 8TH-18 FLS TOR BOARDS ARE M$1,000
2008-07-01ECB CLASS - 1 violation: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION. NO TOE BOARDS. NOTED: FROM 15TH FL TO 2ND FL TO$1,000
2008-06-25DOB complaint, category ?
2008-06-25DOB complaint, category ?
2008-05-29DOB complaint, category ?
2008-05-28DOB complaint, category ?
2008-05-28DOB complaint, category ?
2008-05-28ECB Hazardous violation: HORIZONTAL SAFETY NETTING NOT PROVIDED -UPON INSPECTION CONSTRUCTION OF NB IS IN PROGRESS. STRIPPING OPERATION IS GOING ON IN 20TH$2,500
2008-05-28ECB Hazardous violation: HORIZONTAL SAFETY NETTING NOT PROVIDED -UPON INSPECTION CONSTRUCTION OF NB IN PROGRESS. AT TIME OF INSPECTION AS NOTED STRIPPING O$2,500
2008-05-28ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY - UPON INSPECTION AS NOTED STRIPPING OF 20TH FLR IN PROGRESS. WHILE STRIPPING A PIECE OF WO$1,500
2008-05-28ECB Hazardous violation: FAILURE TO NOTIFY BEST SQUAD, DOB ABOUT THE INCIDENT INVOLVING PUBLIC & PROPERTY SAFETY - UPON INSPECTION AS NOTED STRIPPING OPERA$2,000
2008-05-28ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY - UPON INSPECTION CONSTRUCTION OF NB IN PROGRESS. AT TIME OF INSPECTION AS NOTED WHILE ST$1,500
2008-05-19DOB complaint, category ?
2008-05-02DOB complaint, category ?
2008-04-23DOB complaint, category ?
2008-04-23DOB complaint, category ?
2008-04-23ECB Hazardous violation: FAILURE TO PERFORM ADEQUATE HOUSEKEEPING-UPON INSPECTION CONSTRUCTION OF NB IN PROGRESS. AT TIME OF INSPECTION AS NOTED CONSTRUCTI$880
2008-04-23ECB Hazardous violation: NO TOE BOARDS-UPON INSPECTION, CONSTRUCTION OF NB IS IN PROGRESS. THE BUILDING IS AT ROOF LEVEL, POURING OF CONCRETE ON ROOF SLAB $2,500
2008-04-14DOB complaint, category ?
2008-04-10Permit EQ — ISSUED
2008-04-10Permit EQ — ISSUED
2008-04-10Permit EQ — ISSUED
2008-03-31DOB complaint, category ?
2008-03-19DOB complaint, category ?
2008-03-06DOB complaint, category ?
2008-03-05DOB complaint, category ?
2008-03-05DOB complaint, category ?
2008-03-05ECB Hazardous violation: SEC.27-597 STOP ALL WORK DUE TO QUESTIONABLE CONSTRUCTION OBSERVED ALIGNMENT OF POURS FROM FLR TO FL QUESTIONABLE AND NOT VERTICAL
2008-02-29DOB complaint, category ?
2008-02-29DOB complaint, category ?
2008-02-01Permit EQ — ISSUED
2008-01-31Permit EQ — ISSUED
2008-01-30DOB complaint, category ?
2008-01-30DOB complaint, category ?
2008-01-30ECB Non-Hazardous violation: HORIZONTAL SAFETY NETTING NOT PROVIDED. UPON INSP. FORMING COLUMNS FOR15 FL POURED DECK 14 FL (STRIPPING) 13 FL. NO HORIZONTAL NET$500
2008-01-30ECB Non-Hazardous violation: STANDPIPE SYSTEM - DEFETIVE, NOT MAINTAINED. UPON INSP. POURED CONCRETE IS 14TH FL FORMING COLUMNS FOR 15 STRIPPING FLOOR IS 13TH $1,000
2008-01-29DOB complaint, category ?
2008-01-25DOB complaint, category ?
2008-01-23Job filed: INSTALLATION OF SCAFFOLD SHORING FRAME @ 12, 15, 17 & 18 FLOOR FOR EXISTING HOIST RUNWAY DURING NB CONSTRUCTION BIS # 104548919. NO CHANGE IN USE,
2008-01-22Job filed: A3
2008-01-22DOB complaint, category ?
2008-01-18DOB complaint, category ?
2008-01-13DOB complaint, category ?
2007
2007-12-27ECB Hazardous violation: VERTICAL SAFETY NETTING NOT PROVIDED.AT TIME OF INSPECTION THE VERTICAL NETTING HAS BEEN REMOVED AT THE 6FL FLOOR LEVEL.THE EXPOS$500
2007-12-21DOB violation C:
2007-12-21DOB complaint, category ?
2007-12-17Permit EQ — ISSUED
2007-12-17Permit NB — ISSUED
2007-12-14ECB Non-Hazardous violation: NO HANDRAIL. NOTED: LADDERS INSTALLED FROM 6TH FLR TO 9TH FLR FOR TEMPEGRESS & THERE IS NO HAND RAILS. REMEDY: INSTALL HAND RAILS
2007-12-14ECB Non-Hazardous violation: NO VERTICAL SAFETY NET. NOTED: THE 10TH FLR IS BEING FORMED 9TH FLR STRIPPED & THERE IS NO VERTICAL SAFETY NET. REMEDY: PROVIDE VE
2007-12-14ECB Non-Hazardous violation: VERTICAL SAFETY NET NOT MAINTAINED NOTED: THE 10TH FLR IS BEING FORMED& VERTICAL SAFETY NOT BROKEN & OR MISSING ON 3,5,6 FLR. REME$1,200
2007-12-14ECB Non-Hazardous violation: NO GUARD RAIL. NOTED: THE 10TH FLR IS BEING FORMED & THERE IS NO GUARDRAIL ON 9TH FLR WEST & @ SOUTH ONLY TOP RAIL INSTALLED. REME
2007-12-14ECB Non-Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY DURING CONSTRUCTION OPERATION. NOTED: THE 10TH FLR IS BEING FORMED(SHANT)INSTALLED ON TOP O$1,000
2007-12-14ECB Non-Hazardous violation: NO ELEVATOR IN READINESS. NOTED: THE 10TH FLR IS BEING FORMED & THERE IS NO ELEVATOR IN READINESS. REMEDY: STOP ALL WORK ABOVE 6TH$1,000
2007-12-14ECB Non-Hazardous violation: HORIZONTAL SAFETY NET NOT CLEANED.NOTED:HORIZONTAL SAFETY NET INSTALLED AT 7FL HAS ICE ACCUMULATION.SNOWY SLEET STOP FALLING YESTE
2007-12-14DOB complaint, category ?
2007-12-12DOB complaint, category ?
2007-12-06DOB complaint, category ?
2007-10-26DOB complaint, category ?
2007-10-26DOB complaint, category ?
2007-10-22Permit PL — ISSUED
2007-10-22DOB complaint, category ?
2007-10-19Permit EQ — ISSUED
2007-10-17DOB complaint, category ?
2007-10-16DOB complaint, category ?
2007-10-10DOB complaint, category ?
2007-10-10DOB complaint, category ?
2007-10-09DOB complaint, category ?
2007-10-09DOB complaint, category ?
2007-10-05DOB complaint, category ?
2007-09-27ECB Hazardous violation: WORK CONTRARY TO APPROVED DRAWING. NOTED: SIDEWALK SHED INSTALLED @ 24TH ST APPROVED DRAWING #104876270 STATED SHED TO BE 8' HIGH.$500
2007-09-27DOB complaint, category ?
2007-09-27ECB Hazardous violation: FAILURE TO SAFE GUARD PUBLIC & PROPERTY DURING CONST. OPERATION. NOTED:NB UP TO 4TH FL & THERE IS NO OVERHEAD PROTECTION @ ENTRY W$1,000
2007-09-25ECB Non-Hazardous violation: NO SIDE WALK SHED. NOTED: NB UP TO 4TH FL APPROX 4FT FROM SIDE WALK & 40FT HIGH & THERE IS NO SIDE WALK SHED APPROX. 8FT @ EAST $2,000
2007-09-25ECB Non-Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY DURING CONSTRUCTION OPERATION. NOTED: THE 4TH FL IS BEING FORMED & THERE IS NO OVER HEAD PR$1,000
2007-09-24DOB complaint, category ?
2007-09-21DOB complaint, category ?
2007-09-20Permit EQ — ISSUED
2007-09-18DOB complaint, category ?
2007-09-18DOB complaint, category ?
2007-09-17DOB violation C:
2007-09-17DOB complaint, category ?
2007-09-17DOB complaint, category ?
2007-09-17DOB complaint, category ?
2007-09-13Job filed: INSTALLATION OF TRAILERS ON EXISTING SIDEWALK SHED BIS # 104876270 DURING NB CONSTRUCTION # 104548919. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-09-12Permit EW — ISSUED
2007-09-12Permit EW — ISSUED
2007-09-12ECB Hazardous violation: FAILURE TO PROTECT ROOF OF ADJOINING PROPERTY.ON INSPECTOR NO ROOF PROTECTION PROVIDED ON ADJACENT PROPERLY ROOF.NEW BLDG CONCRETE$500
2007-09-12DOB complaint, category ?
2007-09-12DOB complaint, category ?
2007-09-10Job filed: INSTALLATION OF A CHAMPION US 6000-2R DUAL CAGE PERSONNELL/MATERIAL HOIST 350' HIGH DURING NEW BUILDING CONSTRUCTION (104548919). NO CHANGES IN USE,EG
2007-09-10Job filed: INSTALLATION OF A CHAMPION US 6000-2R DUAL CAGE PERSONNELL/MATERIAL HOIST 350' HIGH DURING NEW BUILDING CONSTRUCTION (104548919). NO CHANGES IN USE,EG
2007-09-07DOB complaint, category ?
2007-09-04DOB complaint, category ?
2007-08-31DOB complaint, category ?
2007-08-31DOB complaint, category ?
2007-08-28ECB Hazardous violation: SEC 27-1018:FAILURE TO PERFORM ADEQUATE HOUSEKEEPING. AT TIME OF INSPECTION FRAME INSTALLATION FOR FORM WORK OCCUPIES MOST OF THE $500
2007-08-28DOB complaint, category ?
2007-08-28DOB complaint, category ?
2007-08-27DOB complaint, category ?
2007-08-27DOB complaint, category ?
2007-08-24Permit EQ — ISSUED
2007-08-23DOB complaint, category ?
2007-08-22DOB complaint, category ?
2007-08-20Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 232' DURING FACADE REPAIR. NO CHANGES IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/9
2007-08-20Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 232' DURING FACADE REPAIR. NO CHANGES IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/9
2007-08-16DOB complaint, category ?
2007-08-07DOB complaint, category ?
2007-08-03DOB complaint, category ?
2007-07-28DOB complaint, category ?
2007-07-28DOB complaint, category ?
2007-06-26Permit PL — ISSUED
2007-06-21Permit NB — ISSUED
2007-06-21Permit EQ — ISSUED
2007-06-16DOB complaint, category ?
2007-06-09DOB complaint, category ?
2007-06-02DOB complaint, category ?
2007-03-19Job filed: Installation of boiler in conjunction with NB #104548919.$1,000
2007-03-19Job filed: Installation of boiler in conjunction with NB #104548919.$1,000
2007-03-02Permit NB — RE-ISSUED
2007-03-01DOB complaint, category ?
2007-03-01ECB Non-Hazardous violation: WORK W/O A PERMIT.NOTED:AT TIME OF INSPECTION AT THE ABOVE SITE.SITE FENCE WAS VIEWED TO BE 12'IN HEIGHT FENCE PER CODE ONLY 8' IN$800
2007-03-01ECB Non-Hazardous violation: NO 24 HR NOTICE. NOTED: AT TIME OF INSP AN ACTIVE SITE FOUNDATION WORKIN PROGRESS BLDG TO BE CONST IS 18 STY HIGH. NO 24 HR NOTICE$500
2007-03-01ECB Non-Hazardous violation: FAILURE TO HAVE DESIGNATED SITE SAFETY MANAGER.NOTED:AT TIME OF INSPECTION AN ACTIVE SITE FOUNDATION WORK IN PROGRESS A DESIGNATIO$2,000
2007-02-27Job filed: Installation of new fire alarm system in conjunction with NB #104548919. No change to use, egress or occupancy.$1,000
2007-02-27Job filed: Installation of new fire alarm system in conjunction with NB #104548919. No change to use, egress or occupancy.$1,000
2007-02-21Job filed: Application filed to install combination of sprinkler and standpipe system in conjunction with new building #104548919. No change in use, egress or oc$2,000
2007-01-09Permit NB — ISSUED
2007-01-09Permit EQ — ISSUED
2006
2006-12-07ECB Hazardous violation: FAILURE TO POST DOT PERMITS:UPON INSPECTION DUMP TRUCK CROSSING SIDEWALK FROM STREET INTO CONSTRUCTION.SITE.DEM CONTRACTOR FAILED $400
2006-11-17Permit DM — ISSUED
2006-11-17Permit EQ — ISSUED
2006-11-17Permit EQ — ISSUED
2006-11-08Permit EQ — ISSUED
2006-11-08Permit DM — ISSUED
2006-11-08Permit DM — ISSUED
2006-11-08Permit EQ — ISSUED
2006-10-11Job filed: DM
2006-10-11Job filed: DM
2006-09-26Job filed: NB
2006-09-26Job filed: NB
2006-09-21Job filed: Application filed for builders paving plan in conjunction with new building #104548919. Total linear footage is 156 lin. ft. No change in use, egres
2006-09-19Job filed: NB
2006-08-28Job filed: DM
2006-08-28Job filed: DM
2006-08-28Job filed: DM
2005
2005-08-22Permit AL — ISSUED
2005-08-09DOB complaint, category ?
2005-08-09DOB complaint, category ?
2005-07-26Job filed: This application is being filed to repair damage roof (100% damage) of auto repair shop and to remove violation # V062305C501M.See attached photo to w$22,000
2005-06-23DOB violation C:
2005-06-23DOB complaint, category ?
2003
2003-03-21DOB complaint, category ?
2003-03-12DOB violation C:
2001
2001-10-03DOB violation C:
1998
1998-01-06ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. A NEW ROOF HAS BEEN ERECTED ONTO SIDE OF EXISTING BUILDING AT 1ST STORY. REMEDY: FILE NECESSARY PLANS AND A$875
1996
1996-10-07ECB Non-Hazardous violation: WORK WITHOUT A PEMRIT WORK NOTED NEW ROOF BUILT ONTO SIDE OF EXISTING BUILDING AT 1ST FLOOR. CONSTRUCTION USED WOOD JOIST AND STRU$350