The city's published records show little recorded distress here in the last three years. More recorded distress than 77% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 1.3. In ZIP 10028, 79% of residential buildings hold an A and
3% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
7 service requests in the last three years. Most common: Noise (3) · Food Establishment (2) · Residential Disposal Complaint (1) · PLUMBING (1).
Filed construction activity
$1,188,495 in permitted construction work filed since
2016 (10 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1910)
No
Six or more residential units (3)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
ZIMAK SECOND AVE LLC
Head officer
KAMRAN HAKIM
Managing agent
CHOICE NY MANAGEMENT
Last registered
2026-01-14
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$2,848,800
$1,281,960
2026
$3,419,000
$1,538,550
2027
$3,605,000
$1,622,250
The city's market estimate has risen
27% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
86 St — Q · 550 ft straight-line (about a 3-minute walk) · station accessibility: full 77 St — 6 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 2 Av / E 82 St — M15 · 100 ft
Citi Bike
E 80 St & 2 Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
7 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $1,500,000 on
2025-01-14 (lender: Amalgamated Bank), covering 3 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-08-19
CMTG $5,632,411 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK
$5,632,411
2026-08-19
AL&R $5,632,411 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK
$5,632,411
2025-01-14
Mortgage $1,500,000 — from 1569 SECOND AVE LLC; ZIMAK SECOND AVENUE LLC to AMALGAMATED BANK
$1,500,000
2025-01-14
AL&R $1,500,000 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK
$1,500,000
2018-11-01
Mortgage $2,100,000 — from 1569 SECOND AVE LLC; ZIMAK SECOND AVENUE LLC to AMALGAMATED BANK
$2,100,000
2018-11-01
Agreement $10,600,000 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK
$10,600,000
2018-11-01
AL&R $10,600,000 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK
$10,600,000
2013-11-14
Mortgage $717,489 — from 1569 SECOND AVE LLC; ZIMAK SECOND AVENUE LLC to INVESTORS BANK
$717,489
2013-11-14
Agreement $8,500,000 — from 1569 SECOND AVE LLC; ZIMAK SECOND AVENUE LLC to INVESTORS BANK
$8,500,000
2013-11-14
AL&R $8,500,000 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to INVESTORS BANK
$8,500,000
2009-06-25
Mortgage $3,453,162 — from ZIMAK SECOND AVENUE LLC to SIGNATURE BANK
$3,453,162
2009-06-25
Agreement $5,000,000 — from ZIMAK SECOND AVENUE LLC to SIGNATURE BANK
$5,000,000
2009-06-25
AL&R $5,000,000 — from ZIMAK SECOND AVENUE LLC to SIGNATURE BANK
$5,000,000
1999-07-13
Mortgage $936,315 — from ZIMAK SECOND AVENUELLC. to INDEPENDENCE COMMUNITY BANK
$936,315
1985-10-08
Mortgage $434,000 — from ZIMAK CO to GOLDMAN, ARNOLD; GOLDMAN, R. ANTHONY
$434,000
Ten-year activity
50250
2017
2018
2019
2020
26
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
4
0
2
6
2018
0
1
7
5
4
17
2019
0
0
3
0
3
6
2020
0
0
7
0
1
8
2021
0
0
24
0
2
26
2022
0
0
13
0
3
16
2023
0
0
20
0
2
22
2024
0
0
2
0
2
4
2025
11
0
4
2
2
19
2026
7
0
2
2
1
12
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Application filed for interior renovation of existing non-load bearing partitions, flooring, ceiling and finishes. Mechanical unit replacement, insta
2026-09-11
311: Food Establishment — Food Worker Hygiene
2026-08-19
CMTG $5,632,411 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK
2026-08-19
AL&R $5,632,411 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK
2026-06-23
Rodent inspection: Passed
2026-05-28
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-05-18
Job filed: Application is filed for new plumbing fixtures including hand sinks, equipment, grease traps and all work as noted on places. No change to Use, Egress
2026-03-26
Job filed: Application is filed for new plumbing fixtures including hand sinks, equipment, grease traps and all work as noted on places. No change to Use, Egress
2026-03-19
Permit Structural — Signed-off
2026-01-08
Job filed: Application is filed for new plumbing fixtures including hand sinks, equipment, grease traps and all work as noted on places. No change to Use, Egress
2026-01-08
Job filed: New steel dunnage for new HVAC units.
2026-01-08
Job filed: Application filed for interior renovation of existing non-load bearing partitions, flooring, ceiling and finishes. Mechanical unit replacement, insta
2025-12-09
Bedbug filing: 0 infested units
2025-12-05
Permit Construction Fence — Signed-off
2025-12-03
Job filed: erect temporary construction fence
2025-12-02
Permit Plumbing — Permit Issued
The full timeline
2026
2026-09-14Job filed: Application filed for interior renovation of existing non-load bearing partitions, flooring, ceiling and finishes. Mechanical unit replacement, insta$305,000
2026-08-19CMTG $5,632,411 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK$5,632,411
2026-08-19AL&R $5,632,411 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK$5,632,411
2026-06-23Rodent inspection: Passed
2026-05-28311: Noise — Noise: Construction Before/After Hours (NM1)
2026-05-18Job filed: Application is filed for new plumbing fixtures including hand sinks, equipment, grease traps and all work as noted on places. No change to Use, Egress$54,000
2026-03-26Job filed: Application is filed for new plumbing fixtures including hand sinks, equipment, grease traps and all work as noted on places. No change to Use, Egress$54,000
2026-03-19Permit Structural — Signed-off
2026-01-08Job filed: Application is filed for new plumbing fixtures including hand sinks, equipment, grease traps and all work as noted on places. No change to Use, Egress$54,000
2026-01-08Job filed: New steel dunnage for new HVAC units.$18,000
2026-01-08Job filed: Application filed for interior renovation of existing non-load bearing partitions, flooring, ceiling and finishes. Mechanical unit replacement, insta$305,000
2025
2025-12-09Bedbug filing: 0 infested units
2025-12-05Permit Construction Fence — Signed-off
2025-12-03Job filed: erect temporary construction fence$7,500
2025-12-02Permit Plumbing — Permit Issued
2025-10-01Permit Structural — Permit Issued
2025-09-22Job filed: Structural work on the 1st floor as indicated on drawings.$31,995
2025-08-18311: Noise — Noise: Construction Equipment (NC1)
2025-08-05Permit Mechanical Systems — Signed-off
2025-08-05Permit General Construction — Permit Issued
2025-08-05Permit General Construction — Signed-off
2025-08-05Permit Mechanical Systems — Permit Issued
2025-08-01Boiler inspection
2025-07-18Job filed: Application is filed for new plumbing fixtures including hand sinks, equipment, grease traps and all work as noted on places. No change to Use, Egress$54,000
2025-07-15Job filed: Application filed for interior renovation of existing non-load bearing partitions, flooring, ceiling and finishes. Mechanical unit replacement, insta$305,000
2025-06-03Rodent inspection: Passed
2025-02-10311: PLUMBING — WATER SUPPLY
2025-02-10Tenant complaint: PLUMBING — WATER SUPPLY
2025-01-14Mortgage $1,500,000 — from 1569 SECOND AVE LLC; ZIMAK SECOND AVENUE LLC to AMALGAMATED BANK$1,500,000
2025-01-14AL&R $1,500,000 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK$1,500,000
2023-06-19311: Residential Disposal Complaint — Trash or Recycling Not Secure
2023-06-15311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2023-06-12311: Residential Disposal Complaint — Trash or Recycling Not Secure
2023-06-05311: Residential Disposal Complaint — Trash or Recycling Not Secure
2023-04-28311: New Tree Request — For One Address
2023-03-06311: HEAT/HOT WATER — ENTIRE BUILDING
2023-03-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-24311: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-24Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-06311: Illegal Parking — Blocked Hydrant
2023-02-05311: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-01311: HEAT/HOT WATER — ENTIRE BUILDING
2023-02-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022
2022-12-26311: HEAT/HOT WATER — APARTMENT ONLY
2022-12-26Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-12-07Bedbug filing: 0 infested units
2022-12-07311: HEAT/HOT WATER — ENTIRE BUILDING
2022-12-07HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM WEST
2022-12-07HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
2022-12-07HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT
2022-12-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-11-30Boiler inspection
2022-11-27311: HEAT/HOT WATER — ENTIRE BUILDING
2022-11-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-11-17311: HEAT/HOT WATER — ENTIRE BUILDING
2022-11-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-12-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-12-15Rodent inspection: Passed
2021-12-03City emergency repair (OMO): nyc hpd emergency operations division - ''essential service work'' at apt# 3 make the necessary repairs to oil boiler to$150
2021-11-30311: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-29311: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-29311: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-23HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM WEST
2021-11-23HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 4th STORY, 1st APARTMENT F
2021-11-23HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT BASEMENT AT BOILER ROOM
2021-11-20311: HEAT/HOT WATER — ENTIRE BUILDING
2021-11-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-09-01311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-07-24311: Outdoor Dining — Sidewalk Zone Blocked
2021-06-23Bedbug filing: 0 infested units
2021-06-13311: Outdoor Dining — Sidewalk Zone Blocked
2021-06-11Boiler inspection
2021-04-01HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-01-28311: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-28311: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-01-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020
2020-12-30311: HEAT/HOT WATER — ENTIRE BUILDING
2020-12-04Boiler inspection
2020-07-31311: Sidewalk Condition — Cellar Door Open/Unprotected
2020-07-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-01311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-03-12311: Taxi Complaint — Insurance Information Requested
2020-01-27Bedbug filing: 0 infested units
2019
2019-12-05Rodent inspection: Passed
2019-10-02311: Sidewalk Condition — Cellar Door Open/Unprotected
2019-05-02Boiler inspection
2019-04-15HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2019-04-05Rodent inspection: Passed
2019-01-17Bedbug filing: 0 infested units
2018
2018-12-31Rodent inspection: Failed for Rat Activity and Other Reason
2018-11-19Rodent inspection: Passed
2018-11-01Mortgage assigned — from INVESTORS BANK to AMALGAMATED BANK
2018-11-01Mortgage $2,100,000 — from 1569 SECOND AVE LLC; ZIMAK SECOND AVENUE LLC to AMALGAMATED BANK$2,100,000
2018-11-01Agreement $10,600,000 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK$10,600,000
2018-11-01AL&R $10,600,000 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to AMALGAMATED BANK$10,600,000
2018-11-01TL&R — from INVESTORS BANK
2018-08-31Boiler inspection
2018-06-12FDNY inspection (RISK)
2018-06-06Rodent inspection: Passed
2018-04-22311: HEAT/HOT WATER — ENTIRE BUILDING
2018-04-22Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-04-20HPD class A: § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES
2018-04-20HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2018-04-19311: HEAT/HOT WATER — APARTMENT ONLY
2018-04-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-12-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-16311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-11-15Boiler inspection
2017-10-16Rodent inspection: Passed
2016
2016-10-25Rodent inspection: Passed
2016-04-15HPD class A: SECTION 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BO
2016-04-15HPD class A: SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES,
2016-04-13311: HEAT/HOT WATER — ENTIRE BUILDING
2016-04-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-10-01HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2015-04-10Permit EW — ISSUED
2015-03-31Job filed: MODIFY FIRE SUPPRESSION SYSTEM #104627076.NO CHANGE IN USE EGRESS OR OCCUPANCY. GAS VALVE UNDER 104596885$3,000
2015-03-31Job filed: MODIFY FIRE SUPPRESSION SYSTEM #104627076.NO CHANGE IN USE EGRESS OR OCCUPANCY. GAS VALVE UNDER 104596885$3,000
2015-02-13311: HEAT/HOT WATER — ENTIRE BUILDING
2015-02-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-02-12311: HEAT/HOT WATER — ENTIRE BUILDING
2015-02-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-28311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-20311: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014
2014-12-22HPD class C: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE AND HUNG BRICK ABOVE AT 1ST STORY BUILDING FRONT ENTRANCE DOOR
2014-12-20311: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-02311: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-01311: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-01311: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-01311: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-12-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-11-29311: HEAT/HOT WATER — ENTIRE BUILDING
2014-11-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-07-09311: HEAT/HOT WATER — ENTIRE BUILDING
2014-07-09Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2013-11-14Mortgage assigned — from SIGNATURE BANK to INVESTORS BANK
2013-11-14Mortgage $717,489 — from 1569 SECOND AVE LLC; ZIMAK SECOND AVENUE LLC to INVESTORS BANK$717,489
2013-11-14Agreement $8,500,000 — from 1569 SECOND AVE LLC; ZIMAK SECOND AVENUE LLC to INVESTORS BANK$8,500,000
2013-11-14AL&R $8,500,000 — from ZIMAK SECOND AVENUE LLC; 1569 SECOND AVE LLC to INVESTORS BANK$8,500,000
2013-11-14TL&R — from SIGNATURE BANK to ZIMAK SECOND AVENUE LLC
2012
2012-07-25Rodent inspection: Passed
2012-02-09311: HEATING — HEAT
2012-02-09Tenant complaint: HEATING — HEAT RELATED
2011
2011-11-21Rodent inspection: Passed
2011-09-13311: HEATING — HEAT
2011-09-13Tenant complaint: HEATING — HEAT RELATED
2011-08-30HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE STEP AT BUILDING ENTRANCE
2011-08-29311: HEATING — HEAT
2011-08-29Tenant complaint: HEATING — HEAT RELATED
2011-08-23311: HEATING — HEAT
2011-08-23Tenant complaint: HEATING — HEAT RELATED
2011-08-22311: HEATING — HEAT
2011-08-22311: HEATING — HEAT
2011-08-22Tenant complaint: HEATING — HEAT RELATED
2011-08-22Tenant complaint: HEATING — HEAT RELATED
2011-08-19311: PLUMBING — WATER-SUPPLY
2011-08-19311: GENERAL CONSTRUCTION — FLOOR
2011-08-19311: GENERAL CONSTRUCTION — STAIRS
2011-08-19311: HEATING — HEAT
2011-08-19311: GENERAL CONSTRUCTION — STAIRS
2011-08-19311: NONCONST — RUBBISH
2011-08-19Tenant complaint: PLUMBING — WATER SUPPLY
2011-08-19Tenant complaint: HEATING — HEAT RELATED
2011-08-19Tenant complaint: GENERAL — STAIRS
2011-08-19Tenant complaint: NONCONST — RUBBISH
2011-08-19Tenant complaint: GENERAL — STAIRS
2011-08-19Tenant complaint: GENERAL — FLOOR
2011-02-14ECB CLASS - 2 violation: B254,4,38,48A,15,32A,39,50A,B,C,D. 50A- NO ANTI-SYPHON ON MANUAL RESET(PRESSURE FULL) 50B- REMOVE ALL STORAGE, 50C- REMOVE ALL FLA$2,500
2010
2010-11-23Rodent inspection: Passed
2010-11-19311: HEATING — HEAT
2010-11-19Tenant complaint: HEATING — HEAT RELATED
2010-11-18Tenant complaint: HEATING — HEAT RELATED
2010-11-18DOB complaint, category ?
2010-11-17311: HEATING — HEAT
2010-11-17Tenant complaint: HEATING — HEAT RELATED
2010-11-11311: HEATING — HEAT
2010-11-11Tenant complaint: HEATING — HEAT RELATED
2010-09-15311: HEATING — HEAT
2010-09-15311: HEATING — HEAT-PLANT
2010-09-15Tenant complaint: HEATING — HEAT RELATED
2010-09-15Tenant complaint: HEATING — HEAT-PLANT
2010-05-08311: Food Poisoning — 1 or 2
2009
2009-06-25Mortgage assigned — from FANNIE MAE to SIGNATURE BANK
2009-06-25Mortgage $3,453,162 — from ZIMAK SECOND AVENUE LLC to SIGNATURE BANK$3,453,162
2009-06-25Agreement $5,000,000 — from ZIMAK SECOND AVENUE LLC to SIGNATURE BANK$5,000,000
2009-06-25AL&R $5,000,000 — from ZIMAK SECOND AVENUE LLC to SIGNATURE BANK$5,000,000
2008
2008-08-05Permit EQ — ISSUED
2008-08-04Job filed: ERECT A TOTAL OF 30 LINEAR FEET BY 12 FEET MAXIMUM HIGH HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 LBS PER SQUARE FOOT. INSTALLATION SHALL
2008-08-04Job filed: ERECT A TOTAL OF 30 LINEAR FEET BY 12 FEET MAXIMUM HIGH HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 LBS PER SQUARE FOOT. INSTALLATION SHALL
2008-08-04DOB complaint, category ?
2008-01-31Permit EQ — ISSUED
2008-01-29Job filed: Install sidewalk shed a total of 20 L.F at 1565 2 Avenue. Work shall comply with LL 33/91. No change in use, egress or occupancy.
2007
2007-02-08DOB complaint, category ?
2006
2006-12-14Job filed: INSTALL FIRE SUPPRESSION SYSTEM FOR RESTAURANT. FIRE SUPP SHUT OFF VALVE IS FILING UNDER APPLICATION # 104596885. NO CHANGE IN USE, EGRESS OR OCCUPANC$6,000
2006-12-14Permit EW — ISSUED
2006-11-13Permit PL — ISSUED
2006-11-09Permit EW — ISSUED
2006-11-09Permit EW — ISSUED
2006-11-09Permit EQ — ISSUED
2006-11-08Job filed: RENOVATION OF RESTAURANT IN EXISTING STORE. INSTALL COOKING EQUIPMENT, PLUMBING FIXTURES, RANGE HOOD AND HVAC SYSTEM. INSTALL MINOR PARTITIONS, NEW ST$70,000
2006-07-26Tenant complaint: PLUMBING — WATER SUPPLY
2005
2005-06-09DOB complaint, category ?
2005-01-19Tenant complaint: HEATING — HEAT RELATED
2004
2004-12-22Tenant complaint: HEATING — HEAT RELATED
2004-12-22Tenant complaint: HEATING — RADIATOR
2004-12-22Tenant complaint: HEATING — RADIATOR
2004-12-22Tenant complaint: HEATING — RADIATOR
2004-12-21Tenant complaint: HEATING — HEAT RELATED
2004-11-15HPD class B: § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER ALL ROOMS LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
2004-11-15HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT SOUTH
2004-11-15HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR === IN THE 1st BEDROOM FROM NORTH AT EAST
2001-04-11Mortgage assigned — from INDEPENDENCE COMMUNITY BANK to FANNIE MAE
2001-02-27DOB violation LL6291:
2000
2000-01-26HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED. AT BOILER ROOM, CELLAR
2000-01-26HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
1999
1999-07-13SAGE — from CITY & SUBURBAN FEDERAL SAVINGS BANK
1999-07-13Deed — from ZIMAK CO. to ZIMAK, SECOND AVE. LLC
1999-07-13Mortgage assigned — from CITY AND SUBURBAN FEDERAL SAVINGS BANK to INDEPENDENCE COMMUNITY BANK
1999-07-13Mortgage $936,315 — from ZIMAK SECOND AVENUELLC. to INDEPENDENCE COMMUNITY BANK$936,315
1999-07-13Agreement — from INDEPENDENCE COMMUNITY BANK to ZIMAK SECOND AVE. LLC
1998
1998-10-14Permit EW — ISSUED
1997
1997-09-16DOB violation LL6291:
1995
1995-11-14Permit EW — ISSUED
1995-08-29DOB violation LL6291:
1995-03-02Permit EW — ISSUED
1995-03-02Permit EW — ISSUED
1994
1994-11-10Mortgage satisfied — from JENDAN REALTY CORP. to ORSZAG, ROSE
1994-11-10WSAT — from GOLDMAN, R. ANTHONY; GOLDMAN, ARNOLD to FOURTH FEDERAL SAVINGS LOAN ASSOCIATION
1994-05-19Permit EW — ISSUED
1994-05-04Mortgage assigned — from ZIMAK CO. to CITY & SUBURBAN FEDERAL SAVINGS BANK
1993
1993-11-22DOB complaint, category ?
1993-05-14SMIS — from ZIMAK CO to GOLDMAN, ARNOLD; GOLDMAN, RICHARD ANTHONY
1993-05-14PAT — from GOLDMAN, ARNOLD to GOLDMAN, RICHARD ANTHONY
1992
1992-04-24DOB violation C:
1992-04-24DOB violation C:
1992-04-14Permit EW — ISSUED
1992-04-10DOB complaint, category ?
1992-02-13Permit PL — ISSUED
1991
1991-11-26Permit EW — ISSUED
1990
1990-07-26Permit EW — ISSUED
1990-07-26Permit EW — ISSUED
1990-07-20DOB complaint, category ?
1990-06-25DOB violation C:
1990-06-19DOB complaint, category ?
1985
1985-10-08Mortgage $434,000 — from ZIMAK CO to GOLDMAN, ARNOLD; GOLDMAN, R. ANTHONY$434,000
1985-10-08Deed — from GOLDMAN, R ANTHONY; GOLDMAN, ARNOLD to ZIMAK CO
1985-10-08Agreement — from FOURTH FED S & L ASSN to GOLDMAN, R. ANTHANY; GOLDMAN, ARNOLD
1983
1983-08-11Mortgage assigned — from ORSZAG, ROSE to FOURTH FDL SV&LN ASC/NY
1983-08-11Mortgage $119,964 — from GOLDMAN, R. ANTHONY; GOLDMAN, ARNOLD to FOURTH FDL SVG&LN ASC/NY$119,964
1983-08-11Mortgage satisfied — from GOLDMAN, ARNOLD to B. POLIVY & SON, INC.
1983-08-11Mortgage satisfied — from JENDAN REALTY CORP. to GOLDMAN, MARK
1975
1975-07-11Mortgage — from GOLDMAN, ARNOLD to B POLING & SONS INC
1973
1973-04-23Mortgage — from JENDAN REALTY CORP to GOLDMAN, MARK
1973-04-16Mortgage — from JENDAN REALTY CORP to ORSZAG ROSE
1966
1966-02-02Mortgage — from ORSZAG, ROSE to LUTHERAN CEMETERY
1966-02-02Deed — from SIEGEL, BENJAMIN EXOF to ORSZAG, ROSE