The city's published records show little recorded distress here in the last three years. Less recorded distress than 78% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 3.3. In ZIP 10065, 78% of residential buildings hold an A and
3% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
1 total — 1 class C (immediately hazardous), 0 class B, 0 class A. Oldest open since 2025-05-16.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
110 service requests in the last three years. Most common: For Hire Vehicle Complaint (61) · Illegal Parking (22) · Street Condition (6) · Noise (5) · Boilers (4) · PLUMBING (3).
Filed construction activity
$13,000 in permitted construction work filed since
2016 (3 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2014)
Yes
Six or more residential units (30)
Yes
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. Buildings receiving 421-a or J-51 benefits are generally required to register their units as rent-stabilized for the duration of the benefit. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
301 EAST 61ST STREET CONDOMINIUM
Head officer
STEPHEN M COHN
Managing agent
NEW BEDFORD MANAGEMENT CORP.
Last registered
2025-09-04
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,156,403
$520,382
2026
$995,353
$447,909
2027
$346,783
$156,053
The city's market estimate has fallen
70% between tax years 2025 and 2027.
Tax exemptions on the roll: 421A 10 YR CAP
For property tax, the Department of Finance values this condo
as if it were a rental building. Its 2023 estimate: gross income $3,511,239 a year
($55.78 per sq ft), operating expenses $830,284
($13.19 per sq ft), net operating income $2,680,955. These are the
city's estimates from comparable rentals, not the building's actual budget, rents or maintenance
charges.
Building systems
Energy grade (LL33)
C — ENERGY STAR score 69/100 (2022 disclosure cycle)
Heating fuel
NATURALGAS
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
59 St — 4 5 6 N R W · 800 ft straight-line (about a 4-minute walk) · station accessibility: none Lexington Av/63 St — M Q · 850 ft straight-line (about a 4-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 2 Av / E 61 St — M15 · 250 ft
Citi Bike
1 Ave & E 62 St · 650 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
110 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
2026-10-05311: Street Condition — Plate Condition - Noisy
2026-09-22Job filed: INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS.
2026-09-04Deed $950,000 — from BEAGLE NYC INC. to QUINDARA, CESAR ANGELO$950,000
2026-09-04Mortgage $760,000 — from QUINDARA, CESAR ANGELO to CITIZENS BANK NA$760,000
2026-09-04PAT — from QUINDARA, CESAR ANGELO to THE 301 EAST 61ST STREET CONDOMINIUM; BEAGLE NYC INC.
2026-08-20Sold for $950,000$950,000
2026-07-11311: Panhandling — N/A
2026-06-28311: Street Condition — Defective Hardware
2026-05-14311: Noise - Vehicle — Car/Truck Horn
2026-05-06311: Noise - Vehicle — Car/Truck Horn
2026-04-16311: Street Condition — Plate Condition - Noisy
2026-04-12311: Street Condition — Plate Condition - Noisy
2026-03-11311: Illegal Parking — Blocked Bike Lane
2026-02-10Mortgage $670,000 — from 1162 SECOND RETAIL BH LLC; LIVIAN 1162 2ND AVE. LLC to NASSAU FINANCIAL FEDERAL CREDIT UNION$670,000
2026-02-10AL&R $670,000 — from LIVIAN 1162 2ND AVE. LLC; 1162 SECOND RETAIL BH LLC to NASSAU FINANCIAL FEDERAL CREDIT UNION$670,000
2026-02-10PAT — from LIVIAN 1162 2ND AVE. LLC; 1162 SECOND RETAIL BH LLC to THE 301 EAST 61ST STREET CONDOMINIUM BOA
2026-02-10Deed $975,000 — from 61ST & 2ND DEVELOPMENT LLC to LIVIAN 1162 2ND AVE. LLC; 1162 SECOND RETAIL BH LLC$975,000
2026-01-28Sold for $975,000$975,000
2025
2025-12-03Bedbug filing: 0 infested units
2025-10-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-03311: Illegal Parking — Blocked Bike Lane
2025-09-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-09-22311: Illegal Parking — Blocked Bike Lane
2025-09-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-09-18311: Illegal Parking — Blocked Bike Lane
2025-09-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-06-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-05-20311: Illegal Parking — Blocked Bike Lane
2025-05-16HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2025-05-01311: GENERAL — VENTILATION SYSTEM
2025-05-01Tenant complaint: GENERAL — VENTILATION SYSTEM
2025-03-24ECB CLASS - 3 violation: LAARS DOMESTIC HW BOILER HAS A DEFECTIVE RE CIRCULATORÝABNORMAL NOISE¨;CORRECT VIOLATION+SUBMIT CERTIFICATE OF CORRECTION
2025-03-23311: Taxi Complaint — Driver Complaint - Non Passenger
2021-05-05Deed $1,500,000 — from BEAGLE NYC INC. to THE CLARE 3B LLC$1,500,000
2021-05-05PAT — from THE CLARE 3B LLC to BOARD OF 301 EAST 61ST STREET CONDOMINIU
2021-04-16Sold for $1,500,000$1,500,000
2021-04-06Mortgage satisfied — from ROMINGER, BLAINE to WELLS FARGO BANK, N.A.
2021-04-06311: Illegal Parking — Blocked Bike Lane
2021-04-06311: Illegal Parking — Blocked Bike Lane
2021-03-25PAT — from LACHMAN, CHARLES to CONDO BOARD OF 301 EAST 61ST STREET COND
2021-03-25Mortgage $2,000,000 — from LACHMAN, CHARLES to MERS$2,000,000
2021-03-25Deed $2,700,000 — from ROMINGER, BLAINE to LACHMAN, CHARLES$2,700,000
2021-03-17Sold for $2,700,000$2,700,000
2021-03-16TL&R — from HE, CHUNHUA to INTERNATIONAL BANK OF CHICAGO
2021-03-16Mortgage satisfied — from HE, CHUNHUA to INTERNATIONAL BANK OF CHICAGO
2021-03-11311: Illegal Parking — Blocked Bike Lane
2021-03-07ECB CLASS - 1 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING. AT 8TH FL ON 61 ST(APT 8B) METAL SILL HAS BECOME DISLODGED AND IS IN DANGER OF FALLING TO S
2021-03-06311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2021-01-16311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020
2020-12-22Bedbug filing: 0 infested units
2020-11-06Agreement $1,670,000 — from COHN, STEPHEN MARTIN; COHN, MIRYAME BATAR to WELLS FARGO BANK, N.A.$1,670,000
2020-11-06Deed — from KROGMEIER, MIRYAME BATAR; COHN, STEPHEN MARTIN to COHN, MIRYAME BATAR; COHN, STEPHEN MARTIN
2020-06-12311: Illegal Parking — Blocked Bike Lane
2020-04-03Certificate of occupancy Final
2020-03-24Certificate of occupancy Temporary
2020-03-03311: Illegal Parking — Blocked Bike Lane
2020-02-24311: Illegal Parking — Blocked Bike Lane
2020-02-22311: Taxi Complaint — Driver Complaint - Non Passenger
2020-02-18311: Illegal Parking — Blocked Bike Lane
2020-01-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-01-15311: Illegal Parking — Blocked Bike Lane
2019
2019-12-27Elevator permit: Furnish and install components and software providing Door Monitor Circuitry to existing controller. All work to comply with ASME$29,400
2019-12-26Bedbug filing: 0 infested units
2019-12-19Rodent inspection: Passed
2019-12-09311: Noise - Vehicle — Car/Truck Horn
2019-12-04311: Illegal Parking — Blocked Bike Lane
2019-12-02Certificate of occupancy Temporary
2019-11-12311: Blocked Driveway — No Access
2019-11-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-08311: Illegal Parking — Blocked Bike Lane
2019-11-01311: Dirty Conditions — E1A Litter Basket / Improper Use
2019-09-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-04311: Illegal Parking — Blocked Bike Lane
2019-08-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-08-27311: Illegal Parking — Blocked Bike Lane
2019-08-20Certificate of occupancy Temporary
2019-08-08311: Illegal Parking — Blocked Bike Lane
2019-07-29311: Illegal Parking — Blocked Bike Lane
2019-03-20PAT — from VOHRA, SHIVAJI CHATRAPATI; VOHRA, ANURADHA to 301 EAST 61ST STREET CONDOMINIUM
2019-03-20Deed $3,733,762 — from 61ST & 2ND DEVELOPMENT LLC to VOHRA, ANURADHA; VOHRA, SHIVAJI CHATRAPATI$3,733,763
2019-03-15Sold for $3,733,763$3,733,763
2019-02-22Certificate of occupancy Temporary
2019-02-01PAT — from JPH REALTY, LLC to BD OF MANAGERS OF 301 EAST 61ST STREET C; 61ST & 2ND DEVELOPMENT LLC
2019-02-01Deed $1,750,000 — from 61ST & 2ND DEVELOPMENT LLC to JPH REALTY, LLC$1,750,000
2019-01-28Sold for $1,750,000$1,750,000
2018
2018-12-31Rodent inspection: Passed
2018-12-27Bedbug filing: 0 infested units
2018-11-20Certificate of occupancy Temporary
2018-09-06Permit Supported Scaffold — Signed-off
2018-09-05Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL$5,000
2018-08-07Certificate of occupancy Temporary
2018-08-03PAT — from CHA, SOOJING to BOARD OF MANAGERS OF THE 301 E 61ST ST.
2018-08-03Deed $2,000,000 — from 61ST & 2ND DEVELOPMENTL LC to CHA, SOOJIN$2,000,000
2018-07-30Sold for $2,000,000$2,000,000
2018-07-23FDNY inspection (RISK)
2018-06-23311: Homeless Encampment — N/A
2018-06-13PAT — from S JAFFEE FAMILY TIC LLC to 301 EAST 61ST STREET CONDOMINIUM BOARD O
2018-06-13Mortgage $3,100,000 — from S JAFFEE FAMILY TIC LLC to MERS$3,100,000
2018-06-13Deed $7,500,000 — from 61ST & 2ND DEVELOPMENT LLC to S JAFFEE FAMILY TIC LLC$7,500,000
2018-06-08Sold for $7,500,000$7,500,000
2018-05-11Certificate of occupancy Temporary
2018-05-03Permit Sidewalk Shed — Permit Issued
2018-05-02Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK$5,000
2018-04-18Rodent inspection: Passed
2018-03-21Boiler inspection
2018-03-21Boiler inspection
2018-03-21Boiler inspection
2018-03-21Boiler inspection
2018-03-08PAT — from WHITESAIL HOLDINGS I, LLC to CONDOMINIUM BOARD OF THE CLARE
2018-03-08Deed $2,630,000 — from 61ST & 2ND DEVELOPMENT LLC to WHITESAIL HOLDINGS I, LLC$2,630,000
2018-02-28Sold for $2,630,000$2,630,000
2018-02-23311: Graffiti — Graffiti
2018-02-08Certificate of occupancy Temporary
2017
2017-11-14Certificate of occupancy Temporary
2017-11-13Deed $2,846,009 — from 61ST & 2ND NYC LLC to COHN, STEPHEN MARTIN; KROGMEIER, MIRYAME BATAR$2,846,009
2017-11-13Mortgage $2,236,000 — from KROGMEIER, MIRYAME BATAR; COHN, STEPHEN MARTIN to WELL FARGO BANK, N.A.$2,236,000
2017-11-13PAT — from COHN, STEPHEN MARTIN; KROGMEIER, MIRYAME BATAR to 61ST & 2ND NYC LLC
2017-11-08Deed — from 61ST & 2ND NYC LLC to HODGE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to HODGE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to BEAGLE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to ESMERALDA NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to 61ST & 2ND DEVELOPMENT LLC
2017-11-08Deed — from 61ST & 2ND NYC LLC to BEAGLE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to 61ST & 2ND DEVELOPMENT LLC
2017-11-08Deed — from 61ST & 2ND NYC LLC to HODGE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to BEAGLE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to BEAGLE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to BEAGLE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to HODGE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to 61ST & 2ND DEVELOPMENT LLC
2017-11-08Deed — from 61ST & 2ND NYC LLC to 61ST & 2ND DEVELOPMENT LLC
2017-11-08Deed — from 61ST & 2ND NYC LLC to GREEN SAND NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to 61ST & 2ND DEVELOPMENT LLC
2017-11-08Deed — from 61ST & 2ND NYC LLC to REAL ESTATE INVERLAD USA MANAGEMENT LLC
2017-11-08Deed — from 61ST & 2ND NYC LLC to BEAGLE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to BEAGLE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to 61ST & 2ND DEVELOPMENT LLC
2017-11-08Deed — from 61ST & 2ND NYC LLC to HODGE NYC INC.
2017-11-08Deed — from 61ST & 2ND NYC LLC to HODGE NYC INC.
2017-11-04311: Noise — Noise: Construction Before/After Hours (NM1)
2017-11-03PAT — from HE, CHUNHUA to 301 EAST 61ST STREET CONDOMINIUM BOARD O; 61ST & 2ND NYC LLC
2017-11-03AL&R $480,000 — from HE, CHUNHUA to INTERNATIONAL BANK OF CHICAGO$480,000
2017-11-03Mortgage $480,000 — from HE, CHUNHUA to INTERNATIONAL BANK OF CHICAGO$480,000
2017-11-03Deed $840,000 — from 61ST & 2ND NYC LLC to HE, CHUNHUA$840,000
2017-11-03PAT — from HE, CHUNHUA to CAO, YANG
2017-11-01Sold for $2,846,008$2,846,008
2017-10-27Deed transfer (nominal price)
2017-10-26Sold for $840,000$840,000
2017-10-20Mortgage $1,475,000 — from ROMINGER, BLAINE to WELLS FARGO BANK, N.A.$1,475,000
2017-10-20PAT — from ROMINGER, BLAINE to 301 EAST 61ST STREET CONDOMINIUM
2017-10-20Deed $3,002,147 — from 61ST & 2ND NYC LLC to ROMINGER, BLAINE$3,002,147
2017-10-12Sold for $3,002,146$3,002,146
2017-10-10Mortgage $1,080,000 — from ALAYEV, ARIEL to CAPITAL ONE NA$1,080,000
2017-10-10Deed $1,374,638 — from 61ST & 2ND NYC LLC to ALAYEV, ARIEL$1,374,638
2017-10-10PAT — from YEN, CHAR-MIN to GREENBERG, TERESA P
2017-10-10Deed $794,000 — from 61ST & 2ND NYC LLC to YEN, CHAR-MIN$794,000
2017-10-10PAT — from ALAYEV, ARIEL to THE 301 EAST 61ST STREET CONDOMINIUM
2017-10-10PAT — from YEN, CHAR-MIN to BOARD OF MANAGERS OF 301 EAST 61ST STREE
2017-10-03Sold for $1,374,637$1,374,637
2017-10-03Deed $780,000 — from 61ST & 2ND NYC LLC to GUAN, YUE$780,000
2017-10-03PAT — from GUAN, YUE to 301 EAST 61ST STREET CONDOMINIUM BOARD O; 61ST & 2ND NYC LLC
2017-10-02Rodent inspection: Passed
2017-09-27Sold for $794,000$794,000
2017-09-26Sold for $780,000$780,000
2017-09-21PAT — from 61-3A LLC to THE BORAD OF MANAGERS OF THE 301 EAST 61
2017-09-21Deed $946,972 — from 61ST & 2ND NYC LLC to 61-3A LLC$946,973
2017-09-20311: Sustainability Enforcement — Sustainability Enforcement Work Order
2017-09-19PAT — from LAVICTOIRE, STACY E to 301 EAST STREET CONDOMINIUM
2017-09-19Deed $2,630,000 — from 61ST & 2ND NYC LLC to LAVICTOIRE, STACY E$2,630,000
2017-09-14Sold for $946,972$946,972
2017-09-13Sold for $2,630,000$2,630,000
2017-09-11PAT — from GOLDCREST REALTY HOLDINGS, INC. to 301 EAST 61ST STREET CONDOMINIUM
2017-09-11Deed $2,499,998 — from 61ST & 2ND NYC LLC to GOLDCREST REALTY HOLDINGS, INC.$2,499,998
2017-09-07Boiler inspection
2017-09-07Boiler inspection
2017-09-07Boiler inspection
2017-09-07Boiler inspection
2017-09-07FDNY inspection (STANDARD)
2017-09-06Sold for $2,499,998$2,499,998
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-05MAPS — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-09-01CDEC — from THE 301 EAST 61ST STREET CONDOMINIUM
2017-08-17FDNY inspection (RISK)
2017-08-17Certificate of occupancy Temporary
2017-05-19Job filed: HEREWITH FILING SUBDIVISION OF CONDO UNITS (CONDO #2556) BLOCK 1436, LOT 1, & CONDO LOTS 1401 THRU 1431. NO WORK TO BE DONE UNDER THIS APPLICATION
2017-05-16FDNY inspection (CONSTR)
2017-05-01FDNY inspection (CONSTR)
2017-04-21FDNY inspection (CDA-90-DRILL)
2017-04-04Rodent inspection: Passed
2017-04-04Certificate of occupancy Temporary
2017-03-03Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2017-01-27FDNY inspection (CDA-90-DRILL)
2016
2016-10-24311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-10-24311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-10-24HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-10-21FDNY inspection (CDA-90-DRILL)
2016-09-22FDNY inspection (CDA-90-DRILL)
2016-09-20Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SCAFFOLD TO COMPLY WITH CHAP
2016-07-01311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2016-06-24311: Elevator — Elevator - Dangerous Condition/Shaft Open/Unguarded
2016-06-23FDNY inspection (CDA-90-DRILL)
2016-06-14311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-06-14311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-06-13311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2016-06-13ECB CLASS - 1 violation: SEC: BC3307.2.6. @ TIME OF INSP I OBSERVED A SIDEWALK SHED & CONSTR FENCE BUILT ON EXP#1- 2ND AVE. FENCE SECTION BUILT IN FRONT OF$1,400
2016-06-08311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-06-08311: General Construction/Plumbing — Adjacent Buildings Not Protected
2016-06-08311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-06-06311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-05-17Rodent inspection: Passed
2016-04-26Job filed: HEREWITH FILING FOR INTERIOR RENOVATIONS AS PER PLANS FOR TEMPORARY SALES OFFICE AND MODEL APARTMENT, IN CONJUCTION WITH NEW BUILDING JOB#121163436.$3,000
2016-03-24311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-03-24311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-03-24ECB CLASS - 3 violation: 3303.8 STANDPIPE NOT PROPERLY & OR COMPLETELY PAINTED RED.RED PAINT HAS FADED & OR IS MISSING LEAVING STANDPIPE NOT UP TO CODE.REM$300
2016-03-21FDNY inspection (CDA-90-DRILL)
2016-03-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015
2015-12-30FDNY inspection (CDA-90-DRILL)
2015-12-15311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-12-11311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-12-11311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-11-02311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-10-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-09-03FDNY inspection (CDA-90-DRILL)
2015-09-02311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-08-21Job filed: RESPECTFULLY FILING FOR NEW MARQUEE AS PER PLANS IN CONJUCTION TO NEW BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$3,000
2015-07-10Job filed: HEREWITH FILING FOR FIRE PROTECTION PLANS IN CONJUNCTION TO NEW BUILDING 121163436. NO CHANGE OF USE,EGRESS OR OCCUPANCY.$3,000
2015-07-01311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2015-06-05Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33
2015-04-30FDNY inspection (CDA-90-DRILL)
2015-02-25Job filed: PROPOSED INSTALLATION OF MULTIPOINT MASON SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-02-20311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-02-19311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2015-02-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015-01-22FDNY inspection (SPECIAL-OTH)
2014
2014-12-30Job filed: INSTALLATION OF A SCAFFOLD TYPE OVERHEAD/ROOF PROTECTION AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. OVER
2014-11-30FDNY inspection (CDA-90-DRILL)
2014-11-24311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-10-20311: Emergency Response Team (ERT) — After Hours Work - Illegal
2014-09-25311: General Construction/Plumbing — Site Conditions Endangering Workers
2014-08-29Job filed: TO ERECT A PERSONNEL/MATERIAL HOIST. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS
2014-08-05FDNY inspection (CDA-90-DRILL)
2014-08-04Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2014-07-25311: General Construction/Plumbing — Site Conditions Endangering Workers
2014-07-23DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-05-02FDNY inspection (CDA-90-DRILL)
2014-04-15311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2013-11-27Job filed: HEREWITH FILING FOR NEW DRY STANDPIPE IN CONJUCTIONS TO NEW BUILDING APPLICATION JOB# 121163436$3,000
2013-11-19FDNY inspection (CONSTR)
2013-11-07311: General Construction/Plumbing — Site Conditions Endangering Workers
2013-10-10311: General Construction/Plumbing — Fence - None/Inadequate
2013-10-02311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2013-10-02311: General Construction/Plumbing — Structural Stability Impacted - New Building Under Construction
2013-09-09FDNY inspection (CONSTR)
2013-08-19FDNY inspection (CONSTR)
2013-08-05FDNY inspection (CONSTR)
2013-07-31311: Emergency Response Team (ERT) — After Hours Work - Illegal
2013-06-18FDNY inspection (DEMO)
2013-05-20FDNY inspection (DEMO)
2013-04-23FDNY inspection (DEMO)
2013-03-11311: BEST/Site Safety — Demolition Notification Received
2013-03-11311: BEST/Site Safety — Demolition Notification Received
2013-01-24311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2013-01-24ECB CLASS - 1 violation: PARTIAL *SWO* ERECTED SUPPORTD SCAFFOLD W/O A SCAFFOLD CERT OF COMPLETION.NOTED:THE FOLLOWING WORKERS DID NOT HAVE A 32HR ERECTORS$2,400
2013-01-22Job filed: INSTALLATION OF A SCAFFOLD WITH STAIRS (FIELD LOCATED) AND DEBRIS NETTING ON THE EXISTING SIDEWALK SHED (FILED SEPARATELY) AS PER PLANS DURING DEMOLIT
2013-01-22Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING DEMOLITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER
2013-01-02Job filed: FILING FOR THE REMOVAL OF ALL INTERIOR FINISHES THROUGHT BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$30,000
2012
2012-12-06Job filed: FULL DEMOLITION OF FIVE STORY STRUCTURE, USING MECHANICAL MEANS.
2012-11-29Job filed: FULL DEMOLIOTION OF FIVE STORY WALK-UP APARTMENT USING MECHANICAL MEANS.
2012-11-29Job filed: FULL DEMOLITION OF FIVE STORY APARTMENT WALK-UP, USING MECHANICAL MEANS.
2012-11-07Job filed: SHORING AND BRACING OF EXISTING PARTY WALL. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$18,500
2012-11-07Job filed: SHORING AND BRACING OF EXISTING PARTY WALL. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$18,500
2012-09-05Job filed: HEREWITH FILING FOR SUPPORT OF EXCAVATION DRAWINGS AS PER PLANS.
2012-08-07Job filed: HEREWITH FILING FOR FOUNDATION AND SUPER STRUCTURE FOR NEW BUILDING AS PER PLANS.
2012-07-31Job filed: NEW JOB DESCRIPTION: INSTALLATION OF NEW AUTO SMOKE/HEAT DETENTION/SPRINKLER A LARM/ CARBON MONOXIDE DETECTORS/1-WAY VOICE COMMUNICATION SYSTEM.$3,000
2012-07-31Job filed: NEW SPRINKLER/STANDPIPE SYSTEM FILE IN CONJUNCTION WITH NEW BUILDING.$3,000
2012-07-30Job filed: HEREWITH FLING NEW BOILER SYSTEM IN CONJUNCTION WITH NEW BUILDING.$3,000
2012-07-30Job filed: HEREWITH FILING FOR NEW EMERGENCY GENERATOR IN CONJUNCTION WITH NEW BUILDING. APPLICATION 121163436$3,000
2012-07-30Job filed: NEW MECHANICAL AND PLUMBING SYSTEMS FILED IN CONJUNCTION WITH NEW BUILDING.$3,000
2012-07-30Job filed: HEREWITH FILING NEW BPP IN CONJUNCTION WITH NEW BUILDING
2012-07-24Job filed: HEREWITH FILING FOR NEW BUILDING AS PER PLANS HERE FILED.
2012-06-28Rodent inspection: Passed
2012-05-08Job filed: COMBINE APARTMENTS 1A,1B,1C,1D INTO ONE UNIT. COMBINE APARTMENTS 2A,2B,2C,2D INTO ONE UNIT. COMBINE APARTMENTS 3A,3B,3C,3D INTO ONE UNIT. COMBINE APAR$90,000
2011
2011-11-10Rodent inspection: Passed
2010
2010-10-13Rodent inspection: Passed
2009
2009-04-09Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 36 LF AS PER PLAN AT 301 EAST 61 STREET. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO
2009-01-07Job filed: MINOR INTERIOR RENOVATION. REPLACING AND/OR REPAIR WALL & FLOORS. REPLACE KITCHEN SINKS, WATER CLOSETS, LAVATORIES & BATH TUB/SHOWER PLUMBING $86,200
2006
2006-12-11Job filed: NB
2006-12-11Job filed: NB
2006-12-11Job filed: NB
2006-10-27Job filed: BUILDERS PAVEMENT PLAN. TOTAL STREETFRONTAGE 125 FEET.
2006-09-14Job filed: Erect a heavy duty sidewalk shed for a total of 90 ft long at 301 East 61 Street - during remedial repairs. Work shall comply iwith LL33/91. No chan
2006-08-18Job filed: WINDOW SEALING WORK AS SHOWN ON PLANS.$15,000
2002
2002-03-27Job filed: Erect 120' of Temporary Sidewalk Shed 300 psf during facade restoration. 60' on E. 61 St. & 60' on 2nd Ave. Shed shall comply with LL 33/91. No c
2000
2000-12-08Job filed: STORE RENOVATION INCLUDING MINOR GYP. BD. WORK, STORE FRONT, AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLEVD$27,000
1999
1999-01-23HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC WALL TILES AT BATHROOM SOUTH WALL AT 5 STY NORTHWEST APT 4D. , SECTION '' ''
1987
1987-06-18HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CARBON BOXES 1ST STY PUBLIC HALL.