Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

210 West 18 Street · Manhattan · BBL 1007677505 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class8
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 85% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty points per 10 units; this building carries 1.7. In ZIP 10011, 68% of residential buildings hold an A and 5% grade D or F. How grades work

this building
A
B
C

Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$2,500 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

22 service requests in the last three years. Most common: Illegal Parking (7) · Encampment (4) · Noise (3) · Street Condition (3) · Sanitation Worker or Vehicle Complaint (1) · Derelict Vehicles (1).

Filed construction activity

$13,895,125 in permitted construction work filed since 2016 (60 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1929)
YesSix or more residential units (47)
No421-a / J-51 tax benefit on the current tax roll

2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)WALKER TOWER CONDOMINIUM
Head officerPENELOPE MARZULLI
Managing agentDOUGLAS ELLIMAN PROPERTY MANAGEMENT
Last registered2025-07-11

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$752,907 $338,808
2026$685,156 $308,321
2027$0 $0

The city's market estimate has fallen 100% between tax years 2025 and 2027.

For property tax, the Department of Finance values this condo as if it were a rental building. Its 2023 estimate: gross income $7,376,188 a year ($45.33 per sq ft), operating expenses $1,920,120 ($11.80 per sq ft), net operating income $5,456,069. These are the city's estimates from comparable rentals, not the building's actual budget, rents or maintenance charges.

Building systems

Energy grade (LL33)A — ENERGY STAR score 90/100 (2022 disclosure cycle)
Heating fuelNO2FUEL
Facade (Local Law 11)SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway18 St — 1 · 200 ft straight-line (about a 1-minute walk) · station accessibility: none
14 St — A C E L · 700 ft straight-line (about a 3-minute walk) · station accessibility: full
BusNearest boarding stop: 7 Av / W 17 St — M7 M20 · 250 ft
Citi BikeW 17 St & 7 Ave · 200 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 011: The Sarah J. Garnet Elementary School
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

210 West 18 Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Anything elseAnything else

22 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

The landlord's report card

Managed by DOUGLAS ELLIMAN PROPERTY MANAGEMENT — 313 buildings, 53,552 units. Grades across the portfolio: A294 · B9 · C2 · D3. See the whole portfolio

BuildingBoroughUnitsGrade
2049 Bartow Avenue BX10914 A
163-15 Baisley Boulevard QN5860 A
120 Erskine Place BX4458 A
209-90 23 Avenue QN1037 A
54-17 31 Avenue QN966 A
330 East 38 Street MN830 A
2928 West 5 Street BK572 A
2940 West 5 Street BK572 A
200 Rector Place MN540 A
200 East 66 Street MN490 A
245 East 54 Street MN444 A
22 Thames Street MN439 A
25 Central Park West MN416 A
1781 1 Avenue MN367 A
425 East 58 Street MN348 A
2 5 Avenue MN343 A
150 West 56 Street MN337 A
25 Sutton Place South MN320 A
25 Broad Street MN308 A
245 East 93 Street MN290 A
83-85 Woodhaven Boulevard QN288 A
139-15 83 Avenue QN282 A
45 Sutton Place South MN278 A
14 West 4 Street MN274 A
9 5 Avenue MN267 A
631 Hudson Street MN261 A
70-20 108 Street QN254 A
200 East 89 Street MN253 A
5 West 53 Street MN245 A
130 William Street MN240 A
230 West 55 Street MN232 A
240 East 47 Street MN229 A
142-05 Roosevelt Avenue QN228 A
641 5 Avenue MN224 A
230 East 20 Street MN223 A
249 8 Avenue MN221 A
333 East 43 Street MN215 A
1461 1 Avenue MN215 A
2360 Broadway MN207 A
1485 5 Avenue MN206 B
101 West 24 Street MN202 A
133 West 11 Street MN199 A
188 East 64 Street MN194 A
139 East 33 Street MN193 A
225 East 34 Street MN190 A
555 West 59 Street MN186 A
211 Central Park West MN183 A
22 West 14 Street MN182 A
242 Madison Avenue MN180 A
1030 3 Avenue MN176 A
120 4 Avenue MN175 A
1185 Park Avenue MN172 A
173 Riverside Drive MN167 A
201 East 25 Street MN164 A
1156 3 Avenue MN163 A
515 East 79 Street MN163 A
111 East 85 Street MN160 A
280 East Houston Street MN158 A
2420 Broadway MN158 A
726 Greenwich Street MN157 A

showing 60 of 313 buildings

Sales, deeds & mortgages

DateRecordAmountPer res. unit
2026-08-11Mortgage $10,150,000 — from WHEN IN NEW YORK LLC to JPMORGAN CHASE BANK, N.A. $10,150,000
2026-07-31Mortgage $6,000,000 — from FINESTONE, BENJAMIN to JPMORGAN CHASE BANK, N.A. $6,000,000
2026-05-18Deed $9,000,000 — from NOT YET RATED VENTURES, LLC to FINESTONE, BENJAMIN $9,000,000
2026-05-07Sold for $9,000,000 $9,000,000 $191,489
2026-02-19Deed $4,550,000 — from BARRON, VICKEY; MOREIRA, LEDINILTON to FEENEY, KEVIN MICHAEL $4,550,000
2026-02-19Mortgage $2,232,409 — from FEENEY, KEVIN MICHAEL to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS $2,232,409
2026-02-06Sold for $4,550,000 $4,550,000 $96,809
2024-12-31Deed $7,750,000 — from MARSELIS 19C, LLC to THE M.M. MCGUIRE LIVING TRUST; MARK M. MCGUIRE, AS TRUSTEE $7,750,000
2024-12-19Sold for $7,750,000 $7,750,000 $164,894
2024-09-23Deed $14,500,000 — from THREE GOOD KIDS LLC to SIB GEN II LLC $14,500,000
2024-09-17Sold for $14,500,000 $14,500,000 $308,511
2024-07-11Mortgage $9,345,000 — from WALKER212W18TH LLC to JPMORGAN CHASE BANK, N.A. $9,345,000
2024-06-13Deed $13,350,000 — from BEST 1 LLC to WALKER212W18TH LLC $13,350,000
2024-05-28Deed $7,950,000 — from BIER, MELLISSA to OSPREY POINT INVESTMENTS VII, LLC $7,950,000
2024-05-20Sold for $13,350,000 $13,350,000 $284,043

Ten-year activity

2001000
106
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201717394532106
2018405111333
20191828241163
2020119523149
20211421635269
202291716639
202312188433
2024332924371
202590109432
2026100513028
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 33 records

DateRecord
2026-08-11Mortgage $10,150,000 — from WHEN IN NEW YORK LLC to JPMORGAN CHASE BANK, N.A.
2026-07-31Mortgage $6,000,000 — from FINESTONE, BENJAMIN to JPMORGAN CHASE BANK, N.A.
2026-07-23Mortgage satisfied — from WHEN IN NEW YORK, LLC to JPMORGAN CHASE BANK, N.A
2026-06-10Permit General Construction — Permit Issued
2026-06-10Permit General Construction — Permit Issued
2026-06-09311: Homeless Person Assistance — Chronic
2026-06-04Permit General Construction — Permit Issued
2026-05-18PAT — from FINESTONE, BENJAMIN to RESIDENTIAL BOARD OF WALKER TOWER CONDOM; BOARD OF MANAGERS OF WALKER TOWER CONDOM
2026-05-18Deed $9,000,000 — from NOT YET RATED VENTURES, LLC to FINESTONE, BENJAMIN
2026-05-14Job filed: PROPOSED INTERIOR RENOVATION OF APARTMENT 9C ON THE 009 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
2026-05-14Permit Suspended Scaffold — Permit Issued
2026-05-07Sold for $9,000,000
2026-04-30311: Encampment — N/A
2026-04-30311: Encampment — N/A
2026-04-30311: Encampment — N/A
2026-04-30311: Encampment — N/A
2026-04-10Job filed: INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
2026-03-24Permit Plumbing — Signed-off
2026-03-12Job filed: Apt. 17B/C - cap/remove, replace, relocate and install plumbing fixtures
2026-03-03Permit General Construction — Permit Issued
2026-02-19Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to TD BANK, N.A.
2026-02-19Deed $4,550,000 — from BARRON, VICKEY; MOREIRA, LEDINILTON to FEENEY, KEVIN MICHAEL
2026-02-19PAT — from FEENEY, KEVIN MICHAEL to WALKER TOWER CONDOMINIUM
2026-02-19Mortgage $2,232,409 — from FEENEY, KEVIN MICHAEL to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2026-02-19PAT — from BARRON, VICKEY to STRAUSS, MICHAEL
2026-02-19PAT — from MOREIRA, LEDINILTON to STRAUSS, MICHAEL
2026-02-06Sold for $4,550,000
2026-02-06Job filed: Renovate Apt. 17B/C on the 16th floor, work to include general construction, all work is interior. No change to use, egress or occupancy.
2025-12-18Mortgage satisfied — from THORNE, MICHAEL; SHAKKOUR, LEILA to QUICKEN LOANS INC.; ROCKET MORTGAGE, LLC; QUICKEN LOANS, LLC
2025-12-01Bedbug filing: 0 infested units
2025-11-17Permit Plumbing — Signed-off
2025-11-17Permit Plumbing — Permit Issued
2025-11-14Permit General Construction — Permit Issued

The full timeline

2026
2026-08-11Mortgage $10,150,000 — from WHEN IN NEW YORK LLC to JPMORGAN CHASE BANK, N.A.$10,150,000
2026-07-31Mortgage $6,000,000 — from FINESTONE, BENJAMIN to JPMORGAN CHASE BANK, N.A.$6,000,000
2026-07-23Mortgage satisfied — from WHEN IN NEW YORK, LLC to JPMORGAN CHASE BANK, N.A
2026-06-10Permit General Construction — Permit Issued
2026-06-10Permit General Construction — Permit Issued
2026-06-09311: Homeless Person Assistance — Chronic
2026-06-04Permit General Construction — Permit Issued
2026-05-18PAT — from FINESTONE, BENJAMIN to RESIDENTIAL BOARD OF WALKER TOWER CONDOM; BOARD OF MANAGERS OF WALKER TOWER CONDOM
2026-05-18Deed $9,000,000 — from NOT YET RATED VENTURES, LLC to FINESTONE, BENJAMIN$9,000,000
2026-05-14Job filed: PROPOSED INTERIOR RENOVATION OF APARTMENT 9C ON THE 009 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$10,000
2026-05-14Permit Suspended Scaffold — Permit Issued
2026-05-07Sold for $9,000,000$9,000,000
2026-04-30311: Encampment — N/A
2026-04-30311: Encampment — N/A
2026-04-30311: Encampment — N/A
2026-04-30311: Encampment — N/A
2026-04-10Job filed: INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
2026-03-24Permit Plumbing — Signed-off
2026-03-12Job filed: Apt. 17B/C - cap/remove, replace, relocate and install plumbing fixtures$24,000
2026-03-03Permit General Construction — Permit Issued
2026-02-19Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to TD BANK, N.A.
2026-02-19Deed $4,550,000 — from BARRON, VICKEY; MOREIRA, LEDINILTON to FEENEY, KEVIN MICHAEL$4,550,000
2026-02-19PAT — from FEENEY, KEVIN MICHAEL to WALKER TOWER CONDOMINIUM
2026-02-19Mortgage $2,232,409 — from FEENEY, KEVIN MICHAEL to MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$2,232,409
2026-02-19PAT — from BARRON, VICKEY to STRAUSS, MICHAEL
2026-02-19PAT — from MOREIRA, LEDINILTON to STRAUSS, MICHAEL
2026-02-06Sold for $4,550,000$4,550,000
2026-02-06Job filed: Renovate Apt. 17B/C on the 16th floor, work to include general construction, all work is interior. No change to use, egress or occupancy.$200,000
2025
2025-12-18Mortgage satisfied — from THORNE, MICHAEL; SHAKKOUR, LEILA to QUICKEN LOANS INC.; ROCKET MORTGAGE, LLC; QUICKEN LOANS, LLC
2025-12-01Bedbug filing: 0 infested units
2025-11-17Permit Plumbing — Signed-off
2025-11-17Permit Plumbing — Permit Issued
2025-11-14Permit General Construction — Permit Issued
2025-09-18Job filed: Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. $20,500
2025-09-10Permit General Construction — Signed-off
2025-09-06311: Illegal Parking — License Plate Obscured
2025-08-29Rodent inspection: Passed
2025-08-08311: Noise - Residential — Loud Music/Party
2025-06-06PAT — from 212W18ST LLC to WALKER TOWER CONDOMINIUM
2025-06-06Deed — from TRIVEDI, PRANAV L to 212W18ST LLC
2025-06-06PAT — from TRIVEDI, PRANAV L. to MCKEEN, CHARLES; NATHANSON, LEONARD B.
2025-06-06Job filed: PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR ALTERATION OF APARTMENT 19C ON THE 018 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$26,600
2025-06-06Job filed: INTERIOR ALTERATION OF APARTMENT 19C ON THE 018 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$235,017
2025-05-10311: Illegal Parking — Blocked Sidewalk
2025-05-01Deed transfer (nominal price)
2025-04-25SMIS — from GOLDMAN SACHS BANK USA; BEATTIE, EDWARD SCOTT; BEATTIE, E. SCOTT; WT APARTMENT 12E LLC
2025-04-18311: Street Condition — Plate Condition - Noisy
2025-04-17311: Street Condition — Plate Condition - Noisy
2025-04-15Air permit (REGISTRATION), fuel: NO2FUEL
2025-04-15Air permit (REGISTRATION), fuel: NO2FUEL
2025-04-15Air permit (REGISTRATION), fuel: NO2FUEL
2025-03-25Mortgage satisfied — from MARSELIS 19C LLC to J.P. MORGAN (SUISSE) SA; JPMORGAN CHASE BANK, N.A.
2025-03-06DTL — from BANK OF NEW YORK MELLON
2025-03-04Mortgage assigned — from J.P. MORGAN (SUISSE) SA to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2025-02-28Job filed: Prepare existing 3rd, 4th, 5th, 6th, and 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row coo$721,000
2025-02-08311: Lost Property — Bag/Wallet
2025-01-14311: Illegal Parking — Blocked Sidewalk
2025-01-14311: Illegal Parking — Blocked Sidewalk
2025-01-13Permit General Construction — Permit Issued
2025-01-12311: Illegal Parking — Blocked Sidewalk
2024
2024-12-31PAT — from THE M.M. MCGUIRE LIVING TRUST; MARK M. MCGUIRE, AS TRUSTEE to WALKER TOWER CONDOMINIUM
2024-12-31Deed $7,750,000 — from MARSELIS 19C, LLC to THE M.M. MCGUIRE LIVING TRUST; MARK M. MCGUIRE, AS TRUSTEE$7,750,000
2024-12-19Sold for $7,750,000$7,750,000
2024-12-12Permit Plumbing — Signed-off
2024-12-11Permit General Construction — Signed-off
2024-12-09Permit Mechanical Systems — Signed-off
2024-12-02Bedbug filing: 0 infested units
2024-11-12Job filed: Remove existing pressure reducing valves (PRV) in the MER room and all associated Pneumatic piping, Replace with new electronic PRV's, Replace existi$300,000
2024-10-30Permit General Construction — Signed-off
2024-10-15Rodent inspection: Passed
2024-10-08Permit General Construction — Permit Issued
2024-09-30311: Street Condition — Defective Hardware
2024-09-30Job filed: Minor changes in partitions and new millwork in existing Apartment 12A. Plumbing work to be filed separately. No change in use, occupancy or egress.$50,000
2024-09-23Deed $14,500,000 — from THREE GOOD KIDS LLC to SIB GEN II LLC$14,500,000
2024-09-23PAT — from SIB GEN II LLC to THE BOARD OF MANAGERS OF
2024-09-23Job filed: Renovate Apt. 17B/C on the 16th floor, work to include general construction, all work is interior. No change to use, egress or occupancy.$200,000
2024-09-23Job filed: Apt. 17B/C - cap/remove, replace, relocate and install plumbing fixtures$24,000
2024-09-20311: Illegal Parking — Blocked Sidewalk
2024-09-17Sold for $14,500,000$14,500,000
2024-09-17311: Illegal Parking — Blocked Sidewalk
2024-09-17311: Obstruction — Cone
2024-09-11Job filed: INTERIOR RENOVATION OF OFFICE SPACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH$9,800
2024-09-10Permit Mechanical Systems — Signed-off
2024-09-10Permit General Construction — Signed-off
2024-09-09Permit General Construction — Signed-off
2024-09-09Permit Mechanical Systems — Signed-off
2024-08-09SMIS — from MAXIM CREDIT GROUP LLC
2024-08-09TL&R — from MAGUIRE WALKER LLC to PH6 SPEAKEASY LLC
2024-08-07Cooling tower inspection
2024-08-07Cooling tower inspection
2024-07-11Mortgage $9,345,000 — from WALKER212W18TH LLC to JPMORGAN CHASE BANK, N.A.$9,345,000
2024-06-14311: Noise — Noise: Construction Before/After Hours (NM1)
2024-06-13PAT — from WALKER212W18TH LLC to 212W18TH LLC; RESIDENTIAL BOARD OF THE WALKER TOWER CO
2024-06-13Deed $13,350,000 — from BEST 1 LLC to WALKER212W18TH LLC$13,350,000
2024-06-13FDNY inspection (RISK)
2024-06-12Permit Sprinklers — Signed-off
2024-06-11Job filed: Modifications to existing plumbing fixtures and sprinkler system on the 19th and 20th floors as related to the renovation of Penthouse # 7 as per plan$22,500
2024-06-07Mortgage satisfied — from BEST 1 LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO; FIRST REPUBLIC BANK
2024-06-04311: Derelict Vehicles — Derelict Vehicles
2024-06-03Job filed: Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. $13,200
2024-05-28Deed $7,950,000 — from BIER, MELLISSA to OSPREY POINT INVESTMENTS VII, LLC$7,950,000
2024-05-28PAT — from OSPREY POINT INVESTMENTS VII, LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO
2024-05-28PAT — from BIER, MELLISSA to STRAUSS, MICHAEL
2024-05-23Mortgage satisfied — from BIER, MELISSA to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO; FIRST REPUBLIC BANK
2024-05-20Sold for $13,350,000$13,350,000
2024-05-17Permit Mechanical Systems — Signed-off
2024-05-16Sold for $7,950,000$7,950,000
2024-05-07ECB CLASS - 1 violation: UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. NOTE: AS PER VIOLATION #111620LLFA01PR, ONWER WERE TO IMMEDIATELY $2,500
2024-04-14Job filed: Filing for the modification to the existing heat exchanger system, work to include replacing existing manual valves with automatic control valves.$500,600
2024-04-05Permit General Construction — Signed-off
2024-04-04Mortgage $2,162,928 — from WHEN IN NEW YORK, LLC to JPMORGAN CHASE BANK, N .A.$2,162,928
2024-04-04Permit Mechanical Systems — Signed-off
2024-04-02SMIS — from MAXIM CREDIT GROUP LLC; MAGUIRE WALKER LLC
2024-04-02Mortgage assigned — from MAXIM CREDIT GROUP LLC to MAGUIRE WALKER LLC
2024-04-02AALR — from MAXIM CREDIT GROUP LLC to MAGUIRE WALKER LLC
2024-03-29Permit General Construction — Signed-off
2024-03-13311: Sanitation Worker or Vehicle Complaint — Noise
2024-03-04Job filed: Prepare existing 3rd, 4th, 5th, 6th, and 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row coo$721,000
2024-03-04Job filed: Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. $20,500
2024-03-04Job filed: Minor alterations to building interior and wall & Floor protection in support of new mechanical equipment. No change to use, egress, or occupancy.$680,000
2024-02-27Job filed: Interior renovation of existing penthouse # 7 on 19th and 20th floors including the removal of existing partitions and installation of new partitions $20,600
2024-02-20Permit Plumbing — Signed-off
2024-02-20Permit Sprinklers — Signed-off
2024-02-15Permit Sprinklers — Signed-off
2024-02-15Permit Plumbing — Signed-off
2024-02-07311: Noise - Street/Sidewalk — Loud Talking
2024-02-01Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK; JPMORGAN CHASE BANK NA to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2024-01-31Permit Mechanical Systems — Signed-off
2024-01-11Job filed: INTERIOR RENOVATION OF OFFICE SPACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH$9,800
2024-01-09Mortgage $6,405,000 — from WALTER TFS LLC to JPMORGAN CHASE BANK, NA$6,405,000
2024-01-03Job filed: Modifications to existing plumbing fixtures and sprinkler system on the 19th and 20th floors as related to the renovation of Penthouse # 7 as per plan$22,500
2023
2023-12-20Job filed: MECHANICAL WORK TO FURNISH AND INSTALL NEW AIR HANDLING UNIT ON EXISTING CHILLER SYSTEM TO SERVE THE 7TH FLOOR SWITCHROOM TO COMPLY WITH VERIZON STAND$549,996
2023-12-15Job filed: Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, con$320,004
2023-12-04Bedbug filing: 0 infested units
2023-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2023-11-21Permit Mechanical Systems — Signed-off
2023-11-17Permit General Construction — Signed-off
2023-11-08Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK; JPMORGAN CHASE BANK, N.A. to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2023-10-23Job filed: Modifications to existing plumbing fixtures and sprinkler system on the 19th and 20th floors as related to the renovation of Penthouse # 7 as per plan$22,500
2023-10-23Job filed: Modification to existing heating, air conditioning, and ventilation systems on 19th and 20th floors as related to the renovation of Penthouse # 7 as p$40,000
2023-10-18Job filed: Interior renovation of existing penthouse # 7 on 19th and 20th floors including the removal of existing partitions and installation of new partitions $20,600
2023-08-08Job filed: SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # M00746573-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2023-08-04Permit Sidewalk Shed — Signed-off
2023-07-09311: Homeless Person Assistance
2023-07-09311: Homeless Person Assistance
2023-05-16Mortgage satisfied — from CHENG, HOBENG; KEYLEAD LIMITED to CITIBANK
2023-05-05311: Illegal Parking — Blocked Sidewalk
2023-04-26PAT — from MCBIX LLC to RESIDENTIAL BOARD OF WALKER TOWER CONDOM
2023-04-26Deed $11,608,000 — from KEYLEAD LIMITED to MCBIX LLC$11,608,000
2023-04-18Sold for $11,608,000$11,608,000
2023-04-06Cooling tower inspection — violation AH8B
2023-04-06Cooling tower inspection — violation AH8J
2023-04-06Cooling tower inspection
2023-04-04TL&R — from DAGID LLC to THE BANK OF PRINCETON
2023-03-28311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-03-21311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-03-20311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-03-20311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-03-20Permit General Construction — Signed-off
2023-03-13Job filed: HEREBY FILING FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$89,330
2023-02-24Mortgage satisfied — from WT APARTMENT 12E LLC to GOLDMAN SACHS BANK USA
2023-02-24Permit General Construction — Signed-off
2023-02-21Mortgage $8,580,000 — from WHEN IN NEW YORK, LLC to JPMORGAN CHASE BANK, N.A.$8,580,000
2023-01-05Facade (LL11) filing, cycle 9: SWARMP
2022
2022-12-20Bedbug filing: 0 infested units
2022-12-16Deed $9,150,000 — from 16D WALKER ACQUISITION LP to WALTER TFS LLC$9,150,000
2022-12-16PAT — from WALTER TFS LLC to THE WALKER TOWNER CONDOMINIUM
2022-12-03311: Homeless Person Assistance
2022-12-02Sold for $9,150,000$9,150,000
2022-11-02TOLCC — from MERCER INTERNATIONAL TRADING LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2022-10-31Mortgage satisfied — from MERCER INTERNATIONAL TRADING LLC to MCLP ASSET COMPANY INC
2022-09-30Mortgage $5,439,000 — from DAGID LLC to BANK OF AMERICA, N.A.$5,439,000
2022-09-30311: Noise - Helicopter — Other
2022-09-09Permit Supported Scaffold — Signed-off
2022-09-08Job filed: SUPPORTED SCAFFOLD FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$100,000
2022-08-05Job filed: SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # M00746573-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2022-08-05Permit Sidewalk Shed — Signed-off
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-07-06Mortgage $10,000,000 — from HALL, GREGORY; HALL, CAROLYN to BANK OF AMERICA, N.A.$10,000,000
2022-07-06PAT — from HALL, GREGORY; HALL, CAROLYN to RESIDENTIAL BOARD OF WALKER TOWER CONDOM; SMJ 210 WEST 18 LLC
2022-07-06Deed $14,162,000 — from MERCER INTERNATIONAL TRADING LLC to HALL, GREGORY; HALL, CAROLYN$14,162,000
2022-07-06PAT — from HALL, CAROLYN to HALL, GREGORY
2022-07-06Job filed: HEREBY FILING FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$89,330
2022-07-03311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2022-06-24Sold for $14,162,000$14,162,000
2022-05-26311: Noise - Helicopter — Other
2022-04-29Permit Structural — Signed-off
2022-04-29Permit General Construction — Signed-off
2022-03-22Cooling tower inspection — violation AH8C
2022-03-22Cooling tower inspection
2022-03-22Cooling tower inspection — violation AH8R
2022-03-22Cooling tower inspection — violation AH8Q
2022-03-22Cooling tower inspection — violation AH8X
2022-03-22Cooling tower inspection — violation AH8L
2022-03-04TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2022-02-11Job filed: REPAIRS OF TRANSFORMER ROOM WALLS AND AIR INTAKE AREA WAY.$397,418
2022-02-10Mortgage $16,450,000 — from DAROUVAR, AS TRUSTEE, SHARON YEHOSHUA; THE WALKER TOWER 18A TRUST to JPMORGAN CHASE BANK, N.A.$16,450,000
2022-02-03Job filed: REPAIRS & REPLACEMENT OF STRUCTURAL STEEL FRAMING BELOW AIR INTAKE AREAWAY IN 17TH STREET SIDEWALK.$300,000
2022-02-02311: Encampment — N/A
2022-02-02311: Encampment — N/A
2022-01-27Mortgage satisfied — from HAFNER, DANIEL STEPHEN to BANK OF AMERICA, N.A.
2022-01-12RPTT&RET $3,283,000 — from STEINERT, JAN ALLAN to EXTRAMONEY TRUST; JAY AVI LIBMAN, AS TRUSTEE$3,283,000
2022-01-12Deed — from STEINERT, JAN ALLAN to 888 WALKER LLC
2021
2021-12-23Bedbug filing: 0 infested units
2021-12-22311: Water System — Possible Water Main Break (Use Comments) (WA1)
2021-12-17Deed — from RICHARD C. BOSSE, JR., AS TRUSTEE; STEINERT BOSSE TRUST; JAN ALLAN STEINERT, AS TRUSTEE to STEINERT, JAN ALLAN
2021-12-16311: Water System — Possible Water Main Break (Use Comments) (WA1)
2021-12-14PAT — from HAFNER, DANIEL STEPHEN to EBER, SAMUEL
2021-12-14PAT — from THE WALKER TOWER 18A TRUST; SHARON YEHOSHUA DAROUVAR, AS TRUSTEE to THE RESIDENTIAL BOARD OF WALKER TOWER CO
2021-12-14Deed $23,500,000 — from HAFNER, DANIEL STEPHEN to THE WALKER TOWER 18A TRUST; SHARON YEHOSHUA DAROUVAR, AS TRUSTEE$23,500,000
2021-12-13311: Water System — Possible Water Main Break (Use Comments) (WA1)
2021-12-09Deed transfer (nominal price)
2021-12-07Permit General Construction — Signed-off
2021-12-06FDNY inspection (RISK)
2021-12-01Sold for $23,500,000$23,500,000
2021-11-23Job filed: Interior renovation of an existing duplex apartment#1516B on the 15th and 16th floors. Work to include non-structural demolition and general construct$320,000
2021-11-17Deed transfer (nominal price)
2021-11-05Mortgage satisfied — from WALKER 011 LLC to NATIONWIDE TITLE CLEARING, INC.; JPMORGAN CHASE BANK, N.A.
2021-11-03PAT — from WHEN IN NEW YORK, LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO
2021-11-03Deed $14,250,000 — from WALKER 011 LLC to WHEN IN NEW YORK, LLC$14,250,000
2021-10-22Sold for $14,250,000$14,250,000
2021-10-20311: Noise - Helicopter — Other
2021-09-25311: Blocked Driveway — No Access
2021-07-22Cooling tower inspection — violation AH8S
2021-07-21311: APPLIANCE — REFRIGERATOR
2021-07-21311: APPLIANCE — REFRIGERATOR
2021-07-21311: APPLIANCE — REFRIGERATOR
2021-07-21Tenant complaint: APPLIANCE — REFRIGERATOR
2021-07-21Tenant complaint: APPLIANCE — REFRIGERATOR
2021-07-21Tenant complaint: APPLIANCE — REFRIGERATOR
2021-07-16Cooling tower inspection
2021-07-16Mortgage satisfied — from ASHE, PRESCOTT to LOANCARE, LLC; GOLDMAN SACHS BANK USA; BANK OF AMERICA, N.A.
2021-07-06PAT — from LATEDINNERPT LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO
2021-07-06Deed $15,350,000 — from DAKRI HOLDINGS, LLC to LATEDINNERPT LLC$15,350,000
2021-07-06Mortgage $9,977,500 — from LATEDINNERPT LLC to JPMORGAN CHASE BANK, N.A.$9,977,500
2021-07-06PAT — from LATEDINNERPT LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO
2021-07-06Deed $15,350,000 — from DAKRI HOLDINGS, LLC to LATEDINNERPT LLC$15,350,000
2021-07-06Mortgage $9,977,500 — from LATEDINNERPT LLC to JPMORGAN CHASE BANK, N.A.$9,977,500
2021-07-06ECB CLASS - 2 violation: FAILURE TO NOTIFY D.O.B. FOR COMPLETE REMOVAL OF SIDEWALK SHED.NOTE:AT TIME OF INSPECTION OBSERVED NOT SIDEWALK SHED ON JOBSITE.NO
2021-06-25Permit EW — ISSUED
2021-06-16Sold for $15,350,000$15,350,000
2021-06-16Sold for $15,350,000$15,350,000
2021-06-15Mortgage satisfied — from BIER, MELLISSA to FIRST REPUBLIC BANK
2021-04-22Permit Structural — Signed-off
2021-04-22Permit General Construction — Signed-off
2021-04-16Job filed: structural work for chiller replacement$1,080,000
2021-04-16Permit Construction Fence — Signed-off
2021-04-08Permit Mechanical Systems — Signed-off
2021-04-06Permit EW — ISSUED
2021-03-24Job filed: structural work for chiller replacement$1,080,000
2021-03-24Job filed: Chiller Replacement$1,300,000
2021-03-22Mortgage satisfied — from WT 15B LLC to BANK OF AMERICA, NA
2021-03-22Mortgage satisfied — from WT 15B LLC to BANK OF AMERICA, NA
2021-03-12Permit Sidewalk Shed — Signed-off
2021-03-11Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2021-03-05Mortgage $9,000,000 — from BEST 1 LLC to FIRST REPUBLIC BANK, A STATE BANK$9,000,000
2021-03-04311: Noise - Helicopter — Other
2021-03-01Deed $21,000,000 — from WT15B LLC to BASIL HOLDINGS, LLC$21,000,000
2021-03-01PAT — from BASIL HOLDINGS, LLC to WALKER TOWER CONDOMINIUM
2021-02-23CONS — from UNITED STATES OF AMERICA
2021-02-17Sold for $21,000,000$21,000,000
2021-02-16Job filed: Filing for Plywood Construction Fence from face of building to curb for a total of 14'4" width and 16' length. Related to Verizon Chiller Replacement $10,000
2021-01-25Deed — from THE YANG FAMILY TRUST; YANG, TRUSTEE, GEOFFREY Y; YANG, TRUSTEE, AMY S to YANG, AMY S
2021-01-25DTL — from THE BANK OF NEW YORK MELLON
2021-01-25Deed — from YANG, AMY S to YANG, TRUSTEE, AMY S; THE AMY YANG 2020 NEW YORK RESIDENCE TRU
2021-01-23311: Noise - Helicopter — Other
2021-01-22PAT — from LEE, CHRISTINE Q to FU, DI
2021-01-22RPTT&RET $14,837,405 — from QUE, LUCY T; QUE, JO AN T; LEE, CHRISTINE Q; QUE, MICHAEL T; QUE, JUANITO O to NATIONAL CHAMPION ENTERPRISES LIMITED$14,837,405
2021-01-21Agreement $3,495,867 — from WT APARTMENT 12E LLC to GOLDMAN SACHS BANK USA$3,495,867
2021-01-21Mortgage $60,633 — from WT APARTMENT 12E LLC to GOLDMAN SACHS BANK USA$60,633
2021-01-19311: Noise - Helicopter — Other
2021-01-12311: Noise - Helicopter — Other
2020
2020-12-31Deed transfer (nominal price)
2020-12-23Permit EW — ISSUED
2020-12-23Permit EW — ISSUED
2020-12-21Mortgage satisfied — from TRIVEDI, PRANAV L to WELLS FARGO BANK, N.A.
2020-12-15Bedbug filing: 0 infested units
2020-11-18Agreement $880,000 — from BARRON, VICKEY; MOREIRA, LEDINILTON to JPMORGAN CHASE BANK, N.A.$880,000
2020-11-18Mortgage $2,923 — from MOREIRA, LEDINILTON; BARRON, VICKEY to JPMORGAN CHASE BANK, N.A.$2,923
2020-11-16ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADES AND APPURTENANCES.EXPOSURE 3,SOUTH ELEVATION:ERODED MORTAR JOINTS. REMEDY:MAIN$625
2020-11-16DOB violation C: ON 11/18/2020 1 GLASS PANEL (25 STORY TERRACE)AND 2 GLASS PANELS AT TERRACE OF APT 15C AT EXP 4, WEST ELEVATION DUE TO PIPE SCAF
2020-11-16DOB violation C: 1" GLASS PANEL DAMAGED DURING WEATHER CONDITIONS
2020-11-04311: For Hire Vehicle Complaint — Equipment Complaint
2020-10-23311: Homeless Person Assistance — N/A
2020-10-15Mortgage $48,072 — from KEVIN C. TANG, TRUSTEE; THE KEVIN C. TANG FAMILY TRUST 12/20/12 to CITIBANK, N.A.$48,072
2020-10-15Agreement $7,744,000 — from KEVIN C. TANG, TRUSTEE; THE KEVIN C. TANG FAMILY TRUST DATED 12/; TANG, KEVIN C to CITIBANK, N.A.$7,744,000
2020-10-13RPTT&RET $14,837,405 — from QUE, JUANITO O; QUE, JO AN T; QUE, MICHAEL T; QUE, LUCY T; LEE, CHRISTINE Q to GOLD CROWN HOLDINGS, LLC$14,837,405
2020-08-31Mortgage $6,000,000 — from GOTHAM TOWER LLC to WELLS FARGO BANK, N.A.$6,000,000
2020-08-28Deed $18,250,000 — from UNITED STATES MARSHAL SERVICE to GOTHAM TOWER LLC$18,250,000
2020-08-28CTOR — from UNITED STATES OF AMERICA to ATLANTIC PROPERTY TRUST; RESIDENTIAL SECTION OF THE WALKER TOWER ; 212 WEST 18TH STREET LL
2020-08-28PAT — from GOTHAM TOWER LLC to BOARD OF MGRS OF WALKER TOWER CONDOMINIU
2020-08-25Job filed: RESPECTFULLY REQUEST TO SUBMIT REVISED FUEL STORAGE PLANS$25,000
2020-08-20TOLCC — from BOARD OF MANAGERS OF WALKER TOWER CONDOM
2020-08-19Sold for $18,250,000$18,250,000
2020-08-10Permit Boiler Equipment — Permit Issued
2020-08-03Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2020-08-03Permit Sidewalk Shed — Signed-off
2020-07-21LOCC — from MERCER INTERNATIONAL TRADING LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2020-07-21TOLCC — from BOARD OF MANAGERS OF WALKER TOWER CONDOM to MERCER INTERNATIONAL TRADING LLC
2020-06-29Mortgage satisfied — from ALALA 5 LLC to CITIBANK NA
2020-06-29Permit EW — ISSUED
2020-06-10Permit PL — ISSUED
2020-06-02SUBM — from FIRST REPUBLIC BANK to FIRST REPUBLIC BANK
2020-06-02Agreement $3,000,000 — from SZIKLAY, JEREMY P; BIER, MELLISSA to FIRST REPUBLIC BANK$3,000,000
2020-05-30311: Noise - Street/Sidewalk — Loud Talking
2020-04-28Mortgage $2,000,000 — from BIER, MELLISSA to FIRST REPUBLIC BANK$2,000,000
2020-03-26Elevator permit: To comply with ASME A17.3 of 2002, as modified by Chapter K3 of Appendix K Section 3.10.12 of the New York City Building Code. -$27,000
2020-03-25Permit EW — ISSUED
2020-03-23311: Street Condition — Pothole
2020-03-10Agreement $1,500,000 — from GORDON, BRUCE; TIBBS, TAWANA to GOLDMAN SACHS BANK USA$1,500,000
2020-02-20Agreement $2,500,000 — from SHAKKOUR, LEILA; THORNE, MICHAEL to QUICKEN LOANS, INC.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS$2,500,000
2020-02-15DOB violation E:
2020-02-15DOB violation E:
2020-02-15DOB violation E:
2020-02-15DOB violation E:
2020-02-15DOB violation E:
2020-02-15DOB violation E:
2020-02-14Job filed: RESPECTFULLY REQUEST TO SUBMIT REVISED FUEL STORAGE PLANS$25,000
2020-01-23Mortgage assigned — from MERS to HSBC BANK USA, N.A.
2020-01-16Permit EW — ISSUED
2020-01-02Deed — from ROBERT H. ELLS, II, AS TRUSTEE; BARBARA JEANNE ELLS, AS TRUSTEE; ELLS 1989 FAMILY TRUST to 212 WEST, LLC
2019
2019-12-28Deed transfer (nominal price)
2019-12-24Permit EW — ISSUED
2019-12-24Permit EW — ISSUED
2019-12-16Bedbug filing: 0 infested units
2019-12-14Job filed: INSTALLATION OF TEMPORARY 74' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PI$1,000
2019-11-14311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2019-11-07Job filed: INSTALLATION OF TEMPORARY 74' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PI$1,000
2019-11-07Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2019-10-30TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2019-10-30Mortgage $2,604 — from TRIVEDI, PRANAV L to WELLS FARGO BANK, N.A.$2,604
2019-10-30Agreement $2,562,500 — from TRIVEDI, PRANAV L to WELLS FARGO BANK, N.A.$2,562,500
2019-10-28Agreement $2,500,000 — from THORNE, MICHAEL; SHAKKOUR, LEILA to MERS$2,500,000
2019-10-28Mortgage assigned — from QUICKEN LOANS INC to QUICKEN LOANS INC; MERS. AS NOMINEE
2019-10-28Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to QUICKEN LOANS INC
2019-10-24Job filed: INSTALLATION OF TEMPORARY 74' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PI$1,000
2019-10-24Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2019-10-24Permit Sidewalk Shed — Signed-off
2019-10-24Permit Supported Scaffold — Signed-off
2019-10-21Job filed: FACADE SSP FILED IN CONJUNCTION WITH BIS APPLICATION # 123804320. NO WORK, NO CHANGE IN USE, EGRESS, AND/OR OCCUPANCY TO BE DONE UNDER THIS APPLICATIO$100
2019-10-16Deed $6,450,000 — from JHA HOLDINGS CHELSEA LLC to FOURTEEN HOLDINGS LLC$6,450,000
2019-10-16PAT — from FOURTEEN HOLDINGS LLC to BD MGRS WALKER TOWER CONDOMINIUM
2019-10-15311: Illegal Parking — Parking Permit Improper Use
2019-10-07311: Blocked Driveway — No Access
2019-09-27SUBM — from FIRST REPUBLIC BANK to FIRST REPUBLIC BANK
2019-09-27Sold for $6,450,000$6,450,000
2019-09-24Agreement $4,000,000 — from ROSENFELD, GERALD; WALKER 11A LLC to CITY NATIONAL BANK, NA$4,000,000
2019-08-26Mortgage $518,457 — from HOWARD, JACK; HOWARD, KATHRYN to JPMORGAN CHASE BANK, N.A.$518,457
2019-08-26Agreement $1,000,000 — from HOWARD, JACK; HOWARD, KATHRYN to JPMORGAN CHASE BANK, N.A.$1,000,000
2019-08-26Mortgage assigned — from CITIBANK, N.A. to JPMORGAN CHASE BANK, N.A.
2019-08-26Mortgage assigned — from CITIBANK, N.A. to JPMORGAN CHASE BANK, N.A.
2019-08-26Agreement $2,500,000 — from HOWARD, KATHRYN; HOWARD, JACK to JPMORGAN CHASE BANK, N.A.$2,500,000
2019-08-08Agreement $2,000,000 — from BIER, MELLISSA to FIRST REPUBLIC BANK$2,000,000
2019-08-08Agreement $2,000,000 — from SZIKLAY, JEREMY; BIER, MELLISSA to FIRST REPUBLIC BANK$2,000,000
2019-08-08Mortgage $2,000,000 — from BIER, MELLISSA to FIRST REPUBLIC BANK$2,000,000
2019-06-27Permit EW — ISSUED
2019-06-25Permit EW — ISSUED
2019-06-17Job filed: MECHANICAL AND SPRINKLER WORK FILING IN CONJUNCTION WITH APPLICATION # 123250356 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$560,000
2019-06-13Cooling tower inspection — violation AH8U
2019-06-13Cooling tower inspection — violation AH9C
2019-06-13Cooling tower inspection — violation AH8F
2019-06-13Cooling tower inspection — violation AH8C
2019-06-13Cooling tower inspection — violation AH8S
2019-06-13Cooling tower inspection — violation AH8T
2019-06-13Cooling tower inspection — violation AH8L
2019-06-13Cooling tower inspection
2019-06-13Cooling tower inspection — violation AH8D
2019-06-03Job filed: INSTALLATION OF MECHANICAL UNITS.$160,000
2019-06-03Permit EW — ISSUED
2019-05-23Agreement — from WT APARTMENT 12E LLC to GOLDMAN SACHS BANK USA
2019-05-14LOCC — from MERCER INTERNATIONAL TRADING LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2019-04-26Job filed: HEREBY FILING FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$202,530
2019-03-29Rodent inspection: Passed
2019-02-27Mortgage satisfied — from NOT YET RATED VENTURES, LLC to CITIBANK, N.A.; MORTGAGE ELECTRONIC REGISTRATION SYSTEMS
2019-02-08Permit EW — ISSUED
2019-02-05Mortgage satisfied — from DAKRI HOLDINGS LLC to GOLDMAN SACHS BANK USA; PHH MORTGAGE CORPORATION
2019-02-05311: New Tree Request — For One Address
2019-01-30311: Other Enforcement — E3B Sidewalk Obstruction
2019-01-23DOB violation E:
2019-01-14Bedbug filing: 0 infested units
2019-01-11Job filed: RENOVATION OF EXISTING CONDO UNIT PH3 ON THE 21ST FLOOR. WORK INCLUDES GENERAL CONSTRUCTION AND PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO$516,000
2019-01-09Elevator permit: Furnish and install components and software providing Door Monitor Circuitry to existing controller. All work to comply with ASME$38,990
2019-01-09311: Noise — Noise: Construction Equipment (NC1)
2019-01-03FDNY inspection (RISK)
2018
2018-09-19Permit Sidewalk Shed — Signed-off
2018-09-18Agreement $2,014,000 — from HOWARD, KATHRYN; HOWARD, JACK to CITIBANK,N.A.$2,014,000
2018-09-18PAT — from HOWARD, KATHRYN to JAMES, COURTNEY
2018-09-18Mortgage $14,000 — from HOWARD, KATHRYN; HOWARD, JACK to CITIBANK,N.A.$14,000
2018-09-18PAT — from HOWARD, JACK to JAMES, COURTNEY
2018-09-18SUBM — from CITIBANK, N.A. to CITIBANK, N.A.
2018-09-18Job filed: INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-09-04Permit EW — ISSUED
2018-07-31Rodent inspection: Passed
2018-06-27PAT — from NYCH01 LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2018-06-27Deed $31,000,000 — from 210 WEST 18TH STREET 2012, LLC to NYCH01 LLC$31,000,000
2018-06-20Job filed: HEREBY FILING FACADE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$77,000
2018-06-18Sold for $31,000,000$31,000,000
2018-06-14311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2018-06-04311: Illegal Parking — Posted Parking Sign Violation
2018-05-12311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2018-05-08Cooling tower inspection — violation AH8L
2018-05-08Cooling tower inspection — violation AH8R
2018-05-08Cooling tower inspection — violation AH8M
2018-05-08Cooling tower inspection — violation AH8E
2018-05-08Cooling tower inspection — violation AH8S
2018-05-08Cooling tower inspection — violation AH8Q
2018-05-08Cooling tower inspection — violation AH8T
2018-05-08Cooling tower inspection — violation AH8V
2018-05-08Cooling tower inspection — violation AH8C
2018-05-08Cooling tower inspection — violation AH8E
2018-05-08Cooling tower inspection — violation AH8B
2018-05-08Cooling tower inspection — violation AH8W
2018-05-07Mortgage satisfied — from MARGIANO, JEANINE T; CHEMLA, ALEXANDRE H; CHEMLA, LORI MARIE to CITIBANK, N.A.
2018-02-10311: Street Condition — Pothole
2018-02-08311: New Tree Request — For One Address
2018-01-22Deed — from BOSSE, JR., RICHARD C to WALKER LEGACY LLC
2018-01-22Deed — from JAN ALLAN STEINERT, AS TRUSTEE; RICHARD C. BOSSSE JR., AS TRUSTEE; THE STEINERT BOSSE TRUS to BOSSE, JR., RICHARD C
2017
2017-12-06Deed transfer (nominal price)
2017-12-06Permit PL — ISSUED
2017-11-22Facade (LL11) filing, cycle 8: SWARMP
2017-11-14Permit EW — ISSUED
2017-11-13Job filed: MISC. RENOVATIONS IN PH5, 20TH & 21ST FL. WORK TO INCLUDE BATHROOM RENOVATIONS AND NEW BAR AREA. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$60,250
2017-11-02Agreement $4,000,000 — from MARSELIS 19C LLC to JPMORGAN CHASE BANK N.A.$4,000,000
2017-10-25Mortgage assigned — from UBS BANK USA; MERS to JPMORGAN CHASE BANK,N.A.
2017-10-25Mortgage $36,044 — from HURWITZ, EVEN to JPMORGAN CHASE BANK,N.A.$36,044
2017-10-25Agreement $2,000,000 — from HURWITZ, EVEN to JPMORGAN CHASE BANK,N.A.$2,000,000
2017-10-24Permit EW — ISSUED
2017-10-24Permit EW — ISSUED
2017-10-19Permit EW — ISSUED
2017-10-19Permit EW — ISSUED
2017-10-19Permit EW — ISSUED
2017-10-17Deed — from STILL A SPEAKEASY TRUST; DAVID JURACICH, AS TRUSTEE to PH6 SPEAKEASY LLC
2017-10-17Mortgage $5,000,000 — from PH6 SPEAKEASY LLC to MAXIM CREDIT GROUP, LLC$5,000,000
2017-10-17AL&R $5,000,000 — from PH6 SPEAKEASY LLC to MAXIM CREDIT GROUP, LLC$5,000,000
2017-10-17Job filed: FILING FOR THE INSTALLATION OF CABLE/DEHYDRATOR CHILLERS & RELATED PIPING AND MISCELLANEOUS GENERAL CONSTRUCTION WORK AS SHOWN ON DRAWINGS FILED H$836,000
2017-10-10Mortgage satisfied — from MERCIER, LAURA to JPMORGAN CHASE BANK NA
2017-10-06Deed transfer (nominal price)
2017-09-29PAT — from MERCIER, LAURA to NADELL, BRUCE; GOLDSTEIN, STUART W
2017-09-29PAT — from 16D WALKER ACQUISITON LP to WALKER TOWER CONDOMINIUM
2017-09-29Deed $10,600,000 — from MERCIER, LAURA to 16D WALKER ACQUISITION LP$10,600,000
2017-09-15Sold for $10,600,000$10,600,000
2017-08-31Agreement $4,907,500 — from GOLD CROWN PROPERTY LLC to CITIBANK NA$4,907,500
2017-08-22Rodent inspection: Passed
2017-08-17Mortgage $4,000,000 — from NOT YET RATED VENTURES, LLC to MERS$4,000,000
2017-08-14Mortgage satisfied — from WALKER 011 LLC to JPMORGAN CHASE BANK NA
2017-08-07Agreement $4,000,000 — from SZIKLAY, JEREMY; BIER, MELISSA to FIRST REPUBLIC BANK$4,000,000
2017-08-07Mortgage $2,000,000 — from BIER, MELISSA to FIRST REPUBLIC BANK$2,000,000
2017-07-27PAT — from ROSEHILL INVESTORS III LLC to WALKER TOWER CONDOMINIUM
2017-07-27Deed $14,750,000 — from WALKER 011 LLC to ROSEHILL INVESTORS III LLC$14,750,000
2017-07-25Sold for $14,750,000$14,750,000
2017-07-13Permit EW — ISSUED
2017-07-13Permit EW — ISSUED
2017-07-13Permit EW — ISSUED
2017-06-28Mortgage $6,100,000 — from WT 15B LLC to BANK OF AMERICA, N.A.$6,100,000
2017-06-21CTOR — from UNITED STATES BANKRUPTCY COURT SOUTHERN to 212 WEST 18 LLC
2017-05-08LOCC — from 212 WEST 18 LLC; 212 WEST 18 LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2017-04-21311: Water System — Leak (Use Comments) (WA2)
2017-04-19Mortgage assigned — from MSND FINANCIAL LLC to THE BANK OF PRINCETON
2017-04-19AL&R $6,500,000 — from DAGID LLC to THE BANK OF PRINCETON$6,500,000
2017-04-19Agreement $6,500,000 — from DAGID LLC to THE BANK OF PRINCETON$6,500,000
2017-04-11311: Water System — Leak (Use Comments) (WA2)
2017-04-11311: Water System — Excessive Water In Basement (WEFB)
2017-04-11311: Water System — Leak (Use Comments) (WA2)
2017-04-10311: Water System — Leak (Use Comments) (WA2)
2017-03-31Agreement $4,400,000 — from CHEMLA, ALEXANDRE H; ALALA 5 LLC; CHEMLA, LORI MARIE to CITIBANK NA$4,400,000
2017-03-29Mortgage satisfied — from SKY WALKER TOWER LLC to JPMORGAN CHASE BANK, N.A.
2017-03-22311: Industrial Waste — Chemical Spill (IAC)
2017-03-17311: Water System — Leak (Use Comments) (WA2)
2017-03-17Permit EW — ISSUED
2017-03-16PAT — from WALKER INVESTMENT HOLDINGS LIMITED to BOARD OF MANAGERS OF THE WALKER TOWER CO
2017-03-16Mortgage assigned — from FIRST REPUBLIC BANK to MSND FINANCIAL LLC
2017-03-16Deed $17,500,000 — from SKY WALKER TOWER LLC to WALKER INVESTMENT HOLDINGS LIMITED$17,500,000
2017-03-16Agreement $6,500,000 — from DAGID LLC to MSND FINANCIAL LLC$6,500,000
2017-03-15Deed $10,000,000 — from KPM WALKER 18 LLC to DAGID LLC$10,000,000
2017-03-15PAT — from DAGID LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2017-03-08Sold for $17,500,000$17,500,000
2017-03-08Permit PL — ISSUED
2017-02-24Sold for $10,000,000$10,000,000
2017-02-16311: Noise - Commercial — Loud Music/Party
2017-02-07Cooling tower inspection — violation AH8V
2017-02-07Mortgage satisfied — from NOT YET RATED VENTURES, LLC to CITIBANK, N.A.
2017-02-07Cooling tower inspection — violation AH8M
2017-02-07Cooling tower inspection — violation AH8X
2017-02-07Cooling tower inspection — violation AH8E
2017-02-07Cooling tower inspection — violation AH8A
2017-02-07Cooling tower inspection — violation AH8F
2017-02-07Cooling tower inspection — violation AH8E
2017-02-07Cooling tower inspection — violation AH8D
2017-02-07Cooling tower inspection — violation AH8T
2017-02-07Cooling tower inspection — violation AH8C
2017-02-07Cooling tower inspection — violation AH8J
2017-02-07Cooling tower inspection — violation AH8T
2017-02-07Cooling tower inspection — violation AH8R
2017-02-07Cooling tower inspection — violation AH8L
2017-02-07Cooling tower inspection — violation AH8Q
2017-02-07Cooling tower inspection — violation AH8M
2017-02-07Cooling tower inspection — violation AH8S
2017-02-07Cooling tower inspection — violation AH8B
2017-02-07Cooling tower inspection — violation AH8S
2017-02-07Cooling tower inspection — violation AH8L
2017-02-07Cooling tower inspection — violation AH8C
2017-02-07Cooling tower inspection — violation AH8K
2017-02-07Cooling tower inspection — violation AH8K
2017-02-07Cooling tower inspection — violation AH8W
2017-02-07Cooling tower inspection — violation AH8H
2017-02-07Cooling tower inspection — violation AH9C
2017-02-07Cooling tower inspection — violation AH8U
2017-02-07Cooling tower inspection — violation AH8R
2017-02-07Cooling tower inspection — violation AH8D
2017-02-07Permit EW — ISSUED
2017-02-07Permit EW — ISSUED
2017-02-07Permit EW — ISSUED
2017-01-26311: Water System — Leak (Use Comments) (WA2)
2017-01-24PAT — from TARLOW, RICHARD to KROLL, ALAN D
2017-01-24PAT — from WALKER 011 LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2017-01-24Deed $16,900,000 — from TARLOW, RICHARD to WALKER 011 LLC$16,900,000
2017-01-24Mortgage $10,000,000 — from WALKER 011 LLC to JPMORGAN CHASE BANK, N.A.$10,000,000
2017-01-18JUDG — from KOZEL, ASHLEY to 212 WEST 18 LLC
2017-01-18Rodent inspection: Passed
2017-01-18DOB violation E:
2017-01-18DOB violation E:
2017-01-18DOB violation E:
2017-01-13Sold for $16,900,000$16,900,000
2016
2016-12-28311: Water System — Excessive Water In Basement (WEFB)
2016-12-20311: Water System — Leak (Use Comments) (WA2)
2016-11-21Mortgage $10,000,000 — from WT 15B LLC to BANK OF AMERICA NA$10,000,000
2016-11-07Job filed: COMBINING OF APARTMENT 14E AND 15D. ALL WORK TO COMPLY WITH TPPN# 3/97 NEW CONVENIENCE STAIR, PARTITIONS AND PLUMBING FIXTURES. NO CHANGE IN USE, OCCU$618,750
2016-11-07Job filed: STRUCTURAL WORK FOR SLAB OPENING FOR CONVENIENCE STAIR.$15,000
2016-11-07Job filed: HVAC, PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH APARTMENT RENOVATION.$71,300
2016-11-07Job filed: COMBINING OF APARTMENT 14E AND 15D. ALL WORK TO COMPLY WITH TPPN# 3/97 NEW CONVENIENCE STAIR, PARTITIONS AND PLUMBING FIXTURES. NO CHANGE IN USE, OCCU$618,750
2016-10-21Mortgage satisfied — from BIER, MELLISSA to FIRST REPUBLIC BANK
2016-09-15311: Recycling Enforcement — ER1 Resident Recyc. (Owner/Manager
2016-08-16PAT — from HAFNER, DANIEL STEPHEN to CURRY, DAVID M
2016-08-16Deed $24,000,000 — from 18A WALKER TOWER LLC to HAFNER, DANIEL STEPHEN$24,000,000
2016-08-16Mortgage $16,800,000 — from HAFNER, DANIEL STEPHEN to BANK OF AMERICA, N.A.$16,800,000
2016-08-16PAT — from HAFNER, DANIEL STEPHEN to CONDO BOARD OF WALKER TOWER CONDOMINIUM
2016-08-08LOCC — from 212 WEST 18TH STREET LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO
2016-08-05Sold for $24,000,000$24,000,000
2016-07-29Permit EW — ISSUED
2016-07-29Permit EW — ISSUED
2016-06-23PAT — from WALKER TOWER 1-8 LLC to WALKER TOWER CONDOMINIUM
2016-06-23Deed $45,000,000 — from BBC CHELSEA, LLC to WALKER TOWER 1-8 LLC$45,000,000
2016-06-10Sold for $45,000,000$45,000,000
2016-05-20Permit EW — ISSUED
2016-05-20Permit EW — ISSUED
2016-05-16Job filed: INSTALLATION OF NEW CHILLER AND DRY COOLER UNITS, AS PER PLANS FILED HEREWITH.$422,900
2016-05-16Job filed: INSTALLATION OF NEW STRUCTURAL STEEL SUPPORTS AND FOOTINGS FOR NEW MODULAR CHILLER, AS PER PLANS FILED HEREWITH.$88,850
2016-05-10311: Noise - Street/Sidewalk — Loud Talking
2016-05-03311: Taxi Report — Driver Report
2016-04-29CORRM $1,500,000 — from TIBBS, TAWANA; GORDON, BRUCE to GOLDMAN SACHS BANK USA$1,500,000
2016-04-22311: Animal Abuse — Other (complaint details)
2016-03-11311: Sidewalk Condition — Defective Hardware
2016-03-09311: Noise — Noise: air condition/ventilation equipment (NV1)
2016-03-07Deed — from MICHAEL THORNE, CO-TRUSTEE; LEILA SHAKKOUR, CO TRUSTEE; LEILA SHAKKOUR, CO-TRUSTEE; MICHAE to THORNE, MICHAEL; SHAKKOUR, LEILA
2016-02-23Rodent inspection: Passed
2016-02-17311: Blocked Driveway — No Access
2016-01-14CTOR — from KOZEL, ASHLEY D to KOZEL, TODD
2015
2015-12-20311: Street Condition — Plate Condition - Shifted
2015-12-15Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2015-12-15Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2015-12-15Permit EQ — ISSUED
2015-11-02311: Sidewalk Condition — Sidewalk Grating - Defective
2015-10-20311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2015-10-20DOB violation C:
2015-10-20DOB violation C: FAILURE TO MAINTAIN BUILDING
2015-10-06Deed $7,650,000 — from DAX DASILVA AS TRUSTEE; MORRIS JACOBSON AS TRUSTEE; THE DASILVA NEW YORK CITY TRUST to BUTTERFLIES IN FLIGHT, LLC$7,650,000
2015-10-06PAT — from BUTTERFLIES IN FLIGHT, LLC to THE CONDOMINIUM BOARD OF WALKER TOWER CO
2015-10-05Mortgage $1,625,000 — from SKY WALKER TOWER, LLC to JPMORGAN CHASE BANK, N.A.$1,625,000
2015-10-05Agreement $10,725,000 — from SKY WALKER TOWER, LLC to JPMORGAN CHASE BANK, N.A.$10,725,000
2015-09-18Mortgage $5,000,000 — from LFADA LLC to BANK OF AMERICA, N.A.$5,000,000
2015-09-18Deed $10,414,000 — from 18C WALKER TOWER LLC to LFADA LLC$10,414,000
2015-09-18PAT — from LFADA LLC to THE CONDOMINIUM BOARD OF WALKER TOWER CO
2015-09-18Certificate of occupancy Final
2015-08-12PAT — from DAKRI HOLDINGS LLC to WALKER TOWER CONDOMINIUM
2015-08-12Agreement $5,000,000 — from DAKRI HOLDINGS LLC to GOLDMAN SACH BANK USA$5,000,000
2015-08-12Mortgage assigned — from BANK OF AMERICA, N.A. to GOLDMAN SACHS BANK USA
2015-08-12Deed $9,250,000 — from ASHE, PRESCOTT to DAKRI HOLDINGS, LLC$9,250,000
2015-08-07311: Street Condition — Defective Hardware
2015-07-28Certificate of occupancy Temporary
2015-07-21311: Blocked Driveway — No Access
2015-06-12Mortgage $4,000,000 — from WALKER 11A LLC to CITY NATIONAL BANK$4,000,000
2015-06-04PAT — from ROSEHILL INVESTORS II LLC to CONDOMINIUM BOARD OF WALKER TOWER CONDOM
2015-06-04Deed $14,000,000 — from WT 15A LLC to ROSEHILL INVESTORS II LLC$14,000,000
2015-06-03311: New Tree Request — For One Address
2015-06-03311: New Tree Request — For One Address
2015-05-15311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2015-05-15Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2015-05-12Deed $13,725,000 — from SMJ 210 WEST 18 LLC to WT 15A LLC$13,725,000
2015-05-12PAT — from WT 15A LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO; SMJ 210 WEST 18 LLC
2015-05-05Certificate of occupancy Temporary
2015-05-01311: Street Condition — Blocked - Construction
2015-03-12311: Blocked Driveway — No Access
2015-02-04311: Illegal Parking — Commercial Overnight Parking
2015-02-04Certificate of occupancy Temporary
2015-01-30PAT — from LAPANA LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO
2015-01-30Deed $10,750,000 — from KASWELL, ROBERT; KASWELL, KATHLEEN to LAPANA LLC$10,750,000
2015-01-21ECB CLASS - 2 violation: REMOVAL OF SHED OR PROTECTIVE MEASURE W/O DEPT APPROVAL. REMOVAL OF SHED W/O DEPT APPROVAL AND BEFORE THE AMENDED REPORT WAS ACC$400
2015-01-10Deed $5,718,750 — from SMJ 210 WEST 18 LLC to 18C WALKER TOWER LLC$5,718,750
2015-01-10PAT — from 18A WALKER TOWER LLC to SMJ 210 WEST 18 LLC; BOARD OF MANAGERS OF WALKER TOWER CONDOM
2015-01-10Deed $17,156,250 — from SMJ 210 WEST 18 LLC to 18A WALKER TOWER LLC$17,156,250
2015-01-10PAT — from 18C WALKER TOWER LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM; SMJ 210 WEST 18 LLC
2014
2014-12-24Facade (LL11) filing, cycle 7: SAFE
2014-12-23Deed $40,730,000 — from SMJ 210 WEST 18 LLC to BBC CHELSEA, LLC$40,730,000
2014-12-23PAT — from BBC CHELSEA, LLC to THE CONDOMINIUM BOARD OF WALKER TOWER CO
2014-12-19311: Street Condition — Blocked - Construction
2014-12-17311: Street Condition — Blocked - Construction
2014-12-16311: Street Condition — Blocked - Construction
2014-12-13311: Street Condition — Blocked - Construction
2014-12-03311: Street Condition — Blocked - Construction
2014-11-24311: Street Condition — Blocked - Construction
2014-11-10Certificate of occupancy Temporary
2014-10-28Mortgage satisfied — from KPM WT19 Holdings LLC to FIRST REPUBLIC BANK
2014-10-25Mortgage $4,000,000 — from MARSELIS 19C, LLC to J.P. MORGAN (SUISSE) SA$4,000,000
2014-10-22311: Derelict Vehicle — With License Plate
2014-10-22311: Illegal Parking — Posted Parking Sign Violation
2014-10-16Deed $16,012,500 — from SMJ 210 WEST 18 LLC to DAVID JURACICH, AS TRUSTEE; STILL A SPEAKEASY TRUST$16,012,500
2014-10-16PAT — from DAVID JURACICH, AS TRUSTEE; STILL A SPEAKEASY TRUST to BOARD OF MANAGERS OF WALKER TOWER CONDOM; SMJ 210 WEST 18 LLC
2014-10-08311: Illegal Parking — Posted Parking Sign Violation
2014-10-08311: Street Condition — Blocked - Construction
2014-10-08311: Street Condition — Blocked - Construction
2014-09-26PAT — from WT 15B LLC to SMJ 210 WEST 18 LLC; BOARD OF MANAGERS OF WALKER TOWER CONDOM
2014-09-26Deed $16,012,500 — from SMJ 210 WEST 18 LLC to WT 15B LLC$16,012,500
2014-09-25311: Dirty Conditions — E3 Dirty Sidewalk
2014-09-23PAT — from 1989 ELLS FAMILY TRUST; ELLS II, TRUSTEE, ROBERT H; ELLS, TRUSTEE, BARBARA J to WALKER TOWER CONDOMINIUM
2014-09-23Deed $12,100,000 — from KPM WT19 HOLDINGS LLC to BARBARA J ELLS, TRUSTEE; ROBERT H. ELLS II, TRUSTEE; 1989 ELLS FAMILY TRUST$12,100,000
2014-09-17PAT — from WALKER JEMM LLC to THE CONDOMINIUM BOARD OF WALKER TOWER CO
2014-09-17Deed $4,073,000 — from SMJ 210 WEST 18 LLC to WALKER JEMM LLC$4,073,000
2014-09-01311: Illegal Parking — Posted Parking Sign Violation
2014-08-28311: Illegal Parking — Posted Parking Sign Violation
2014-08-25Permit EW — ISSUED
2014-08-21311: Illegal Parking — Posted Parking Sign Violation
2014-08-19311: Noise — Noise: air condition/ventilation equipment (NV1)
2014-08-15Mortgage $1,500,000 — from BIER, MELLISSA to FIRST REPUBLIC BANK$1,500,000
2014-08-05Certificate of occupancy Temporary
2014-08-04311: Street Condition — Blocked - Construction
2014-07-31311: Non-Emergency Police Matter — Other (complaint details)
2014-07-16311: Street Sign - Damaged — Construction
2014-07-08311: Street Condition — Blocked - Construction
2014-07-08311: Street Condition — Blocked - Construction
2014-07-08311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2014-07-01Permit EQ — ISSUED
2014-06-25311: Noise — Noise: air condition/ventilation equipment (NV1)
2014-06-24311: Blocked Driveway — No Access
2014-06-18311: Noise — Noise: air condition/ventilation equipment (NV1)
2014-05-27311: Noise — Noise: air condition/ventilation equipment (NV1)
2014-05-26311: Noise — Noise: air condition/ventilation equipment (NV1)
2014-05-23PAT — from BARRON, VICKEY; MOREIRA, LEDINILTON to WALKER TOWER CONDOMINIUM
2014-05-23PAT — from 210 WEST 18TH STREET 2012, LLC to THE CONDOMINIUM BOARD OF WALKER TOWER CO
2014-05-23Mortgage $1,000,000 — from BARRON, VICKEY; MOREIRA, LEDINILTON to JPMORGAN CHASE BANK, NA$1,000,000
2014-05-23Deed $2,291,062 — from SMJ 210 WEST 18 LLC to BARRON, VICKEY; MOREIRA, LEDINILTON$2,291,063
2014-05-23Deed $31,311,188 — from SMJ 210 WEST 18 LLC to 210 WEST 18TH STREET 2012, LLC$31,311,188
2014-05-17311: Illegal Parking — Posted Parking Sign Violation
2014-05-15Mortgage $1,000,000 — from HOWARD, KATHRYN; HOWARD, JACK to CITIBANK, N.A.$1,000,000
2014-05-15Mortgage $2,000,000 — from HOWARD, JACK; HOWARD, KATHRYN to CITIBANK, N.A.$2,000,000
2014-05-12311: Street Condition — Blocked - Construction
2014-05-09PAT — from KPM WT19 HOLDINGS LLC to SMJ 210 WEST 18 LLC; BOARD OF MANAGERS OF THE WALKER TOWER CO
2014-05-09Deed $11,437,500 — from SMJ 210 WEST 18 LLC to KPM WT19 HOLDINGS LLC$11,437,500
2014-05-09Mortgage $6,875,000 — from KPM WT19 HOLDINGS LLC to FIRST REPUBLIC BANK$6,875,000
2014-05-07311: Sidewalk Condition — Blocked - Construction
2014-05-05311: Illegal Parking — Posted Parking Sign Violation
2014-05-01Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP
2014-05-01Permit EQ — ISSUED
2014-04-25Certificate of occupancy Temporary
2014-04-14311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-04-14311: Noise — Noise: Construction Before/After Hours (NM1)
2014-04-11311: Noise — Noise: Construction Before/After Hours (NM1)
2014-04-09Mortgage $4,000,000 — from TRIVEDI, PRANAV L to WELLS FARGO BANK, N.A.$4,000,000
2014-04-09Deed $7,789,612 — from SMJ 210 WEST 18 LLC to TRIVEDI, PRANAV L$7,789,613
2014-04-09PAT — from TRIVEDI, PRANAV L to THE CONDOMINIUM BOARD OF WALKER TOWER CO
2014-04-07PAT — from JHA HOLDINGS CHELSEA LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2014-04-07Deed $4,073,000 — from SMJ 210 WEST 18 LLC to JHA HOLDINGS CHELSEA LLC$4,073,000
2014-04-07PAT — from DASILVA, TRUSTEE, DAX; JACOBSON, TRUSTEE, MORRIS; THE DASILVA NEW YORK CITY TRUST to THE CONDOMINIUM BOARD OF WALKER TOWER CO
2014-04-07Deed $4,582,125 — from SMJ 210 WEST 18 LLC to JACOBSON, TRUSTEE, MORRIS; DASILVA, TRUSTEE, DAX; THE DASILVA NEW YORK CITY TRUST$4,582,125
2014-04-04Rodent inspection: Passed
2014-04-03Deed $7,636,875 — from SMJ 210 WEST 18 LLC to ANJALICA LLC$7,636,875
2014-04-03PAT — from ANJALICA LLC to WAALKER TOWER CONDOMINIUM
2014-03-27Mortgage $7,150,000 — from KPM WALKER 18 LLC to FRST REPUBLIC BANK$7,150,000
2014-03-27PAT — from KPM WALKER 18 LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO; SMJ 210 WEST 18 LLC
2014-03-27Deed $11,437,500 — from SMJ 210 WEST 18 LLC to KPM WALKER 18 LLC$11,437,500
2014-03-25311: Rodent — Condition Attracting Rodents
2014-03-20Mortgage $5,772,000 — from NOT YET RATED VENTURES LLC to CITIBANK, N.A.$5,772,000
2014-03-20Mortgage $1,500,000 — from GORDON, BRUCE; TIBBS, TAWANA to GOLDMAN SACHS BANK USA$1,500,000
2014-03-20PAT — from NOT YET RATED VENTURES LLC to THE WALKER TOWER CONDOMINIUM
2014-03-20Deed $9,042,060 — from SMJ 210 WEST 18 LLC to NOT YET RATED VENTURES LLC$9,042,060
2014-03-12Mortgage $3,750,000 — from DAKRI HOLDINGS LLC to GOLDMAN SACHS BANK USA$3,750,000
2014-02-20311: Noise — Noise: air condition/ventilation equipment (NV1)
2014-02-19Mortgage $3,500,000 — from WT APARTMENT 12E LLC to GOLDMAN SACHS BANK USA$3,500,000
2014-02-12PAT — from HOWARD, KATHRYN E to HOWARD, JACK
2014-02-12PAT — from HOWARD, JACK; HOWARD, KATHRYN to WALKER TOWER CONDOMINIUM
2014-02-12PAT — from FREIMAN, BURT to CUTLER, ANDREW N
2014-02-12Deed $7,775,000 — from FREIMAN, BURT to HOWARD, JACK$7,775,000
2014-02-12311: Illegal Parking — Commercial Overnight Parking
2014-02-11Mortgage $1,000,000 — from MERCIER, LAURA to JPMORGAN CHASE BANK, N.A$1,000,000
2014-02-11PAT — from THE STEINERT BOSSE TRUST DATED DECEMBER ; BOSSE JR., TRUSTEE, RICHARD C; STEINERT, TRUSTE to WALKER TOWER CONDOMINIUM
2014-02-11Deed $7,255,031 — from SMJ 210 WEST 18 LLC to STEINERT, TRUSTEE, JAN ALLAN; BOSSE JR., TRUSTEE, RICHARD C; THE STEINERT BOSSE TRUST DAT$7,255,031
2014-02-10PAT — from SKY WALKER TOWER LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO
2014-02-10Deed $14,255,500 — from SMJ 210 WEST 18 LLC to SKY WALKER TOWER LLC$14,255,500
2014-02-10Mortgage $9,100,000 — from SKY WALKER TOWER LLC to J.P. MORGAN (SUISSE) SA$9,100,000
2014-01-31Mortgage $500,000 — from BIER, MELLISSA to FIRST REPUBLIC BANK$500,000
2014-01-30PAT — from MICHAEL THORNE, TRUSTEE; LEILA SHAKKOUR REVOCABLE TRUST; MICHAEL THORNE REVOCABLE TRUST; L to WALKER TOWER CONDONOMINIUM
2014-01-30Mortgage $4,000,000 — from THE MICHAEL THORNE REVOCABLE TRUST; THE LEILA SHAKKOUR REVOCABLE TRUST; MICHAEL THORNE, TR to JPMORGAN CHASE BANK, N.A.$4,000,000
2014-01-30Deed — from THORNE, MICHAEL; SHAKKOUR, LEILA to LEILA SHAKKOUR, TRUSTEE; THE LEILA SHAKKOUR REVOCABLE TRUST; THE MICHAEL THORNE REVOCABLE
2014-01-28PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2014-01-28Deed $7,173,571 — from SMJ 210 WEST 18 LLC to GORDON, BRUCE; TIBBS, TAWANA$7,173,571
2014-01-28PAT — from 212 WEST 18TH STREET LLC to WALKER TOWER CONDOMINIUM
2014-01-28PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2014-01-28Deed $50,912,500 — from SMJ 210 WEST 18 LLC to 212 WEST 18TH STREET LLC$50,912,500
2014-01-28PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2014-01-28PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2014-01-28PAT — from TIBBS, TAWANA; GORDON, BRUCE to RESIDENTIAL BOARD
2014-01-28Certificate of occupancy Temporary
2014-01-27PAT — from MARZULLI, JR., JOHN A; MARZULLI, PENELOPE B to WALKER TOWER CONDOMINIUM
2014-01-27Mortgage $1,200,000 — from MARZULLI, PENELOPE B; MARZULLI, JR., JOHN A to CITIBANK, N.A.$1,200,000
2014-01-27Deed $7,280,488 — from SMJ 210 WEST 18 LLC to MARZULLI, PENELOPE B; MARZULLI, JR., JOHN A$7,280,488
2014-01-27PAT — from CHEMLA, ALEXANDRE to MARGIANO, JEANINE T
2014-01-27PAT — from MARZULLI, PENELOPE B to STRAUSS, MICHAEL
2014-01-27PAT — from ALALA 5 LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2014-01-27PAT — from MARZULLI,, JOHN A JR. to STRAUSS, MICHAEL
2014-01-27Mortgage $4,400,000 — from ALALA 5 LLC to CITIBANK, N.A.$4,400,000
2014-01-27Mortgage $4,400,000 — from ALALA 5 LLC to CITIBANK, N.A.$4,400,000
2014-01-27Deed $13,237,250 — from SMJ 210 WEST 18 LLC to ALALA 5 LLC$13,237,250
2014-01-27PAT — from SCHIFF CHEMLA, LORI; CHEMLA, LORI to MARGIANO, JEANINE T
2014-01-27Mortgage $7,962,000 — from KEVIN C. TANG FAMILY TRUST; TANG, AS TRUSTEE, KEVIN to CITIBANK, N.A.$7,962,000
2014-01-16311: Illegal Parking — Posted Parking Sign Violation
2014-01-15PAT — from TANG, TRUSTEE OF, KEVIN C; THE KEVIN C. TANG FAMILY TRUST DATED 12/ to SMJ 210 WEST 18 LLC; BOARD OF MANAGERS OF THE WALKER TOWER CO
2014-01-15Deed $12,473,562 — from SMJ 210 WEST 18 LLC to TANG, TRUSTEE OF, KEVIN C; THE KEVIN C. TANG FAMILY TRUST DATED 12/$12,473,563
2014-01-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-01-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-13Mortgage satisfied — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-08PAT — from KASWELL, ROBERT; KASWELL, KATHLEEN to SMJ 210 WEST 18 LLC; THE RESIDENTIAL BD OF THE WALKER TOWER C
2014-01-08Deed $6,975,012 — from SMJ 210 WEST 18 LLC to KASWELL, KATHLEEN; KASWELL, ROBERT$6,975,013
2014-01-07PAT — from MARSELIS 19C, LLC to RESIDENTIAL BOARD OF THE WALKER TOWER CO
2014-01-07Deed $6,700,085 — from SMJ 210 WEST 18 LLC to MARSELIS 19C, LLC$6,700,085
2014-01-02PAT — from MERCER INTERNATIONAL TRADING LLC to BOARD OF MANAGERS OF WALKER TOWER CONDOM
2014-01-02Mortgage $7,500,000 — from MERCER INTERNATIONAL TRADING LLC to MERS$7,500,000
2014-01-02Deed $12,728,125 — from SMJ 210 WEST 18 LLC to MERCER INTERNATIONAL TRADING LLC$12,728,125
2013
2013-12-27PREL — from WELLS FARGO BANK, NA
2013-12-27PREL — from WELLS FARGO BANK, NA
2013-12-27Certificate of occupancy Temporary
2013-12-24Deed $9,418,812 — from SMJ 210 WEST 18 LLC to BORGES, FRANCISCO L$9,418,813
2013-12-24PAT — from BORGES, FRANCISCO L to WALKER TOWER CONDOMINIUM
2013-12-24PAT — from BORGES, FRANCISCO L to RINGEL, JAY B
2013-12-20Deed $5,294,900 — from SMJ 210 WEST 18 LLC to WT APARTMENT 12E LLC$5,294,900
2013-12-20PAT — from WT APARTMENT 12E LLC to WALKER TOWER CONDOMINIUM
2013-12-19Mortgage $2,150,000 — from HURWITZ, EVEN to MERS$2,150,000
2013-12-19PAT — from HURWITZ, EVEN to RESIDENTIAL BOARD OF WALKER TOWER CONDOM
2013-12-19PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-19Deed $9,520,638 — from SMJ 210 WEST 18 LLC to STILL BI-COASTAL, LLC$9,520,638
2013-12-19PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-19PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-19Deed $10,691,625 — from SMJ 210 WEST 18 LLC to SMDV LLC$10,691,625
2013-12-19PAT — from SMDV LLC to WALKER TOWER CONDOMINIUM
2013-12-19PREL — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-19Deed $12,982,688 — from SMJ 210 WEST 18 LLC to 212 WEST 18 LLC$12,982,688
2013-12-19PAT — from TARLOW, RICHARD to BOARD OF MANAGERS OF THE WALKER TOWER CO
2013-12-19Deed $14,255,500 — from SMJ 210 WEST 18 LLC to TARLOW, RICHARD$14,255,500
2013-12-19PAT — from STILL BI-COASTAL LLC to RESIDENTIAL BOARD OF WALKER TOWER CONDOM
2013-12-19PAT — from 212 WEST 18 LLC to WALKER TOWER CONDOMINIUM BOARD OF MANAGE
2013-12-19PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-19Deed $7,382,312 — from SMJ 210 WEST 18 LLC to HURWITZ, EVEN$7,382,313
2013-12-19PAT — from TARLOW, RICHARD to KROLL, ALAN D
2013-12-19PREL — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-17Deed $6,613,534 — from SMJ 210 WEST 18 LLC to BUTTRICK, JOHN$6,613,534
2013-12-17PAT — from BUTTRICK, JOHN to THE CONDO BOARD OF WALKER TOWER CONDOMIN
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16PREL — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16PREL — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16Deed $9,851,569 — from SMJ 210 WEST 18 LLC to SHAKKOUR, LEILA; THORNE, MICHAEL$9,851,569
2013-12-16PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-16PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-16PAT — from THORNE, MICHAEL; SHAKKOUR, LEILA to WALKER TOWER CONDOMINIUM
2013-12-16PAT — from ASHE, PRESCOTT to WALKER TOWER CONDOMINIUM
2013-12-16Mortgage $5,000,000 — from ASHE, PRESCOTT to BANK OF AMERICA, N.A.$5,000,000
2013-12-16Deed $6,975,012 — from SMJ 210 WEST 18 LLC to ASHE, PRESCOTT$6,975,013
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16PAT — from GOLD CROWN PROPERTY, LLC to RESIDENTIAL BOARD
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16PAT — from ASHE, PRESCOTT to CROFT, ESQ, DOUGLAS M
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16Deed $7,687,788 — from SMJ 210 WEST 18 LLC to GOLD CROWN PROPERTY, LLC$7,687,788
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16Mortgage $4,907,500 — from GOLD CROWN PROPERTY, LLC to CITIBANK, N.A.$4,907,500
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-16SUBM — from WELLS FARGO BANK, N.A. to SMJ 210 WEST 18 LLC
2013-12-13Mortgage $5,550,000 — from WALKER 011 LLC to JPMORGAN CHASE BANK, N.A.$5,550,000
2013-12-13PAT — from WALKR011 LLC to CONDO BOARD OF WALKER TOWER CONDOMINIUM
2013-12-13PREL — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-13Deed $9,418,812 — from SMJ 210 WEST 18 LLC to WALKER 011 LLC$9,418,813
2013-12-13PREL — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-12PAT — from BIER, MELLISSA to WALKER TOWER CONDOMINIUM
2013-12-12Deed $7,636,875 — from SMJ 210 WEST 18 LLC to BIER, MELLISSA$7,636,875
2013-12-12PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-12PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-12PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-12PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-12-12Deed $9,418,812 — from SMJ 210 WEST 18 LLC to WALKER 11A LLC$9,418,813
2013-12-12PAT — from WALKER 11A LLC to BOARD OF MANAGERS OF THE WALKER TOWER CO
2013-12-12Mortgage $2,000,000 — from BIER, MELLISSA to FIRST REPUBLIC BANK$2,000,000
2013-12-11PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WWEST 18 LLC
2013-12-11PAT — from THE YANG FAMILY TRUST; YANG, TRUSTEE, GEOFFREY Y; YANG, TRUSTEE, AMY S to SMJ 210 WEST 18 LLC; BOARD OF MANAGERS OF WALKER TOWER CONDOM
2013-12-11PAT — from BEST 1 LLC to WALKER TOWER CONDOMINIUM
2013-12-11PREL — from WELLS FARGO BANK NATIONAL ASSOCIATION AS to SMJ 210 WEST 18 LLC
2013-12-11Deed $10,029,762 — from SMJ 210 WEST 18 LLC to KEYLEAD LIMITED$10,029,763
2013-12-11Deed $7,331,400 — from SMJ 210 WEST 18 LLC to YANG, TRUSTEE, AMY S; THE YANG FAMILY TRUST; YANG, TRUSTEE, GEOFFREY Y$7,331,400
2013-12-11Mortgage $4,000,000 — from KEYLEAD LIMITED to CITIBANK, N.A.$4,000,000
2013-12-11PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WWEST 18 LLC
2013-12-11PAT — from YANG, GEOFFREY Y to BRAVERMAN, LORI J
2013-12-11PAT — from YANG, AMY S to BRAVERMAN, LORI J
2013-12-11PREL — from WELLS FARGO BANK NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-11PAT — from KEYLEAD LIMITED to THE CONDO BOARD OF WALKER TOWER CONDOMIN
2013-12-11Deed $12,219,000 — from SMJ 210 WEST 18 LLC to BEST 1 LLC$12,219,000
2013-12-10PAT — from MERCIER, LAURA to PLOTKIN, LOREN H; GOLDSTEIN, STUART W
2013-12-10Deed $5,905,850 — from SMJ 210 WEST 18 LLC to MERCIER, LAURA$5,905,850
2013-12-10Deed $12,219,000 — from SMJ 210 WEST 18 LLC to THREE GOOD KIDS LLC$12,219,000
2013-12-10PREL — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION,
2013-12-10PAT — from THREE GOOD KIDS LLC to WALKER TOWER CONDOMINIUM
2013-12-10PAT — from MERCIER, LAURA to BRD OF MANAGERS WALKER TOWER CONDOMINIUM
2013-12-10Deed $7,382,312 — from SMJ 210 WEST 18 LLC to DAKRI HOLDINGS LLC$7,382,313
2013-12-10PAT — from DAKRI HOLDINGS LLC to WALKER TOWER CONDOMINIUM BOARD OF MANAGE
2013-12-10PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-10PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-10PREL — from SMJ 210 WEST 18 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION,
2013-12-09PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-09PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION to SMJ 210 WEST 18 LLC
2013-12-09PAT — from FREIMAN, BURT to CUTLER, ANDREW N
2013-12-09PAT — from FREIMAN, BURT to WALKER TOWER CONDOMINIUM
2013-12-09Deed $5,027,609 — from SMJ 210 WEST 18 LLC to FREIMAN, BURT$5,027,609
2013-12-08311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20ADEC — from WALKER TOWER CONDOMINIUM; VERIZON NEW YORK INC
2013-11-20MAPS — from VERIZON NEW YORK INC; WALKER TOWER CONDOMINIUM
2013-11-15Certificate of occupancy Temporary
2013-11-07Job filed: FILING FOR APPROVAL OF CONDOMINIUN SUBDIVISION.
2013-11-07Job filed: FILING FOR APPROVAL OF CONDOMINIUN SUBDIVISION.
2013-11-05311: Homeless Encampment — N/A
2013-08-21DOB violation E:
2013-08-21DOB violation E:
2013-08-21DOB violation E:
2013-08-20DOB violation E:
2013-08-20Certificate of occupancy Temporary
2013-07-19Job filed: FILING HEREWITH FIRE PROTECTION PLAN AS SHOWN ON DRAWINGS FILED HEREWITH. FILED IN CONJUNCTION WITH ALT 1 APPL.# 120372578$1,000
2013-07-19Job filed: FILING HEREWITH FIRE PROTECTION PLAN AS SHOWN ON DRAWINGS FILED HEREWITH. FILED IN CONJUNCTION WITH ALT 1 APPL.# 120372578$1,000
2013-07-18311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2013-07-16311: Noise — Noise: Construction Equipment (NC1)
2013-06-28Permit EQ — ISSUED
2013-06-28Permit EQ — ISSUED
2013-06-28Permit EQ — ISSUED
2013-06-28Permit EQ — ISSUED
2013-06-27Job filed: INSTALLATION OF 367 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2013-06-27Permit EQ — ISSUED
2013-05-09311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-04-23Rodent inspection: Passed
2013-04-20311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2013-04-05311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2013-03-28Job filed: FILING HEREWITH BUILDERS PAVING PLAN AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE; OCCUPANCY OR EGRESS. FILED IN CONJUNCTION WITH ALT 1 APPL.
2013-03-26311: Rodent — Rat Sighting
2013-03-22Permit EQ — ISSUED
2013-03-22Permit EQ — ISSUED
2013-03-22Permit EQ — ISSUED
2013-03-22Permit EQ — ISSUED
2013-03-22Permit EQ — ISSUED
2013-03-07311: Construction Safety Enforcement — SST Tracking Complaint
2013-03-06ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTR DOCUMENTS OR APPROVED AMENDMENTS. NOTED: SUPPORTED SCAFFOLD ABOVE SWS AT EXPOSURE #1 OVER$1,000
2013-02-25311: Noise — Noise: Construction Before/After Hours (NM1)
2013-02-25311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-02-25311: Noise — Noise: Construction Before/After Hours (NM1)
2013-01-17Permit EW — ISSUED
2013-01-17Permit EW — ISSUED
2013-01-09Job filed: FILING HEREWITH TEMPORARY SPRINKLER LOOP ON THE 8TH FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$21,000
2013-01-09Job filed: FILING HEREWITH TEMPORARY SPRINKLER LOOP ON THE 8TH FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$21,000
2013-01-02311: Elevator — Elevator - Dangerous Condition/Shaft Open/Unguarded
2013-01-02ECB CLASS - 1 violation: *CEASE USE* 01L10:DEVICE #1P18547 UNDER EA1888/11 - DEFECTIVE STOP SWITCH.CALL 212-566-5542 FOR REINSPECTION & TO LIFT *CEASE USE*$1,000
2012
2012-12-08311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-11-09DOB violation E:
2012-11-09DOB violation E:
2012-11-09DOB violation E:
2012-11-09DOB violation E:
2012-11-07Job filed: APPLICATION FILED HEREWITH FOR LEGALIZATION OF SALES OFFICE ON 1ST FLOOR. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2012-11-07Permit EW — ISSUED
2012-10-29311: General Construction/Plumbing — Site Conditions Endangering Workers
2012-10-23311: BEST/Site Safety — Safety Netting/Guard Rails - Damaged/Inadequate/None (Over 6 Stories/75 Feet)
2012-10-23ECB CLASS - 1 violation: SEC.. 1704.22.1.1 FAILURE TO FILE OP98 FOR HYDROSTATIC TEST. AT TIME OF INSPECTION BLDG UNDER ALT #120372578 & STANDPIPE #12082441$12,000
2012-10-23ECB CLASS - 2 violation: SEC. 3309.10 NO ROOF PROTECTION PROVIDED FOR MECHANICAL EXHAUST SYSTEMS. NOTE AT TIME OF INSPECTION WORKERS INSTALLING BRICKY SCAF$4,000
2012-10-23ECB CLASS - 1 violation: WORK W/O A PERMIT. OBSERVED SALES OFFICE ERECTED AT 1ST FL W/SALES STAFF ON DUTY W/O 1ST OBTAINING A PERMIT FOR BUILT OUT AS PER S$8,000
2012-10-23Permit EW — ISSUED
2012-10-23Permit EW — ISSUED
2012-10-05311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-10-05311: Noise — Noise: Construction Before/After Hours (NM1)
2012-09-10Job filed: RE-LOCATION OF FIRE COMMAND STATION/CONVERSION TO AUTOMATIC SMOKE/HEAT DETECTION/PRINKLER ALARM/1-WAY VOICE COMMUNICATION/SMOKE PURGE SYSTEM OF THE RE$200,000
2012-09-10Job filed: RE-LOCATION OF FIRE COMMAND STATION/CONVERSION TO AUTOMATIC SMOKE/HEAT DETECTION/PRINKLER ALARM/1-WAY VOICE COMMUNICATION/SMOKE PURGE SYSTEM OF THE RE$200,000
2012-08-22Rodent inspection: Passed
2012-08-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-07-23Permit EQ — ISSUED
2012-07-20Facade (LL11) filing, cycle 7: SAFE
2012-07-20311: General Construction/Plumbing — Facade - Defective/Cracking (Ll11/98)
2012-07-20DOB violation LL11/98: CYCLE 7 UNSAFE REPORT FILED
2012-07-20Job filed: TO FILE APPLICATION FOR INSTALLATION OF MULTI POINT SUSPENDED SCAFFOLD ON EXISTING 17TH FLOOR SLAB ON THE EAST ELEVATION AS SHOWN ON THE PLANS. NO CHA
2012-06-28311: Noise — Noise: Construction Equipment (NC1)
2012-06-25Permit EW — ISSUED
2012-06-21Job filed: FILING HEREWITH; MODEL APARTMENT ON THE 10TH FLOOR. CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN U$50,000
2012-06-21Job filed: FILING HEREWITH; MODEL APARTMENT ON THE 10TH FLOOR. CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN U$50,000
2012-06-19311: Homeless Encampment — N/A
2012-06-18Permit EQ — ISSUED
2012-06-17311: Noise — Noise: Jack Hammering (NC2)
2012-06-10311: Noise — Noise: Construction Equipment (NC1)
2012-06-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-05-20311: Emergency Response Team (ERT) — After Hours Work - Illegal
2012-05-10311: General Construction/Plumbing — Accident - Construction/Plumbing
2012-05-10ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATION UPON INSPECTION & INFORMATION OBTAINED FROM THE SIT$2,400
2012-03-30Job filed: ADDITIONS TO CLASS E FIRE ALARM SYSTEM OF VESDA SYSTEM ON THE 7TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$30,000
2012-03-28311: Noise — Noise: Construction Before/After Hours (NM1)
2012-03-26Permit EQ — ISSUED
2012-03-22311: Noise — Noise: air condition/ventilation equipment (NV1)
2012-03-22Permit EQ — ISSUED
2012-03-22Permit EQ — ISSUED
2012-03-22Permit EQ — ISSUED
2012-03-22Permit EQ — ISSUED
2012-02-28Permit EQ — ISSUED
2012-02-24Job filed: TO FILE APPLICATION FOR SUPPORTED PIPE SCAFFOLD (+/-) 271'-0" LONG AND MAXIMUM (+/-) 96'-0" HIGH ON SIDEWALK SHED AS SHOWN ON THE PLANS.NYC DOB SIDEWA
2012-02-07311: General Construction/Plumbing — Accident - Construction/Plumbing
2012-01-27Permit EW — ISSUED
2012-01-27Permit EW — ISSUED
2012-01-20Permit EW — ISSUED
2012-01-20Permit EW — ISSUED
2012-01-19311: Sidewalk Condition — Blocked - Construction
2012-01-12311: Illegal Parking — Blocked Sidewalk
2012-01-11311: Noise — Noise: Construction Before/After Hours (NM1)
2012-01-10311: Noise — Noise: Construction Equipment (NC1)
2012-01-10311: Noise — Noise: Construction Before/After Hours (NM1)
2012-01-10311: Elevator — Elevator - Dangerous Condition/Shaft Open/Unguarded
2012-01-10ECB CLASS - 3 violation: 98BB05,99BB05,67X10,97O02.(98BB05)5 YEAR.(99BB05)1 YEAR.(67X10)COMMUNICATIONS.(97O02)CLEAN ENTIRE DEVICE.$200
2012-01-10ECB CLASS - 3 violation: 98BB05,99BB05,67X10,97O02.(98BB05)5 YEAR.(99BB05)1 YEAR.(67X10)COMMUNICATIONS.(97O02)CLEAN ENTIRE DEVICE.$200
2012-01-10ECB CLASS - 3 violation: 98BB05,99BB05,67X10,97O02.(98BB05)5 YEAR.(99BB05)1 YEAR TEST.(67X10)COMMUNICATIONS.(97O02)CLEAN ENTIRE DEVICE.$200
2012-01-10ECB CLASS - 3 violation: 98BB05,99BB05,67X10,97O02.(98BB05)5 YEAR.(99BB05)1 YEAR.(67X10)COMMUNICATIONS.(97O02)CLEAN ENTIRE DEVICE.$200
2012-01-06ECB CLASS - 2 violation: 21J01,02X10,40O02,98BB05,99BB05. 21J- ADJUST CLUTCH - CLIPPING ROLLERS02X- 2 WAY COMMUNICATION.$500
2012-01-06ECB CLASS - 2 violation: 03I10,02X10,40O02,98BB05,99BB05. 02X- 2 WAY COMMUNICATION.$500
2012-01-06ECB CLASS - 2 violation: 21J01,02X10,40O02,98BB05,99BB05. 21J- ADJUST CLUTCH - CLIPPING ROLLERS. 02X- 2 WAY COMMUNICATION.$500
2012-01-06ECB CLASS - 2 violation: 12L10,40O02,37O02,98BB05,99BB05,02X10. 02X- 2 WAY COMMUNICATION.$500
2012-01-05Permit EW — ISSUED
2012-01-05Permit EW — ISSUED
2012-01-03311: Dirty Conditions — E3 Dirty Sidewalk
2011
2011-12-28311: Elevator — Elevator - Defective/Not Working
2011-12-10311: Noise — Noise: Construction Equipment (NC1)
2011-12-03311: Noise — Noise: Construction Equipment (NC1)
2011-11-28311: General Construction/Plumbing — Site Conditions Endangering Workers
2011-11-27311: Noise — Noise: Construction Before/After Hours (NM1)
2011-11-22ECB CLASS - 1 violation: BC3310.6 FAILURE TO HAVE DESIGNATED SITE SAFETY MANAGER AS INDICATED ON PW2 PRESENT ON SITE AT MINIMUM OF ONCE EVERY TWO WEEKS EXA
2011-10-31Job filed: INSTALLATION OF A SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION, FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO C
2011-10-31Permit EQ — ISSUED
2011-10-27Job filed: MODIFICATIONS TO EXISTING STANDPIPE PER PLANS FILED HEREWITH. NO CHANGE IN USE; OCCUPANY OR EGRESS. FILED IN CONJUNCTION WITH ALT 1 APPL.# 120372578$50,000
2011-10-13311: Air Quality — Air: Soot, Other (Use Comments) (AB4)
2011-10-13311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2011-10-13311: Noise — Noise: Construction Equipment (NC1)
2011-09-20311: General Construction/Plumbing — Accident - Construction/Plumbing
2011-09-20ECB CLASS - 2 violation: SEC. 3301.7. DESIGN DRAWING REQUIRED. NOTE: AT THE TIME OF MY INSPECTION CONSTRUCTION SITE CHAIN HOIST IS ATTACHED TO I BEAM W/O A$400
2011-09-16311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2011-09-16Permit EW — ISSUED
2011-09-16Permit EW — ISSUED
2011-09-14311: Noise — Noise: Jack Hammering (NC2)
2011-09-13Job filed: INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE; OCCUPANCY OR EGRESS. FILED IN CONJUNCTION WITH A$794,500
2011-09-13Job filed: INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE; OCCUPANCY OR EGRESS. FILED IN CONJUNCTION WITH A$794,500
2011-09-13Job filed: INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE; OCCUPANCY OR EGRESS. FILED IN CONJUNCTION WITH A$794,500
2011-08-27311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2011-08-17ECB CLASS - 2 violation: 3310.6 FAILURE TO HAVE DESIGNATE SITE SAFETY ON PW2 ASSIGNED TO THIS SET AS OF JULY 1 2011 MIKE PERSUTT HAS NOT BEEN THE SITE SAFE$800
2011-07-01Permit EW — ISSUED
2011-06-28Job filed: FILING FOR STEAM SERVICE REMEDIATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$270,000
2011-06-20311: Sidewalk Condition — Unsafe Worksite
2011-06-11311: Emergency Response Team (ERT) — After Hours Work - Illegal
2011-05-31Rodent inspection: Passed
2011-05-26DOB violation E:
2011-05-26DOB violation E:
2011-05-26DOB violation E:
2011-05-26ECB CLASS - 2 violation: WARNING SIGNS & LIGHTS TO PROTECT PUBLIC FROM HAZARDS - DANGER SIGNS -VEHICULAR BARRICADES - AT TIME OF OBSERVED BARRICADES ON STR
2011-05-26DOB violation E:
2011-05-26DOB violation E:
2011-05-26ECB CLASS - 2 violation: WARNING SIGN AND LIGHT TO PROTECT PUBLIC FROM HAZARDS - DANGER SIGN - VEHICULAR TRAFFIC BARRICADE - AT TIME OF INSPECTION, OBSERVE
2011-05-26DOB violation E:
2011-05-26ECB CLASS - 1 violation: USE OF SUPPORTED SCAFFOLD W/O A SCAFFOLD USER CERTIFICATE - AT TIME OFINSPECTION - OBSERVED ONGOING DEMO ON 17TH FLR. 2 WORKERS ON$400
2011-05-26DOB violation E:
2011-05-20311: Street Condition — Pothole
2011-05-19Permit EQ — ISSUED
2011-05-18Job filed: INSTALLATION OF A SINGLE 7000 LB CAPACITY TORNBURG RACK & PINION HOIST DURING BUILDING ALTERATION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPT
2011-05-18Job filed: INSTALLATION OF A SINGLE 7000 LB CAPACITY TORNBURG RACK & PINION HOIST DURING BUILDING ALTERATION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPT
2011-05-13Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS AT 2ND FLOOR SETBACK. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR
2011-05-13Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS AT 2ND FLOOR SETBACK. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR
2011-05-13Permit EQ — ISSUED
2011-05-12311: Asbestos — Asbestos Complaint (B1)
2011-05-12311: Noise — Noise: Construction Equipment (NC1)
2011-05-12Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP
2011-05-12Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP
2011-05-12Permit EQ — ISSUED
2011-04-27Permit EW — ISSUED
2011-04-08Job filed: INSTALLATION OF 367 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2011-04-08Job filed: INSTALLATION OF 367 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2011-04-08Permit EQ — ISSUED
2011-04-05Job filed: REMOVE STRUCTURAL ELEMENTS; SLABS AND WALLS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE; OCCUPANCY OR EGRESS. NEW INSTALLATIONS FILED AND AP$425,000
2011-04-05Job filed: INSTALLATION OF PLYWOOD AND WIRE MESH FENCE, AS PER DRAWINGS FOR BLDG ALTERATION FILED SEPARATELY. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 COD
2011-04-05Job filed: REMOVE STRUCTURAL ELEMENTS; SLABS AND WALLS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE; OCCUPANCY OR EGRESS. NEW INSTALLATIONS FILED AND AP$425,000
2011-04-05Job filed: INSTALLATION OF PLYWOOD AND WIRE MESH FENCE, AS PER DRAWINGS FOR BLDG ALTERATION FILED SEPARATELY. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 COD
2011-04-05Permit EQ — ISSUED
2011-03-24311: Water System — Leak (Use Comments) (WA2)
2011-03-23Job filed: INSTALLATION OF SMOKE CONTROL SYSTEM INTERFACED WITH EXSTG FACP AS SHOWN ON PL ANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY$150,000
2011-03-23Job filed: INSTALLATION OF A CFF800 DUAL AGENT GAS DELUGE SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$158,000
2011-03-23Job filed: PA FILED FOR REVISED FA PLANS TO SHOW REVISED SEQUENCE OF OPERATIONS,NOTES,AND DEVICE LAYOUT AND DETAILS.INSTALLATION OF HEAT DETECTION SYSTEM FOR DUA$480,000
2011-03-21Job filed: INSTALLATION OF EXHAUST FANS, FIRE DAMPERS AND MAKE UP AIR UNITS WITH DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUP$771,000
2011-03-21Job filed: INSTALLATION OF EXHAUST FANS, FIRE DAMPERS AND MAKE UP AIR UNITS WITH DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUP$771,000
2011-03-21Job filed: FILING FOR LOCAL LAW 26 SMOKE CONTROL UPGRADES. MINOR REMOVALS, INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND FINISHES AS SHOWN $465,000
2011-03-18Job filed: ADDITIONS TO CLASS E FIRE ALARM SYSTEM OF VESDA SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2011-03-18Job filed: ADDITIONS TO CLASS E FIRE ALARM SYSTEM OF VESDA SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2011-03-12311: Sidewalk Condition — Blocked - Construction
2011-03-04311: Emergency Response Team (ERT) — After Hours Work - Illegal
2011-03-03311: Elevator — Elevator - Defective/Not Working
2011-03-02311: Construction Safety Enforcement — Excavation Tracking Complaint
2011-03-01ECB CLASS - 2 violation: FAILURE TO FILE SPECIAL INSPECTION.STATEMENT OF RESPONSIBILITY(TR-1)PRIOR TO PERMIT ISSUANCE & PRIOR TO START OF WORK UNDER SPECIA
2011-03-01ECB CLASS - 2 violation: WORK W/O A PERMIT. NONTED: MECHANICAL REMOVALS FOR PURPOSES OF FULL GUT DEMO/RENOVATION AT BULKHEAD FLRS 20-23 ARE ESSENTIALLY COM
2011-03-01ECB CLASS - 2 violation: WORK W/O A PERMIT. NOTED: CONCRETE WORK COMPLETED AND/OR IN PROGRESS OBSERVED UNDER ALT 2 PERMIT #120325139 AND ALT 2 PERMIT #120
2011-02-11311: Noise — Noise: Private Carting Noise (NQ1)
2011-02-06311: Blocked Driveway — No Access
2011-02-05311: Blocked Driveway — No Access
2010
2010-12-21Job filed: INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH.
2010-11-24Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS & DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS$11,000
2010-11-24Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS & DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS$11,000
2010-11-24Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS & DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS$11,000
2010-11-22Job filed: FILING TO REMOVE A PORTION OF EXISTING STANDPIPE RISER ON FLOORS 1-7 AND REPLACE W/ NEW 8" COMBINATION FSP/SPRINKLER RISER THROUGHOUT BUILDING AS SHOW$25,000
2010-11-16Job filed: FILING FOR THE INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2010-11-16Job filed: FILING FOR MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 4TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$45,000
2010-11-12Job filed: PROPOSE TO FILE NEW STEEL FRAMING & MISC. SLAB OPENINGS AS PER PLANS FILED HEREWITH.
2010-11-12Job filed: REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOORING AND HUNG CEILING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$200,000
2010-11-12Job filed: FILING FOR DUCTWORK MODIFICATIONS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2010-11-12Job filed: FILING HEREWITH MECHANICAL DUCTWORK AND AIR CONDITIONING AS PER PLANS FILED HEREWITH.
2010-10-27Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS & DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS$10,000
2010-10-27Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS & DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS$10,000
2010-10-26Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS & DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS$13,000
2010-10-15311: Noise — Noise: Construction Equipment (NC1)
2010-09-20311: Asbestos — Asbestos Complaint (B1)
2010-07-07Job filed: FILING FOR INSTALLATION OF AN AUTOMATIC SMOKE DETECTION SYSTEM FIRE ALARM SYSTEM (VESDA) ON THE 1ST FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NOCHANG$60,000
2010-06-09Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS AND DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS F$8,000
2010-06-09Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS AND DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS F$8,000
2010-06-09Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CELINGS AND DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS FI$8,000
2010-06-09Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS & DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS$13,000
2010-06-09Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS AND DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS F$11,000
2010-06-07Rodent inspection: Passed
2010-06-07Job filed: CONVERT FLOORS 8-23 OF EXISTING TELEPHONE EXCHANGE BUILDING TO RESIDENTIAL USE; RELOCATE ZONING FLOOR ARE; NEW PARTITIONS; CEILINGS; DOORS; FLOORS AND$17,000,000
2010-04-30Job filed: FILING TO INFILL EXISTING SHAFT OPENING ON THE FIRST FLOOR AND NEW STEEL DUNNAGE ON THE SECOND FLOOR ROOF AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHAN$150,000
2010-04-30Job filed: FILING FOR THE INSTALLATION OF HVAC EQUIPMENT AND REMOVAL AND INSTALLATION OF DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$240,000
2010-04-30Job filed: FILING FOR ADDITION/MODIFICATIONS TO THE EXISTING FIRE LARM SYSTEM ON THE 1ST FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$75,000
2010-04-30Job filed: FILING FOR THE REMOVAL AND INSTALLATION OF PARTITIONS, HUNG CEILING, FLOORING AND MISCELLANEOUS GENERAL CONSTRUCTION WORK AS SHOWN ON DRAWINGS FILED H$800,000
2010-04-29Job filed: FILING FOR THE INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$100,000
2010-04-22Job filed: ADDITIONS/MODIFICATIONS TO A MODIFIED CLASS E FIRE ALARM SYSTEM IN FLOORS BASE MENT AND 1-7.$120,000
2010-04-20311: Graffiti — Graffiti
2010-04-20Job filed: FILING FOR SPRINKLER WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$560,000
2010-04-19Job filed: FILING FOR MODIFICATIONS TO PARTITIONS, CEILINGS, FLOORING AND MISCELLANEOUS GENERAL CONSTRUCTION WORK FOR NETWORK SEPARATION AS SHOWN ON DRAWINGS FIL$300,000
2010-04-19Job filed: FILING FOR THE INSTALLATION AND MODIFICATION OF MECHANICAL EQUIPMENT AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,250,000
2010-04-19Job filed: FILING FOR THE INSTALLATION OF STRUCTURAL STEEL DUNNAGE AND BUS DUCT SUPPORTS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPAN$200,000
2010-04-02Job filed: FILING HEREWITH INTERIOR DEMO OF PARTITIONS; CEILINGS DOORS. REMOVAL OF DISTRIBUTION DUCTWORK. REMOVAL OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS FILED$10,000
2010-01-06ADEC — from 210 WEST 18TH STREET CONDOMINIUM
2010-01-06ADEC — from 210 WEST 18TH STREET CONDOMINIUM
2010-01-06ADEC — from 210 WEST 18TH STREET CONDOMINIUM
2010-01-06ADEC — from 210 WEST 18TH STREET CONDOMINIUM
2010-01-06ADEC — from 210 WEST 18TH STREET CONDOMINIUM
2010-01-06ADEC — from 210 WEST 18TH STREET CONDOMINIUM
2010-01-06ADEC — from 210 WEST 18TH STREET CONDOMINIUM
2010-01-06ADEC — from 210 WEST 18TH STREET CONDOMINIUM
2009
2009-12-15MAPS — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15CDEC — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15CDEC — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15MAPS — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15CDEC — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15MAPS — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15MAPS — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15MAPS — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15MAPS — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15CDEC — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15CDEC — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15MAPS — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15CDEC — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15CDEC — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15MAPS — from 210 WEST 18TH STREET CONDOMINIUM
2009-12-15CDEC — from 210 WEST 18TH STREET CONDOMINIUM
2009-10-22Job filed: FILING HEREWITH CONDOMINIUM SUBDIVISION AS SHOWN ON DRAWINGS.
2009-10-02Job filed: FILING HEREWITH CONDO PLANS FOR SUBDIVISION.
2006
2006-11-03Facade (LL11) filing, cycle 6: SAFE
2006-08-22Job filed: Filing for the installation of sprinkler piping only, to be connected to a future riser installed as part local law 26 requirements as shown on drawin$20,000
2006-04-20Job filed: Filing for facade repairs as shown on drawings filed herewith. No change in use, egress or occupancy.$40,000
2006-04-06Job filed: FILING FOR THE LEGALIZATION OF FUEL STORAGE SYSTEM INCLUDING TANK, PIPIN G, LEAK DETECTORS AND RELATED DEVICES AS SHWN ON DRAWINGS FILED HEREWITH. NO $25,000
2006-03-30Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 203' DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/9
2005
2005-09-28Job filed: Filing to create a record of LL5/73 compliance- No work to be performed under this application. See comments section #16- Including AI1-Additional inf$100
2005-09-07Job filed: Filing for the removal and installation of HVAC equipment, related ductwork and plumbing work as shown on drawings filed herewith. No change in use, $300,000
2005-09-07Job filed: Filing for the installation of sprinklerPIPING ONLY. TO BE CONNECTED TO A FUTURE RISER INSTALLED AS PART LOCALLAW 26 REQUIREMENTS AS SHOWN ON DRAWINGS$20,000
2005-09-07Job filed: Filing for non load bearing partition changes, new flooring, hung ceiling and bathrooms as show on drawings filed herewith. No change in use, egress $50,000
2005-09-07Job filed: FILING FOR MODIFICATIONS TO THE EXISTINGMODIFIED CLASS 'E' FIRE ALARM SYSTEM, NEW SMOKE DETECTORS, STROBES,SPEAKERS AND RELATED DEVICES AS SHOWN ON DR$25,000
2005-08-10Job filed: Filing for ductwork modifications as shown on drawings filed herewith. No change in use, egress or occupancy.$20,000
2005-08-10Job filed: Filing for the installation of fuel pipe enclosures as shown on drawings filed herewith. No change in use, egress or occupancy.$50,000
2005-08-10Job filed: Filing for the installation of sprinkler heads as shown on drawings filed herewith. No change in use, egress or occupacy.$10,000
2004
2004-12-22Job filed: Filing for the renovation of office space; minor demolition, new non-loadbearing partitions, flooring, and hung ceiling as shown on drawings filed her$20,000
2004-12-06Job filed: FOR MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM, NEW SMOKE DETECTOR S, STROBES, HORNS AND RELATED DEVICES AS SHOWN ON DRAWINGS FILED HEREWITH. NO$5,000
2004-12-06Job filed: Filing for ductwork modifications as shown on drawings filed herewith. No change in use, egress or occupancy.$150,000
2004-03-03Job filed: Filing for a direct replacement of a fuel storage tank as shown on drawings filed herewith. No change in use, egress or occupancy.$50,000
2003
2003-07-24Job filed: Erect plywood construction fence 3' from property line. Filed in conjunction with Alt II 103478817 which is approved and permitted. No change in use
2003-06-09Job filed: Mechanical ductwork modifications in lobby and removal of plumbing fixtures as per plans . No change in use egress or occupancy.$50,000
2003-06-09Job filed: Architectural modifications in existing lobby as per plans filed herewith . No change in use egress or occupancy.$150,000
2002
2002-10-03Job filed: Structural modification in conjunction with installation of exterior cable shaft. No change in use, egress, or occupancy.$85,000
2002-10-03Job filed: Install one new roof drain on new shaft with required leader. Work also includes minor mechanical work. No change in use egress or occupancy.$15,000
2002-10-03Job filed: Install exterior cable shaft as per plans filed herewith . No change in use egress or occupancy.$200,000
2002-10-02Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 4TH FLOOR CLASS'E'MODIFICATIONS FILED SEPARATELY, ADDITIONAL VESDA SYSTEMS FILED SEPARATELY. NO CHANGE IN USE,E$5,000
2002-09-26Job filed: INSTAL VESDA SUBSYSTEM ON PART OF THE 7 TH FLOOR CLASS'E' MODIFICATIONSF ILED SEPARATELY, ADDITIONAL VESDA SYSTEM FILED SEPARATELY. NO CHANGE IN USE,$5,000
2002-09-26Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 7TH FLOOR CLASS'E' MODIFICATIONS FILED SEPARATELY. ADDITIONAL VESDA SYSTE MS FILED SEPARATELY. NO CHANGE IN USE$5,000
2002-09-26Job filed: INSTALLVESDA SYBSYSTEM ON PART OF THE7TH FLOOR CLASS'E'MODIFICATIONS FILED SEPARATELY,ADDITIONALD VESDA SYSTEMS FILED SEPARATELY. NO CHANGE IN USE,EGR$5,000
2002-09-26Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 7TH FLOOR. CLASS'E' MODIFICATION FILED SEPARATELY. ADDITIONAL VESDA SYSTEMS FILED SEPARATELY. NO CHANGE IN USE,$5,000
2002-09-26Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 5TH FLOOR CLASS'E'MODIFICATIONS FILED SEPARATELY.ADDITIONAL VESDA SYSTEM FILED SEPARATELY.NO CHANGE IN USE,EGRE$5,000
2002-09-26Job filed: INSTALL VESDA SUBSYSTEM ON PART OT THE 5TH FLOOR CLASS'E' MODIFICATIONS FILED SEJPARATELY, ADDITIONAL VESDA SYSTEMS FILED SEPARATELY. NO CHANGE IN USE$5,000
2002-09-26Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 4TH FLOOR CLASS'E'MODIFICATIONS FILED SEPARATELY,ADDITIONAL VESDA SYSTEM FILED SEPARATELY. NO CHANGE IN USE, EG$5,000
2002-09-26Job filed: INSTALL VESDA SUBSYSTEM ON PART OF 4TH FLOOR CLASS'E' MODIFICATIONS FILED SEPARATELY. ADDITIONAL VESDA SYSTEM FILED SEPARATELY. NO CHANGE IN USE,EGRES$5,000
2002-09-26Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 6TH FLOOR. CLASS 'E'MODIFICATION FILED SEPARATELY. ADDITIONAL VESDA SYSTEMS FILED SEPARATELY. NO CHANGE IN USE,$5,000
2002-09-25Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 3RD FLOOR CLASS E MODIFICATIONS FILED SEPARATELY ADDITIONAL VESDA SYSTEM S FILED SEPARATELY NO CHANGE IN USE EG$5,000
2002-09-25Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 7TH FLOOR CLASS'E'MODIFICATIONS FILED SEPARATELY. ADDITIONAL VESDA SYSTEMS FILED SEPARTELY. NO CHANGE IN USE,EG$5,000
2002-09-25Job filed: INSTALL VESDA SUBSYSTEM ON PART TO THE 3RD FLOOR CLASS'E'MODIFICATIONS FILED SEPARATELY,ADDITIONAL VESDA SYSTEM FILED SEPARATELY. NO CHANGE IN USE, EG$5,000
2002-09-25Job filed: INSTAL VESDA SUBSYSTEM ON PART OF THE 3RD FLOOR CLASS'E'MODIFICATIONS FILED SEPARATELY, ADDITIONAL VESDA SYSTE FILED SEPARATELY. NO CHANGE IN USE,EGR$5,000
2002-09-25Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 1 ST FLOOR CLASS E MODIFICATIONS ILED SEPARATELY ADDITONAL VESDA SYSTEM FILED SEPARATELY NO CHANGE IN USE EGRES$5,000
2002-09-25Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 1 ST FLOOR CLASS E MODIFICATIONS ILED SEPARATELY ADDITIONAL VESDA SYSTEM FILED SEPARATELY NO CHANGE IN USE EGRE$5,000
2002-09-23Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 2 ND FLOOR CLASS E MODIFICATION F LED SEPARATELY ADDITIONAL VESDA SYSTEM F ILED SEPARATELY NO CHANGE IN USE EGR$5,000
2002-09-23Job filed: INSTALL VEADS SUBSYSTEM ON PART OF THEV 2ND FLOOR CLASS E MODIFICATIONS FILED SEPARATELY ADDITIONAL VESDA SYSTEM FILED SEPARATELY NO CHANGE IN USE EG$5,000
2002-09-23Job filed: INSTALL VESDA SUBSYSTEM ON PART OF THE 2 ND FLOOR CLASS E MODIFICATIONS ILED SEPARATELY ADDITIONAL VESDA SYSTEMS FILED SEPARATELY NO CHANGE IN USE EG$5,000
2002-08-27Job filed: FIRE ALARM MODIFICATIONS ON THE CELLAR A ND 1ST AS PER PLANS FILED HEREW TH NO CHANGE IN USE EGRESS OR OCCUPANCY THE SCOPE OF WORK INCLUDEDS THE 2ND F$15,000
2002-04-30Job filed: FIRE ALARM MODIFICATIONS ON THE 6TH,7TH, 8TH FLOORS AS PER PLAN FFILED H REWITH NO CHAGNE IN USE EGRESS OR OCCUPA NCY.$15,000
2002-04-30Job filed: FIRE ALARM MODIFICATIONS ON THE 12, 13TH AND 14TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2002-04-30Job filed: FIRE ALARM MODIFICATIONS ON THE 9-11TH FLOORS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2002-04-30Job filed: FIRE ALARM MODIFICATIONS ON THE 3,4,5TH FLOORS AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2002-04-24Job filed: FIRE ALARM MODIFICATIONS ON THE 15,16,17 FLOORS AS PER PLANS FILED HEREW TH NO CHANGE IN USE EGRESS OR OCCUPANCY.$15,000
2002-04-19Job filed: Fire Alarm modifications on the 18,19,20 floors as per plans filed herewith . No change in use, egress or occupancy$15,000
2001
2001-10-23Job filed: Modifications to mechanical ductwork in cellar as per plans filed herewith. No change in use, egress, or occupancy.$10,000
2001-10-23Job filed: General construction inclusive of partition modifications in cellar. No change in use, egress, or occupancy.$75,000
2001-08-10Job filed: General construction on the 3rd floor inclusive of partition modifications as per plans filed herewith. No change in use, egress, or occupancy.$100,000
2001-08-10Job filed: Modifications to mechanical ductwork on the 3rd floor as per plans filed herewith. No change in use, egress, or occupancy.$30,000
2001-08-10Job filed: Mechanical modificaton on the seventh floor as well as installation of plumbing fixtures as per plans filed herewith. No change in use egress or occu$235,000
2001-08-10Job filed: Interior construction on the 7th Floor as per plans filed herewith. No change in use egress or occupancy.$145,000
2001-08-01Job filed: General construction inclusive of installation of partitions for new MER on 2nd floor. Structural modifications to existing dunnage on 1st floor setb$175,000
2001-08-01Job filed: Install 2 new air handlers, 2 AC units in 2nd floor MERs. Install 2 new drycoolers on 1st floor setback. Modifications to mechanical ductwork and in$400,000
2001-06-27Job filed: Removal of interior partitions. No change in use egress or occupancy.$55,000
2001-06-27Job filed: Removal of mechanical ductworkand plumbing fixtures . No change in use, egress or occupancy.$15,000
2001-04-12Job filed: Modification of interior partitions on the 12th and 14th floors. No change in use egress or occupancy.$300,000
2001-04-12Job filed: Modification on mechanical ductwork on part of the 12th and 14th floors. Install plumbing fixtures. No change in use, egress or occupancy$500,000
2001-04-12Job filed: Fire Alarm modifications on the 12th floor and 14th floor. No change in use egress or occupancy.$10,000
2000
2000-10-11Job filed: Modification of interior partitions on the 6th floor as per plans filed herewith No change in use, egress, or occupancy.$150,000
2000-10-11Job filed: MODIFICATION OF MECHANICAL DUCTWORK ON THE 6TH FLOOR, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$240,000
2000-10-11Job filed: Modifications to fire alarm on the 6th floor as per plans filed herewith. No change in use, egress, or occupancy.$3,000
2000-09-07Job filed: Install modified class E Fire Alarm system. Filed for compliance with Local Law #5 of 1973. No change in use, egress or occupancy. This system will re$100,000
2000-06-09Job filed: fILING FOR PARTITION CHANGES AND MISCELLANEOUS GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$125,000
2000-06-09Job filed: fILING FOR FIREALARM MODIFICATIONS AS PER PLANS. . NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2000-06-09Job filed: MECHANICAL WORK.$50,000
2000-05-19Job filed: INSTALLATION OF A HEAVY DUTY SHED 304' DURING PARAPET REPAIR. NO CHANGE IN USE,EGRESS OR OCCUPAC. SHED TO COMPLY WIT LL33/91.
2000-05-09Job filed: FACADE REPAIR IN COMPLIANCE WITH LL11/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY$650,000
2000-05-04Job filed: This application is filed to show compliance with LL5/73. Compartmentation plans filed herewith. The scope of work includes repair work, upgrading o$200,000
2000-04-25Job filed: FILING HEREWITH FOR THE INSTALATION OF MECHANICAL EQUIPMENT AND RELATED DUCTWORK AND PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$450,000
2000-04-25Job filed: Filing herewith for minor partition changes and miscellaneous general constructi on work as per plans. No change in use, egress or occupancy.$450,000
2000-04-25Job filed: FILING HEREWITH FOR FIRE ALARM MODIFICAT IONS AS PER PLANS. NO CHANGE I USE, EGRESS OR OCCUPANCY. MODIFICATION CONSISTS OF AN ADDITION TO THE EXISTIN$100,000
1996
1996-08-28ECB Non-Hazardous violation: INSTALLATION OF MECHANICAL EQUIPTMENT WITHOUT FIRST OBTAINING A WORK PERMIT. NOTED: (1) 700 TONS A/C UNIT AT BASEMENT (2) 16 TONS $700
1992
1992-07-01DOB violation LL1080:

Support this site Back to the building page